Loading...
HomeMy WebLinkAboutBLD2009-00294 Garage Living - BLD Permit / Conditions - 5/22/2009 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton,WA 98584 i� RESIDENTIAL BUILDING PERMIT BLD2009-00294 OWNER: DAVE MOORE RECEIVED: 4/21/2009 CONTRACTOR: JAG CONSTRUCTION LLC 360-340-2950 LICENSE: JAGCOL*961RZ EXP: 1/10/2011 ISSUED: 5/22/2009 SITE ADDRESS: 2990 E STATE ROUTE 302 BELFAIR EXPIRES: 11/22/2009 PARCEL NUMBER: 122163100050 LEGAL DESCRIPTION: N 75' OF S 650'OF N 1150' G.L.3 WLY R/W PCL 1 OF BLA#01-41 PROJECT DESCRIPTION: DIRECTIONS TO SITE: Garage with Living space NO KITCHEN ALLOWED ALLYN NORTH BAY RD SR 302, 2990 E General Information Construction &Occupancy Information Square Footage Information No.of Bedrooms: 1 Type of Constr.: VB Type of Use: SF Insp.Area: No. of Bathrooms: 1 Occ. Group: R-3U Lot Size: Deck: 48 Type of Work: ACC Fire Dist.: 5 No. of Stories: 2 Occ. Load: Building:896 Garage-Attached 896 Valuation: Building Height: Occ. Status: Primary Basement: Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: E 10.0 Ft. Shoreline: 153.0 Ft. Water Body: North Bay g Rear: W 153.0 Ft. Slope: Ft. SEPA?: No Model: Width: Ft. Side 1: N 5.0 Ft. Shoreline Desig.: Urban Year: Serial No.: Side 2: S 28.0 Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Hosebibs 3 Furnace<100K 1 Plan Check Fee KKK 4/21/2009 $726.02 S22009000 Kitchen Sink 1 Ventilation Fan 2 EH Plan Review KKK 4/21/2009 $41.00 s bb9bbb Lavatories 1 Dryer Vent 1 Planning Review Fee KKK 4/21/2009 $205.00 S22009000 Showers 1 Building State Fee ARC 4/29/2009 $4.50 S12009000 Water Closets (Toilets) 1 Building Permit Fee ARC 4/29/2009 $1,116.95 S12009000 Water Heaters 1 Mechanical Permit Fee ARC 4/29/2009 $45.30 S12009000 Clothes Washer 1 Mechanical Base Fee ARC 4/29/2009 $28.50 S12009000 Plumbing Permit Fee ARC 4/29/2009 $58.40 S12009000 Plumbing Base Fee ARC 4/29/2009 $24.70 S12009000 Total $2,250.37 BLD2009-00294 Please refer to the following pages for conditions of this permit. 1 of 5 CASE NOTES FOR BLD2009-00294 CONDITIONS FOR BLD2009-00294 1) This structure has NOT been reviewed or approved as an Accessory Dwelling Unit (ADU): A second dwelling unit detached from an existing single-family dwelling for use as a completely independent or semi-independent unit with provisions for cooking, eating, sanitation and sleeping. TO BE APPROVED, all ApUs are required to meet the requirements under Mason County Development Regulations 17.03.029. X 2) Ow er/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 3) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in perm t revocation. X 4) All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County 0r finance or regulation, must be reviewed and approved by Mason County prior to construction. 5) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Ins ector shall be made prior to requesting additional inspections. 6) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with M on County ordinances and building regulations. X 7) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150' from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where suc roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X BLD2009-00294 Please refer to the following pages for conditions of this permit 2 of 5 8) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X . i 9) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). 10) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit hol have prevented action from being taken. No more than one extension may be granted. X 11) The pl review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. 12) II approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and must be collected by the Building De a tment prior to any further inspections being performed or approvals granted. X 13) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, c9nnpctors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. X 14) All property lines shall be clearly identified at the time of foundation inspection. 15) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1- -647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X� 16) Retaini'g walls needed to support a s arge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall. 17) Per IRC - SECTION R905 - REQUIREMENTS FOR ROOF COVERINGS - R905.1 Roof covering application. Roof coverings shall be applied in ac dance with the applicable provisions of this section and the manufacturer's installation instructions. 18) Per 2003 IRC - SECTION 1609 -WIND LOADS - 1609.1 Applications. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads prescribed herein. Decreases in wind load shall not be made for the effect of shielding by other structures. Per FIGURE 1609 BAK WIND SPEED (3-SECOND GUST) the wind speed for Mason County is 85 MPH. Xl )414 BLD2009-Ob 94 Please refer to the following pages for conditions of this permit. 3 of 5 19) No temporary or final occupancy until utilities has completed an inspection of the sewer connection. Owner/Contractor is responsible for obtaining this inspection. 20) The proposed garage project must be consistent with all applicable policies and other provisions of the Shoreline Management Act, its rules, and the M County Shoreline Master Program. Xas 00 21) ApprovIEfd per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. X 22) The'a roved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Bu) g Department prior to any further inspections being performed or approvals granted. X 23) A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. `NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/cont r is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. 24) Washington State Energy Code Compliance as been approved using the following: Heat Type: Electric or other fuels, Compliance Method: Prescriptive option IV, Window(Max U-Factor):0.35, Skylight(Max U-Factor):0.58, Doors (Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-38 (see exception), Slab Insulation R-10. Exception: R-30 insulation may be installed, up to 500 sq. ft., in single rafter or joist vaulted ceilings where the distance of the top of the ceiling and the upd rside of the roof sheathing is less than 12-inches and there is 1-inch vented airspace above the insulation. 67 25) AppUpant acknowledges that the garage structure is only permitted for a land use consistent with the current Rural Residential 5 zone of the parcel. X BLD2009-00294 Please refer to the following pages for conditions of this permit. 4 Of 5 26) BUILDING DEPARTMENT HAS APPROVED THIS STRUCTURE AS A GARAGE WITH HEATED AREA ABOVE ONLY.This structure has NOT been reviewed or approved as an Accessory Dwelling Unit (ADU): A second dwelling unit detached from an existing single-family dwelling for use as a completely independent or semi-independent unit with provisi s for cooking; eating, sanitation and sleeping. ADUs are required to meet the requirements under Mason County Development Regulations 17.03.029. X This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described propert�and ucture for review an inspection. OWNER OR AGENT: DATE: ! y BLD2009-00294 Please referto the following pages for conditions of this permit. 5 of 5 From: Debbera Coker To: Moore, Celeste CC: Borden, Allan Subject: Re: Confirm use of structure located at 2990 E St. Pt 302 Based upon your description the use of the structure has not changed from the original occupancy approval during the final inspection of the building permit BLD2009-00294. This email is cc'd to the planner who verifies that the use of the structure is consistent with land use regulations. The building department has closed the enforcement case related to the initial complaint. Thank you for your cooperation and providing the requested information so quickly. >>> "Celeste Moore" <celestemoore@kwpuyollup.com> 3/28/2012 5:07 PM >>> Debbera, Per your request, the structure is exactly like it was when we received the final certificate of occupancy. Lower floor is garage parking, exercise area, and workshop. The upper floor is bedroom, bathroom, open living space, kitchen sink, fridge, dishwasher. Our daughter uses this space when she comes home from college. If you have any further questions please call me at 253-221-9000. Thank You Celeste Moore Sent from my iPad On Mar 27, 2012, at 3:06 PM, "Debbera Coker" <Dlc@co.moson.wa.us> wrote: > Hello Celeste, > Thank you for responding to the inspection card left at your property on March 23, 2012. Our office has received a complaint that the lower floor has been finished and a kitchen added to the structure after the final inspection of building permit BLD2009-00294 had been performed. The referenced permit was approved for a 2-story structure with a garage and habitable accessory space on the upper floor. Please provide a statement in writing that identifies the use of the lower and upper floors in order to verify that the use is consistent with the original approval. When received and verified our office will close the investigation case, number BCC2012-00025. > If you have additional questions please let me know. > Debbera Coker > Mason County Building Department > Building Inspector IV/Code Enforcement > Phone: (360)427-9670 ext 510 > FAX: (360) 427-7798 > e-Mail: DLC@co.mason.wa.us > PO Box 186 > 426 West Cedar Street > Shelton, WA 98584 FORM MUST BE COMPLETED IN INK MASON COUNTY PERMIT NO. PLEASE PRESS HARD BUILDING PERMIT APPLICATION _ 426 W. Cedar• P.O. Box 186, Shelton, WA 98584 Shelton (360) 427-9670 - Belfair (360) 275-4467 - Elma (360) 482-5269 �4 rl On the web www.co.mason.wa.us 40—Al APPLICANT INFORMATION CONTRACTOR INFORMATION Owner r-e Company Name Mailing Address o�5� r 5 6 1 ?� .z Mailing"Address City_ State -` Zip Codes City State Zip Code Phone Other Ph. Phone ,, Other Ph. Lien/Title Holder Contractor Reg. # Exp. Email address C<- ` tt � ���{ %�- 4 - �f�! E Mail Address Drivers Lic.# ",ry DOB — Drivers Lic.# DOB SEPTIC /WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic Connect to Water System Name of Water System Well - Sewer System Name of Sewer System PARCEL INFORMATION - 12 Digit Parcel No. Fire District Legal Description Site Address(Please include street name, street number and city) Directions to site ' a Will timber be cut and sold in parcel preparation?Yes/"No Is property within 200' of Saltwater U-r' Lake - River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No TYPE OF JOB - New Add Alt Repair Other _ PRIMARY RESIDENCE ❑ SEASONAL ❑ Use of Building Describe Work No. of Bedrooms, No. of Bathrooms a Square Footage- 1 st Floor 2nd Floor 3rd Floor Basement Deck Covered Deck Other Sq. ft. Garage Attached Detached Carport Attached Detached MANUFACTURED HOME INFORMATION - Make Model Year Length Width Serial No. No. of Bedrooms No. of Bathrooms Type of Heat Purchase Price $ Replacement Unit? Yes/ No Installer Name Certification No. OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative,or the contractor. I further declare that I am entitled to receive this permit and to do the work as proposed in the application. I declare that I have obtained the permission from all the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection.This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days.PROOF OF CONTINUATION OF WORK IS BY MEANS OFAPROGRESS INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THEAPPLICATION. X Date: Owner/Owners Representative/Contractor (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accepted by: i r Date DEPARTMENTAL REVIEW APPR V D DENIED NOTES Building Department Planning Department Environmental Health Department Fire Marshal FEES Building Permit Fee Site Inspection Plan Review Fee EH Review Fee Plumbing & Base Fee 16 3- 10 Planning Review Fee Mechanical & Base fee �3 .80 Other Wood /Gas/ Pellet Stove Fee State Fee 'S� Violation Fee Nd iFAX Pre-Paid at Submittal Valuation $ TOTAL FEES PERMIT NO. .Lj;&6 MASON COUNTY PLUMBING/MECHANICAL PERMIT APPLICATION 426 W.Cedar• P.O. Box 186, Shelton,WA 98584 — Shelton (360) 427-9670•Belfair(360)275-4467• Elma (360) 482-5269 !AL On the web www.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR, INFORD�TION,r Owner _ t`.1 v ia` 1' f�_ Company Name '( Mailin Address .,t_:.� .$ 0 ��Ii Ll' �irN Mailing Address City '-.- , x , tatq �,4; Zip Code City State Zip Code Phone . ,!! I Je4_ij; - Other Ph. Phone Other Ph. Lien/Title Holder Contractor Reg.#— Exp. E mail address E Mail Address Drivers Lic.# DOB Drivers Lic.# DOB SEPTIC INFORMATION - Connect to New Septic Existing Septic. Connect to Sewer System Name of Sewer System PARCEL INFORMATION - 12 Digit Parcel No. la Q I I o — i — ( (y) din Fire District Legal Description Site Address (Please include street name, street number and city) Cc c- Directions to site Is property within 200'of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs > 15% TYPE OF JOB - New Add Alt Repair Other Use of Building Location of Fixtures/Units - 1 st Floor 2nd Floor Basement Garage Closet PLUMBING FIXTURES (Show Number of each) MECHANICAL UN�TS Type of Fixture No. of Fixtures Fees Fuel Type:Electric y LPQ_ Natural Gas— Heat Pump_ Toilets Type of Unit No. of Units Fees Bathroom Sink Furnace tr Bath Tubs Heatpumps Showers Spot Vent Fan T— Water Heater / Propane Tank Clothes Washer t Gas Outlets Kithen Sinks Wood/Gas/Pellet Stove Dishwasher — Kitchen Exhaust Hood Hosebibs =-_ Dryer Vent Other Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL O MVER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. X Date: Owner/Owners Representative/Contractprl, (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Planning Pd Ck# Date Bld Pd Receipt No. DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Occ Group—Type Constr. Planning Department Environmental Health Department FEES Plumbing & Base Fee Site Ins ection Mechanical & Base fee UFC Plan Review Fee Wood/Gas/Pellet Stove Fee Other Violation Fee TOTAL FEES V j � , f PLANINING: MASON C APPROOUNTY DVErCD P[ ALL SETBACKS ARE MEASURED SITE PLAN REQUIRED TO P.,, FROM THE FURTHEST I CHANG BJ ECT TO A P,- Lu PROJECTION OF THE BUILDING .. BY-79!Date— oo ova 200 4A SEWER GRINDER PUMP Lu -------------------------------------------------- ....SEWER iJNE--- —------------- —-------------------- --------- —----------- IW ui r--ELECT LINE 00 FBUL4<+iEAD 1 0 4m 74' IMSTING 90.OCK Cl Lu EXISTING SFD `PR0P0SED28'X3KZ 313D 2 BA ADMARAGE -35' m 15 761 / l___ ___� Q -water cu Lu z DRIVEWAY 0 ui EXIST AEU - _ V = Z Q NN LINEoc Ln im NY zwo / {� N 0 t-,% 'gr Q 11 ELF-0 _v no 0 PARCELL#122163100050 ELJ R E C E I V rE C I- APR 21 2009 426 WS CEDAR SCALE - 1"=20' P4 co