Loading...
HomeMy WebLinkAboutCOM2010-00003 Remodel - COM Permit / Conditions - 2/4/2010 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext.352 ili Shelton,WA 98584 to • COMMERCIAL BUILDING PERMIT COM2010-00003 OWNER: SOUTH SHORE ENTERPRISES LLC RECEIVED: 1/21/2010 CONTRACTOR: DOGWOOD CONSTRUCTION 360-898-6102 LICENSE: DOGWOC1990R4 EXP: 12/242011 ISSUED: 2/4/2010 SITE ADDRESS: 320 E DALBY RD SUITE A UNION EXPIRES: 8/4/2010 PARCEL NUMBER: 322325094015 LEGAL DESCRIPTION: UNION HOOD CANAL LAND & IMP CO BLKS: 94-96 LOTS: 1-3,28-30 & PTNS OF VAC BOGUE & OAKS ST SEE SURVEY 31 PROJECT DESCRIPTION: DIRECTIONS TO SITE: SMALL INTERIOR REMODEL FOR THE NEW TENANTS BROCKDALE RD, MCREAVY RD, R ON DALBY RD TO SITE ADDRESS ON (OUR COMMUNITY CREDIT UNION THE LEFT SIDE, LOCATED IN SUITE A General Information I I Construction&Occupancy Information Type of Use: COMMERCIAL Insp.Area: o f Un 1 Type of Constr.: VB ro m 1 Occ. Group: B Type of Work: ALT Fire Dist.: 6 t 1 Occ. Load: Valuation: $ 8,655.66 Height: Pre-Manufactur d Unit I ormation Square Footage Information Make: Length: Lot Size: Model: Width: Building: Year: Serial No.: Basement: Parking Spaces: Setback In atio Shoreline& Planning Information Front: Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.: Not Applicable Side 1: W 20.00 Ft. SEPA?:No Comp. Plan Desig.: Rural Activity Ctr. Side 2: Ft. Fire Protection System Information Auto Fire Alarm System?: Y Emergency Key Box?: Y Standpipe?: N Auto Fire Sprinkler System?: N Access Road?: Fixed Fire Suppression System?: Y Fire Extinguishers?: Y PP Y Fire Hydrants?: N Fire Lanes?: Y COM2010-00003 Please refer to the following pages for conditions of this permit. 1 of 4 Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Ventilation Fan 2 Plan Check Fee rIhAm 1/91/,?nin �1nR 71 c19n1nnn Planning Review Fee MAMA 1/91/9n1n a,iin nn c19n1nnn EH Plan Review KKK 1/91/9n1n A1n3 nn gr9ninnn Water Adequacy Plan KKK 1/91/9n1 n 41n i nn gw?n1 nnn IFC Plan Check Fee I MAI 1/9Q/9n1n -t5d AR C19n lnnn Building Permit Fee I Aw 1/9Q/9n1n MA7 95 c19nlnon Building State Fee I AIN 1/9Q/7n1n td Sn c19ninnn Mechanical Permit Fee I Aw 1/9Q/9n1n eiR nn c19ninno Mechanical Base Fee I AW 1/9Q/9n1n £9R 5n c19nlnnn Total $917.32 CASE NOTES FOR COM2010-00003 CONDITIONS FOR COM2010-00003 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential ri*s and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-9 he person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 2) All approved plan are required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be rged and collected by the Mason County Building Department prior to any further inspections being performed or approvals granted. X �' 3) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE OR OCCUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x 4) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason ty Building Inspector shall be made prior to requesting additional inspections. X= 5) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-com pliant,with Mason County ordinances and building regulations. X COM2010-00003 2 of 4 6) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the,perr�tit holder have prevented action from being taken. No more than one extension may be granted. X /�,C? 7) --Install a Knox box per section 506 of the 2006 International Fire code. Please contact the local fire distict for more information and inspection. X tall 2A10BC fire extinguishers throughout the building with a maximum travel distance of 75 feet in any direction and mounted no more than 60 )fthes to the top of the unit above the floor. The existing fire alarm system may be adversely effected by the changes in the interior wall layout, a pre-inspection will need to be called for. If the system is required to be modified to accommodate the changes, a fire alarm permit will need to be applied for and approved prior to the work being done The existing system is required to be fully monitored by a UL certifed monitoring company. )XZ 8) Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. X T� 9) Parking shall be sufficient for 14 standard parking stalls (9 feet by 20 feet) and 2 handicap parking stalls (12.5 feet by 20 feet)with sufficient maneuvering aisles. Handicap stalls shall be of a smooth surface at level or ramped to entry, located closest to the bui ng entry, and shall be signed with the International Symbol of Access. Screening from adjacent residential properties is required. X 10) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. - For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned wor which may affect your project. X Z�� This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and ture for review and inspection. OWNER OR AGENT: %' ::v DATE a -1��- - COM2010-00003 3 of 4 Permit#-- /6 0XV3 MASON COUNTY BUILDING 111 ,426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location 5I0 i�- �k I he 94 This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been found: Items listed below must be corrected to gain compliance dOv7e�, —"r, lMarS G ( �� G/,►1 You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK ❑ Call for re-inspection when corrections are made before continuing ❑ please contact our office ❑ Make corrections, items will be checked on next inspection regarding possible structural ❑ OK to damage incurred by recent "natural/man made" ❑This is not a complete inspection disasters.This is NOT Date Department 6L'Jn CORRECTION NOTICE. Inspector • o* ,s JOT I 140',4 THIm4h, T"wm * qu I ti' e l J 'A CONCRETE MECHANICAL Z► MANUFACTURED HOME O o C o Gas Pippinging Footings !Setbacks Date v By a Ribbons = 0o Interior Date By interior-Date By Date By (A ___ _ o Exteror Date By Exterior-Date By Setup Point Load!Isolated Footings INSULATION _ pate By m BG 1 SLAB INSULATION Date By Data By FIRE DEPARTMENT Z Foundation Walls Floors Date By M Date By Data By DECKS FRAMING Walls Date By Date 1) By V)c, Data By PROPANE TANKS Cn PLUMBING vault Date By N Date By OTHER r Groundwork Arc r Type: n Dale t3y Date By Date By WKV DRYWALL Type_ O Int Brace Wall pave By Date By ic Date By FINAL INSPECTION N Water Line Fire Soperation O Late By, Data By Date By O O Pass or Request Inspect. c Type of Insp. Fail Date Date Done By Comments W �rN� k P�s3 z Nlt� z s,LN I i O A