HomeMy WebLinkAboutBLD2009-00504 Reroof - BLD Permit / Conditions - 6/18/2009 Insction Line
360)427262
* MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427(9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
lrf,, Shelton, WA 98584
RESIDENTIAL BUILDING PERMIT
BLD2009-00504
OWNER: CIRUS DARLING
CONTRACTOR: SOUTHGATE ROOFING LICENSE: EXP: RECEIVED: 6/18/2009
SITE ADDRESS: 201 E LAKESHORE DR ALLYN ISSUED: 6/18/2009
PARCEL NUMBER: 12220500 EXPIRES: 12/18/2009
LEGAL DESCRIPTION: v GE 1 TR 50
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
Re-Roof Lakeland Villiage
General Information Construction &Occupancy Information Square Footage Information
No. of Bedrooms: Type of Constr.:
Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Group: Lot Size: Deck:
Type of Work: RR Fire Dist.: 5 No. of Stories: Occ. Load: Building:
Valuation: Building Height: Occ. Status: Basement:
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body:
Rear: Ft. Slope: Ft. SEPA?:
Model: Width: Ft. Side 1: Ft. Shoreline Desig.:
Year: Serial No.: Side 2: Ft. Comp. Plan Desig.:
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Building State Fee KKK 6/18/2009 $4.50 S22009000
Re-Roof Fee KKK 6/18/2009 $117.50 S22009000
Total $122.00
BLD2009-00504 Please referto the following pages for conditions of this permit. 1 of 3
CASE NOTES FOR
BLD2009-00504
CONDITIONS FOR
BLD2009-00504
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647-098 T e person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
2) Owner/A t i esponsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
X
3) SING RAFTER JOIST ROOF REPLACEMENT SHALL BE INSULATED TO A MINIMUM r R-30 ALLOWING FOR A MINIMUM OF ONE INCH
CON INUOUS VENTED AIRSPACE ABOVE THE LEVEL OF INSULATION. X
_ 105Z600F
4) Existing roof shall a insulated to a minimum of R-30 if: The roof is uninsulated or in Zation is removed to the level of the sheating, OR All insulation in
the roof/ceilin as previously installed exterior to the sheating or nonexistant.
X
5) Per 20 3 IRC -SECTION 1609-WIND LOADS - 1609.1 Applications. Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads prescribed herein. Decreases in wind load shall not be made for the effect of shielding by other structures. Per FIGURE 1609
BASIC WIN SP D (3-SECOND GUST) the wind speed for Mason County is 85 MPH.
X
6) Per IR SECTION R905 - REQUIREMENTS FOR ROOF COVERINGS - R905.1 Roof covering application. Roof coverings shall be applied in
accordance ith a applicable provisions of this section and the manufacturer's installation instructions.
X
7) All con Zctlon must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revoc
X
8) All buildin permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason Coun ances and building regulations.
X
BLD2009-00504 Please referto the following pages for conditions of this permit. 2 of 3
9) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
> action for a period n t exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have pre nt ion from being taken. No more than one extension may be granted.
X
This permit beco null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. E ence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The caner or the agent on the ow behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described property and structur v nd inspe
OWNER OR AGENT: _ l DATE: �_
BLD2009-00504 Please referto the following pages for conditions of this permit. 3 of 3
4/28/2010
Case Activity Listing 10:01:38AM
Case #: BLD2009-00504
' 1
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
BLDA010 Application Received 6/18/2009 6/18/2009 None DONE KKK 6/18/2009 KKK
BLDA100 Approved for Issuance 6/18/2009 None DONE KKK 6/18/2009 KKK
BLDA500 Issue Building Permit 6/18/2009 None DONE KKK 6/18/2009 KKK
BLDA540 Print Inspection Card 6/18/2009 None DONE KKK 6/18/2009 KKK
BLDA510 Reprint Building Permit 7/23/2009 None DONE PIB 7/23/2009 PIB
BL 55 Final Inspection-Passe 7/23/2009 7/24/2009 None PASS TFR /29/2009 PIB
Page 1 of 1 CaseActmty_rpt
1
50 CoU MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
i Mason County Bldg. III, 426 West Cedar Street
PO Box 186, Shelton, WA 98584
www.co.mason.wa.us (360)427-9670 Belfair(360)275-4467 Elma(360)482-5269
iR,4
NON-STRUCTURAL RE-ROOF APPLICATION
Roof Slope: /
Old Roof Material:
New Roofing Material: � p
Sheathing: T DO
t Underlayment: l/
l
Existing Insulation:
New Insulation:
Roof Slope: IRC section R904.1
Roof slope must be indicated to ensure selected roof covering is allowed on designed pitch.
Roof Covering: IRC section R905
Selected roof covering must be installed in accordance with manufacturer's specifications and IRC
requirements.
Insulation: WSEC 101.3.2.5 exception 2a & 2b
Existing roofs shall be insulated to the requirements of this Code if.
a. The roof is uninsulated or insulation is removed to the level of the sheathing or,
b. All insulation in the roof/ceiling was previously installed exterior to the sheathing or non- existent.
Attic Ventilation: IRC section 806
Enclosed attic and rafter area shall be supplied with cross-ventilation.The net area shall not be less than
1/150 of the area of the space to be ventilated. If 50% and not more than 80% of the ventilating area is
provided from the upper portion of the space to be ventilated, then 1/300 is allowed.
Applicant/Owner: Contractor: G
Parcel No: /-I-c2-1 QQ�`j ,D Permit No.:
Signature: Date: r
ARC 10/19/04 re-roofappliation.do
o CONCRETE MECHANICAL MANUFACTURED HOME
o Date A
C) footings t Setbacks Gas Piping Ribbons r
o Interior Date By Interior-Date By Date By Z
CrI Q
CD Exterior Date By Exterior-Date B
INSULATION n
Point Load t Isolated Footings Date By
BG!SLAB INSULATION C
Date By_ Data By FIRE DEPARTMENT C/)
Foundation walla Floors Date By
Date By Date By DECKS
F RAM I NG Walls Date By
Date By Data BY PROPANE TANKS
PLUMBING vault Date By
Dater OTHER
Groundwork Attic
Date B3 Type:
Date By y Date L;
D.W.V DRYWALL Type:
Int Brace Wall Date gy W
Date By Date By FIINAL INSPECTItUN v
Water Line Flts Sepe rattan IN)
Date By Date Qy Date 7. Z� BY p
m �
Pass or Request Inspect. c
Type of Insp. Fail Date Date Done By Comments car,
s o
CD
CD
8
a
0
m
0
C
rn'
m
O