Loading...
HomeMy WebLinkAboutBLD2012-00444 SFR - BLD Permit / Conditions - 7/27/2012 Inspection Line (360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, WA 98584 i� RESIDENTIAL BUILDING PERMIT BLD2012-00444 OWNER: DANIEL MASTERS RECEIVED: 6/25/2012 CONTRACTOR: LICENSE: EXP: ISSUED: 7/27/2012 SITE ADDRESS: 41 E SPRAGUE AVE UNION EXPIRES: 1/27/2013 PARCEL NUMBER: 322325079007 LEGAL DESCRIPTION: UNION HOOD CANAL LAND & IMP CO BLK: 79 LOTS: 7-8 PROJECT DESCRIPTION: DIRECTIONS TO SITE: RESIDENCE US HWY 106 TO ORRE NOBLE RD RIGHT ON SHARPE RIGHT ON SPRAGUE General Information Construction&Occupancy Information Square Footage Information No. of Bedrooms: 3 Type of Constr.: VB Type of Use: SF Insp.Area: No. of Bathrooms: 2 Occ. Group: R-3/U Lot Size: Deck: Type of Work: NEW Fire Dist.: 6 No. of Stories: 1 Occ. Load: Building:1,664 Garage-Attached 484 Valuation: $ 189,948.84 Building Height: 18 Occ. Status: Primary Basement: Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: N 90.0 Ft. Shoreline: Ft. Water Body: Rear: S 3 1.0 Ft. Slope: Ft. SEPA?: No Model: Width: Ft. Side 1: E 8.0 Ft. Shoreline Desig.: Not Applicable Year: Serial No.: Side 2: W 8.0 Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Water Closets (Toilets) 2 Ventilation Fan 3 Planning Review Fee GMM 6/25/2012 $205.00 S1201200000001 Lavatories 2 Dryer Vent 1 Plan Check Fee GMM 6/25/2012 $973.54 S1201200000001 Bath Tubs 1 Exhaust Hood 1 EH Plan Review KKK 6/25/2012 $ 103.00 S6201200000001 Showers 1 Building State Fee LDK 7/23/2012 $4.50 S2201200000001 Water Heaters 1 Building Permit Fee LDK 7/23/2012 $ 1,497.75 S2201200000001 Clothes Washer 1 Mechanical Permit Fee LDK 7/23/2012 $49.20 S2201200000001 Kitchen Sink 1 Mechanical Base Fee LDK 7/23/2012 $28.50 S2201200000001 Dishwasher 1 Plumbing Permit Fee LDK 7/23/2012 $93.20 S2201200000001 Hosebibs 2 Plumbing Base Fee LDK 7/23/2012 $24.70 S2201200000001 Total $2,979.39 BLD2012-00444 Please refer to the following pages for conditions of this permit. Page 1 of 6 CASE NOTES FOR BLD2012-00444 CONDITIONS FOR BLD2012-00444 1) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Depent prior to any further inspections being performed or approvals granted. X 2) Owneri Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. 3) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or rr(emov l-Uf �roved documents will result in failure of required building inspections. 4) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X 5) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Buildin epartment prior to any further inspections being performed or approvals granted. X_J/4 6) Washington State Energy Code Compliance has been approved as follows: Heat Type: Electric or other than electric, Compliance Method: Prescriptive option III, Window(Max U-Factor):0.30, Skylight(Max U-Factor):0.50, Doors (Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38 advanced or R-49 standard, Vault Insulation R-38, and Slab Insulation R-10. In addition the following credit from Table 9-1 shall be completed: 3A& 5A X 92 4 BLD2012-00444 Please refer to the following pages for conditions of this permit. Page 2 of 6 7) A permanent certificate, completed by the builder or registered design professional, shall be posted within three feet of the electrical distribution panel. The certificate shall list the predominant R-values of insulation installed in or on ceiling/roof, walls, foundation (slab, basement wall, crawlspace wall and/or floor), and ducts outside the conditioned spaces; U-factors for fenestration; and the solar heat gain coefficient(SHGC) of fenestration. Where there is more than one value for each component, the certificate shall list the value covering the largest area. The certificate shall list the type and efficiency of heating, cooling, and service water heating equipment, duct leakage rates including test conditions as specified in WSEC Section 503.10.2, and air leakage results if a blower door test was conducted. Building envelope air leakage control shall be considered acceptable when tested to have an air leakage less than 0.00030 Specific Leakage Area (SLA) when tested with a blower door at a press of 50 Pascals (0.2 inch w.g.). Testing shall occur at any time after rough in and after installation of penetrations of the building envelope, including penetrations for utilities, plumbing, electrical, ventilation, and combustion appliances and sealing thereof. The blower door test results shall be recorded on the permanent certificate required located near the electrical distribution panel. Air leakage testing is not required for additions less than 750 square feet. Reference WSEC 105.4 Certificate and 502.4.5 Building Air Leakage Testing. Compliance certificates are available online at the WSU Energy program website titled, "WSEC 2009 Certificate" and are available in X or'/z sheets. The Mason County Permit Center will also have some available. X -&Ll 8) A minimum of 50 percent of all luminaires shall be high efficacy luminaries unless lighting compliance was approved using the options available in WSEC Section 1520 or 1530. Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaries unless permanently installed outdoor luminaires are controlled by a motion sensor(s)with integral photocontrol photosensor or installed in or around swimming pools or water features. All fluorescent fixtures must be fitted with T-8 or smaller lamps (but not T-10 or T-12 lamps). Reference, 505. X � 9) REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. X 10) A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. X ZQ 11) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. A. Drainfield/Reserve requires a 10ft setback from all footing/foundations. B. Septic tank(s) requires 5ft setback from all footing/foundations. C. No jeq��t n drains within 30ft, down gradient of drainfield/reserve area. X BLD2012-00444 Please refer to the following pages for conditions of this permit. Page 3 of 6 12) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). J X : 13) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roa&,ect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X 7 14) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be chargedMi all be collected by the Building Department prior to any further inspections being performed or approvals granted. X 15) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit rvctigrt, 16) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be loctje/d within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your projects %'l�� X 17) XPlacemeA of structure must comply with standards set forth per the international codes regarding descending and/or ascending slopes. 18) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinan or gulation, must be reviewed and approved by Mason County prior to construction. Xf 19) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENTAND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspecto ha)I be made prior to requesting additional inspections. X /% 1 BLD2012-00444 Please refer to the following pages for conditions of this permit. Page 4 of 6 20) All property lines shall be clearly identified at the time of foundation inspection. X � 21) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason Co or nances and building regulations. X 22) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder h t�Mnted action from being taken. No more than one extension may be granted. X 23) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, conneX4/4 and flashing. Install metal connectors approved for contact with the new types of pressure treated material. X 24) Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall. X 25) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure these structures meet the setback conditions listed. X C 26) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Approv Si a Plan"to ensure these structures are shown and meet the setback conditions listed. X 7� 27) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-6 0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X--- �I 28) Prior to final approval, all upland areas disturbed or n ted by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X - 29) Temporary erosion control measures must be implemented to prevent water quality rad tion of adjacent waters or wetlands. Silt fencing must be installed and maintained until upland vegetation has become established. X BLD2012-00444 Please refer to the following pages for conditions of this permit. Page 5 of 6 This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for period of 180 days at an P y , P p y y time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees o0Mon County access to the above described property and structure for review and inspection. OWNER OR AGENT: DATE: 7- 2 7 -1,;2, BLD2012-00444 Please refer to the following pages for conditions of this permit. Page 6 of 6 MASON COUNTY PERMrT NO. j D?--pj BUILDING PERMIT APPLICATION 426 W. Cedar• P.O. Box 186, Shelton,WA 98584 Shelton(360) 427-9670• Beffair(360)275-4467•Elma (360) 482-5269 On the web www_co.mason.wa.us APPILICW INFORMATION CONTRACTOR INFORMATIO Owner a- - r �^ . Company Name ' e- Mailing Address ) MairT Address ED C• Tip Code City L. tat I Zip Code Phone�.0_ '� � Other Ph. J G - Phone Other P r - Contractor Reg.#,: �} E FnRE address E Mail Address B� 4 9 SEPTIC/WATER SYSTEM INFORMATION-Connect to New Septic Existing Septic Connect to Water System Name of Water System Well Water System Name of Water System • PARCEL INFORMATION- 12 Digit Parcel N — ? _Q.. Fire District Legal Description • Site Address (Please include street n e,street number and ity) r1 {. Directions to site i ` , � Will timber e cut aKh sold in parcel preparation?Yes Is property within 200' of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs ] 15% Is this permit submittal theresult of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No TYPE OF JOB-Newer'Add Aft Repair Other PRIMARY RESIDENCE ❑ SEASONAL ❑ Use of Building Describe Work Il E No of BPrim s of Ba Square Footage-1st Floor 2nd Roor 3rd Flop ern Deck Covered Deck Other Sq.ft Garag` �Attached Detached Carport Attached Detached MANUFAC .REB-Ii MATION -Make Model ear Length Width Serial No. No.of Bedrooms o.of Bathrooms T of Heat Purchase Price Replace oft? Yes/No I staller Name rtification No. OWNER/BUILDER Acimowledges submission of inam iriformabOn may result in a stop work order or permit revocation.Adciowfedgemerrt of suctt is by mgnat ze below.I decare that I am the owner;mmers legal representffive,or the contractor.I further declare that I am envied to receive this pemzt and to do the work as proposed in the appfic ation.I declare that I have o'btaui' ed the permission from all the necessary parfies.If permission is required from any easrrerrt holder,or arty other party in regarding this application or the work proposed in the applica5on,I have obtained pa mission from them to apply for this pwrrd and conduct t-e work proposed The owner or agent on owners behalf,represents that the rtor Tkbon provided is arse and grants emp oyees of Masan County access to the above described property and srnctvre for review and inspection. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. _ X � Date- jo� ` er I Owners Representafive I Contractor (mdc:�e which one)FOR OFFICIAL USE BEYOND THIS POINT Accepted by. Date DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department 3 IZ L4)C- Planning Department Environmental Health Department Public Works Department Fire Marshal FEES Bufld"ing Permit Fee Sf-e Ins ection Plan Review Fee EH Review Fee Plumbing&Base Fee Planning Review Fee Mechanical &Base fee Other Wood/Gas/Peflet Stove Fee State Fee Violation Fee Pre-Paid at Submittal valuation$ TOTAL FEES PERMIT NO. MASON COUNTY PLUMBING/MECHANICAL PERMIT APPLICATION 426 W. Cedar• P.O. Box 186, Shelton, WA 98584 Shelton (360)427-9670•Belfair(360)275-4467• Elma(360)482-5269 On the web www.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR INFO MATION • Owner Company Name ~ Mailing Addres Mailin Address City k,II, :b ia, Sta _Zip Code City ta Zip Code - Phone-,. Phon 1"•y Other Ph. Lien/Title Holder Contractor Reg. # Exp. E mail address' E Mail Address Drivers Lic.# DOB Drivers Lic.# DOB SEPTIC INFORMATION - Connect to New Septic Existing Septic— Connect to Sewer System Name of Sewer System • PARCEL INFORMATION- 12 Digit Parcel No. Fire District Legal Description Site Address (Please include street name,street number and city) Directions to site Is property within 200'of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs 1 15% TYPE OF JOB -New Add Alt Repair Other Use of Building Location of Fixtures/Units- 1 st Floor 2nd Floor Basement Garage Closet PLUMBING FIXTURES(Show Number of each) MECHANICAL UNITS Type of Fixture No. of Fixtures Fees Fuel Type:Electric_LPG_Natural Gas_Heat Pump_ Toilets jyoe of Unit No.of Units Fees Bathroom Sink Furnace Bath Tubs Heatpumps Showers I Spot Vent Fan Water Heater Propane Tank Clothes Washer a Gas Outlets Kithen Sinks i Wood/Gas/PelletStove Dishwasher _ Kitchen Exhaust Hood Hosebibs Dryer Vent t Other Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary p�Hes4lf-permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application,1-have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection.. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. X Date:— Owner/Owners Representative/Contractor (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Planning Pd Ck# Date Bld Pd Receipt No. DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Occ GroupT e Constr. 2'S IZ �rOL Planning Department Environmental Health Department FEES Plumbing& Base Fee Site Inspection Mechanical & Base fee UFC Plan Review Fee Wood/Gas/ Pellet Stove Fee Other ,Violation Fee TOTAL FEES U 1 PLANNING REVISE 17 r - 2 14D T c AP 04 1 f AASON COUNTY [)CD PLAIN O - — — -- — — — — - - - -` SITE PLAN REQUIRED TO SE ON SI E17t j CHANGES SUBJET TO APPR VAL ' - TRttil K 1 _ D ItEj @ yP E iCl s 7' Al Cs �. ALL SETBACKS ARE MEASURED FROM THE FURTHEST � �� g PROJECTION OF THE BUILDING LO REVISION 4 �t E VED Q. �r i 57: �ATr 2 V- b i aa.3 RECERi ED ."J� 020.12 N MASON COUNTY Department of Labor and Industries PO Box 44450 N . , w , HI-LfNE HOMES Olympia, WA 98504-4450 Re : CC HILINH*983BD UBI-=601`-584'067 Registered as provided by Law as: Construction Contractor �` L HI-LINE HOMES 11306 62ND AVE E _ x 11/8/2013 PUYALLUP WA 98373 .4 a ?Prescriptive Energy Code Compliance for Single Family and Duplex Housing:Zone 1 Project Information Contact information Dan &Teresa Masters project HLH #1664 Nathan Glass- Designer 41 E Sprague Avenue HiLine Homes Union, WA 253-840-1849 x129 This set of forms has been developed to assist permit applicants documenting compliance with the Washington State.EnergyCode,(2009 edition).This set is for structures built under the IRC and located in Climate Zone 1. The following forms provide much of the required-documentationfor plan review. The details noted here must also be shown on the drawings(WS.EC.104.2). This form is not a substitute for the energy code itself.To obtain a copy of energy:code, go to.the following:web address.http:/Iwww.energy.wsu.edu/code Glazing 10 Glazing U-Factor Door 9 Vaulted W0112. Wall. i1je Wall, eXe 5 Slab6 Option Area Ceiling 3: Above Below Below Floor on %of Floor Vertical Overhead" U=Factor Ceiling Grade Grade ('Trade Grade R-49 or R-21 R-21 R-10 C-)I 13% 0.34 0.50 0.20 R-38 R-38 Int:'. TB R 40 R-30 .. 2 :Adv. R49 or R-21 R-21 R-10 OIl 25% 032 0.50 0.20 R-38 R-38 Int.� TB R-10 : R-30 2 Adv. R49 or. R-21. R-21 R-10 OIII Unlimited 0.30 0.50 0.20 R-38 R-38 R-10 7 TB R-30 2 Int Adv. See WSEC table&l for footnotes Glazing Schedule Attached to Document Does not apply. (SEE INSTRUCTIONS)Using Prescriptive Option III.All glazing and doors meet maximum U-factor.Alternate heating size method submitted. ❑ Option I or 11,Glazing to floor area imit(WSE.C.602.7.2) ❑ Area weighted window;skylight or door U-factor(WSEC 602.7.2) ❑ As part ofthe heating system sizing calculation (IRC M1401.3&WSEC 503.2;2) Radiant slab: ❑ R-10 foam insulation, continuous with thermal break(WSEC 502.1.4.9) Chapter-9 Options Total of 1 Credit Required Opt. Opt. Description 1 a Hi h Efficienc HVAC Equipment 1 ❑ 1b High Efficiency HVAC Equipment 2 ❑ 1c High Efficiency HVAC:Equipment 3 ❑ 2 High Efficiency HVAC Distribution System ❑ 3a- ..Efficient Building Envelope 1 0.5 . 3b Efficient Building Envelope ❑ 3c Su er-Efficient:Buildin Envelope 3 ❑ 4a Air:Leakage-Control and Efficient Ventilation ❑ 4b Additional Air Leakage Control and Efficient Ventilation ❑ 5a Efficient Water Heating0.5 .❑ . 5b High ffieciency Water Heatin ❑ 6 Small,13welling Unit ❑ 7 Large Dwelling Unit ❑ 8 Renewable Electric Energy *1200 kwh ❑ Total Credits 1.00 WSEC Prescriptive Worksheet(2010 edition)Zone 1 WSUEEP10-010 Copyright 2010 i Glazing Schedule Project Information Contact Information Dan & Teresa Masters project HLH #1664 Nathan Glass- Designer 41 E Sprague Avenue HiLine Homes Union. WA 253-840-1849 x129 Conditioned Floor Area 1664 Sum of UA for Heating System Sizing 77.9 Sum of All Glazing Areas From Below 264 Glazing to Floor Area Ratio 15.86% 602.7.2 Exception Ratio (not to exceed 1%) Exterior Doors Plan Component Door Percent Width Height Glazing Door Door ID Description Ref. U-factor Glazed Qt. Feet Inch Feet "" Area Area UA Front Entry Door 0.200 1 31 6 e 20.01 4.0 One Exempt Swinging Door<24 Square Feet Sum of Glazing Area, Door Area. and UA (do not include exempt door) 1 20.0 4.0 Area Weighted U= UA/Area 0.20 Sum of Area and UA for Heating system size only(include exempt door) 1 20.0 4.0 Vertical Glazing (Windows, Glazed doors using Exception 602.6#1) Plan Component Glazing Width Height Glazing ID Description Re`. U-factor Qt. Feet "°h Feet I"Ch Area UA Living Room Double SGD 0.280 1 11 10 6 10 80.9 22.64 Living Room 0.280 1 8 5 40.0 11.20 Bedroom #2 0.280 1 4 5 20.0 5.60 Bedroom #3 0.280 1 4 4 16.0 4.48 Master Suite 10.280 1 6 1 4 1 1 24.0 6.72 Master Bathroom 0.280 1 3 3 9.0 2.52 Kitchen 0.280 1 4 3 14.0 3.92 Dining Room 0.280 2 6 5 60.0 16.80 Sum of Area and UA 263.9 73.88 Area Weighted U = UA/Area 0.28 WSEC Prescriptive Worksheet(2010 Edition) WSUEEP10-010 Copyright 2010 Overhead Glazing Plan Component Glazing Width Height ID Description Ref. U Qt. Feet Inch Feet Inch Area UA Sum of Area and UA Area Weighted U = UA/Area Doube Glazed Garden Windows Section 602.7.2 Exception Plan Component Width Height ID Description Qt. Feet Inch Feet Inch Area UA Sum of Area Sum of Area X 3(This total is automatically included in the glazing area total.) Glazing UA for Heating System Size Only=Area X 0.63 WSEC Prescriptive Worksheet(2010 Edition) WSUEEP10-010 Copyright 2010 simple Heating System stem Size: Climate Zone 1 Project Information Contact Information Dan &Teresa Masters project HLH #1664 Nathan Glass- Designer 41 E Sprague Avenue HiLine Homes Union, WA 253-840-1849 x129 Indoor Design Temperature 70 Outdoor Design Temperature 22 Design Temperature Difference (AT) AT=Indoor—Outdoor Design Temp 48 Conditioned Floor Area 1 1664 Conditioned Volume 1 13312 Glazing Copy Sum of UA from Glazing Schedule 78 Attic U-Factor X Area = UA R-49 0.027 1664 44.9 R-38 Advanced 0.026 Single Rafter or Joist Vaulted Ceilings U-Factor X Area = UA R-38 Vented 0.027 Above Grade Walls U-Factor X Area = UA R-21 0.056 1042 58.4 Floors U-Factor X Area = UA R-30 0.029 R-38 0. 1664 E4A Below Grade Walls U-Factor X Area = UA 2' Depth Walls 0.042 3.5' Depth Walls 0.041 7'Depth Walls 0.037 Slab Below Grade F-Factor X Length UA 2' Depth 0.59 3.5' Depth 0.64 7' Depth 0.57 Slab on Grade F-Factor X Length = UA R-10 2' perimeter 0.54 R-10 Full - Heated 0.55 Sum of UA 223 Envelope Heat Load 10693 Btu J Hour Sum of UA X AT Air Leakage Heat Load 69011 Btu/Hour ((Volume X 0.6)X AT)X.018)) Building Design Heat Load 17593 Btu /Hour Air Leakage+Envelope Heat Loss Building and Duct Heat Load F 1_.15 20232 Btu/Hour If ducts are located in unconditioned space:Sum of Building Heat Loss X 1.15 If ducts are located in conditioned space:Sum of Building Heat Loss X 1 Maximum Heat Equipment Output 150% 1 30349 Btu/ Hour Building and Duct Heat Loss X 1.50 WSEC Prescriptive Worksheet(2010 Edition) WSUEEP10-010 Copyright 2010 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Permit Assistance Center SHELTON(360)427-9670 BELFAIR(360)275-4467 Elma (360)482-5269 FAx: (360)427-7798 WEB SITE: www.co.mason.wa.us P.O. Box 186, SHELTON 98584 2009 Washington State Energy Code (WSEC) Effective January 1, 2011. Ventilation & Indoor Quality Ventilation code provisions are now located in the 2009 International Residential Code (IRC), 2009 International Mechanical Code (IMC), & 2009 International Building Code The following information will be required for the WSEC and ventilation code plan review: 1. Complete the Washington State Energy Code/Ventilation code application located on the reverse side including information about the project, proposed compliance methods and proposed energy credit(s) listed in Table 9-1 attached to this form. All dwelling units are required to develop at least one credit from Table 9-1. 2. Include all windows, skylights, sliding glass doors, french doors and any other door with 50% glass or more on the window and door schedule. Use rough opening dimensions to calculate size. It is always helpful to list the u-factors of windows and doors, if known. If you do not know u-factors, the plan reviewer will assume that all window & door glazing will have the required u-factor of the compliance option. When using the area weighted average methods to comply with prescriptive-path include calculations with submittal documents. 3. Identify the location and fuel type of the heating system, water heater, location of exhaust fans (bathroom, laundry, kitchen, etc.) and R-factor of proposed insulation for walls, floors, ceilings, and slabs on the building plans. Indoor and outdoor lighting shall be high efficacy luminaires that comply with WSEC section 505. To verify compliance, provide lighting information on plans. 4. Questions? Call Mason County Community Development at(360) 427-9670 ext. 352. WSEC compliance information and code text is also available on the WSU-Energy Program website at: http://www.energy.wsu.ed u/code/ Prescriptive Requirements " for Group R Occupancy Climate Zone 1, Table 6-1 Glazing Glazing U-factor wall12 Wall Wall Slab 6 Area% Vaulted int ext Door U- Above on Option of Floor vertical Overhead Factors Ceilingz Ceiling3 Grade below Below Floor 5 Grade grade Grade R-49 or R-21 R-21 I 13% .34 .50 .20 R-38 R-38 int TB R-10 R-30 R-10 adv R-49 or R-21 R-21 11* 25% .32 .50 .20 R-38 R-38 int' TB R-10 R-30 R-10 adv R-49 or R-21 R-21 Unlimited .30 .50 .20 R-38 R-38 int' TB R-10 R-30 R-10 EJ adv *Reference Case/Call(360)427-9670 ext.352 for footnote information. Log&solid timber wall with a min. avg.thickness of 3.5"are exempt from the above grade wall insulation requirements. MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT WSEC/Ventilation Code Compliance Application Owner: IParcel#: 3223250-71023 Type of project: n _4vuj ly Total Sq. Ft. 1s Flogr : y 2" floor: Heated Basement: of heated area:: ! (o Heating System Type: .® Electric wall heater O Electric Central Furnace O LPG Furnace O Heat Pump with electric furnace O Heat pump with gas furnace O Ductless Heat Pump O Boiler, specify fuel type: O Other: Specify: Glazing Compliance P Prescriptive Option see reverse side circle one: 1 II II I Percentage: Method p Component Performance , Chapter 5— Calculation worksheets required Check one: Other (Specif Check one µ Whole House Ventilation system µ Whole House Ventilation u Other, Ventilation using exhaust fans&window or Integrated with a Forced Air describe: System wall fresh air vents(M1508.4) System(M1508.5) Referencing WSEC Section 901, "Additional Residential Energy Efficiency Requirements,"all NkW residential units must develop 1credit from Table 9-1. Identify and describe which option(s)will be used ENERGY to comply. If the table is not attached to this form you can access the table on our website at: http://www.co.mason.wa.us/forms/Community Dev/index. h . CREDITS Option: Description:VK06k(,PCA dn. rj v= 0.2.8 win Iz-38 VndtrP Table 9-1 3A 5A e(ec-fin�L wo;� w 64t+e4- rpt EF o.e 3 / low- rto-w 4"t, s Window & Door Schedule (If needed, attach an additional sheet) Total Manufacturer Room/location U-Factor Size Quantity Square Feet Windows:IVII tcCt,� Lt v7 SG D . 2g t I'° )c Liv; 0 Ito 94 #2 L(OK60 t 20 B4,11, *3 uo x Ltc I I (o MOLL f u b 0 x%-to I 2N AOL& 30r30 t 9 r -k� H o V 3 It 1 1 u p;,,i (opxso 2- (0o Windows: Total Sq. ft. 2 6 W Doors: r0n� _ 20 20 Cr�r EKtr 2g)r 68 t 1g Doors: Total Sq. Ft 33 Total window and door area 301 Total window& door area 301 / divided b totals .ft of heated area (c6H - �S %of glazing l Y) 9 � - 9 9