HomeMy WebLinkAboutBLD99-0147 Post Office - BLD Permit / Conditions - 7/14/1999 MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
E3 U I L_ D I N C3 PERM I T FOR INSPECTIONS CALL 427-9670
1?jb01 BETWEEN 5pm AND 8am 427-7262
BLD99-0147 PARCEL : 12220507-41fflt PLAT :ALPLO 74 DIV : BLK : 74 LOT :
JOB ADDRESS : 18321 E STATE ROUTE 3 ALLYN
OWNER : ALLYN POST OFFICE 425-603-1312
CONTRACTOR : �p���
LEGAL : ALLYN BLK, 74 LOT 1-11 VAC. SCHULZE ST ADJ. LOT 1=VAC. ALLEY ADJ. VAC. SULLIVAN ST. ADJ. LOTS 1-11
CLASS OF WORK . . :NEW BEDR : 0 BATH : 2 TYPE AMOUNT BY DATE RECE IPT TYPE AMOUNT BY DATE RECE IPT
TYPE OF USE . . . . :COM STORIES . . . . . . . .0
OCCUP . GROUP . :B BLDG . HE I GHT . . : O .Oft PLCK S 1643.01 KI 03110199 49646 PLY $ 98.00 KS 07114/99 0
TYPE OF CONST . . :5N FIREPLACES . . . . : 0 EHCP S 50.00 KS 07114199 0 PLM1 = 21.10 KS 07114199 0
OCCUP . LOAD . . . . : 293 WOODSTOVES . . . . : 0 FIR $ 821.50 KS 07114199 0 MCH 11 78.22 KS 07114/99 0
DWELL .UNITS . . . . : 0 PARKING SPACES : 0 NREC 1 42.01 KS OT114199 0 Additional fees not shorn here. .... .
INSPECTION AREA : 2 SHOREL I NE7 . . . . :N P R M T f 2437.60 KS 07114199 0 TOTAL: 5157.25 VALULATION: 409170
SETBACKS-------------- TOILETS . . . . . . . . . . : 4 FUEL TYPES---------- BOILERS/COMP---- MOBILE HOME--
FRONT . . .E 100 .Oft BATH BASINS . . . . . . : 4 : /ELE/ / / : 0-3 HP . : 0
REAR . . . .W 20 .Oft BATH TUBS . . . . . . . . : 0 3-15 HP . : 0 MODEL :
SIDE ( 1 ) .N 40 .Oft SHOWERS . . . . . . . . . . : 0 FURN < 100K BTU : 2 15-30 HP . : 0 -MAKE------
SIDE (2) .S 35 .Oft WATER HEATERS . . . . : 1 FURN >=100K BTU : 0 30-50 HP . : 0
SHRLINE .N O .Oft CLOTHES WASHERS . . : 0 FURN - FLOOR . . . : 0 50+ HP . : 0 -YEAR------
AREA ---------------- KITCHEN SINKS . . . . : 5 HEAT PUMP . . . . . . : 2
LOT SIZE . . : FLOOR DRAINS . . . . . : 0 VENT SYSTEMS . . . : 0 EVAP COOLERS : 0 LENGTH : 0
BUILDING . . . : 5251sf DRINKING FOUNT . . . : 0 VENT FANS . . . . . . : 2 HOODS . . . . . . . : 0 WIDTH . : 0
BASEMENT . . . : Osf LAUNDRY TRAYS . . . . : 0 DOMES . INCINeO -SERIAL#----
DECKS . . . . . . : Osf DISHWASHERS . . . . . . : 0 AIR HANDLING UNITS-- COMML . INCIN :O
GAR/CARP :? Osf GARB DISPOSALS . . . : 0 <= 10000 cfm . : 0 RELOC/REPAIR : 0
AT/DT . :? URINALS . . . . . . . . . . : 0 > 10000 cfm . : 0 OTHER UNITS . : 1
MISC PLM FIXTURES : 0 GAS OUTLETS . : 0
PROJECT DESCRIPTION:POST OFFICE
PROJECT LOCATION:ROUTE 3, TOWN OF ALLYN
THIS PERMIT BECOMES 1pf-F-D"010 IF flK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF CONSTRUCTION OR WORK IS SUSPENDED FOR A PERIOD
�OF 180 DAYS AT ANY T ME AFTER CON D. EVIDENCE OF CONTINUATION OF WORK IS A PROGRESS INSPECTION WITHIN THE 180 DAY PERIOD, FINAL INSPECTION MUST BE
APPROVE BEFO U
OWNER OR AGE DATE: 7
BLO-PRMT, r 03131191 COMPLIANCE TO ATTACHED CONDITIONS IS REQUIRED
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
P E R M I T C (D N E) I T 1 O N S
Case No . : BLD99-0147
Fore ALLYN POST OFFICE
Page : 1
1,) Approved per dimensions and setbacks on submitted site plan . X
2 ) Parking shall be sufficient for 29 normal parking stalls (9 feet by 20 feet ) and 2
handicap parking stalls ( 12 .5 feet by 20 feet ) with sufficient maneuvering aisles .
Handicap stalls shall be of a smooth surface at level or ramped to entry , located
closest building entry, and shall be signed with the International Symbol of
Access a ng from adjacent uses and properties Is required .
X
3 ) Temporary erosion control measures must be implemented to prevent water quality
degradation adjacent waters or properties . Silt fencing or straw matting must be
instal d d_ intained until upland vegetation has become established .
X -<
4 ) The applicant shall comply with Mason Co . Public Works request to control stormwater
flows from the development site or seek permission from WA . Dept . of Transportation to
install a high���Ior
cpacity culvert at the Scultz Street acces to State Route 3 ; this
must be re I to occupancy of the building under construction by this permit .
X
5 ) Proposed structure or any portion thereof greater than 30" in height from grade line,
must maintain a minimum of 5 ' setback from all property lines , easements and 10 ' from
all County an Road right of ways .
6) This application is subject to Buffer and Landscaping requirements as established under
Mason County Ordin 1 .03 .036 .
X
7) The use, handling and storage of hazardous materials or flammable and combustible
liquids in exc ss gallons is not allowed without the approval of the Mason County
Fire Marshal . _
X
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
8 ) Provisions for surface/subsurface drainage control must be implemented with new
construction or development on site and MUST NOT adversely impact adjacent parcels .
Under the requirements of Mason County Stormwater Ordinance , either private ditches and
drains will meet requirements of the stormwater ordinance or prior approval will be
granted to use an existing utility and drainage easement dedicated for that specific
purpose . For further information regarding this ordinance and the REQUIREMENT to
obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason Count Road , Contact the Mason County Public Works Department
prior to construction at Ext 490 .
For any construction which oposed to be located within 25 ' of a Mason County road
right of way, it is sug a ted to contact that office to review future planned work which
may affect your projec .
X
9) A SEPERATE PERMIT AND (4 ) SETS OF CONSTRUCTION PLANS SHALL BE REQUIRED FOR THE PROPOSED
PYLON SIGNS INDICATED ON SHEET A1 . 1 DETAILS #10 & #11 THESE SHALL BE SUBMITTED TO THE
MASON COUNTY BUILDING DEPARTMENT FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION .
10) THE PROPOSED RETAINING WALLS INDICATED ON THE CONSTRUCTION PLANS WILL REQUIRE AN
ADDITIONAL PERMIT THIS--SHALL BE SUBMITTED FOR REVIEW AND APPROVAL FROM THE MASON COUNTY
BUILDING DEPARTMENT IOR CONSTRUCTION .
X
11 ) All approved plans are required to be on-site for inspection purposes . If inspection
is called for and plans are not on site Approval WILL NOT be granted . In addition, a
Re- Inspection fee in the amount of $42 .06 per hour (minimum 1 hour ) will be charged and
must be collected by epartment prior to any further inspections being performed or
approval granted
X
12) PURSUANT TO 1997 UNIFORM BUILDING CODE , ALL SITES MUST HAVE APPROVED NUMBERS OR
ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE
STREET OR ROAD FRONTING THE PROPERTY . MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT
THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A REINSPECTION FEE , BASED
ON RATES AS ADOPTED BY THE JURISDICTION AND THE 1997 UNIFORM BUILDING CODE WILL BE
ASSESSED IF OWN RACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING
INSPECTIONS .
X
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
13 ) The approved plot plan is required to be on-site for inspection purposes . If
inspection is called for and plot plan is not on site, Approval WILL NOT be granted . In
addition , a Re- Inspection fee in the amount of $42 .00 per hour (minimum 1 hour ) will be
charged and must be collected by this department prior to any further inspections being
p rfor o proval granted .
X
14 ) 1997 UBC CHAPTER 17, SECTION 1701 : SPECIAL INSPECTION IS REQUIRED FOR THE 3000PSI
CONCRETE ALL REPORTS SHALL BE REQUIRED TO BE PROVIDED TO THE MASON COUNTY BUILDING
DEPT . PRIOR TO THE FINAL INSPECTION PROVIDE COPY OF APPROVED TESTING LABORATORY
CERTIFI CAT IO T ASON COUNTY BUILDING DEPT OR AS APPROVED BY THE BUILDING OFFICIAL .
x
15 ) Any changes in construction shall be reviewed by engineer of record and submitted in
writing to e a n County Building Department prior to construction .
X
16 ) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UBC REQUIREMENTS AND OCCUPANCY
IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION . ANY CHANGE OF USE OR OCCUPANCY
WOULD R T I ERMIT REVOCATION . CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE .
x
17 ) Proposed structure or p��ortions t eof wi�an)e
an projection over 30" In height from grade
line, must maintain a separati between adjacent structures and that
furthest projection . X
18 ) Changes to approved building plans that effect compliance to the 1991 ington State
Energy Code , 1991 Ventilation and Indoor Air Quality
Code, the Uniform Building Code and/or Mason County Regulations m st
be approved by Mason County prior to constructionX
19) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS U P R ASON COUNTY BUILDING
DEPARTMENT AND UNIFORM BUILDING CODE .x
Case No . : BLD99-0147
l^
CONCRETEFoo*W-Sabo* dab by Ribbons
dab by INSULATION da% by
■�
deft by
FRS t Wak FIRE DEFT.
i1 Err
• da% .
by deb by
FLLUBM • Atic OTHER
Gmundwork
daW 1
• r t
D.W.V.
INSPECTION
Ideft by dale t by Ida" by
V
!n •
a`, • l � �j �/
77
r
•
r /
c Z3 i Lr►
/ / // r = f! /L
od `_ ZIP
I i
I
CONCRETE 7
Fbo6W-Sobock dale Ribbon
dab by Go Piping dob by
Foundafon Wait dale by Set UP
doe by N1SULATM dift by
BGtSLAS kmdakn Fbort Final
date by dam by dato by
FRAMM Waft FSiE DEPT.
dift by ddPLUkOMe by do* by
Gmund Atlic OTHER
dab by dMe by
D.W.V. WALLBOARD NARAIG
dab by dale by
ftow Lkie FNAL MBPECTION
by date by daft by
( -�2.,"'�--g� {� �� l l % /� G[..FCT/>� f/YTS-ii'.E A?�'.9a-1s•�B��Acb'�
�n.s
• �- r C9 CA r GNP QJ\ >
1�ZL `/ /
CY /fin 7� L
4
I
I
I
I
1
i
12/16/98 10: 02 FAX 253 274 4778 AHBL ENGINEERS Z 002/004
PROJECT MEMO
TO: File
FROM: Elizabeth Rivers
CC: Mason Co. Dept. of Community HBL
Development, Wade Perrow (WPC), David
Boe, BOE Architects CIVIL & S T R U C T U R A L
DATE: December 14, 1998 ENGINEERSI PLAN NERS
PROJECT: Allyn U.S.P.O.
OUR FILE NO.: 98260.10/.30
SUBJECT: Meeting Notes
On December 11, 1998, Wade Perrow, of Wade Perrow Construction, and Dan Shaw and
Elizabeth Rivers of AHBL,Inc. met with representatives of Mason County, Alan Tahja, P.E.,
of the Public Works Department, and Allan Borden, Senior Planner, (current planning) and
Bob Fink, Long Range Planner, of the Department of Community Development. The
purpose of the meeting was to discuss requirements for obtaining land use permits for
redevelopment of land in the town of Allyn,Mason County,Washington. The proposed
project is a United States Post Office (U.S.P.O.) to replace an existing facility. The current
location is adjacent to the proposed site in the Allyn Center commercial development.
The following issues were discussed:
Stormwater (Alan Tahja)
When redevelopment has 50% impervious cover a stormwater plan is required. The
stormwater plan must accommodate treatment of a six-month storm. Water quality treatment
will be required for the Post Office site only since it will be constructed on property held
under separate ownership from the adjacent Allyn Town Center development. No upgrade of
the existing Allyn Town Center storm drainage system will be required in terms of water
quality treatment. The newly installed culvert pipe that is located approximately 350 feet
south of the site under Highway 3 can accommodate the projected flow and attenuation will
not be required of this project.
The County's preference for water quality treatment is a bioswale, but a coalescing plate
oil/water separator may be used as well. Any water quality system used must meet the
requirements of the Washington State Department of Ecology (DOE) manual. Any open
ditches with slopes greater than five percent must be rock-lined.
Regarding the use of inserts in catch basins, the County does not have any in place at the
present time, so would require data prior to installation and a rigorous maintenance covenant
after construction.
is\Planning\yr 1998\98260\260pm01.doc
2215 North 30th Street, Suite 300, Tacoma, WA 98403 . 206-383-2422 . FAX 383-2572
12/16/98 10:03 FAX 253 274 4778 AHBL ENGINEERS Z 003/004
Project Memorandum
• Allyn U.S.P.O.
December 14, 1998
Page 2
Dan Shaw was provided with the maintenance covenant format that will require scheduled
maintenance of water quality facilities in the autumn and after scheduled events.
Landscaping and Setbacks (Allan Borden)
The perimeter landscaping requirements correspond to the setback requirements. A post
office is a Category H land use. The adjacent land uses and the landscape buffer and setback
requirements are:
south mobile home park Category III 10 feet
north commercial Category V 20 feet
west self-storage building Category V 20 feet
east recreational veh. park Category III 10 feet
Buffer areas can be reduced to 10 feet if a screening fence is substituted for landscaping.
Landscaping required will consist of:
one canopy tree for every 100 s.f. of perimeter buffer area
two understory trees for every 100 s.f. of perimeter buffer area
three shrubs for every 100 s.f. of perimeter buffer area
Parkin (Allan Borden)
The proposed project will need to demonstrate that adequate parking is being provided. The
code requires one parking stall for every 500 s,f, of gross building area.
Signs (Allan Borden)
There are no sign regulations, but they are required to be located five feet from the property
line.
Lighting (Allan Borden)
There are no site lighting requirements.
2215 North 30th Street, Suite 300, Tacoma, WA 98403 9 206-383-2422 . FAX 383-2572
12/16/98 10: 04 FAX 253 274 4778 AHBL ENGINEERS 2004/004
Project Memorandum
• Allyn U.S.P.O.
December 14, 1998
Page 3
ADA (Allan Borden)
The site and building will need to conform to the accessibility requirements of the Americans
with Disabilities Act (ADA).
Fire Protection (Alan Tahja)
Fire protection will be required if building openings are located within 20 feet of the property
line.
Building Permit
Buildings greater in size than 4000 s.f. require that drawings be signed by an architect and
engineer.
Entitlement Process (Allan Borden)
The County will require a building permit application, plumbing and mechanical engineering
plans, and a SEPA Environmental Checklist.
Long Range Planning (Bob Fink)
The project site is located within the Allyn Town Center, The Town of Allyn has been
designated in the Mason County Comprehensive Plan as a Rural Activity Center. The
proposed use, a U.S.P.O. facility,is consistent with the current Comprehensive Plan. The
Allyn community has initiated an effort to formulate a sub-area plan. Goals and Policies have
been developed and they are currently seeking funding to complete the plan. It is not
anticipated that this plan will be completed prior to project vesting and/or completion.
Regardless, the proposed project is consistent with the Goals and Policies that have been
developed.
2215 North 30th Street, Suite 300, Tacoma, WA 93403 . 206-383-2422 . FAX 383-2572
Vl
tv
ova !y' lD �r�y ,� � ��, ,� � ,,�2 ��a-�`: ► ti�
r
v �]•ysrl
7 �
1427
Q-Z
XIV74
?1�11
kn/
407
1�
sty
U41��o 2 C,,�(VL,6)
�zvr
-7 vG'
Stu
Co ,�G�e h ilr-lnrl(a
cZCCeL 12 /'�-mot/
� ctitryt l 3 52) c�-iLe
��,,�e����-�✓ fog C�-� ����,�� � ����
-flD,
G�� 1
ERMITNO.'. BLD
MASON COUNTY
BPILDING PERMIT APPLICATIO 3'AD
r 426 W.CedarlP.O.Box 186,Shelton,WA 98584
Shelton 360 427-9670 Belfair 360 275�467 Elma 360 482-5269 Seattle 206 464-6968
APPLI ANT INFORMATION,-; CONTRACTOR INFORMATION
OWneAL. `#t.t_.- f; t.�!'�_F Contractor Name J t (�'. -r- `
Mailing Address,;� r'V44t_(f' 4CL:! Mailing Address}.0. f-1�---• 1-72 e
City l- LL t°- Statej�}_ Zip Code`f;;Oe"'6 City-1f4 RAIZI--3e ti StateIVA Zip Codc,-Ah l: 1;
Phone t'i 6.1% 13I Z. Other Ph. Ph. '•'(5;,7�c-r 'r., Other Ph.(
Lien/Title Holder — Contractor Reg #',,';.1 l.r=E ?.'+?.r,- F N
Address Expiration -x, l__� l .-cv
SEPTIC/WATER SYSTEM INFORMATION-Connect to New Septic Existing Septic__Connect to Sewer
System Name of Sewer System Well Water System_�Name of
Water S m yste 1.' --
PARCEL INFORMATION-12 digit Tax Parcel No./2.c Z Q /0l4 / Lf- Fire District
Legal 7sv-u,n/-1-i
Site Address(Please include street name,street number and city) Zz' 'e)z
Directions to site
Will timber be cut and sold in parcel preparation?(Yes/No)IQQ
Is your property within 200'of the following:Body of Water(Name) 1%O Saltwater
Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or
Bluffs
TYPE OF JOB New Add Alt Repair Other Use of Building V.S.
Describe Work
No.of Bedrooms No.of Bathrooms Z SQUARE FOOTAGE-1st Floor ZS-/ 2nd Floor
3rd Floor Loft Basement Deck Other sq.ft.
Garage Attached Detached Carport Attached Detached
MOBILE HOME INFORMATION-Make Model Model Year
Length Width Serial No. No.of Bedrooms No.of Bathrooms
Type of Heat Purchase Price$ Replacement Unit?(Yes/No)
Installer Name Certification No,
NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF
CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED.
PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the
information provided is accurate and grants employees of Mason County access to the above described property and structures for review and
inspection of this project. Acknowledgment of such is by signature below:
OWNER AFFIDAVIT-I certify that I am exempt from the requirements of the CONTRACTOR'S AFFIDAVIT-I certify that I am currently registered as a
Contractor Registration Law RCW 18.27 and am aware of the ordinance contractor in the State of Washington and that I am aware of the ordinance
requirements for which this permit is issued and that all work will be done in requirements regulating the work for which this permit is issued and all work
conformance therewith. No changes shall be made without first obtaining shall be done in conformance therewith. No changes shall be made without
approval. first obt' oyaL,- .
...[Tale
FOR OFFICIAL USE'BEYOND THIS POINT
) �U
Accepted by'%" r. Date Submittal Amount Due%i'l l li Receipt No. j /
DEPARTMENTAL EVIEW APPROVED DENIED CONDITION CODES
Building Department
Occ Group Type Constr. A.
/
Planning Department ^�G VYLG 1
Environmental Health Departments l
i
Public Works Department
I
Fire Marshal
Valuation$
-FEES
Building Permit Fee Site Inspection
Plan Review Fee / UFC Plan Review Fee ;
Plumbing&Base Fee Public Works Review Fee
Mechanical&Base Fee �_ Other
Wood/Gas!P-elletSiave_Fee Other ( �T
Vio e Pre-Paid at Submittnf
. NW y.> TOTAL FEES
x
PERMITNO.. 136-,Z) ?q-0/4?
MASON COUNTY
PLUMBING/MECHANICAL PERMIT APPLICATION
426 W. it Box 196,Shelton,WA 98584
Shelton 360 427-9670 Belfair 360 275-4467 EIma l360 482.5269 Seattle 206 464.6968
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owners . - i Contractor Name
Mailing Address , !t a' Mailing Address
Cite,r e it State•.. '& Zip Code -' City i Irf r' State i Zip Code
Phon r �r <'_ Other Ph.( Ph.(_.r;r ) c Other Ph.(_�
Lien/Title Holder Contractor Reg.#
Address Expiration L /
SEPTIC INFORMATION-Connect to New Septic Existing Septic Connect to Sewer System Name of
Sewer System
PARCEL INFORMATION-12 digit Tax Parcel No. i %�- / / r `.r. i Fire District
Legal Descriptiondi ni;'i� ri: n:L ZT �'617'_1 ii,. r�r� i:.I _O^
Site Address(Please include street name,street number and city) 7 .--
Directions to site :c
Is your property within 200'of the following:Body of Water(Name) di J — Saltwater
Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or
Bluffs
TYPE OF JOB New Add Alt Repair Other Use of Building 6: ..Jo,`T c�F7 i c�C —7�^^
Location of Fixture nits 1st Floor ' 2nd Floor Basement Garage Closet CJCJ
PLUMBING FIXTURES(Show Number of each) MECHANICAL UNITS Fuel Type: Electric.)
Type of Fixture No.of Fixtures Fees LPG Natural Gas Heatpump
Toilets ZA Toe of Unit No.of Units Fees
Bath Basins zJ Furnace
Bath Tubs Heatpumps —
Showers '+ Vent Fans
Water Heater �_ Z_ Propane Tank
Laundry Wsher Gas Outlets
Sinks gL 3S— Wood/Gas/Pellet Stove
Dishwasher Direct Vent?
Other Other t. *tmo-rcr,
Other Other
Base Feed Base Fee 7_7—
TOTAL PLUMBING ��, TOTAL MECHANICAL
A FLOOR PLAN AND PLOT PLAN MAY BE REQUIRED DEPENDING ON THE TYPE OF FIXTURE/UNIT.
NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF
CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED.
PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the
information provided is accurate and grants employees of Mason County access to the above described property and structures for review and
inspection of this project. Acknowledgment of such is by signature below:
OWNER AFFIDAVIT-I certify that I am exempt from the requirements of the CONTRACTOR'S AFFIDAVIT-I certify that I am currently registered as a
Contractor Registration Law RCW 18.27 and am aware of the ordinance contractor in the State of Washington and that 1 am aware of the ordinance
requirements for which this permit is issued and that all work will be done in requirements regulating the work for which this permit is Issued and all work
conformance therewith. No changes shall be made without first obtaining shall be done in-oonformance therewith. No changes shall be made without
approval. first obtai s�pprpyel'
X Date
FOR OFFICIAL VSE BEYOND THIS POINT
Accepted by Date Submittal Amount Due Receipt No.
- > t EP.ARTMENTALREVIEW 'APPROVED DIE CONDITION CODES
Building Department
Occ Grou Type Constr.
Planning Department
I
Other
Other
FEES
Permit Fee Site Inspection
Plan Review Fee UFC Plan Review Fee
Plumbing&Base Fee Other
Mechanical&Base Fee Other
Wood/Gas/Pellet Stove Fee Pre-Paid at Submittal
Violation Fee TOTAL FEES
FORM MUST BE COMPLETED IN INK
PLEASE PRESS HARD MASON COUNTY PROJECT SITE INFORMATION
—f�m' Case No.
Na e
_PARCEL NUMBERAZ22 Cl--,5 Pam% Date
SHOW THE FOLLOWING ON SITE PLAN Show Direction by indicationg N,S,E.W in relation to the
site plan
Lot Dimensions Fences
Existing Structures Driveways
Structure Setbacks Shorelines
Water Lines Topography
Well Location(including adjacent) Drainage Plan
Names of Streets Easements
Names of Fronting Streets Septic System
DRAW SITE PLAN BEL W Include adjacent properties if on shoreline or within 100 feet q adjacent property line.
adjacent property line- I ( Fadjacent property line
I � I
i U I
I I
z 40
I I
I
I I
I I
I � I
, I I
I 1
I I
I I
I
I I
adjacent property line-> (--adjacent property line
SAMPLE SITE PLAN
adjacent property lined 3iO <-adjacent property line
.SiASG v AL I. HW—J�-
—YPCSL_�I J
�) a prft ~I
1
I I
VACANT I C.AMA66
1 ►ao/oaGD
T Asrtjeu.�rwaA� So �
I 1
I
� I I
80'—11
I
/00'
I
- e-LL
I I
* /00'—�
I
I �
adjacent property line-� I \; (-adjacent ro ert line
TOPOGRAPHY PROFILE(Show a side view of property. Show slopes,cuts and fills. If possible include height and the
degree of slopes. See sample topography profile.)
SAMPLE TOPOGRAPHY PROFILE
dls+a..ca to
\ dieta.,cc ro
Sropa to¢
dli+anca
♦o a
natur Dat
NORTH
3 BAY
B 0 E
i5�w'�sr
..........
Architects
705 Pacific Avenue
DR. Tacoma, WA 98402
253.383.7762
ST FAX.383.8041
ALLYN SITE
M.
gwnoo PROJECT-
lal
is CN�ET
UNITED S TA TES
POS T OFFICE
VICINITY MAP
NOT TO SCALE
ALLYN, WA
MAIN OFFICE; NCL
S 73.00*00" E 190.00
3
A D D m
rm-m
m� •r
�{ o t- - - -
N p 1 SPACES 41 9'
3iOx
rnrn� , y Z
�f 1
I � x I
15' 12' 10' 20' 2A' 219 [/1 I
e Z Z I MMIMLIM
MINR'1Uh1 y_ W BLFFER
EIFFER D I 3ET5AGK
SETBAC (1
w, r•
N v 1
D I I
J / LANDSCAPE 0
Zg Zg mN -
•Z --z D
?u M �\\—I �
o
N
m S 73.00'00" E 190.00
rn LA
c� ?� -•
o L
X Cs
2 O
a A n
n n o
< Z o
o
� I
Ef(253)311-2422
Allyn U.S.P.O., Allyn WA Scale:
CTURAL ENGINEERS
ERS•LANDSCAPE ARCHITECTS
le 300-TACOMA,WA 98400 SITE PLAN North
AX (253)383-2572
Case number:MIS Is � -t96 C1
MASON COUNTY
PRE-SUBMISSION CONFERENCE REQUEST FORM
The purpose of the pre-submission application is to identify and/or eliminate as many potential problems as
possible in order for the project to be processed without delay. Representatives from the building department, fire,
environmental health,planning, and public works may attend the meeting to discuss rules and regulations applicable to the
proposed project.Topics covered during the meeting will include the comprehensive plan, shoreline program, zoning,
availability of sewer and potable water,development concepts, construction, fire, and life safety of the proposed project.
By providing the most accurate and detailed information on the application and site plan your pre-submission conference
will be more informative.
Pre-Submission conferences are held every Wednesday and last approximately one hour. To schedule a meeting
complete the application on both side and return 7 copies of the site plan to the Mason County Permit Assistance Center,
attn. M. M. acSems. If you have questions call (360)427-9670 ext. 281. f:�'X C3(a 0) 49,1 --I-I el Gt
Date: V
l 2 /y 98 Site Plan
Applicant: Submit 7 copies
Name_ Ajae- P', r ro-ul , GAd{ Per rvw lfc s4rud10 4 Include the following
Address D. ,fox /S 0 CIt4 floor lJA �'8 335' information on site plans:
Daytime telephone 2-.5-3
✓ Property lines,easements,and right-
Representative of-ways.
,p ✓ The location of all existing and
Name_ �/, , >(,(,{.( S hLW.) o l' Eb za,be4k R t V proposed structures. Include square
Address 22/5 /1/, 30&r ,&e., / ,�A 98 y03 footage of existing and proposed
Daytime telephone Zy7_2- buildings.
✓Parcel Number: 12 digits Setback distance,in feet,from all
�j OD property lines and buildings.
Z'1 ✓ Existing and proposed road access to
and from the site.
Description of Project: ,/ parking sites
Include square footage of structure,.use of buildings i.e. office,warehouse,etc,
✓ Location of on-site sewage tanks and
occupancy classification(UBC,Table 3-A),and construction type. Provide one set drainfields.
of plans, if available. 52 78 5oucz re- FCGf V Location of drinking water supply of
O v0a.•2GG/ C�assc from — ,8 proposed site and surrounding sites.
�vild;ng lJs�e — fosf D,�r�e,
y / ✓ Steep bluffs,wetlands,streams,and
.S roc_r T Pe_^ V/V n,0 n-rGl T� bodies of water
✓ Location of fire hydrants and
emergency vehicle access roads,
including grade.
_ Continued on reverse side
Has this project been discussed during a previous Pre-Submission Conference? If yes,please indicate date
yes , �v I U i�98 ��n>� Ca�sf �. ��1«.►�f�
Will the building have employees? If yes,how many? 3 e eS
What is the water availability of the proposed project? If there is an existing well, what is the name of the system?
bud liC �va-��Sv , 4, �f�a�bor GJQ�-�' -tliq y4i- her ` pr,coo, 01&9,6
What is planned for an on-site sewage system? If you are proposing a new on-site system provide detail on the required
site plan.
// �&w /by( lc�i✓u, G�/// be �� � exi.sfi , sep-f C.
2 L� / � /� ��/h a"I &�Zse""1 Pit-7L-
ADDITIONAL COMMENTS:
A/2 V f- 2 fd 5r' last r-a, . P o 030-l /4 ' /.S 7
s ;� la'r res�e4 d' /7 ova eG. I M w ' o,ill ff` 04td
v apt c/a rc` cQ 1v /+ ULL-SL42Dom, ij t .
G i 7L! � S ✓ram
v74A ara
e
� �o as Qs D tee- a�ca� �usfi C n G�27�C.r-
��
Q
APPLICABLE BUILDING CODES:
1997 Uniform Building Code -WAC 51-40
1997 Uniform Mechanical Code -WAC 51-42
1997 Uniform Plumbing Code-WAC 51-46/51-47
1994 Non-Residential Energy CodeNentilation and Indoor Air Quality Code
Mason County Ordinance
Date and Time Conference Scheduled:
Location: 1>� �) 31 �,
MASON COUNTY
PRE-SUBMISSION CONFERENCE APPLICATION
Mason County uses the pre-submission conference to assist applicants in preparing
proposals which are consistent with all Mason County, City of Shelton (when
applicable) and PUD concerns and regulations. At the pre-submission conference,
representatives of all relevant departments will be in attendance and will be able to
inform you of the regulations..and standards with which your proposal must comply.
This is a general informational meeting for the applicant and does not constitute
approval of the proposal. Pre-submission conferences are only held on Wednesdays
and are approximately 60 minutes in length. SEVEN COPIES OF A DETAILED SITE
PLAN SHALL BE SUBMITTED ONE WEEK PRIOR TO THE CONFERENCE. The site
plan must contain all setbacks between proposed and existing structures and the
property lines. If applicable, please show all critical areas (shorelines, wetlands,
landslide hazard areas.) All existing and proposed structures must be shown and
labeled with their use and the type of construction materials to be used (i.e. stick built,
modular, etc.)`PLEASE PRINT when completing this application.
APPLICANT: 4-C y ✓-_ SITE ADDRESS:
CONTRACTOR: L v C,-sw�+ r
CONTACT: TAX PARCEL NUMBER:
PHONE#: 2.52,
Describe Project, indicating square footage of building and describe the use of the building in as much
detail as possible. "J C1 s5H!n-c A u—v-1 Co��e U`d� W k LL-
cA ),IC LA ) sc�
LD I N(�
Type of Construction (Please circle): Wood Concrete Masonry Metal Other:
Water Source: �Y ✓C.y W��� �15 'Wl Septic System:
For Office Use Below This Line
Meeting Date: ( /1 Meeting Time: J C)0 I ��
Meeting Location`EUD Ir
cry
MON 10 . 53 AM CTL, INC 20G 5880928 P. n ;
CONSTRUCTION TESTING LABORATORIES, INC.
10111 South Tacoma Way, Suite D-7,Tacoma,WA 98499
Telephone(206) 588-0805
Facsimile(206) 588-0928
! e a '�,.�'5-NYC•F«'1.6M r�..).rr A
y,[,/�b.\.: •Y`Gb1QSel.L:✓J.,.. r...r.w.�r�ww.wr..wr.r�rw.wr.sra rv�Iw ... t. a ...<:....>.,._„a. <.. ... .
• •. �. �...��.v..P. ._la.Jo[?at!a'u:zY..,.<[.bL:raiYl,i+.ct7<on,,.ucw->ux:r.��
We are pleased to introduce our testing firm and to acquaint you with our services.
We have a skilled staff of professional engineers, engineering technicians and clerical
personnel, in addition, our laboratory is fully equipped for a wide range of testing and is
regularly inspected by the Cement & Concrete Reference Laboratory (CCRL), the American
Materials Reference Laboratory (AMRL) and the U.S. Army Corps of Engineers. We are a
Washington Association of Building Officials (WABO) registered inspection and testing
agency and are accreditted by the American Association of State Highway and
Transportation Officials(AASHTO).
Our goal is to ensure our clients receive the best prosslble products and services. To this
end we look closely not only with the client, but also with the firms servicing the client. in
our consulting capacity, we try to provide alternate solutions, so that the client can select
the one best suited to his needs and cost requirements.
Among those services we offer the following:
S J.
a. Visual inspection of site
b. Inspection & testing of the site preparation
C. Monitoring of backfilling operations, placing or fills and subgrade preparations
d. Laboratory analysis of soils and aggrega�
e. Compaction Control
CAS ,t1N-PL AC,E+ 0Nt RETE,PEINFORCIIVG STEEL, AMSONR�- SHOTCRETE
a. Aggregate Testing & Mix Designs
b. Batch plant inspection
c. inspection of forms and resteel
d. Concrete inspection, sampling and testing
e. Masonry Inspection, sampling and testing
f, Shotcrete inspection and testing
a. Fabrication inspection
b. Placement Inspection
C. Visual welding Inspection
d. Anchoring (TORQUE & PROOFLOADS)
e. Bolt Pull-Out(TENSION) tests
f. Non-Destructive Weld Testing
NO" 10 :42 AM CTL, I HC 206 5880928 P. 01
CONSTRUCTION TESTING LABORATORIES, INC.
10111 South Tacoma Way,Suite D-7, Tacoma,WA 98499
Telephone(206)588-0805
Facsimile (206)588-0928
........... . .
a. Inspection for conformance with specifications
b. Sampling (CUT-OUTS)
C. Laboratory analysis
.........
PILING
a. Inspection of drilled or driven piling
b. Fabrication Inspection of pre-cast concrete piles
c. Inspection & testing of auger cast piles
T ASPHAL-. VCZ.0NCRM"qGRE6ATt PITS,
................
a. Site inspection
b. Plant&pit inspection
C. Quality control testing
d. Complete asphalt mix designs
e. Asphalt coring & testing
f. Nuclear density testing
po _cAsrc6NcPE'rE
a. Fabrication Inspection
b, Non-destructive testing
0. Wood moisture testing(in field)
b. Molsture vapor through floor/slab
NA,tLTNG..1N$PE0VQN,..
a. Inspectlon for conformance with specifications
a. Non-destructive testing of welding, concrete and location of reinforcing steel in
hardened concrete.
INTRODLIC,PW
MON 1 0 :43 §4M CTL, INC 206 5880928 P. 0
CONSTRUCTION TESTING LABORATORIES, INC. fil
10111 South Tacoma Way,Suite D-7,Tacoma,WA 98499
Telephone(206) 588-0805
Facsimile(206) 588.0928
...........
.............. ............
NOAt;M!#
a. Inspection by certified energy code inspector for compliance with building code.
W.
arc
UA
iNTR0CKX.PGJ
MOH 10 :43 AM GTL-, I HC 206 5890929 P. 0
CONSTRUCTION TESTING LABORATORIES, INC. 25
10111 South Tacoma Way,Suite D-7,Tacoma,WA 98499
Telephone(206)588-0803
Facsimile(206)588-0928
MAJOR CURRENT PROJECTS
t i.
Matsushita Semi-Conductor Plant..........Puyallup
Terminal#5.............................................. Port of Seattle
Sea Land Expansion................................Port of Tacoma
Intel Site................................................... DuPont
Pioneer Aggregate Facility.....................DuPont
Mary Baker Russell Additions.................Pacific Lutheran University
Farmers Market Expansion..................... Port of Olympia
Gateway Newspaper Expansion............. Gig Harbor
Inn at Gig Harbor.................................... Gig Harbor
Bridle Trials Substation...........................Bellevue
Snoqualmie Ridge................................... Snoqualmie
Northend Tacoma Overlook.................... Tacoma
Olympia post office ................................Tumwater
Ondo Building......................................... Chehalis
Squadron operations AMF Facility........ McChord AFB
MAJORPRO.Or
CONSTRUCTION TESTING LABORATORIES INC. r_.x
�1 pL K ST�R.�. 10111 So t)� T.rc m l�r Y, Suil fl-7; �aCDIT? �-96f 9
Tut No. (206)S$8 Q�3IFxc Na. (�06}S88 09z8
CD
<�'re�1tf#��r,7�e ��FCa�1.71tec1nr
Matragtnr,Y�gCt�i'¢l >� _ ..yi DO{IG.iC7fJ1�E
p ;assurance}�sphal!�+s�a�n`
n ��_: ro�eril7�,rpxlc&Pa�7ng t:ivtlEagrteer, P`�'
Y Cn,x-:.a'.�rbxx- d.dnwY _ �--. — .FA, n,.w•-vA ✓V� Inn wrr.w+nwr..n • • . .-
anagryualfty�oralraf, -- — ---- --
------------------7 71
s`: . � . ,_..; ;� Asstrt'ar,�a.13or1cingi 03v1(s7on �,
-
Cabarfilrery 76 h6rciai - -
;.-.. �. .. � t �tf}�+£�C��'L��rL�;4l+f � ; ;`;ARA1�: U��i�';�rSOf�• �
St�cr�t�r�It3lsparci�vr Clerk.i yi+i�r
u
r rs}R.M. , �'11�C�1{iSJgK
seniorngirieersrt�,'
Sem�.T,�ing�ix�tf»#� S_Er�rr�rjEriq�n�enrrg _
a � �ectvirr ' � � -- Tect�r�ic�arl
T�e#7DrC�a11 ` •
� ;"1+YA8¢J�e�t�ter� �� : W1;8Q Rer,1►s�erc�ri Regrs
:e •;. .;; - fie••r: '' '`�}•;`�a v:a N.:F�f tP ., .....
i 5� �y{�r-�p.(�� �:(�(�'� r i:i,: £i�4yy3'y�'p;,-}-0;a;a,• -<�2�� Y �k �: �y yip {��/• p /y���/ �{
E�/Pp fRAY1 2YILL
r.�� r 4 a,rA a. T �3.�8�?mot•r•�: .
Nb
WA"BO Rug,fstered ,, SUS t t q X 'ga l�artizwaklt B Pair7hq"
A FL I,R G'A
MON 10 :45 AM CTL• INr 206 5880928 F.
CONSTRUCTION TESTING LABORATORIES, INC.
10111 South Tacoma Way,Suite D-7,Tacoma,WA 98499
Telephone(206) 588-0805
Facsimile(206) 588-0928
t...Wes.......... -..._�... ....._.........i:...�......__..x.._.. „__._.: ., .._.... . ,,. ,,,,,n r..,...... .a. ......:.�s>._.<..,....,.,.�,...N....a.�y.....-,.,,........a
Jack C. Ross...................... President, Technical Director, Lab Supervisor
Dennis M. Smith................. Manager, Quality Control Assurance Building
Division - WABO Registered
Joel H. Ross....................... Manager, Quality Control Assurance Asphalt
Division -Earthwork& Paving
Doug Cooke........................ Civil Engineer, P.E.
Dave Rupert........................ Laboratory Technician, Geologist
Steve Hong......................... Senior Engineering Technician - WABO Registered
Mike Kisak.......................... SenlorEnglneering Technician - WABO Registered
Gary Carlson...................... Senior Engineering Technican - WABO Registered
George (Ray) Melton.......... Engineering Technician - WABO Registered
Ed Gann.............................. Engineering Technician - WABO Registered
Robert(Bob) Rowden........ Engineering Technician - Earthwork & Paving
Frances M. DeLeon............ Secretary/Dispatcher
Sarah Gammon.................. Clerk Typist
ROSTER.iTW
MON 10 :46 AM CTL, INC 206 5880928 F'. ���•
l l lr/'• ,� r"rj ''^.��` ,\ -
,':: ::` 4.i�'al'!,' Mil/ ^. kkI
—INii);��\11'Iryi;,.• •�\dl_!1/�,ii:\ p\Cl//,,�A�U17//S;J ;rt„^!t/•, \\, (i4,_;a1'A�.•_:�\d I��,':<\�\l 1n�5% \\I /l�s;i::�\d^pi,.;,.,\�^/s.: .:tt /At.
IN1��� �•� ;rr�`;%!i\�-7i`1�;'rZ1'YiS•�i1', R4•s�fit-N 11•���\;r>lfr'�11J �,i'�C;�/ ,,r!'h....
�.:.7�1%r �
�
.,Z` WASNINGTON ASSOCIATION OF BUILDING OFFICIALS
AK; Special Impechon ;
P �.;
i �1
raf 11an
Xg
Agency
Agency Name '
(iy _
° CONSTRUCTION TESTING
LABORATORIES, INC . (CTL) r
TACOMA
J�.7
4< � The premise of the Washington Association of Building Officials (WABO) special inspection registration `�==
`$ program is that the "special inspector' referred to in Section 306 of the Uniform Building Code is a quality
ti,L! control organization with management and supervisory personnel, special inspectors and laboratory
technicians, and the appropriate equipment and facilities to conduct special inspection and material testing
in accordance with those standards stipulated in the Uniform Building Code.
{ � Types of Construction or operation
zti ; Reinforced Concrete
Prestressed Concrete
Sholt
Structural Masonry
' Structural Ste:l And We'laing
. , Spray-applied Fireproofing
_ 'J `
The organization named or this Ceecate of Registraton has, as prescribed In Section 306 of the tJnHonri Building " "
SpeCh� g
' Wde, demonstrated competence to the satisfaction of Lha buildingoNcial n the services of a.WABQ r is
, tered special inspector,by qualifying for registration as an agency,as prescribed in the WABO Agen and Inspector
Performance Ouamication Standard•No.3C6, for tha par.cular types) of wnstru on or oper tact above. ■
,>s July 1, 2000'
Expiration Date Exealt9rz Director
/•�\i r" iri"�� ;,Ln r\�/"\iri•?�r;i�iirz,�.,i�„r�iO:J,e`s\���3�'�'��yr��'�,,�'yL�i�,��#�\����''t�� ,,�s,�LrJi�;�b`s`*���\�t'���>_.
'. ;>w,Jl>lJy4��,J:,`J��1..,�t�,�.;J\,�-�,�-J�.,���.t v :!% � / ;o� ,�/i;a\�, air �\�,�a�i;�\;\�.✓'/ur.t�\��s �l�l;!„\`• .�u;us,�:°�rm��`;,-%'';;�,�.
s,\a\..`;,gimp\�1 �ru►»� i n n\,\� •,/iqt�\.�✓p \\ � ,/ri;l\\ v,✓ /ri t� ,x u t� r�� Ari,,11 ,, � r/,, ,•.� ; 1 , 1, ,l\. /
Non WPC, Inc. LETTER OF TRANSMITTAL
P.O. Box 1728
Gig Harbor,Washington 98335 Date 3/9/99 Job No. 98439
(253) 851-9309 Attention
Fax (253) 851-6475 Re. USPS—Allyn
TO: Mason County
WE ARE SENDING YOU a Attached ❑Under separate cover via the following items:
❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications
❑ Copy of letter ❑ Change Order ❑
COPIES DATE NO.PAGES DESCRIPTION
4 sets Drawings — consisting of Civil C 1 through C5
Architectural A l.l through A5.4, Structural S 1.1 thru S3.2,
HVAC M-1, Electrical E 1.1 thru E 1.3
2 ea Building permit plans checklist
2 ea WA State Non-resident Energy Code Compliance Form
2 ea Structural calculations
2 ea Drainage and erosion control reports
2 ea Building specifications
THESE ARE TRANSMITTED as checked below:
❑ For approval ❑Approved as submitted ❑ Resubmit copies for approval
❑ For your use ❑ Approved as noted ❑ Submit copies for distribution
❑ As requested ❑ Returned for corrections ❑ Return corrected prints
❑ For review and comments ❑
❑ FOR BIDS DUE ❑ RETURN PRINTS TO US AFTER USE
REMARKS Also included are:
2 ea Lower Hood Canal Field Inspection Forms (Septic system pump records
2 ea Septic design letter—Accelerated Septic Designs and Monitoring Company
2 ea Water determination of Adequacy
1 set Building permit application forms
1 ea Check for plan review No. 47208 for$1,643.00
COPY TO: file
SIGNED: Steven Perovich
/f enclosures are not as noted,kindly notify its at once.
TP L
A\.z.
CI- eu,-e-
10 -A 0 c(7- -�*,S
3 1,4 L
�, d" e.44.- -I
ir 5. to I -
Ar
75 -
SLY S,
Ct
10 - f4 occ-Le_4 (,.j -Re r5ov,5 Ek n ✓r-
tt 3 I 3, t Z q JD
z3��c�soNs.
6'/e7-•, 7_ 'U 6-Ed l r,,v Tim </ 0,
�. �2 _ I ��ec.✓ mac,I I `J � 12 —���s�c rS
¢r
,S abler 2:3
C-s 3 l rT-) G v1 ✓7
S✓tee� r'l� � - �'_ (,.,.,� IS- Z , �d.�c.��c S z - ,�H� -t-� la e�
ccf�-
TS
iGo �_ 3 . S
Yl e3 S ( v I I `J e G,o%%� f o Sq ' O✓� �� r�
5 4 c ✓ (.� 1 I /to
U Z 1 � J �✓.Y L�J�- 1/`ea�d L'3 .j' �- S - � �� � � i.�u;�d G��s GK
r-�
"�°� `� ,✓�'�� u��y 7(<1
BUILDING. IT
3 /11 / �
DATE 'L,�y✓L�
Planner Area t
Parcel # � L5��
CHECKLIST FOR PROPOSED CONSTRUCTION /►('�r (-e�
Yes No
[ ) [ Within 200 FT of SMP designated shoreline, wetlands,
etc.
Where?
[ ] ( Located near possible Critical Area,
What Kind? (Wetlands, Streams, Lakes, Landslide Hazard)
[ ] ( ] RLC already done?
[ ] [ l Proposed construction within floodplain
Eagle nest
Six year moratorium
Multi-Setbacks
State road access needed
[ [ ] Commercial Development (parking standards, sign
ordinance, public works review, other applicable
[ ] /agencies)
( Mobile Home or RV Park
1
Mason County
Dept. of Community Development
P.O. Box 578
Shelton, WA 98584
please prQtt neatly or type in.fon mum
Document Title(s)
f3dCary n'� LIAX
Reference Number(s) of related documents
S,tnVE>/
Additional Reference#is on page
S,r,r 9C M C�rvlS�vftt�,C —
Grantor(s) £iast,First and Middieinitiaal) ,r �j1�� (��rvt�i�JLtYti,��er� ar2rs�r,P
C Kr-4 t„CvY►Scan I
Sawn d1Yc,, C.- ca-f c l-n
SSG - jtl Ca
IY1CJtt L- �� 1Sav)
\/ W1��t- _ C Additional grantors on page
G ranteeIs) (Last,First and Middle Initial)
ll,e, �h 1►
Additional legal is on page
Legal Description (abbreviated form:i.e.W,block,plat or section•township,range,quarter/quarter)
Gr l S�v l/ I Gcv+ sec Z t `.2.2 N. ?:ZW lNrY1
Assessor's Property Tax Parcel/Account Number
2 22z2- Z1 ,Qo)gv 22 z22 -Zl -o(jlC)v Z 22ZZ "z? Additional grantors on page �—
�,22Z2 -Z,� -Uo23o ZZ222 -Z4 - c�o�arJ, --
uracy o
The Auditor/Recorder will rely on the information provided on this form The staff will not read the document to verify the acc
completeness of the indexing information provided herein.
f
C Phone:(350)427-9670 Ext.450 Jerry W.Hauth,PE,PLS
MFax:(360)427-8425 Director
A O
S V DEPARTMENT OF PUBLIC WORKS
ON COURTHOUSE BLDG 1, 411 NORTH 5TH STREET
TP.O.BOX 1850 SHELTON,WASHINGTON 98584
N Y 3
July 13, 1999
AHBL Engineering
Attention; Dan Shaw
2215 North 30th Street, Suite 300
Tacoma, WA 98403
Re: Allyn Post Office Stormwater Plan Review
Dear Dan,
As we discussed over the phone this morning, Brad Lindgren and Larry Deemer, both WSDOT
employees, visited the Allyn Post Office site this morning to consider your proposed stormwater
site plan, and to investigate additional features not shown on the developed site plan. Larry
Deemer is WSDOT's maintenance foremen for this area, and is very familiar with the existing
stormsewer system serving the subject property. Larry claims that the existing 12" culvert at the
intersection of Schultz Street and State Route 3 is inadequate for existing conditions, and he is
concerned that the runoff from the proposed post office will only aggravate the problem. Brad
Lindgren, the WSDOT Hydraulic Engineer reviewing the current plans, seems less insistent
about requiring discharges to conform with Ecology's downstream erosion control discharge
rates, but as the recipient of runoff from the new post office, he is rightly concerned with the
State's conveyance capacity. The 12" culvert at Schultz Street appears to be the governing
structure with a capacity only slightly above the 2.18 cfs expected to issue from the post office
area and contributing areas. In addition to the flows indicated in your plan addendum, other areas
in the Allyn Center contribute to the Shultz Street culvert. It appears two obvious solutions are
available. Either the discharge from the uplands needs to be detained and attenuated, or the
existing constrictions need to be remedied. This is the reasoning behind a request that the
existing 12" culvert serving Shultz Street be considered for replacement/upsizing as part of your
projects' construction. If you decide it is most economical to replace the Shultz Street culvert,
the details for its replacement should be worked out with WSDOT/Brad Lindgren.
A specification sheet for the oil/water separator is requested so that its rated capacity and
suitability for this application can be determined.
A copy of a recorded Operation& Maintenance Covenant has been received by Public Works
and is considered acceptable.
At this point,the last issue to resolve is whether to detain and attenuate flows from the proposed
development site, or to seek permission from the State Department of Transportation to install a
higher capacity culvert at the Shultz Street access to Highway 3.
Please feel free to contact me at County extension 461 if you have any questions regarding these
comments, or if I can provide any assistance.
Sincerely, 1
ALN� A. TAHJA,
County Hydraulic Engineer
AT:at
cc: Allan Borden, DCD- Planner
Brad Lindgren, WSDOT-Hydr. Engr. (360) 3 5 7-2 714
WPC, Inc.
P.O. Box 1728
Gig Harbor, WA 98335
July 12, 1999 (253) 851-9309 • Fax (253) 851-6475
Wade Perrow Construction,Inc.
Mason County Permit Center
P O Box 186
Shelton, WA 98584
ATT: Kelly Mayo
RE: USPO, Allyn Center
Permit#BLD99-0147
Mason County Letter of 6/29/99
Dear Sir:
As regards the referenced letter we offer the following:
• Items"'2,3,4,5 and 6 have been addressed and the correction noted on the enclosed
drawings(see attachment).
,3 ok• Item#1 —Noted. Should this wall be deemed necessary, a separate permit will be
applied for. It is our understanding of the UBC that if this wall is under four feet high
a permit is not required. If this is contrary to your regulation, please advise.
• Item#9—UH-1 produces 30,000 BTU's.
• Item #7—The weight of each unit is 165 lb. and each unit requires about six square ` S
feet.
• Item#8 —No action required.
We hope the above information satisfies your requirements.
Respectfully,
4 ,
Steven Perovich
Project Manager
Encl.: Drawings and letter of transmittal
cc: Mr. & Mrs. Harper
`Yllly
d 4
sA,Q{E
r
+ Y
COMMUNITY DEVELOPMENT
Solid Waste Planning Utilities
I N T E R
MEMO
O F F I C E
DATE: JUNE 24, 1999
TO: BETTY WING AND AL 7NBORDEN�-'
FROM: GARY YANDO
SUBJECT: ALLYN POST OFFICE
As you are both aware we have been working with the Postal Service
regarding the building permit application submitted for a new post office in
Allyn. It has been impacted by the invalidation issued by the Hearings
Board back in January. I have attached a copy of a resolution I plan to
present to the Board of County Commissioners on July 13, 1999 which will
allow for us to issue the applicable permits.
I want to ask you Betty to see if you can make sure that everything is
completed at your side of the house so when the resolution is signed we
can immediately issue the building permit.
Allyn you need to make sure that DCD is able to sign off the project and
that there is no holdup. It is my understanding that the permit is ready to be
issued from our side of the house. SEPA has been completed and etc. If
this is the case would it be possible to sign off the permit and send it to
building so everything is together? You can attach a statement that the
building permit is approved subject to the resolution being approved on July
13, 1999.
Please take the steps necessary to keep me informed. Your assistance is
appreciated.
L
RESOLUTION NO.
A RESOLUTION ACKNOWLEDGING THE UNITED STATES POSTAL SERVICE'S
DETERMINATION OF THE NEED FOR A NEW POST OFFICE IN ALLYN,
WASHINGTON TO SERVE THE SURROUNDING RURAL AREA AND EXPRESSING
MASON COUNTY'S INTENT TO SUPPORT THE POSTAL SERVICE IN CONSTRUCTING
A NEW POST OFFICE IN ALLYN.
WHEREAS, under the federal Postal Reorganization Act, 39 U.S.C. & 101 et seq., the United
States Postal Service has a duty to establish and maintain postal facilities of such character and in
such locations that postal patrons throughout the nation will have ready access to essential postal
services;
WHEREAS, under the Postal Reorganization Act, it is an expressed policy of the United States
Postal Service to provide a maximum degree of effective and regular postal services to rural
areas, communities, and small towns;
WHEREAS, under the Postal Reorganization Act,the United States Postal Service is authorized
to determine the need for post offices and to provide such offices as it determines are needed to
fulfill its Congressionally-mandated duties;
WHEREAS, the United States Postal Service has determined that the existing post office serving
Allyn and the surrounding rural area is inadequate to serve the postal service needs of that area
and has determined that construction of a new post office is necessary to adequately serve those
needs;
WHEREAS, the United States Postal Service has consulted with Mason County in an effort to
comply with local planning requirements and building codes to the maximum extent feasible
consistent with postal needs and objectives.
NOW, THEREFORE, BE IT HEREBY RESOLVED, that, in cooperation with the United States
Postal Service in the exercise of its Congressional mandate to provide rural postal services and
Page 2
Resolution No.
post offices as it determines to be necessary Mason Couny shall support, approve, and permit
construction of a new post office in Allyn to replace the existing, but inadequate,Allyn Post
Office in order to ensure that postal service to Allyn and the surrounding rural area continues
without interruption.
DATED this day of July, 1999.
BOARD OF COMMISSIONERS ATTEST:
MASON COUNTY, WASHINGTON
CHAIRPERSON CLERK OF THE BOARD
APPROVED AS TO FORM:
COMMISSIONER
COMMISSIONER DEPUTY PROS. ATTORNEY
Printed by Kelly _Mayo _ _ 5/27119.99 __ 2 : 08pm
---------------------------------------
From: Betty Wing
To: Kelly Mayo
Subject: Allyn Post Office Qf
--------------------------------------- �9 \
===NOTE====------=====5/27/1999==1:41=P k� �Ar
Spoke to Steve Paravitz who is the (o t� r
genreal on this project. He understands q
the details of the invalidity but is q'a �kL� t'S�
asking if we could put hin application rw' d b``�kV,
lV/ �
in the "to be reviewed" bin to CG�� kk
determine if they have any major J
structural issues or engineering issues
that haven't been addressed that he
could be working on right now. 1
explained that we don't typically do
the review until we determine if it is
a "go" because sometimes these projects
change. He understands all fo this and
knows he will have to pay for the plan
review even if his project is
ultimately denied.
Would you please move th Allyn Post
Office B1d99-0147 from the hold bin to
the review bin. This is a project that
will not be modified with a breezeway
and Gary honestly expects this will be
addressed very shortly by the hearings
board. Come see me if you have any
questions on this. Thanks.
---------------------------------------
GARY YANDO,DIRECTOR
�oN.srq rFo
o A° N u DEPARTMENT OF COMMUNITY DEVELOPMENT
o T Z PLANNING -SOLID WASTE - UTILITIES
Z7 N Y y BLDG. I • 411 N. 5111 ST. a P.O. BOX 578
of 1864 SHELTON,WA 98584 • (360) 427-9670
April 9 , 1999
Mr. & Mrs. Harper
6 Tulalip Key
Bellevue, WA 98006
Dear Mr. & Mrs. Harper,
This letter is in regards to your application to construct a new
post office in Allyn, and is a follow-up to the Notice to
Applicants that was sent to you in late January. As stated in
that notice, Mason County is subject to an Order of Invalidity
imposed by the Western Washington Growth Management Hearings
Board on January 14th of this year.
Unfortunately the Order of Invalidity does affect your project as
proposed. For the following reasons your project can not be
approved by the Planning Department at this time:
1) New construction
2) The building is non-residential in purpose.
3) The application was submitted after January 14th 1999 .
4) No claim for vesting was made upon application. The project
does not appear to meet any of the invalidity exemption criteria
as described in RCW36. 70A.302 (enclosed) .
This department is hopeful that the current situation will be
resolved in a timely manner. You are welcome to reapply at such
time. If you have further questions, please contact me at
extension 270 .
Sinc ely,
Gary Yando, Director
Dept. of Community Development
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning Division
411 N. Fifth, P.O. Box 578, Shelton, WA 98584
(360) 427-9670
DATE: 04/09/99
TO:
6 TULALIP KEY
BELLEVUE WA 98006
NOTIFICATION OF COMPLETENESS
RE: POST OFFICE
Case No. : BLD99- 0147
Parcel No. : 122205074001
Dear Applicant :
Mason County has received your permit application for proposed
construction or development (the case number is noted above) and has
determined that the application is complete for the purposes of beginning
the permit review pursuant to Mason County Code, Title 15 (Mason County
Development Code. )
Mason County Department of Community Development will proceed with the
review process of your permit application; however, additional information
may be required by another department at a later date. If you have
questions about your application, please contact this department at
(360) 427-9670 or (360) 275-4467, ext . 12
Sincerely,
�& lC�
Land Use Planner
Department of Community Development
COMMENTS:
Your application materials for this commercial building have been
submitted and are considered complete. On January 14, 1999, the Western
Washington Growth Management Hearings Board issued a Finding and Order
that portions of the Mason County Comprehensive Plan are considered
invalid. This Order affects the processing of permits for new
construction. Until issues concerning the Comprehensive Plan are
resolved, your submitted building application will be held from further
permit processing.
Received
F; . - rr`
Jennifer Harper
6 Tulalip Key � ,
Bellevue, WA 98006
(425) 603-1312
Mr. Allan Borden, Senior Planner January 28, 1999
Department of Community Development
Mason County
PO O Box 578
Shelton, WA 98584
RE: Allyn, WA United States Post Office
Commercial Building Permit and SEPA Environmental Checklist Submittal
Dear Mr. Borden:
As owner of a Mason County parcel with tax number 12220-50-73001, I am writing to authorize
Ms. Elizabeth Rivers,of AHBL, Inc. to act as my agent for the submittal of a Commercial
Building Permit and associated SEPA Environmental Checklist. Ms. Rivers can be reached at
the following address and telephone number:
Elizabeth Rivers
AHBL, Inc.
2215 North 301h Street, Suite 300
Tacoma, WA 98403
(253) 383-2422 and Fax (253) 383-2572
If you have any questions,my telephone number is (425) 603-1312
Thank you.
Sincerely,
rennifer Harper
Property Owner
12/16/98 10:02 FAX 253 274 4778 AHBL ENGINEERS Q 001/004
HBL PRINCIPALS:
GEOFFREY HOOSDON,P.E.S.E.
ALLAN E.BESSETTE.PE,SE
A kA GEORGE J.LINDSAY,PE.
CIVIL & STRUCTURAL SEAN M,CGMFORT.PE.
ENGINEERSAPLANNERS PAUL B.MCCORMICK,PE.SE.
Fax Transmittal ASSOCIATES
DOREEN S.GAVIN,P.E.
THOMAS R.HICKS,P.E.SE
To: Allan Borden,Bob Fink Date: December 16, 1998 JAWS R.CARLSEN,PE
Mason County Project No.: 98260.10,Task 10
DANIEL L BOOTH,PE,AF_
Dept.of Community Development Project Name: Allyn U.S.P.O.
Regarding: Meeting notes
Fax No.: 360-427-8425
Phone No.: 360-427-9670
WE ARE FAXING: (4)Sheets including the cover sheet. A hard copy will ❑ will not ® be sent.
THESE ARE TRANSMITTED:
® For review and comment ❑ Approved as noted
❑ For your use ❑ As requested
❑ For approval
REMARKS:
Thank you again for meeting with Wade Perrow, Dan Shaw, and me last Friday to discuss the Allyn
Post Office project. We appreciated your assistance and look forward to working with you on this
project.
Included herewith are our notes from the meeting. Please review them to ensure we understand
correctly what we will be required to do in order to obtain site development approval and a building
permit.
We sent the application for a pre-submittal conference to Mr. MacSems on Monday, December 14`h and
included this memo.
If you have comments or questions, you may call either Dan Shaw or me at 253-383-2422.
Thank you!
Regards
Elizabeth Rivers,AICP, ASLA
\\COMPAO NTSERVER\NTSER J\PLANNING\YR_1996\98260\26OFTOlAB,DOC
2-215 NORTH 30TH STRErr,SurrE 300 TAco►x WA 98403 PH:(253)383-242-2 FA(:(253)383-2572 AHBL_INC®IXNETCOM,COM