HomeMy WebLinkAboutFIR2008-00077 - FIR Permit / Conditions - 11/6/2008F
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262
Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext.352
Shelton,WA 98584Irflo '
FIRE PROTECTION PERMIT FIR2008-00077
APPLICANT: SOUTH SHORE ENTERPRISES RECEIVED: 10/13/2008
CONTRACTOR: SOUND GUARD SECURITY 357-6014 LICENSE: SOUNDGS984BW EXP ISSUED: 11/6/2008
SITE ADDRESS: 320 E DALBY RD UNION EXPIRES: 5/6/2009
PARCEL NUMBER: 322325094015
LEGAL DESCRIPTION: UNION HOOD CANAL LAND & IMP CO BILKS: 94-96 LOTS: 1-3,28-30 & PTNS OF VAC BOGUE& OAKS ST SEE SURVEY 30/5
PROJECT DESCRIPTION: AFA
GENERAL INFORMATION System Information
Type of Use: COMM
- Fire District: 1 Sprinkler Heads: Audible Switches: Pull Stations:
Hood&Duct t: N Flow Switches: Visual Devices: Door Releases:
Dry Chemical?: N Pressure Switches:: Smoke Detectors: Duct Detectors:
Wet Chemical?: N Zones: Heat Detectors:
Sprinkler?: N
Standpipe?: N SQUARE FOOTAGE FEES
Monitoring Company: ACI First Floor: Type Amount Due Amount Paid
Monitoring Phone No.:(360)456-1441 Second Floor:
Auto Fire Alarm?:Y Third Floor;: Auto. Fire Alarm Plan $117.81 $117.81
Auto. Fire Alarm Permit $181.25 $181.25
Total: $299.06 $299.06
FIR2008-00077 Please refer to the following pages for conditions of this permit. 1 of 4
� 1
CASE NOTES
FIR2008-00077
CONDITIONS FOR
FIR2008-00077
1.) Per section 901.2.1 of the 2006 International Fire code, Statement of Compliance.
Before requesting final approval of the installation, the installing contractor shall furnish a written statement to the fire code official that the subject fire
protection system has been installed in accordance with the approved plans and has been tested in accordance with the manufactures specifications and
the appropriate installation standard. Any deviations from the design standards shall be noted and copies of the approvals for such deviations shall be
attached to the written statement.
X
2.) The fire alarm system is required to be fully monitored by a UL certified monitoring company.
X
All equipement, components, appurtenances and devices are required to be compatible.
X
This permit becomes null and void if work or constructio uthorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation f wor a pr ess inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is
by means of a progress inspectio . own r rth gent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above
described property and structur f r vi d i ection.
OWNER OR AGENT: DATE:
FIR2008-00077 Please refer to the following pages for conditions of this permit. 2 of 4
TI (n
55 CONCRETE MECHANICAL MANUFACTURED HOME 0
p Date
Footings J Setbacks Gas Piping BY Ribbons =
Cinterior Date By interior-Date By Dante By � (n
O Exterior Date BY Exterior-Dote B _
O Set-up O
v Point Load!Isolated Footings INSULATION Date By
Date By
BG r SLAB INSULATION FIRE DEPARTMENT m
Data By
Foundation Waft Floors Date By --I
—Date B De rn
y s By DECKS X
FRAMING wars Date By
Date By Data By PROPANE TANKS N
PLUMBING vault Date BY m
Date By- OTHER Cn
Groundwork Attic
Date By Date By Type:
Data By
D_w.v DRYWALL Type:
int Brace Wall Date B
Date By Data 8 y
Water Lin* Fire Sepratidn Y FINAL INSPECTION
e c
O
Date By Date By Data By co
O
o Pass or Request Inspect. o
Type of Insp. Fail Date Date Done By Comments ti
c �K-frl 2--26- )
(n
a
w
to
61 08M G�aJ
0
0
a
o'
o
N
3
w
0
.c.