Loading...
HomeMy WebLinkAboutPAR2002-00023 - PAR Application - 2/22/2002 ODA . Case Number:PAR o�ODQ-Cjooa3 8 2 2 2002 MASON COUNTY �(`� �VSUBMISSION CONFERENCE REQUEST FORM SS�S.%`The purpose of the pre-submission application is to identify and/or eliminate as many potential problems as possible in order for the project to be processes without delay. Representatives from the Building Department, Fire Marshal's office,Environmental Health,Planning and Public Works Departments may attend the meeting to discuss rules and regulations applicable to the proposed project. Topics covered during the meeting will include the comprehensive plan,shoreline program,zoning,availability of sewer and potable water,development concepts,building construction,fire protection,and life safety of the proposed project. Your pre-submission conference will be informative when you provide accurate and detailed information on the Pre-Submission Conference Application Form and the site plan. Pre-submission conferences are held every Wednesday and last approximately one-hour.To schedule a conference complete the application on both sides and return seven(7)copies of the site plan to the Mason County Department of Community Development,attn:Pre-Submission Conference Coordinator.P.O.Box 186, Shelton,WA 98584. Fax request forms to(360)427- 7798. If you have questions call(360)427-9670 ext. 281. L:�:: � W , Date: eoV1 t)�, Site Plan Applicant: Submit 7 copies S / Name: Address: P X q 9 u (Il"Dik UJIW Include the following Daytime Telephone: � 1p r) - 'rig'- '�'4k information on the site plan: ✓ Property lines,easements, and right-of- Representative: ways. Name: ' + 0, r 4 Lk `C' J ✓ The location of all existing and proposed Mailing Address: . C2 - i2� `� Cl n o A . structures. Include square footage of Daytime Telephone: 3(pG - �� R1 existing and proposed structures. Parcel Number: (12 digits) ✓ Setback distance, in feet, from all property 9 y p o gg lines and buildings. 3aa 3 - So - y 0c) ✓ Existing and proposed road access to and from the site. Description of Project: Include square footage of structure, use of buildings (I.e. office, `� Pang sites warehouse, restaurant, storage, etc.), occupancy classification per ,� Location of on-site sewage tanks and U.B.C. table 3-A, and construction type. Provide one set of drainfields. plans, if available. Use a separate sheet if necessary. ✓ Location of drinking water supply. Include location on the proposed site and surrounding parcels. J 5 ( ' -�i� / G> (r^ r, ' f ✓ Steep bluffs,wetlands, streams, and bodies (r ,� of water. ✓ Location of fire hydrants and emergency vehicle access roads, including grade. ✓ Surface and storm water run-off routes. Continued on reverse side Has this project been discussed during a previous Pre-Submission Conference? If yes, please indicates date AG Will the building have employees? If yes,how many? Q-7 What is the water availability of the proposed project? If there is an existing well,what is the name of the system? Pl c i> — I What is planned for an on-site sewage system? If you are proposing a new on-site system provide detail on the required site plan. _S&i!> e)M Sl ADD ITIONAL COMMENTS: APPLICABLE BUILDING CODES: 1997 Uniform Building Code-WAC 51-40 1997 Uniform Mechanical Code-WAC 51-42 1997 Uniform Plumbing Code-WAC 51-46/51-47 1994 Non-Residential Energy CodeNentilation and Indoor Air Quality Code Mason County Ordinance Date and Time Conference Scheduled: JS/1 (� 3 v I i = Oo A Location: �����c, 5 rs � �� r X 5D