Loading...
HomeMy WebLinkAboutBLD2006-00468 Garage, Living - BLD Permit / Conditions - 8/30/2006 Inspection Line(36 0)4 27-726 2 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext. 352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2006-00468 OWNER: HANS ARIENS CONTRACTOR: LICENSE: EXP: RECEIVED: 3/27/2006 SITE ADDRESS: 20 E SHERWOOD CREEK RD ALLYN ISSUED: 8/30/2006 PARCEL NUMBER: 122203490153 EXPIRES: 2/28/2007 LEGAL DESCRIPTION: TR 3 OF SP #2456 SEE SP#517 PROJECT DESCRIPTION: DIRECTIONS TO S GARAGE WITH LIVING QUARTERS 2nd dr' wa do erwood Creek Rd on R about 150 ft from intersection Hw General Information Construction & OccupaW Nfor tin , Square Footage Information No. of Bedrooms: Typ o st Type of Use: SF Insp. Area: No.of Bathrooms: 1 cc. r - U Lot Size: Deck: Type of Work: ACC Fire Dist.: 5 No. of Stories: 2 Oc . Lo Building:1,660 Carport-Attached 288 Valuation: Building Hei ht: 22 St s: im Basement: Manufactured Home InformationLF et ck form ion Shoreline&Planning Information Make: Length: Ft. 1 Shoreline: Ft. Water Body: NONE N 2 t. Slope: Ft. SEPA?: Unkn Model: Width: Ft. Shoreline Desig.: NartlApplicable 7 Ft. Year: Serial No.: E 1 Ft. Comp. Plan Desig.: Urban Growth AreaPlumbing Fixtures chanical Fixtures FEES Type Qty. City. Type By Date Amount Receipt Kitchen Sink 1ood 1 Plan Check Fee KS 3/27/2006 $509.44 S12006000 Lavatories 1 Ventilation Fan 1 Planning Review Fee KS 3/27/2006 $155.00 S12006000 Showers 1 Woodstove 1 Address Fee GMM 4/5/2006 $140.00 S22006000 Water Closets (Toilets) 1 EH Plan Review TW 4/6/2006 $75.00 S22b06bo0 Water Heaters 1 Building State Fee RTB 5/1/2006 $4.50 S22006000 Building Permit Fee RTB 5/1/2006 $783.75 S22006000 Mechanical Fee RTB 5/1/2006 $70.20 S22006000 Mechanical Base Fee RTB 5/1/2006 $23.50 S22006000 Plumbing Fee RTB 5/1/2006 $35.00 S22006000 Plumbing Base Fee RTB 5/1/2006 $20.00 S22006000 Public Works Review JES 6/12/2006 $36.55 S22006000 Total $1,852.94 BLD2006-00468 Please referto the following pages for conditions of this permit. 1 of 4 CASE NOTES FOR BLD2006-00468 CONDITIONS FOR B LD2006-00468 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X (• 2) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X aL 3) A Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at (360)427-9670, ext. 450. The building permit will not be"finaled" until the permit holder can show proof that the access permit from Public Works has been "finaled"and approved. X , 4) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. X lC f - 5) In accordance with international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads,"all new structures that require an address shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting inspections. X � l 6) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. X �. BLD2006-00468 Please referto the following pages for conditions of this permit. 2 of 4 7) All slabs within the heated space shall be insulated to a minimum R-10 for at least 24". Monolithic slabs shall be insulated around the perimeter from the top of the slab to the bottom of the footing X 8) Washington State Energy Code Compliance has been approved using the following: Heat Type: Electric or other fuels, Compliance Method: IV, Window(Max U-Factor):0.40, Skylight(Max U-Factor):0.58, Doors (Type/Max U-Factor):0.40 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-30, Slab Insulation R-10. X 9) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). X 10) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. X 4( 11) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X 12) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. X_ 13) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall)be made prior to requesting additional inspections. X L l (r, 14) All property lines shall be clearly identified at the time of foundation inspection. X 15) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X ;✓ BLD2006-00468 Please refer to the following pages for conditions of this permit. 3 of 4 16) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. X__, t 17) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. X 18) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure these structures meet the setback conditions listed. X /l 19) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed. X ( ,(.' - 20) Prior to final approval, all upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X 21) Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. Silt fencing must be installed and maintained until upland vegetation has become established. X f f This permit becomes null and void if work orconstruction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owneror the agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for r view an(/:Pmpection. 1 - OWNER OR AGENT: 6 ��� - DATE: i BLD2006-00468 Please refer to the following pages for conditions of this permit. 4 of 4 lot$ Mason County Dept. of Community Development Mason County Bldg. 3 426 W. Cedar P.O. Box 186 (360)427-9670 Local (360)482-5269 Elma Shelton, WA 98584 (360) 275-4467 Belfair Notice to Obtain Final Inspection March 04, 2010 HANS ARIENS PO BOX 287 ALLYN WA 98524-0287 Case No.: BLD2006-00468 Parcel No.: 122203490153 Project Description: GARAGE WITH LIVING QUARTERS The Mason County Department of Community Development is currently reviewing all permits that are expired and have not been approved for occupancy and use. Pursuant to Mason County Code, Title 14 Building and Construction, a permit and final inspection for this type of activity is required under the 2006 International Building Code or the code your permit was issued and your property is currently in violation status of occupancy and use. Please contact our office to make the necessary arrangements 21 days from the date of this letter. Failure to contact our office to make the necessary scheduled inspections may result in enforcement actions. To bring your site into compliance, you must schedule an inspection. One (1) $73.00 site investigation fee will need to be paid prior to inspection along with any outstanding fees currently due on your building permit. For every inspection required after that, you may be charged $73.00 again, per inspection until final inspection and conditions are met. To schedule an inspection, please call (360) 427-9670 ext. 262. If you should have any questions regarding this notification, please contact me at (360) 427-9670 ext 726. Sincerely, u� Larry y Mason County Department of Community Development Cc: Property File March 04, 2010 BLD2006-00468 W o CONCRETE MECHANICAL MANUFACTURED HOME y Date' 07 0 Footings t Setbacks Gas Pipin BY/�l.�� Ribbons ra.VA Z 0 Interior Date By Interior-Date By Date By w Exterior Date By Exterior-Date BS*t.up _ D Point Load I Isolated Footings INSULATION Date By z BG I SLAB INSULATION cn Date By Datat7!_-Z'0_ gy FIRE DEPARTMENT Foundation Wails Floors Date By Date By Data - - BY DECKS _ FRAMING Walls Date By Date BYIyJ Data By _ PROPANE TANKS PLUMBING Vauk Date By Data By OTHER Groundwork Attic Datey j,. Type:Bye Date ,._ . By Date By D,w.V DRYWALL Type: Int Brace Wail pate By W Date - J- (J'T BY Date B y FINAL INSPECTION Water Line Fire Separation CD Date p/ By 01 1 Date By Date By CD Pass or Request inspect. c Type of insp. Fail Date Date Done By Comments l CD Co a07 2nok7 r Zn M, f/ -07 0 Building Kermit # 116 r MASON COUNTY BUILDING 111 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location of) fdC44 ••'Z'st/ ,ZZ This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been found: Items Listed below must be corrected to gain code compliance m You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK ❑ Call for re-inspection when corrections are made before continuing ❑ Make corrections, items will be checked on next inspection -0�OK to &- ❑ This is not a complete inspection Department 1-4wol Date C " Inspector fCC moos MOOV THIV--- Building Permit # f."0 MASON COUNTY BUILDING 111 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location 20 eo( C✓- ;0.zw This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been found: Items Listed below must be corrected to gain code compliance S '�Ib! 4,05 .`1 ca2zd A-A&z, ,4 � C!/NL J70 Gl►Tl7aG'�.t 5 r ZK' 7 You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK p Call for re-inspection when corrections are made before continuing -A make corrections, items will be checked on next inspection jd OK to . 67 l�y-v�G �Gvc l 14n>� p This is not a omplete irls6ection Department Date i2 " Inspector ■ �� � NuT ;M* *V TH I - T, " ,� ' m crop /;Vo ��oY Gym r� 1/ 170Z) BUILDING DEPARITM.E NT INSPECTION REQUEST /1a tr`7 g-7 REQUEST TAKEN BY TIME DATE OF INSPECTION �) TODAY'S DATE DATE INSPECTION IS REQUES'Iln�T NAME ON PERMIT SITE ADDRESS �`Ce�D� C1 Cl��(QAr PERMIT# Co ! 6 O TYPE OF PERMIT �rqL TELEPHONE #, NAME �y/ S INSPECT.AREA TYPE OF INSPECTION: 2 7 S S FOOTING JNT.SHEAR WALL NAILING HOLES FOUNDATION V FINAL PROGRESS SLAB INSULATION MOBILE HOME FOOTING OTHER SLAB ROUGH-IN PLUM MOBILE HOME SET-UP FRM/PLUMB/MECH/PEN MOBILE HOME FINAL INSULATION WOODSTOVEIPROPANE l 7/ ✓ CONFIRMED DATE !`` CONTACT TIME �� '� —