Loading...
HomeMy WebLinkAboutBLD2212 Mobile Trailer - BLD Application - 12/28/1978 BUILDING PERMIT APPLICATION MASON COUNTY P.O. Box 186 Shelton, Washington 98584 c DATE ISSUED S �� PERMIT NO. OWNER NAME MAIL ADDRESS CITY&STATE ZIP PHONE DIRECTIONS TO JOB SITE LEGAL. (❑ SEE ATTACHED SHEET) DESCR NAME MAIL ADDRESS CITY&STATE LICENSE NO. PHONE CONTRACTOR USE OF BUILDING Class of work: ❑ NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE Describe work: — u—LPL4, :� 7- Vt— d Valuation of work: $ PLAN CHECK FEE PERMIT FEE SPECIAL CONDITIONS: ` - � APPLICAT ION �ACCEPTED BY1 PLANS CHECK BY APPROVED FOR( I$SYA�ICE Type of Occupancy Division lJ��',/({./ Const. Group 4 Size of Bldg. No. of Max. (Total) Sq. Ft. Stories Occ. Load CONTRACTOR AFFIDAVIT PERMANENT SEASONAL E.D.NUMBER I certify that I am a currently registered contractor in RESIDENCE the State of Washington and I am aware of the MOBILE HOME ordinance requirements regulating the work for which the permit is issued and all work done will be in Special Approvals Required Received Not Required conformance therewith. ZONING HEALTH DEPT. Firm PUBLIC WORKS By ROAD DEPT. Lic. No. Date OWNERS AFFIDAVIT I certify that I am exempt from the requirements of the N O T I C E contract or registration law RCW 18.27, and am aware of the Mason County ordinance require ents for SEPARATE PERMITS ARE REQUIREDFOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. which this permit is issued and that ail work done will be conformance t ewith. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUCTION OR WORK IS ���/ SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER Owne. / Date . WORK IS COMMENCED. V PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH