Loading...
HomeMy WebLinkAboutBLD2009-00064 SFR - BLD Permit / Conditions - 3/4/2009 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, WA 98584 t4 RESIDENTIAL BUILDING PERMIT BLD2009-00064 OWNER: NADIA NAWAR RECEIVED: 2/2/2009 CONTRACTOR: RE/ADD CONSTRUCTION 253-961-9048 LICENSE: READDC"161PC EXP: 10/2/2009 ISSUED: 3/4/2009 SITE ADDRESS: BERG RD ALLYN EXPIRES: 9/4/2009 PARCEL NUMBER: 2185000055 LEGAL DESCRIPTION: LA LAGE#12 PHASE II LOT: 55 PROJECT DESCRIPTION: DIRECTIONS TO SITE: RESIDENCE WITH GARAGE AND COVERED PORCH GO TO ALLYN TAKE LAKELAND DIRVE UP HILL STAY ON OLD RANCH TAKE LEFT ON SODERBERG GO 5 BLOCKS OR SO ON LEFT General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: 2 Type of Constr.: V-B Type of Use: SF Insp.Area: No. of Bathrooms: 3 Occ. Group: R-3 Lot Size: Deck.- Type of Work: NEW Fire Dist.: 5 No. of Stories: 1 Occ. Load: Building:2,438 Garage-Attached 544 Valuation: Building Height: Occ. Status: Primary Basement: cov. deck 568 Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: E 20.0 Ft. Shoreline: Ft. Water Body: SEPA?: No Side 1: N 5.0.0 Ft. Model: Width: Ft. Rear: W 2 Ft. Slope: Ft. Shoreline Desig.: Not Applicable Year: Serial No.: Side 2: S 5.0 Ft. Comp. Plan Desig.: Urban Growth Area Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Dishwasher 1 Exhaust Hood 1 Plan Check Fee KKK 2/2/2009 $1,213.78 S22009000 Hosebibs 2 Furnace<100K 1 EH Plan Review KKK 2/2/2009 $41.00 S22009000 Kitchen Sink 1 Gas Outlets 2 Water Adequacy Plan Review KKK 2/2/2009 $41.00 S22009000 Lavatories 3 Propane Tank 1 Address Fee KKK 2/2/2009 $173.50 § bbsbbb Showers 1 Ventilation Fan 4 Planning Review Fee KKK 2/2/2009 $205.00 S22009000 Water Closets (Toilets) 3 Heat Pump 1 EH Plan Review CEW 2/6/2009 $62.00 S22009000 Water Heaters 1 Propane Stove 1 Building State Fee RTB 2/9/2009 $4.50 8 bb9bbb Bath Tubs 1 Dryer Vent 1 Building Permit Fee RTB 2/9/2009 $1,940.15 S22009000 Clothes Washer 1 Mechanical Permit Fee RTB 2/9/2009 $248.14 S22009000 Mechanical Base Fee RTB 2/9/2009 $28.50 S22009000 Plumbing Permit Fee RTB 2/9/2009 $111.84 S22009000 Plumbing Base Fee RTB 2/9/2009 $24.70 S22009000 ADJUST--Plan Check Fee RTB 2/9/2009 $47.32 S22009000 Total $4,141.43 BLD2009-00064 Please referto the following pages for conditions of this permit. 1 of 5 CASE NOTES FOR BLD2009-00064 CONDITIONS FOR BLD2009-00064 1) All other necessary permits from Mason County, Washington State and/or Federal Agencies that rpquired for this proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. X 2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-T9z\The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 3) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Depar# ent prior to any further inspections being performed or approvals granted. x 4) Ownec./-.�gen is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. x << � 5) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or remof approved documents will result in failure of required building inspections. X c� 6) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X 7) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Build+ Dgpgrtment prior to any further inspections being performed or approvals granted. X IL BLD2009-00064 Please refer to the following pages for conditions of this permit. 2 of 5 8) Washington State Energy Code Compliance has been approved using the following: Heat Type: Electric or other fuels, Compliance Method: Prescriptive option IV, Window(Max U-Factor):0.35, Skylight(Max U-Factor):0.58, Doors (Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-38 (see exception), Slab Insulation R-10. Exception: R-30 insulation may be installed, up to 500 sq. ft., in single rafter or joist vaulted ceilings where the distance of the top of the ceiling and the under of the roof sheathing is less than 12-inches and there is 1-inch vented airspace above the insulation. 9) A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor i kno ledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. X 10) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather hall have a minimum compressive strength of 3000 psi (I RC Table R402.2). X L < 11) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be char ed and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. X �=�.. 12) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit r cation. X k�\A 13) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. BLD2009-00064 Please refer to the following pages for conditions of this permit. 3 of 5 14� All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordi a or regulation, must be reviewed and approved by Mason County prior to construction. X 15) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspe �r shill )fie made prior to requesting additional inspections. X 1_ 16) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All propane tanks filled on site must be located a minimum of 10' from any possible source of ignition (electrical outlets, electrical fixtures, compressors, etc), mechanical system air intake (direct vent appliance, ventilation air intake, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. Propane tanks less than 125 gallons must also be located a minimum of 5' from any building opening (foundation vents, windows, doors etc). Setback to the public way, or access easements shall be the greater of 25-ft or as specified in the Mason County Development Regulations. Setback to property lines shall be the greater of 5-ft or as specified in the Mason County Development Regulations. If a propane tank is exposed to probable vehicular damage, protective bollards t bq installed. 17) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All Propane tanks between 125 and 500 gallons must be located a minimum of 10' from any building, possible source of ignition (electrical outlets, electrical fixtures, compressors, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. Setback to the public way, or access easements shall be the greater of 25-ft or as specified in the Mason County Development Regulations. Setback to property lines shall be the greater of 10-ft or as specified in the Mason County Development Regulations. If a propane tank is exposed to probable vehicular damage, protective bollards must be Xstalle t ` c 18) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All propane tanks must meet t st Ilation requirements and minimum setbacks as listed in the Mason County Fire Marshal's Standards for the Installation of Propane Tanks. X ,� - 19) Fuel piping shall be inspected after the installation of fuel piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the time of inspection the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel piping system shall not be _lZd u til the final inspection has been performed and approved by a Mason County building inspector. 20) The placement of small propane tanks are not normally subject to a permit review by the Planning Department; however, propane tanks are subject to Planning Department regulations. Such r ulations primarily consist of setbacks from shorelines and features considered to be critical areas (streams, wetlands, slopes, etc.) If you think sucfife toe exist on or nearby your property, please contact the Planning Department so that exact setback requirements can be determined. X 1 I� 21) All property lines shall be clearly identified at the time of foundation inspection. X \t A k BLD2009-00064 Please referto the following pages for conditions of this permit. 4 of 5 t 22) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure tore,guest a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mao oA. pmy ordinances and building regulations. X 23) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit (older�v prfvgnted action from being taken. No more than one extension may be granted. e 24) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, conne�ejrs, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. X��� 25) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure these structures meet the setback conditions listed. X dz=�4 , 26) Landin s and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "App v d Stqlan"to ensure these structures are shown and meet the setback conditions listed. 27) Applicant shall use 15 to 20 foot area at rear of property as the location where roof and surface runoff can be infiltrated into the area soil as a small pond or dry, r amater feature (rather than being tightlined to edge of property). X This permit becomes null and void if work or construction authorized is not oommenoed within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a pr ress inspection.The owner or the agent on a owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described o e and structur f r\eview and' sp ecti n :(_71 OWNERORAGENT: n, DATE: `J " �'— BLD2009-00064 Please refer to the following pages for conditions of this permit. 5 of 5 ry D o o CONCRETE MECHANICAL MANUFACTURED HOME Date m Footings Setbacks Gas Piping-� By Ribbons D o Interior Date By Interior-Date Ste'/1'�`1 By 3 pate By Exterior Date By Exterior-Date By Sat-up D Point Load/isolated Footings INSULATION pate By p BG 1 SLAB INSULATION D Date ,!2 By Data By FIRE DEPARTMENT Foundation Walls Floors Date By Date. By Date By DECKS FRAMING . Wails Date By Date ,s`- gy Data By 7P PROPANE TANKS PLUMBING vault Date Ely Date By OTHER Groundwork Attic Date By Date By Type- Date By DM.V DRYWALL Type. ant.Brace Wall Date By W Date s_ BY Date By FINAL INSPECTIV p v v Water Line Fin Separation PQ CD Date By Date By Date 7.�* �� By / p m � Pass or Request Inspect. c Type of fnsp. Fail Date Date Done By Comments rn CD =3 k,4 f-C ffs5 3 41 E CD Q!J ,,may TL CD W4 LL I G 7— -- ,r=9-offCn o i T-!i-�-S T/�r G 0 t Z LA CS-E-W 12 {I R-Sr—IRV 11 y - C-ONCR.E'�. 15 o d a LP S�oEwA uL 2�' S`ASA O 85 ' N ��1c� 12 Name Parcel# BLD# Mason County Department of Community Development Small Parcel Stormwater Management Application/Worksheet (page 1 of 2) Per Mason County Code,Title 14, Chapter 14.48 a stormwater site plan is required whenever a building application is made for residential development, or redevelopment', with more than 2,000 square feet of impervious surface2. 'Redevelopment means,on an already developed site,the creation or addition of impervious surfaces,structural development including construction, installation or expansion of a building or other structure,and/or replacement of impervious surface that is not part of a routine maintenance activity,and land disturbing activities associated with structural or impervious redevelopment. =Common impervious surfaces include,but are not limited to,rooftops,walkways,patios,driveways,parking lots or storage areas, concrete or asphalt paving,gravel roads,packed earthen materials, and oiled,macadam or other surfaces which similarly impede the natural infiltration of stormwater.Open,uncovered retention/detention facilities shall not be considered as impervious surfaces. Surface Type Length X x Width _ Area *All dimensions in feet Buildings X = s X Measurements for buildings are taken at the X perimeter of the farthest projections(example: eaves/gutters) X = 53a Driveways X = X = Length of drive begins at the right of way X = Parkin Areas X = X = Any paved, gravel or packed area per definition X _ above table Patios/Walks X = X = Any paved, gravel or packed area per definition X _ above table Others X = " X = - If,the total impervious area of the proposed,sit X = { development is greater than 2000 square feet jajSmaif Parcel Stbrmwater SitePlan is Require Total lmpenrious Surface Area (sum of all areaGkk ) _ _ — If the Total Impervious Surface Area is LESS THAN 2000 Square Feet, please read,acknowledge and sign below. Based Upon the information you have provided a Slormwater Site Plan IS NOT required for this development activity. Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that 1 am the owner,owner's legal representative,or the contractor. I further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above- des property for review and inspection s may be required. X Owner/Agen Contractor circle one)Date: ' '` -�'A If the Total Impervious Surface Area is GREATER THAN 2000 Square Feet, please read, acknowledge and sign the information provided on page 2 of 2. Page 1 of 2 Name n Parcel# 12216 c50 — GOOSS BLD# Mason County Department of Community Development Small Parcel Stormwater Management Application/Worksheet (page 2 of 2) Based Upon the information you have provided a Stormwater Site Plan IS Required for this development activity. Title 14, Chapter 14.48 of the Mason County Code(MCC)regulates compliance requirements for Stormwater Management in this jurisdiction. A complete copy of the ordinance can be found on the Mason County website: http//www.co.mason.wa--us/code/Commissioners/index.htm Please follow the links to "Title 14, Chapter 14.48 Stormwater Management". Regulated activities shall be conducted only after Mason County Public Works approves a Stormwater site plan (Mason County Code Title 14 Chapter 14.48 section 14.48.70). You will receive a copy of the Public Works document entitled "Managing Storm Drainage on Small Lots,The Small Parcel Stormwater Site Plan". This document will assist you in preparing the necessary information and plans for Public Works to review and approve. Per Department of Public Works this document will constitute an approved plan if all of the relevant details* are to be installed in their entirety AND no part of the stormwater system adversely affects any septic system (see Environmental Health information below). If an alternative system is to be used a plan will need to be submitted to Public Works for approval. A design by a registered professional may be required for more complex sites. *These details are found in the document Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan on the pages that begin with "Handout" PLEASE INITIAL BELOW TO INDICATE THE STORMWATER MANAGEMENT PLAN FOR THIS SITE A) The relevant details from Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan will be installed in their entirety AND the system will be located as not to adversely affect any septic systems on this,or any other,parcel. B) An alternative plan and/or professional design will be submitted to the Department of Public Works for approval AND the system will be located as not to adversely affect any septic systems on this,or any other,parcel. If you have further questions pertaining to parcel drainage and stormwater management Mason County's Public Works Department can provide additional instructions, guidance and examples. (Section 14.48.130)contact Public works at: Phone: (360)-427-9670 EXT. 450 Mail: P 0 Box 1850, Shelton WA 98584 Physical: 415 N 6th St, Shelton WA 98584 If this development has,or will have,a sep tic/d rain field system you may need to contact Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this,or any other, parcel. You may also wish to consult with the septic design professional involved with the project. Mason County Division of Environmental Health can be reached at: Phone: (360)-427-9670 EXT. 352 Mail: P 0 Box 1666, Shelton WA 98584 Physical: 426 W Cedar St, Shelton WA 98584 A condition will be added to the building permit that states, in part,that all conditions the stormwater site plan will be met prior to a request for final inspection of the building permit. OwnerBuilder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner,owner's legal representative,or the contractor. I further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above- de bed property for review and inspe ion as may be required. � q X Owner/Agen ontractor ircle one)Date: I —0 ` Page 2 of 2 MASON COUNTY PERMIT NO. BUILDING PERMIT APPLICATION -�t 426 W. Cedar• P.O. Box 186, Shelton, WA 98584 N �' U�1 Shelton (360) 427-9670 • Belfair (360) 275-4467 • Elma (360) 482-5269 _ 1P On the web www.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR INFORMATION Owner Company Name Mailing Address Mailing Address City State Zip Code City State Zip Code Phone Other Ph. Phone Other Ph. Lien/Title Holder Contractor Reg. #�_ Exp. E mail address E Mail Address Drivers Lic. # DOB Drivers Lic.# DOB SEPTIC /WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic Connect to Water System Name of Water System Well Sewer System Name of Sewer System PARCEL INFORMATION - 12 Digit Parcel No. Fire District Legal Description Site Address (Please include street name, street number and city) 4- Directions to site ',Q 17 tip 6i4 Will timber be cut and sold in parcel preparation?Yes/No Is property within 200'of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No TYPE OF JOB - New Add Alt Repair Other PRIMARY RESIDENCE ❑ SEASONAL ❑ Use of Building Describe Work �� No. of Bedrooms No. of Bathrooms Square Footage- 1 st Floor 2nd Floor 3rd Floor Basement Deck_ Covered Deck Other Sq. ft. Garage Attached Detached Carport Attached Detached MANUFACTURED HOME INFORMATION - Make Model Year Length Width Serial No. No. of Bedrooms No. of Bathrooms Type of Heat Purchase Price $ Replacement Unit? Yes/ No -- Installer Name Certification No. OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative,or the contractor. I further declare that I am entitled to receive this permit and to do the work as proposed in the application. I declare that I have obtained the permission from all the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or 4 agent on owners behalf, represents that the informaticn provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS ,,O��FA��PROGRESS INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. X—�4 b a=` tt'� 1._,�V 1" Date: III— Owner/Owners�epresentative ontractor (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Date DEPARTMENTAL REVIEW AP ROVED DENIED NOTES Building Department Planning Department Environmental Health Department Fire Marshal FEES Building Permit Fee -/ Site Inspection Plan Review Fee EH Review Fee Plumbing & Base Fee �O Planning Review Fee Mechanical & Base fee �7� /y S'OOther Wood /Gas/ Pellet Stove Fee 73- OP State Fee y S� Violation Fee Pre-Paid at Submittal Valuation $ TOTAL FEES