Loading...
HomeMy WebLinkAboutCOM2010-00004 Change in Tenant - COM Permit / Conditions - 2/4/2010 w MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262 K` Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext.352 Shelton,WA 98584 i COMMERCIAL BUILDING PERMIT COM2010-00004 OWNER: SOUTH SHORE ENTERPRISES LLC RECEIVED: 1/21/2010 CONTRACTOR: LICENSE: EXP: ISSUED: 2/4/2010 SITE ADDRESS: 320 E DALBY RD SUITE A UNION EXPIRES: 8/4/2010 PARCEL NUMBER: 322325094015 LEGAL DESCRIPTION: UNION HOOD CANAL LAND & IMP CO BLKS: 94-96 LOTS: 1-3,28-30 & PTNS OF VAC BOGUE &OAKS ST SEE SURVEY 31 PROJECT DESCRIPTION: DIRECTIONS TO SITE: CHANGE IN TENANT VACANT SUITE TO BE CHANGED TO BROCKDALE RD, MCREAVY RD, R ON DALBY RD TO SITE ADDRESS ON OUR COMMUNITY CREDIT UNION THE LEFT SIDE General Information A I CIpinstruction&Occupancy Information Type of Use: COMMERCIAL Insp.Area: No.of Units. Type of Constr.: o B room Occ. Group: Type of Work: TRA Fire Dist.: 6 N .o tori s: Occ. Load: Valuation: B i in ei Pre-Manufactur it Information Square Footage Information Make: Le the Lot Size: Model: Width: Building: Year: Serial No.: Basement: Parking Spaces: Setbac Information Shoreline&Planning Information Front: Ft. ' e: Ft. Rear: Ft. \..Shoreo pe: Ft. Water Body: Shoreline Desig.: Side 1: Ft. SEPA?: Comp. Plan Desig.: Side 2: Ft. Fire Protection System Information Auto Fire Alarm System?: Emergency Key Box?: Standpipe?: Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?: Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?: COM2010-00004 Please refer to the following pages for conditions of this permit. 1 of 4 • Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Tenant Review Fee rIMRA 1r)imin -t1d1 nn glgnlnnn IFC Plan Check Fee I AMA 1/gQrmin R7n Sn C1,2n1nnn Total $211.50 CASE NOTES FOR COM2010-00004 CONDITIONS FOR COM2010-00004 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered p ry g eg stered Further Information can be obtained at 1-800-647-09,$2'`The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X � ' � 2) All approved plan are required to be on-site for inspection purposes. If inspection is called for and plans are-not on site, Approval WILL NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be c ed and collected by the Mason County Building Department prior to any further inspections being performed or approvals granted. X 3) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OFOR OCCUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x 4) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason CouBuilding Inspector shall be made prior to requesting additional inspections. X 5) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant ith Mason County ordinances and building regulations. X ._ 6) All p6mits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the per holder have prevented action from being taken. No more than one extension may be granted. X COM2010-00004 2 of 4 This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property aW structure for review and inspection. OWNER OR AGENT: �^ DATE: COM2010-00004 3 of 4 1 K CONCRETE MECHANICAL MANUFACTURED HOME C 0 o Gas Piping Footings/Setbacks Date By Ribbons = o interior Date By Interior-Date By Date Fly Cl) 2 C) Exterior Date By Exterior-Date By set.up Point Load/isolated Footings INSULATION Gate By m BG I SLAB INSULATION Date By Data By FIRE DEPARTMENT Z Foundation Wails Floors Date By m Date By Data By DECKS ;0 FRAMING Walls Date By Date By Data By PROPANE TANKS W PLUMBING vault Date By N Date By OTHER r Groundwork Attic r Date By Date By Type 0 Dale By D.W.V DRYWALL Type- n Int.Brace Wall Date By 0 Date By Date By FINAL INSPECTION N Water Line Fire Seperation Date By Date By Date By O Pass or Request Inspect. c Type of Insp. Fail Date Date Done By Comments 0