HomeMy WebLinkAboutDDR2004-00168 SUP Cell Tower - DDR Letters / Memos - 10/29/2004 MASON COUNTY Shelton (360) 427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 Planning Elma (360) 482-5269 Mason County Bldg. 1411 N.5th P.O. Box 279 Shelton,WA 98584 October 29, 2004 Notice of Decision Case: DDR2004-00168F0 BE KEPT IN THE-7 PAR+ FL I;ILF Applicant: Washington State Patrol Notice is hereby given that Washington State Patrol, who is the applicant for the above-referenced Special Use Permit, has been granted the Special Use Permit. The request was approved pursuant to the Mason Count q Pp p Y Ordinance #5-98, Land Use Regulations for Cellular Communication Facilities and the Mason County Development Regulations Ordinance No. 82-96, specifically for the purpose of special uses. A State Environmental Policy Act (SEPA) Determination of Nonsignificance was issued on June 18, 2004. This is a final County decision. No further appeals to the County are available. Appeal may be made to Superior Court or the appropriate administrative agency as regulations apply. It is the appellant's responsibility to meet all legal requirements of any appeal process. If you have questions or require clarification on these issues please contact Tammi Clark, Land-User Planner with Mason County at 360-427-9670 x295. 2— L001 L) 1 BEFORE THE HEARING EXAMINER FOR MASON COUNTY 2 Phil Olbrechts, Hearing Examiner 3 RE: Washington State Patrol FINDINGS OF FACT, CONCLUSIONS 4 OF LAW AND FINAL DECISION. 5 MCC 1.05.044 Special Use Permit 6 - KEP I IN I F 7 INTRODUCTION PARCEL FILE 8 The applicant has applied for a 155-foot self-supporting 3-leg communication tower to replace an existing 100-foot communication tower. A Special Use Permit is 9 required for the tower because it exceeds the height limit for communication towers 10 imposed by Section 4(b)(1) of Ordinance 5-98. The Examiner approves the Special Use Permit subject to the conditions recommended by staff. 11 ORAL TESTIMONY 12 13 Tammi Clark presented the staff report. 14 EXHIBITS 15 See Case Index, attached to Staff Report. 16 FINDINGS OF FACT 17 Procedural: 18 1. Applicant. The applicant submitted its application on September 2, 2004. 19 2. Hearing. The Hearing Examiner conducted a hearing on the application on October 12, 2004, at 1:00 p.m., in the Mason County Board of Commissioners 20 Meeting Chambers. 21 Substantive: 22 3. Site/Project Description. The applicant has applied for a 155-foot self- 23 supporting 3-leg communication tower to replace an existing 100-foot 24 communication tower. The proposed replacement tower is located on the Washington State Patrol Academy and will be used by the WSP to update its communications 25 system and increase coverage. The WSP Academy is located approximately 25 miles north of Olympia, Washington,just of Highway 101. The parcel is approximately 27 acres. The facilities on-site include an administration building, dormitories, Washington State Patrol Special Use Permit P. 1 Findings, Conclusions and Decision {PA0582852.DOC;1/13009.9000001} I classrooms and conference rooms, a multi-purpose room with a gymnasium and I training tank/pool, a kitchen and dining hall, an outdoor firing range, a driver training 2 course and an auto shop. The campus is treed and landscaped. 3 4. Characteristics of the Area. The WSP Academy is currently located within an urban growth area. Dayton-Airport Road runs along the north end of the 4 parcel. There are a few single family residences across Dayton-Airport Road, an auto wrecking yard and a correction facility to the west of the Academy. The Washington 5 State Department of Transportation and the Port of Shelton Sanderson Field lie to the 6 east. 7 5. Adverse Impacts of Proposed Use. The tower is to be located in a relatively central portion of the 27 acre site. Although there are some single family 8 homes that adjoin the site, no comments against the project have been received. Given the already intense use of the WSP site and the fact that the structure will 9 replace an existing tower that is already 100 feet in height, no added or significant 10 impacts from the proposed tower are discernible. 11 CONCLUSIONS OF LAW 12 Procedural: 13 1. Authority of Hearing Examiner. MCC 15.03.050(J) provides the Examiner 14 with the authority to review and act upon special use permit applications. I 15 Substantive: 16 2. Comprehensive Plan Designation. The comprehensive plan designation of i 17 the site is urban growth area. 18 3. Review Criteria and Application. Section 4(b)(1) of Mason County 19 Ordinance 5-98 limits the height of communication towers to 90' for single users. However, Section 6(a)(1) provides that these height limitations can be waived if the 20 criteria for a special use permit are satisfied. MCC 1.05.044 governs the criteria for special use permits. Sections 6(c) and (d) of Ordinance No. 5-98 add additional 21 criteria for special use permit review for radio towers. All referenced criteria are laid out below with applicable Conclusions of Law. 22 23 MCC 1.05.044(A): That the proposed use will not be detrimental to public health, safety and welfare. 24 4. As noted in the Findings of Fact, the proposed radio tower will be 25 centrally located on a 27 acre parcel that is already intensely developed by relatively large structures. No adverse comments were received by any neighboring residential property owners and there are no discernible adverse impacts generated by the tower. Washington State Patrol Special Use Permit p. 2 Findings, Conclusions and Decision {PA0582852.DOC;1/13009.90000011 Given these factors, the proposed use will not be detrimental to public health, safety 1 and welfare. 2 MCC 1.05.044(B): That the proposed use is consistent and compatible with the 3 intent of the comprehensive plan. 4 5. The proposal is consistent with the Mason County Comprehensive Plan because it is compatible with adjoining land uses and is located in an area designated 5 in the Mason County Comprehensive Plan as urban growth area, which allows the 6 type of use proposed. 7 MCC 1.05.044(C): That the proposed used will not introduce hazardous conditions at the site that cannot be mitigated through appropriate measures to protect adjacent 8 properties in the community at large. 9 6. The proposal is not introducing any hazardous conditions at the site. 10 MCC 1.05.044(D): That the proposed use is served by adequate public facilities 11 which are in place, or planned as a condition of approval or as an identified item in the County's Capital Facilities Plan. 12 7. The proposal will not require any public services or facilities that are not 13 already there. 14 MCC 1.05.044(E): That the proposed use will not have a significant impact upon 15 existing uses on adjacent lands. 16 8. As noted previously, the proposal does not have any discernible adverse impact upon neighboring properties. They also note that the closest adjoining 17 properties are facilities owned by the Washington State Department of Transportation 18 and the Port of Shelton Sanderson Field. 19 MCC 1.05.044(F): If located outside the urban growth area, that the proposed use will not result in the need to extend the urban services. 20 21 9. The proposal will not result in a need to extend urban services. 22 Ordinance No. 5-98, Section 6(1): Height of proposed tower. 23 10. The proposed tower structure is 155' tall, 55' taller than the existing communications tower. 24 25 Washington State Patrol Special Use Permit p. 3 Findings, Conclusions and Decision {PA0582852.DOC;1/13009,900000/} Ordinance No. 5-98,Section 6(2): Proximity to residences or residential districts. 1 2 11. Residential structures are over 750' away from the tower across Dayton- Airport Road. 3 Ordinance No. 5-98, Section 6(3): Nature of uses on adjacent nearby properties. 4 12. Adjacent properties are Washington State Department of Transportation 5 and the Port of Shelton Sanderson Field. There are a few residential structures across 6 the Dayton-Airport Road. 7 Ordinance No. 5-98, Section 6(4): Surrounding tree coverage. 8 13. The surrounding area is landscaped and treed. Pictures labeled as Exhibit 7 show that there are numerous mature firs around the tower site. 9 10 Ordinance No. 5-98, Section 6(5): Surrounding topography. 11 14. The surround area is relatively flat and level. 12 Ordinance No. 5-98, Section 6(6): Design of tower. 13 15. The proposed tower is a three legged lattice structure. It has a galvanized 14 coating, which is light gray in color. It will be located approximately 45' on the south side of the existing tower. 15 Ordinance No. 5-98, Section 6(7): Proposed ingress-egress. 16 17 16. Ingress and egress to the tower is by the Academy's private roadway. 18 Ordinance No. 5-98, Section 6(8): Availability of suitable existing towers and other structures as discussed in Section 6.d of this ordinance. 19 17. No existing suitable towers are within the area. Costs to relocate WSP's 20 existing radio equipment, other users and secure another site to WSP standards would 21 jeopardize the project completion. 22 DECISION 23 The Hearing Examiner approves the requested Special Use Permit for the proposed communications tower, subject to the conditions for approval recommended by staff 24 at page 5 and 6 of their report. 25 Washington State Patrol Special Use Permit p. 4 Findings, Conclusions and Decision {PA0582852.DOC;1/13009.900000/) Dated this 13th day of October, 2004. 1 2 3 Phl Olbrechts 4 Mason County Hearing Examiner 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Washington State Patrol Special Use Permit p. 5 Findings, Conclusions and Decision (PA0582852.DOC;1/13009.9000001) CASE INDEX Washington State Patrol DDR2004-00168 Index # Date Description 1 September 30, 2004 Exhibit 1: Staff Report 2 September 2, 2004 Exhibit 2: Special Use Permit Application 3 September 2, 2004 Attachment A of Special Use Permit Application: A licants response to SUP criteria 4 September 2, 2004 Attachment B of Special Use Permit Application: Site plan 5 September 2, 2004 Attachment C of Special Use Permit Application: List of adjacent property owners 6 September 2, 2004 Exhibit 3: Applicant's response to Ordinance 05-98 3a Telecommunications Towers-Goals Exhibit 4: Applicant's response to factors considered 7 September 2, 2004 in granting Special Use Permits-Ordinance 05-98, Section 6 c & d 8 September 16, 2004 Exhibit 5: Notice of Special Use Permit Application 9 June 18, 2004 Exhibit 6: SEPA Determination of Nonsignificance (Issued b WSP) 10 1 September 14, 2004 Exhibit 7: Photographs of site provided by Tim Chan Exhibit 11 November 17, 2003 8: Determination of No Hazard to Air Navi ation September 30, 2004 TO: Mason County Hearings Examiner FROM: Tammi Clark, Department of Community Development SUBJECT: Special Use Permit DDR2004-00168 for Replacement Communications Tower STAFF REPORT 1. Introduction. This report evaluates a Special Use Permit application no. DDR2004-00168 (Exhibit 2) for a proposal to replace an existing 100-foot communication tower with a 155-foot self-supporting 3-leg tower. The existing microwave dishes and antennas will be relocated to the new tower. The purpose of this permit is to review potential impacts of constructing a 155-foot tall self-support communication tower in an area designated Urban Growth Area. References to County Regulations are to Ordinances as approved. 2. Applicant. Washington State Patrol. 8623 Armstrong Road SW, PO Box 42626, Olympia, WA. Contact Person: Timothy Chan, Mechanical Engineer ll. 3. Property Location. 631 W Dayton-Airport Road, Shelton, Mason County, WA. Parcel Number 42002-32-60010. TR 1 of N '/z SW, 631 W Dayton-Airport Road. 4. Date of application. September 2, 2004 5. Date of Public Notice. September 16, 2004 6. Project Description. The proposal is to replace an existing 100-foot communication tower with a 155-foot self-supporting 3-leg communication tower. The existing microwave dishes and antennas will be relocated to the new tower. The proposed replacement tower is located on the Washington State Patrol Academy and will be used by the WSP to update the communication system and increase coverage. The following is the reason Washington State Patrol has given for the proposed communications tower. "The Washington State Patrol currently has a 100-foot tower erected at the Academy in 1983. The tower is inadequate to support new communications needed for today's operation. The new proposed tower will replace the existing radio tower. Visual impact is minimized as the replacement tower is placed between existing building. WSP SUP No. DDR2004-00168 1 Other tower users are Department of Homeland Security, Justice and Treasury." 7. Evaluation. A. Characteristics of the site: The Washington State Patrol Academy is located on the Olympic Peninsula, approximately 25 miles north of Olympia, Washington, just off Highway 101 . The parcel is approximately 27 acres. Facilities on site include an administration building, dormitories, classrooms and conference rooms, a multi-purpose room with a gymnasium and training tank/pool, a kitchen and dining hall, an outdoor firing range, a driver training course and an auto shop. The campus is treed and landscaped. B. Characteristics of the area: The Washington State Patrol Academy is currently designated Urban Growth Area. Dayton-Airport Road runs along the north end of the parcel. There are a few single-family residences across Dayton-Airport Road, an auto wrecking yard and a correction facility to the west of the Academy. Washington State Department of Transportation and the Port of Shelton Sanderson Field lie to the east. C. Comprehensive Plan Designation. The Comprehensive Plan Designation of the site Urban Growth Area. 8. SEPA Compliance. Washington State Patrol issued a Determination of Nonsignificance, on June 18, 2004 (Exhibit 6). The final comment date was July 2, 2004. No comments were included with the DNS. 9. Other Permits. In addition to this Special Use Permit, this proposal will require a Mason County building permit. 10. Analysis. This proposal requires a Special Use Permit under Ordinance No. 5-98 Standards for Telecommunication Antennas and Towers (as approved) because the proposed 155 foot tall tower does not meet the dimensional requirements of Mason County Ordinance (MCO) 5-98, Standards for Telecommunications Antennas and Towers, section 4.b.1 . Since the proposed 155-foot tall tower exceeds the 90-foot height limit for a single user, a Special Use Permit is required. The proposed communications tower does meet the foot-for-foot property line setback requirement per MCO 5-98, section 6.e.1. 11. Compliance with Mason County Comprehensive Plan Development Regulations This proposal requires a Special Use Permit because it is possesses unique characteristics due to size, nature, intensity of use, technological processes, demands upon public services, relationship to surrounding lands, or other factors, as noted in Section 1 .05.040 in the Mason County Development Regulations. This WSP SUP No. DDR2004-00168 2 Section provides six criteria for review. Response by applicant marked as Attachment A. 1 . That the proposed use will not be detrimental to the public health, safety and welfare; 2. That the proposed use is consistent and compatible with the intent of the Comprehensive Plan; 3. That the proposed use will not introduce hazardous conditions at the site that cannot be mitigated through appropriate measures to protect adjacent properties and the community at large. 4. That the proposed use is served by adequate public facilities which are in place, or planned as a condition of approval or as an identified item in the County's Capital Facilities Plan; 5. That the proposed use will not have a significant impact upon existing uses on adjacent lands, 6. If located outside an Urban Growth Area, which the proposed use will not result in the need to extend urban services. Discussion: 1. The proposed replacement tower is located on the Washington State Patrol Academy and will be used by the WSP and other public agencies. The new tower will allow the State Patrol to update the communication system and increase coverage to protect the public safety and welfare. The Federal Aviation Administration has issued a Determination of No Hazard to Air Navigation (Exhibit 8). 2. The proposal appears to be consistent with the Mason County Comprehensive Plan because the tower will be located in an area designated as Urban Growth Area in which this type of proposal is allowed. 3. The proposal does not appear to be introducing any hazardous conditions at this location. 4. The proposal will not require public services or facilities from County Capital Facilities. 5. The proposal does not appear to have any significant impacts on adjacent land uses. The tower is located on the east side of the State Patrol property. Adjacent eastern property is the Washington State Department of Transportation and Port of Shelton Sanderson Field. 6. The proposal will not result in the need to extend urban services. 12. Compliance with goals of Ord. No. 5-98 Standards for Telecommunication WSP SUP No. DDR2004-00168 3 Antennas and Towers The proposed communication tower does not meet the height standard of this ordinance. Under MCO 5-98, the height limit for a single-user communications tower is 90 feet. The proposed 155-foot tower proposed by WSP exceeds this height limit, therefore a Special Use Permit is required. The tower proposal meets the goals of Ordinance 5-98 in that it will be designed for the joint use of other agencies. There is currently a 100-foot tower that will be replaced with a 155-foot tower. The increase in tower height is necessary in order to support the new communications needed for today's operation. Visual impact is minimized, as the replacement tower is to be located between existing buildings. Response by applicant marked as Exhibit 3. 12. FACTORS CONSIDERED IN GRANTING SPECIAL USE PERMITS: There are eight review factors noted in section 6.c. and 6.d. of ordinance 5-98 that need to be addressed. Response by applicant marked as Exhibit 4. 1 . height of proposed tower: 2. proximity to residences or residential districts: 3. nature of uses on adjacent and nearby properties: 4. surrounding tree coverage: 5. surrounding topography: 6. design of tower: 7. proposed ingress-egress: 8. existing suitable towers or structures: Discussion: 1. The proposed tower structure is 155 feet tall. 2. Residential structures are over 750 feet away from the tower across the Dayton- Airport Road. 3. Adjacent properties are Washington State Department of Transportation and the Port of Shelton Sanderson Field. There are a few residential structures across the Dayton-Airport Road. 4. The surrounding area is landscaped and treed. Pictures labeled as Exhibit 7 show that there are numerous mature firs around the tower site. 5. The surrounding area is relatively flat and level 6. The proposed tower is a three legged lattice structure. It has a galvanized coating, which is light gray in color. It will be located approximately 45 feet on the south side of the existing tower. WSP SUP No. DDR2004-00168 4 7. Ingress and egress to the tower is by the Academy's private roadway. 8. No existing suitable towers are within the area. Costs to relocate WSP's existing radio equipment, other users and secure another site to WSP standards would jeopardize the project completion. 13.Conclusions. For the proposal to be in compliance with Ordinance No. 5-98 Standards for Telecommunication Antennas and Towers, a Special Use Permit is required because the height of the proposed tower exceeds the 90-foot height limit for a single user tower. The proposed location does meet the foot-for-foot property line setback requirement of MCO 5-98, so the tower does meet required setbacks. The nearest property line is 874 feet due east. The proposed communications tower does not appear to negatively impact adjacent properties or land uses. This tower will replace an already existing 100-foot tower and will be located about 45 feet south of the existing tower. The Department of Community Development has not received any negative comments or concerns about the project through the initial public notice process. The proposed location should minimize potential visual impacts from the tower on the subject property because of the adjacent landscaping. The permit will be subject to buffer and landscaping requirements of Ordinance No. 5-98. The proposed communications tower appears to meet the review criteria of the Mason County Development Regulations for Special Use Permit consideration Staff recommends approval of the Special Use Permit, subject to the following conditions: 15. Conditions: 1 . The applicant shall retain existing vegetation surrounding the tower to provide for the necessary buffering and landscaping required by Mason County Ordinance 5-98 and Development Regulations. 2. The applicant shall minimize site clearing during the construction of the tower to aid in visual screening and provide for needed erosion control measures during construction and operation of the facility. 3. The applicant shall consider the collocation of additional communication antennas on the approved tower upon the request by other telecommunication companies/agencies in order to reduce the need for additional communications tower construction in the area. 4. The applicant shall remove the communications tower within ninety days of the date of notice that the subject facility is abandoned (i.e. taken out of use for all facility users for any period of twelve consecutive months). This special use permit shall terminate upon removal of the tower. WSP SUP No. DDR2004-00168 5 5. The tower must be designed for a minimum of three users, per Mason County Ordinance 5-98. I I WSP SUP No. DDR2004-00168 6 ` MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT APPLICATION FOR SPECIAL USE A Special Use is one that possesses unique characteristics due to size, nature, intensity of use, technological processes involved, demands upon public services, relationship to surrounding lands, or other factors. The purpose of this application is to provide for adequate oversight and review of such development proposals, in order to assure that such uses are developed in harmony with surrounding land uses, and in a manner consistent with the intent of the Development Regulations for Mason County; Ordinance No. 82-96. Applicant name /—L , I- stool+.. Po.'+ro 1 Telephone# 3&o 59 6—6 o(k C o."+.,* : TI o`Ftiy C fah Mailing address -- 8 (023 �✓w, Sf✓'orto Roae� j O (. TWA 98So�} 262(e Site address - C� l �✓ k, �14irnor+ RA, Sty.-ItoN 98Ste} 89`}'S Tax Parcel# 4 Z o o 2 - 3 2 - (0 0 0 10 Legal Description N ��� GW �1 W Do...� ►•, A��ao�� RJ Type of Special Use Permit: Communications Tower ✓ Accessory Dwelling Unit Oversize construction Other On a separate piece of paper,please state your reasons for requesting a Special Use Permit. Be sure to address the following six criteria,your request will be evaluated based on these criteria. `u s 1) Will the proposed use be detrimental to public health,safety, and welfare? d 2) Will the proposed use be consistent and compatible with the intent of the Comprehensive Plan? a' 3) Will the proposed use introduce hazardous conditions, at the site,that can not be a de' mitigated through appropriate measures to protect adjacent properties and the community at large? 01, 4) Is the proposed use served by adequate public facilities, which are in place,planned as a condition of approval or as an identified item in the County's Capital Facilities Plan? 5) Will the proposed use have a significant impact upon existing uses on adjacent lands? 6) If located outside of an Urban Growth Area,will the proposal result in the need to extend urban services? • Please provide a site plan that includes the following:❑ Indicate Scale and North Arrow S e G G6A—a-,cl,-e_4� (J\1 N V\S ❑ Property line dimensions,easements,and right-of-ways. l ❑ The location of all existing and proposed structures.Include square footage of existing and proposed structures. ❑ Setback distance,in feet from all property lines and structures. ❑ Existing and proposed road access to and from the site. ❑ Parking sites ❑ Location of on-site sewage tanks and drainfields. ❑ Location of drinking water supply.Include location on the proposed site and surrounding parcels. ❑ Steep bluffs,wetlands,streams,and bodies of water ❑ Location of fire hydrants and emergency vehicle access roads,including grade. ❑ Surface and storm water run-off routes. Applicant(s) signature L", C -` Special Use Permit: P� $900.00 Hearings Examiner: $200.00 Applicant will also be billed for all advertising costs. Acceptance of this application,by Mason County does not guarantee approval. I:\PLANNING\C&RPAC\SPECIALUSE.PER REVISED: 03-06-03 NON RESIDENTIAL DEVELOPMENT INITIAL REVIEW QUESTIONNAIRE In accordance with Washington State's Growth Management Act, the Mason County Comprehensive Plan regulates the placement, expansion or modification of commercial, indistrial and public facilities to certain areas of the county. In the interest of saving you time and money the Department requires this initial review checklist to be completed and reviewed by this department prior to the submission of any building permits. Applicant NameW I � ��ro ( Daytime Phone # ( 3Go) S96 - 60 11 owx --- Mailing Address-ra21 A,-.ti-6roao_goA-t—Q!*j r _WSL_5$9o4-2&z16 Site Address _�31 �! o,-f_ Rom! is tlel 10 1 Directions to Site ----��V t V -- C � — � 1 ► r r or� S�1 Q 1T0 11 — -------1--1--------- ---- — ---- ------ -�tS PrO�ogo.` doe.S No� ►^a.cjy' ra.. SeP�►c Or SQwn.Y; Septic---------or Sewer_— Water Supply_ Tax Parcel Number # _ 20 0 Legal Description-7 a _ t �— c� Type of Development_ ------------------------------------------------- Applicant's Signature l OFFICIAL USE ttttzxttttttttttttttttttttttttixttttnzzttttttttttttttttixtttttttttttt>xtttttttt>zttttttttttttttttttttttttttttttnttttttttttttttnzxtttttttt 1UGA Approved By Existing Commercial Date •,•••, •a & uavtsl, VML91T REGULATIONS May S,2002 Publication cost is the responsibility of the applicant. Final permit processing will = occur until advertising fees have been paid to the newspaper by the applicant. The Shelton-Mason County Journal will bill the applicant directly. I/WE understand that ME must sign and date the attached acknowledgment indicating and that I/WE understand that is MY/OUR responsibility. I/WE must submit the signed page as part of application in order for it to be considered as complete. 6A3to�- DATE' Yu GL L. ►ticT�r v 5�0��� P6V-0 OWNER I APPLICANT . `� Washington State Patrol 155' Tower Replacement Special Use Permit Application 1 The proposed replacement tower is located on the Washington State Patrol Academy and will be used by the Washington State Patrol and other public agencies. The new tower will allow the State Patrol to update the communication system and increase coverage to protect the public safety and welfare. 2 The tower is consistent and compatible with the intent of the Mason County's comprehensive Plan. 3 The tower will not introduce hazardous conditions to the site, adjacent properties and community. 4 The site is Washington State Patrol Training Academy no public services or facilities will be needed from County Capital Facilities. 5 The proposed tower will not impact any existing adjacent lands uses. The tower is located on the east side of the State Patrol property. Adjacent eastern property is Washington State at Department of Transportation and Port of Shelton Sanderson Field. 6 The proposed tower will is located on the Washington State Patrol Academy site and will not need urban services. 7 See attached plans. Adjacent Property Owner List Within 300 Feet of Property Boundaries 0V11 Range, Township, Section Parcel # Property Owner Port of Shelton 42002 00 62000 450 W Business Park Rd Shelton, WA 98584-1284 - - __ - - John & Kusuman Titus 7500020 23405 164th Ave. SE Kent, WA 98042-3718 Pavletich, Dean M 7590012 1702 Walker Park Rd Shelton, WA 98584-1149 Jeffrey F & Sally A Geibel 7590013 11230 E Chapman Rd Shelton, WA 98584-8464 WSP Memorial Foundation 7590102 PO Box 7544 Olympia, WA 98507-7544 Shelton Church of Christ 7590101 740 W Dayton Airport Rd Shelton, WA 98584-8945 Shelton Church of Christ 7590100 740 W Dayton Airport Rd _Shelton, WA 98584-8945 Day, Edward A 23 00000 780 W Dayton Airport Rd �Shelton, WA 98584-8945 Nichols, Robert L 2300010 790 Dayton Airport Rd Shelton, WA 98584-8945 Citi Mortgage Inc. 2300020 27555 Farmington Rd Farmin ton Hills. MI 48334-33 Roxe Anne & Thomas Doherty 2300020 1206 N 8th Shelton, WA 98584-3329 Port of Shelton 42011 006000 450 W Business Park Rd Shelton, WA 985.84-1.284 Port of Shelton 000300 450 W Business Park Rd Shelton, WA 98584-1284 J Hofert Co. 42003 0000000 PO Box 2602 Hailey, ID 83333-2602 / Mason County Courthouse t^� 41 60010 411 N 5thg 12/ Shelton WA 98584-3000 property-owner L. C' Page 1 of 1 -FS "zfog 5c5 UWr'LIS ,�� ►-n U05L1q0� C,.�(j V 0 hossb dry 0 p� Luo-qs-Lo-p '�,rq8 � 0-44rod "5 bM 1 N Cp I+ v� J nl O °a �Z r I ACADEMY � WASH � NGTONSTATEPATROL z o Q I 9 Z. Z Q X 0:10 155 TOWER REPLACEMENT =U Va (n Q O� 3 F h� PROJECT CONTACTS: OWNER: WASHINGTON STATE PATROL DESCRIPTON OF PROJECT: PO BOX 42626 The proposal is to replace an existing 100—foot communication tower with a 155—foot OLYMPIA, WA 98504 self—supporting 3—leg tower. Relocate existing microwave dishes and antennas from existing tower to new tower. ■ 59 APPLICANT: WASHINGTON STATE PATROL FACILITIES MANAGEMENT DIVISION PROJECT LOCATION: PO BOX 42626 631 W Dayton-Airport RD, Shelton, WA 98584-8945 L � OLYMPIA, WA 98504-2626 N 11411 N run TELEPHONE: 360-596-6000 = FAX: 360-596-6040 PARCEL NUMBER: 1n 42002 32 60010 CONTACT: TIMOTHY CHAN WASHINGTON STATE PATROL LEGAL DESRCRIPTION: FACILITIES MANAGEMENT DIVISION N 112 of SW, Section 2, T. 20, R. 4, W.M. J PO BOX 42626 ° 0 OLYMPIA, WA 98504-2626 � w TELEPHONE: 360-596-6011 Q 3 FAX: 360-596-6040 a' W Z w I— O Q w F= = a w t0 (j U N z a o z � w SHEET INDEX PR J T 3 O r o " LOG10 ~ o " o T-1 COVER SHEET a d CD V ` Z o A-1 SITE PLAN ,o�y N Z A-2 SETBACK PLAN d� a oy,Er err. a SURVEY i N01-01 GENERAL NOTES s 0 o E01-01 TOWER PROFILE APPVD: o Ear F01-01 TOWER FOUNDATION i F02-01 FOUNDATION TEMPLATE � t o Aawo: E F03-01 FOUNDATION Tx BRIDGE PIER N F04-01 FOUNDATION REBAR CHART 1lL� V VICINITY MAP O 1. DATE BY REVISION 9/II/03 JU IKYI50)W/ADDEODA SCALE: HONE N DATE: 7/14/04W ON. BY: T.CHXN ENGR: EH0 SHEET: CA Q CHK: cHK T—1 NO. 03TUWER�' r . I tl N n NO 1� ♦O On EXISTING J�z DRIVEWAY ass 0- Li�> Zo Q� I �wn z+ z ax f NORTHO 8 ~No r1 EXISTING r = ROADWAY oad o a``Os EXISTING Nm 2 ROADWAY TOWER s "` O i NEfW 155' TOWER WSP TRAINING ACADEMY ENTRANCE --- - � SITE PLAN II E I TING L G E G WITH EXISTINGloo EXISTING !i FU LING S A ION XISTIN RADIO MAINTENANCE HELTE BLDG T SHOP EXISTING AUTO SHOP J FUE G EXISTING O NK EXISTING FENCE Er SHED o w Z F— p Z a Q Q - 3 EXISTING N EL o ROADWAY z w T Z W 0/� � v, N M V Q TREE Z CLUSTER � Q z o U Q EXISTING FENCE 0 a U TOWER PLAN 3 E AR 0 to2'6' 10' 25 o SCALE 1'-20' SCALE o NORTH N 1. eh+/w no n[vltco r/AWUD� DATE:. 7/14N04 M DWH. BY: T.CHAN ENM- ENC SHEET: a Q C7HEKE: CH A—1 N0. DATE BY —_ REVISION Fl WER-1 E• I ,IZL 819 rri I � ro00 (n A n � IUO r � r r a o Z O 0 0 o a m � 3 N O 2 X p WASHINGTON STATE PATROL ��� WASHINGTON STATE PATROL z m n NEW COMMUNICATION TOWER IASHINCf0115TA18 PAIROL FACILITIES MANAGEMENT DIVISION i y �• Z 0623 AR STRONG RD/P.O. BOX 42626 - OLYMPIA, WA - 98504-2626 � SETBACK PLAN z PN: r 60> SD6-6® FAX: (360) 50 8-8040 z SHELTON, WA STAMP NW 114 SW 114 SEC 2 TWNP 20 N. RANGE 4 EWM FNO a'CONE.WON MN COPPER PIN. O SEE ADS WX ie P le,FOR CORNER $ N6ipEY. 2 S 8723'34' E 5285.38 DAYTON AIRPORT ROAD SET RE9N A10 CAP LS t7660 800.00 1485.38 2 1 PAVED \FND J/,'RF ALYEPTCD(SE7 CAP LS 1)1e0) E. LOf ALSO`ND RCB4f AAO W IS 1565J Tw"CEGMIEL Iv0 CARpORr BLOC CUE Se7Dri I.a!'(M7f ACC£VRD) 1 I' SEE ROS IDL le p . S T N FUItOR CORNER HISTORY. ROS XX 12 P 96 10'GRAWL FM LANE PRNE ,ALL rn C 3 e n O N O 0 100 200 P CUT T � ❑ OLD PAWD LANE AIEINONN SANE AS PCINN ON ROS NOL 17 P 207.BASED ON FIELD TIES TO RE EAST AND REST r/,COWERS OF SECTION 2 AS SMIRK MACE N FFIVIIL Y OF 1994. SIRMT Pfs"MCD eY FIELD MWRSE WTIMS USNF A S' TOTAL STAMK CLOAAWS EXCEEDED REVIAREWNTS OF MC 3M-130. ALL YVMAENTS NSRED N FE&I OF 199,. GEORGE 6 LOT ADG LEGAL OENIPTON MR THIS FROPEAFT FOUND IN WSDEL COUNTY Af/1J9 tJ9.F96T PAGE OF DOCGAEM. n R10 M T20y O.Jt' [ND W S 8723',a' r 600.DO / m n \GSGYK OUTLET O ❑ � 6'WOOD IEEE 2 0 METALS.S"OP SLOG TARGET g0 MNGE ROS VOL 17 P 207 ; GMYEL b RT p N S FWD RETSW LS 1e902 O LEGEND. Ner2JT a,r N 800.00 --- FEK'C.e'Oaw LINK EXCEPT AS NOTED. / 500.00 o CLYRIFRI.ADON TOWER .7 J,'4 IIID J/,'P NT1e 0.,9' S 8723'3a• E 1400.00 N2P Y a„' 6'a0W(TYPJ EUMTGNS 5NOIRN WERE TAKEN ATM GUTTER LINE n Z H ROS I« 7 P 142 ROS WL 16 P 164 FNO REBVP AND CAP LS 11355 N a0'CFOW STIA P.SEE ROS NIL 1e P IN FOR MIRWR MSTOR,. \] I 10 ril DATE 1 NO. DESCRIPTION BY DwN BY DATE JOB NO. P.O.BOX 249 tJRB April 11. 1994 1 w5P TOPOGRAPHY SURVEY FOR SHED TON ACADEMY G E OM ETR IX PUYALLUP, WA. 98371 1 CHKD BY SCALE SHEET WASHINGTON STATE PATROL SURVEYING, INCORPORATED 840_5680 JRB I'- IGO 1 OF I FILE NO. 0190204 REVISIONS GENERAL LOCATIONS AND SPLICES ARE IN ACCORDANCE WITH THE CONSTRUCTION JOINT STANDARDS. REV DESCRIPTION DWN OiK APP LOCATIONS AND DETAILS AND AS SHOWN ON THE REINFORCING STEEL SHOP 1. THE GENERAL STRUCTURAL NOTES ARE INTENDED TO AUGMENT THE DRAWINGS AND DRAWINGS. 4. BACK FILL SHALL BE INSPECTED TO ENSURE THE RECOMMENDED 95%OF STANDARD SPECIFICATIONS. SHOULD CONFLICTS EXIST BETWEEN THE DRAWINGS, PROCTOR DENSITY HAS BEEN ACHIEVED AS DETERMINED BY ASTM D-1557 STANDARD. SPECIFICATIONS AND/OR THE GENERAL STRUCTURAL NOTES, THE STRICTEST 6. ANCHOR BOLTS SHALL BE SET BY TEMPLATE TO WITHIN A 1/8' TOLERANCE IN ANY PROVISION SHALL GOVERN. PLAN DIRECTION IN PIERS AND FOOTINGS,WITH THE MINIMUM PROJECTION INDICATED 5. AFTER THE COMPLETION OF SOIL AND CONCRETE WORKS THE INSPECTOR SHOULD ON THE DRAWINGS UNLESS NOTED OTHERWISE. COMPLETE A FINAL REPORT STATING THE WORK WAS IN CONFORMANCE WITH 2. THE STRUCTURE IS DESIGNED TO BE STABLE AFTER THE CONSTRUCTION IS FULLY APPROVED DRAIWNGS AND SPECIFICATIONS. A COPY OF THE REPORT SHALL BE COMPLETED. THE CREW MUST FOLLOW APPROVED ERECTION PROCEDURES IN ORDER 9. THE CONCRETE SUBCONTRACTOR SHALL BE RESPONSIBLE FOR ALL POUR SEQUENCES SUBMITTED TO THE ENGINEER OF RECORD. TO ENSURE THE SAFETY OF THE CONSTRUCTION AND ITS PARTS DURING ERECTION. AND CONSTRUCTION PROCEDURES FOR ALL CONCRETE WORK TO ACCOUNT FOR TEMPERATURE DIFFERENTIALS AND SHRINKAGE OCCURRING DURING THE 6. SHOP TESTING OF WELDS AND FIELD TESTING OF BOLTS SHALL BE AS FOLLOWS: 3. ALL CONSTRUCTION SHALL COMPLY FULLY WITH THE APPLICABLE PROVISIONS OF CONSTRUCTION PHASE UNTIL THE CONSTRUCTION IS PERMANENTLY IN A OSHA AND THE LOCAL GOVERNING CODES, LATEST EDITION, AND ALL REQUIREMENTS MECHANICALLY CONTROLLED ENVIRONMENT. A) ALL WELDS SHALL BE VISUALLY INSPECTED AND A MINIMUM OF 10% AT RANDOM SPECIFIED IN THE CODES SHALL BE ADHERED TO AS IF THEY WERE CALLED FOR OR SHOULD BE MEASURED AND CHECKED USING THE MAGNETIC PARTICLE INSPECTION SHOWN ON THE DRAWINGS. METHOD (MPI) IN ACCORDANCE WITH ASTM 109 FOR FINAL PASS ONLY. STRUCTURAL STEEL 4. ALL WORK CONSTRUCTED PER THESE DRAWINGS SHALL BE CHECKED AND VERIFIED BY B) MAGNETIC PARTICLE INSPECTION(MPI)TEST 100%OF ALL FULL PENETRATION WELDS. QUALITY ASSURANCE AS DETERMINED BY THE ENGINEER. 1. ALL STEEL FABRICATION AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION (RISC - 9TH EDITION) MANUAL AND C) MAGNETIC PARTICLE INSPECTION (MPI) TEST 100%OF ALL LEG SPLICE WELDS. SPECIFICATIONS'SPECIFICATIONS FOR THE DESIGN, FABRICATION AND ERECTION OF DESIGN LOADS STRUCTURAL STEEL FOR BUILDINGS'. D) BOLTS TIGHTENED BY TURN-OF-THE-NUT METHOD, SHALL BE INSPECTED IN ACCORDANCE WITH ASTM A325 REQUIREMENTS. WIND LOADS AS PER ANSI/TIA/EIA-222-F 2. ALL WELDING SHALL BE DONE USING E-70 ELECTRODES AND IN ACCORDANCE WITH . THE AMERICAN WELDING SOCIETY (A.W.S.) STANDARDS AND SPECIFICATIONS E) TESTS SHOULD BE PERFORMED BY A PERSON AUTHORIZED BY THE ENGINEER OF BASIC WIND SPEED: 100 MPH ANSIJAWS D1.1-98. RECORD AND A COPY OF THE FINAL RESULTS SHOULD BE SUBMITTED TO HIM. RADIAL ICE: 0.50' 3. BASE MATERIAL SHALL BE CORRECTLY PREHEATED BEFORE WELDING AND POST HEATED AFTER WELDING IN ACCORDANCE WITH THE ENGINEER APPROVED WELDING REDUCTION FACTOR FOR WINO PRESSURE IN ICED CONDITIONS 1 PROCEDURE. 4. ALL STEEL SOLID ROUND LEG SHALL CONFORM TO ASTM A-572 STEEL SPECIFICATION FOUNDATIONS - MIN. 58 KSI YIELD STRENGTH AND PINS SHALL CONFORM TO ASTM A-572 GR.50 STEEL SPECIFICATION - MIN. 50 KSI YIELD STRENGTH. 1. THIS FOUNDATION DESIGN IS BASED ON LOADS SHOWN ON THE DESIGN PROFILE. 5. ALL STEEL ANGLE, PLATE AND MISCELLANEOUS MEMBERS SHALL CONFORM TO ASTM A- 2. FOUNDATION HAS BEEN DESIGNED BASED ON A SOIL REPORT BY LSI Adapt, Inc. 572, GR.42,STEEL SPECIFICATION-MIN. 42 KSI YIELD STRENGTH,AND/OR CSA CAN3- (PROJECT NO. WA04-11543-GEO, DATED JULY 9, 2004). G40.21 GRADE 44 STEEL SPECIFICATION. 3. CONTACT THE ENGINEER CONCERNING ANY CHANGES IN THE INSTALLATION DUE TO 6. ALL STEEL CHANNEL MEMBERS SHALL CONFORM TO ASTM A-572 GR.42 SPECIFICATION ANY DIFFERENCE OF THE ON SITE EXISTING CONDITIONS. MIN. 42 KSI YIELD STRENGTH, AND/OR CSA CAN3-G40.21 GRADE 44 STEEL 4. A FIELD INSPECTOR SHALL PERFORM A SITE INSPECTION OF THE FOUNDATION SPECIFICATION. DWG REFERBqCE INSTALLATION TO INSURE COMPLIANCE WITH THE PLANS. 7. THE FINISHED DIAMETER OF BOLT HOLES SHALL NOT BE MORE THAN 1/16 INCH LARGER THAN THE NOMINAL BOLT DIAMETER UNLESS OTHERWISE NOTED. 5. CHECK AREA FOR LOCATION OF UNDERGROUND PIPES,CABLES, CONDUIT,ETC. PRIOR TO STARTING EXCAVATION. 6. MATERIAL MAY BE CUT BY SHEARING, SAWING, OR CUTTING WITH A ROUTER OR GAS CUT. MATERIAL GREATER THAN 112' THICKNESS SHALL NOT BE SHEARED. S. ALL WORK SHALL BE DONE IN ACCORDANCE WITH LOCAL CODES AND SAFETY REGULATIONS REQUIREMENTS. PROCEDURES FOR PROTECTION OF EXCAVATIONS, 9. CUT EDGES SHALL BE TRUE AND SMOOTH. AND FREE FROM EXCESSIVE BURRS AND EXISTING CONSTRUCTION AND UTILITIES SHALL BE ESTABLISHED PRIOR TO START OF RAGGED BREAKS. SHEARED EDGES OF THICK PLATES SHALL BE PLANED TO A DEPTH FOUNDATION WORK. OF 1/4 INCH. RE-ENTRANT CUTS SHALL BE AVOIDED. IF USED, THEY SHALL BE FILLETED BY DRILLING PRIOR TO CUTTING. 7. WELDING OF REINFORCING STEEL AND EMBEDMENTS IS PROHIBITED UNLESS OTHERWISE NOTED ON DRAWINGS. 10. TOLERANCES AS INDICATED IN THE RISC CODE OF STANDARD PRACTICE SHALL BE CAREFULLY FOLLOWED DURING FABRICATION. 8. CONCRETE COVERAGE OVER ALL STEEL SHALL CONFORM TO ACI 315 BUILDING CODE MINIMUM REQUIREMENTS AND AS SHOWN ON STRUCTURAL DETAILS. THE CONCRETE 11. PRIOR TO GALVANIZING ALL FABRICATED STEEL SHALL BE THOROUGHLY SHOP COVER OVER REBAR SHALL BE 3' TO 6'. INSPECTED AND QUANTITIES COUNTED ACCORDING TO COMPANY APPROVED QUALITY CONTROL INSPECTION METHODS. 9. INSPECT BOTTOM OF EXCAVATION PRIOR TO PLACING STEEL CAGE AND CONCRETE TO INSURE NO LARGE AMOUNTS OF LOOSE DIRT OR FOREIGN MATERIALS REMAINS. 12. ALL BOLTS, WASHERS AND NUTS SHALL CONFORM TO ASTM A325 TYPE N. 5/8'UNLESS _ 10. SPACING DEVICES SMALL BE USED AS REQUIRED TO MAINTAIN THE SIDE CLEARANCE NOTED OTHERWISE. E BETWEEN THE STEEL REINFORCEMENT AND EXCAVATION WALL. 13. BOLTS SHALL BE TIGHTENED USING THE TURN-OF-THE-NUT METHOD AS DESCRIBED IN e SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR ASTM A490 BOLTS �- �.•\"� 11. CONCRETE SHALL BE PLACED INTO EXCAVATION WITHIN SHORTEST NUMBER OF HOURS ITEM 802. EXCEPT AS NOTED OTHERWISE. WITH THE USE OF A CHUTE OR HOPPER DEVICE TO DIRECT THE CONCRETE TO FALL WITHIN THE CENTER OF THE STEEL CAGE. CONCRETE SLUMP SHALL NOT BE LESS 14. ALL EXPOSED STEEL SHALL BE HOT-DIPPED GALVANIZED PER ASTM A123 THAN 4' NOR MORE THAN 5'. CONCRETE SHALL NOT BE ALLOWED TO HIT THE STEEL SPECIFICATIONS AFTER FABRICATION. -:f CAGE WHICH WOULD CAUSE SEGREGATION OF THE MATERIAL. 15. ALL STEEL HARDWARE SHALL BE HOT-DIPPED GALVANIZED PER ASTM A153. - ' 12. VIBRATE THE TOP 5 FT. OF CONCRETE IN ORDER TO ACHIEVE PROPER COMPACTION. _- SLOPE TOP OF CONCRETE AS REQUIRED FOR PROPER DRAINAGE AWAY FROM TOWER. - - FIELD ERECTION 13. BACK FILL SHALL BE PLACED IN 6' - 8' HORIZONTAL LIFTS AND COMPACTED TO A MINIMUM 95% OF THE MAXIMUM DRY DENSITY IN ACCORDANCE WITH ASTM TEST 1. THE CREW SHOULD COMPLY WITH ALL INSTALLATION PROCEDURES, SAFEGUARDS AND - - DESIGNATION D-698(STANDARD PROCTOR). THE FILL MATERIAL SHALL BE FREE FROM MEANS AND METHODS OF CONSTRUCTION. ALL WORK SHALL BE PERFORMED IN LARGE ROCKS, WASTE, DEBRIS AND SHALL BE PLACED AT OR NEAR THE OPTIMUM ACCORDANCE WITH OSHA REQUIREMENTS. MOISTURE CONTENT. _ 2. MINIMUM RECOMMENDED WEATHER CONDITION THAT SHOULD BE OBSERVED TO INSURE ` 14. TEMPORARY STEEL CASING OR OTHER SAFETY MEASURES SHALL BE APPLIED WHILE A SAFE WORKING CONDITION SHALL BE:WIND SPEED NOT TO EXCEED 10.15 MPH. NO INSTALLATION OF DRILLED PIERS 'CAISSONS' TO PREVENT CAVING OF EARTH INOT THUNDERSTORMS FORECASTED AND WITH TOWER STEEL TEMPERATURE BETWEEN 20•F THE SHAFT AND TO PROVIDE A WATER-TIGHT SEAL. AND 95•F (-6.7•C AND 35•C). FOLLOW ALL APPLICABLE OSHA SAFETY GUIDELINES. 3. ALL PRECAUTIONS AND EFFORTS SHALL BE TAKEN TO INSURE THE TOWER STABILITY RADIAN CAST-IN-PLACE CONCRETE DURING THE ERECTION. 1. CONCRETE WORK SHALL CONFORM TO REQUIREMENTS OF ACI 301-92"SPECIFICATIONS 4. INSTALLATION OF THE TRANSMISSION LINES SHALL BE SHOWN ON THE LAYOUT FOR STRUCTURAL CONCRETE FOR BUILDINGS', EXCEPT AS MODIFIED BY STRUCTURAL DRAWINGS AND IN ACCORDANCE WITH THE MANUFACTURERS REQUIREMENTS AND REQUIREMENTS NOTED ON THE DRAWINGS. INSTALLATION INSTRUCTIONS. www.rddianoorp.com 2. ALL CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 4000 PSI. 5. ANY STRUCTURAL MEMBER THAT HAVE DAMAGED GALVANIZED SURFACES SHALL BE CLEANED AND TOUCHED UP WITH TWO COATS OF ZINC-RICH PAINT. PEORIA,IL,USA OAKVILLE,ON,CANADA 3. CONCRETE STRUCTURAL FRAMING HAS BEEN DESIGNED BY THE ULTIMATE STRENGTH +1800727 ROHN +18664RADIAN METHOD PER ACI 318.92 BUILDING CODE. 6. UPON COMPLETION OF ALL WORK, THE SITE SHALL BE CLEARNED OF ALL DEBRIS AS REQUIRED. ANY SURPLUS MATERIALS NOT REMOVED FROM THE SITE SHALL BE 4. ALL REINFORCING STEEL BARS SHALL CONFORM TO ASTM A615, GRADE 60. NEATLY STORED IN AN AREA DESIGNATED BY THE OWNER REPRESENTATIVE. Copyright-Dupkation,recording,dWowmanduseIsPmNbiled REINFORCING SHALL BE DETAILED AND FABRICATED IN ACCORDANCE WITH MANUAL OF STANDARD FOR DETAILING REINFORCED CONCRETE (ACI 315 - LATEST EDITION).5. THE SUBCONTRACTOR SHALL SUBMIT THE CONCRETE MIX DESIGN(S) FOR REVIEW. SPECIAL INSPECTION DEPIT .OFGENERALADMINISTR. PROPORTION MIX DESIGNS AS DEFINED IN ACI 301 ARTICLE 3.9. THE SUBMITTAL 1. A FIELD INSPECTOR FROM AN INDEPENDENT INSPECTION AND TESTING COMPANY SHALL INCLUDE CEMENT TYPE AND SOURCE, CEMENT CUBE STRENGTH, AGGREGATE SHALL BE RETAINED TO PERFORM INSPECTIONS OF THE CONCRETE, SOIL AND SOIL GENERAL NOTES GRADATIONS. WATER TESTS, AD-MIXTURE CATALOGUE INFORMATION AND CYLINDER COMPACTION WORKS. STRENG H TEST RESULTS FOR THE CONCRETE. 154r-4nr RS70 SERIES uAST 2. THE FIELD INSPECTOR SHALL PERFORM A SITE INSPECTION OF THE FOUNDATION •J WSPRAJCADJEMYWW�AU"1J1 6. ALL REINFORCEMENT TO BE FABRICATED AND ERECTED ACCORDING TO THE ACI INSTALLATION TO ENSURE THE COMPLIANCE WITH THE DRAWINGS AND PERTINENT / STANDARDS: 'DETAILS AND DETAILING OF CONCRETE REINFORCEMENT', ACI 315 - DOCUMENTATION. THIS SHALL INCLUDE VISUAL INSPECTION OF THE REBAR AND LATEST EDITION AND -MANUAL OF ENGINEERING AND PLACING DRAWINGS FOR ANCHOR BOLTS TO CONFIRM THE QUANTITY OF REINFORCING STEEL AND CONDITION DWN: C)i)CD: DATE: REINFORCED CONCRETE STRUCTURES', ACI 315R - LATEST EDITION. OF EXCAVATION IMMEDIATELY BEFORE THE CONCRETE INSTALLATION. O,R JWF Au9/11/2004 7. LAPS, ANCHORAGES AND SPLICES COMPLY WITH THE REQUIREMENTS OF ACI 315-92. 3. SLUMP TEST. AIR CONTENT AND COMPRESSION TEST ON CYLINDERS SHALL BE ENGR: ENGRAPP'D: AND IN NO CASE LAPS AND SPLICES WILL BE LESS THAN 30 BAR DIAMETERS. PERFORMED FOR EVERY 30 CUBIC YARDS IN ACCORDANCE WITH ASTM C-39, C-143 EN DRAWING NO: REV: 70-WTSX-NOI-01 0 FILE NO. DESIGN SPECIFICATION: EIA-222-F 0190204 BASIC WIND SPEED: 100.0 mph ANTENNA LOADING CHART REVISIONS RADIAL ICE: 0.5 in REV DESCRIPTION DWN CHK APP POS. DESCRIPTION QTY ELEVATION Tx LINE QTY AZIMUTH COMMENTS STATUS 1 HP6 1 153'-0" EW64 1 170' I 8'-4" EL. 154'-4" 2 HP8 1 153'-0" EW64 2 45' I V O O 3 HP4 1 113'-0" EW64 1 450 I ? 4 SRL-229 1 106'-0" FLC12503 1 0o I x 5 HP6 1 100' 0" EW64 1 170' I > 6 SRL-225 1 40' 0" LDF4 1 0° I KCSCLG 8'-4" EL. 139'-5" STATUS:E-EXISTING,F-FUTURE,I-INITIAL r, D N V 00 J `) x m x x \ o N x J Y > N II KCSCML 8--4" EL. 119'-6" v Q f x n x Y X f") KCSCNM 10'-4" EL.99'-7' O DWG REFERENCE u v z xJ X ti O X X X > J ry\ KCSCQN 12'-4" EL.79'-8" m LADDER C/W SAFETY CLIMB .' o A > -T� w w M n- vM X A J F N KCSCRQ 14'-4" EL. 59'-9" 1 a Y v- X x M LL_ KCSC}2R 16'4" w EL.39' 10" Aw�r--AF x > CD X Ce m TYPICAL SECTION `\—"' R A„D I A"N Y M x X J J J J www.radiancorp.com ^� KCSM 18'`1" EL. 19'-11" PEORIA,IL,USA OAKVILLE,ON,CANADA m \ +1 800 727 ROHN +1 866 4RADIAN (ce 7 co Copyright-Duplication,recording,disc)s and use is prohibited X Y > ¢ m w A W/G BRIDGE DEFT. OF GENERAL ADMINISTR. J J D r-4 TOWER PROFILE KCSCIT 20'-4„ a 36 Kips 154'4'RS70 SERIES MAST o CD 0 0 20'-4" WSP ACADEMY,WA CD Q o o r,j o I,j o rn o. o. DWN: CNK'D: DATE: z rn z o m <M oil o i' U = BASE K70BAHET 4 O.R JWF Aug/06/2004 ~ ENG'R: ENG'R APP'D: r o ono �o oow =wo =o u o E.V Q Q¢ Q Q Ln cn J(, QK Or1 2rL �K �U N = M N DRAWING NO: REV: 70-WTSX-E01-01 0 FILE NO. 0190204 REVISIONS REVI DESCRIPTION DWN CHK APP (26)#8 VERTICAL BARS #3 TIES to o> co t _ r\ 6'0 r; t \ PROJECTION %o FINISHED GRADE / t \ F 1 I A A I I �- - -a \ 6'R1 x3S DEEP- I I (3)#3 Top Ties SPACED CAISSON I I AT 0'-6-Approx DWG REFERENCE F---------1 (34)#3 TIES SPACED AT V-0"Approx I Ln M En I 1 M r----- — t (26)#8 VERTICAL BARS ,o, - . . <0, ,C) l�, \�� I I L-------J i€ I 1 r Cw .e g 9'-107 " ' 19'-91 16" S kG-/STEoo`�?w S�)NAL Ft` PLAN VIEW TYPICAL PIER Est Conc Vol=37.70 cu yard/PIER 2L�C4 NOTES 1 FOR ANCHOR BOLT INFORMATION,SEE FOUNDATION TEMPLATE DRAWING. /�� " RADIAN 2 DRAWING NOT TO SCALE. ALL DIMENSIONS ARE ACCURATE TO+/-1/16". REBARS SHOWN ARE FOR ILLUSTRATION PURPOSE ONLY. (4)ANCHOR BOLTS yvww•radianoorp.00m NUT TOP&BOTTOM PEORIA,IL,USA OAKVILLE,ON,CANADA +1 800 727 ROM +1 866 4RADIAN Copyright-Duplimtlon,recording,dixlmn and use B prohibited 0 (2)1/20 x 11/2"A325 DEPT.OF GENERAL ADMINISTR. (2)ANCHOR BOLT FOUNDATION SPACER PLATE TOWER BASE #70BA001C WSP ACADEMY,WA 0 O DWN: CHIM DATE: O.R. JWF I Aug/09/2004 ENGR ENGR AD: SECTION A-A E.V PP' DRAWING NO: REV: 70-WTSX-F01-01 0 FILE NO. 0190204 REVISIONS REVI DESCRIPTION DWN CHK APP NOTE:- 1.Assemble the template parts so that a perpendicular line from the face-center of the angle assembly on any given face is aligned within f 1/2"(13mm)with the center of the opposite template plate. Locate center � point on the angle assembly horizontals by marking mid / i \ point betwheen symmetrical bolt holes. o+ / I \ 2.Assemble the template so that the center-to-center o� distance of bolt groups is within±1/8"(3mm). 3.All anchor bolt template plates must be at the same / i \ elevation±1/8"(3mm)before pouring concrete. 4.Assemble the anchor bolts with nuts above and / \ below the template fully tightened to maintain the / i \ anchor bolts at the proper orientation. `P / \ S.Place concrete so that it does not push the anchor bolts out of proper alignment �01 ✓s 6.At all three faces,measure the noted distances between bolts to confirm matching dimensions. DWG REFERENCE 7.Both the side angles and the anchor bolt template CP' plates are optional items. Depending on the Idt chosen, 5/80 x 1 3/4"A325 \ these items may or may not be included. Other materials and methods may be utilized to set the tower / Ryp') \ foundation and the anchor bolts. / I \ OF w AS/�LL / -#70TMO02A \ \ J RADIAN / (Typ•) www.radiamorp.00m — — — PEORIA,IL,USA OAKVILLE,ON,CANADA 70TMO03A +1 800 727 ROHN +1866 4RADIAN 70TM003A Cop^fit-Duphc ,moxdkv,disdmm and use Is goNbioed 70TM001B(Typ.) A SEE NOTE 7. DEPT.OF GENERAL ADMINISTR. 19'-9 13/16"C,/C PIER) FOUNDATION 5/80 x 1 3/4"A325 20'-4" NOMINAL FACE WIDTH RS70 FOUNDATION TEMPLATE (6)PLACES BOTTOM SECTION: K70GTQ WSP ACADEMY,WA ANCHOR BOLTS: (4)1 3/8 0 DWN: GAM DATE: FOUNDATION TEMPLATE STUB LEG SIZE: V8x8x5/8 o.R ]WF Aug/09/2004 ENGR ENG'R APP D: EN DRAWING NO: REV: 70-WTSX-F02-01 0 FILE NO. 0190204 V-6"0 REVISIONS REV DESCRIPTION DWN CHK APP 0 J PLAN VIEW 1'-6"0 KEEP PIER LEVEL WITH TOWER PIER Tx BRIDGE POST I �z — DWG REFERENCE GRAVEL PAD(IF REQUIRED) I GRADE uj 1 I I I mI I � 1 I w I I F-- I ---I I I V AS f (4)#6 VERT. BARS 0,�� �ticT a •- I I I (9)#3 TIES EQUALLY -p k 36251 Fp/ 3 CDI 1 SPACED @ 1'-2"Max f•S SIEFF�aG1 I I (SEE NOTE 2) SIO ti A 0 I I I O Pi 1 I 3„ i s u3 I I 1 All � t, ui I I I TyP RADIAN I I 1 R I I www.radia xorp.com � L_— ---J PEORIA,IL,USA OAKVILLE,ON,CANADA +1 800 727 ROHN +1 866 4RADIAN Copyright-Dupllatlon,recording,disdosure and use is prohibited Tx LINE BRIDGE PIER DEPT. OF GENERAL ADMINISTR. FOUNDATION GENERAL NOTES: Est Concrete Volume=0 Tx BRIDGE PIER.64 cu yard/PIER WSP ACADEMY,WA 1. CONCRETE CONSTRUCTION AND REINFORCING NOTES ARE SHOWN ON THE REBAR DRAWING. OWN: CHK'D: DATE: O.R JWF Aug/10/2004 2. WHEN A TX-BRIDGE PIER IS LOCATED WITHIN THE AREA OF A TOWER BASE PAD,THE ENG'R: ENG'R APP'D: E.V BRIDGE PIER REBAR SHOULD BE TIED INTO THE TOWER PAD REBAR. DRAWING No: REV: 70-WTSX-F03-01 0 FILE NO. 0190204 REVISIONS CHK APP BAR LIST FOR REINFORCING STEEL REV DESCRIPTION DWN BAR BAR TOTAL BAR BENDING DIAGRAM QTY. TOTAL LOCATION SIZE TYPE LENGTH DIM. "A" REQ'D VVT.(LBS) GENERAL CONCRETE CONSTRUCTION NOTES: 1 CONCRETE IS TO HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4 KSI AT 28 DAYS. BENT 2 REINFORCED CONCRETE CONSTRUCTION SHALL BE IN ACCORDANCE WITH A ACI STANDARD 318. CAISSON #3 16'-3" T-0" 111 678 3 THE MINIMUM CONCRETE COVER OVER REBAR SHALL BE 75mm(3"). Tx BR PIER #3 3'-8" 1' 0" 900 HOOKS 18 25 4 A)FOR EARTH CONDITIONS- POUR CONCRETE ON UNDISTURBED SOIL TIE Q 0 BOTH ENDS B)FOR ROCK CONDITIONS-REMOVE LOOSE WEATHERED ROCK AND ONLY POUR CONCRETE OR GROUT ON GOOD SOLID ROCK. S BACKFILL SHALL BE SELECTED MATERIAL,WELL COMPACTED IN LAYERS NOT EXCEEDING 300mm(12"). 11, 6 BACKFILL SHALL BE PLACED SO AS TO PREVENT THE ACCUMULATION OF WATER a 1350 HOOKS AROUND THE INSTALLATION. STIRRUP a o BOTH ENDS In DWG REFERENCE DIM. "A" DIM. "B" 12 GENERAL CONCRETE REINFORCING NOTES: STIRRUP 1 CONCRETE REINFORCING STEEL SHALL BE IN ACCORDANCE WITH ASTM A615. JA ] 2 REINFORCING STEEL SHALL BE GRADE 400(GRADE 60),UNLESS NOTED OTHERWISE. m 3 EMBEDDED STRUCTURAL ANCHOR STEEL WILL BE SUPPLIED BY RADIAN. STIRRUP ALL OTHER STEEL IS TO BE SUPPLIED BY THE FOUNDATION CONTRACTOR. A 1350 HOOKS BOTH ENDS OF w.gsf CAISSON #8 STRAIGHT 35'-0" 78 7290 � > m Tx BR PIER #6 STRAIGHT 9'-4" 8 112 O�r � `s A 36251 w� �FCIST-ER�� G� �SS70NAt A, i E PI 'Es � �1 RADIAN www.rac iancorp.corn R m PEORIA,IL,USA OAKVILLE,ON,CANADA SUBSTITUTION OF IMPERIAL FOR METRIC SIZES&WEIGHTS GRAND TOTAL BAR WEIGHT(LBS) 8105 +1 B00 727 ROHN +1 866 4RADIAN Metric Mass Mass X-sectional X-sectional Imperial Mass Mass X-sectional X-sectional Copyright-Dupliation,recording,disdo and use is prohibited Bar Size Iblft k Im Area In' Area mm' Bar Size IbRt k Im Area In' Area mm- tOM 0.528 0.785 0.16 100 3 0.376 0.560 0.11 71 15M 1.055 1.570 0.31 200 4 0.668 0.994 0.20 129 DEPT. OF GENERAL ADMINISTR. 20M 1.583 2.355 0.47 300 5 1.043 1.552 0.31 200 FOUNDATION 25M 2.638 3.925 0.78 500 6 1.502 2.235 0.44 284 REBAR CUTTING CHART 30M 3.693 5.495 1.09 700 7 2.044 3.042 0.60 387 35M 5.275 7.850 1.55 1000 8 2.670 3.973 0.79 510 WA WSP ACADEMY, 9 3.400 5.060 1.00 645 55M 7.912 11.775 2.88 1500 10 4.303 6.404 1.27 819 DWN: CHK'D: DATE:SSM 13.188 19.625 3.88 2500 11 5.373 7.907 1.56 1006 O.R JWF Aug/10/2004 14 7.650 11.384 2.25 1452 18 1 13.600 20.239 4.00 2581 ENG'R: ENG'RAPP'D: E.V DRAWING NO: REV: 70-WTSX-F04-01 0 Application Materials H Telecommunication Antennas & Tower A See Special Use Application B See above responses to Special use Application C See attached plans D See attached Tower Profile plan E01-01 E The Washington State Patrol currently has a 100-foot tower erected at the Academy in 1983. The tower is inadequate to support new communications needed for today's operation. The new proposed tower will replace the existing radio tower. Visual impact is minimized as the replacement tower is placed between existing buildings. Other tower users are Department of Homeland Security,Justice and Treasury. F The proposal is to replace existing 100' Washington State Patrol tower established at the Academy in 1983. No suitable communication site is available within the area. Page 1 of 2 a 1 Washington State Patrol 155' Tower Replacement Special Use Permit Application 1 The proposed replacement tower is located on the Washington State Patrol Academy and will be used by the Washington State Patrol and other public agencies. The new tower will allow the State Patrol to update the communication system and increase coverage to protect the public safety and welfare. 2 The tower is consistent and compatible with the intent of the Mason County's comprehensive Plan. 3 The tower will not introduce hazardous conditions to the site, adjacent properties and community. 4 The site is Washington State Patrol Training Academy no public services or facilities will be needed from County Capital Facilities. 5 The proposed tower will not impact any existing adjacent lands uses. The tower is located on the east side of the State Patrol property. Adjacent eastern property is Washington State at Department of Transportation and Port of Shelton Sanderson Field. 6 The proposed tower will is located on the Washington State Patrol Academy site and will not need urban services. 7 See attached plans. Application Materials H Telecommunication Antennas & Tower A See Special Use Application B See above responses to Special use Application C See attached plans D See attached Tower Profile plan E01-01 E The Washington State Patrol currently has a 100-foot tower erected at the Academy in 1983. The tower is inadequate to support new communications needed for today's operation. The new proposed tower will replace the existing radio tower. Visual impact is minimized as the replacement tower is placed between existing buildings. Other tower users are Department of Homeland Security, Justice and Treasury. F The proposal is to replace existing 100' Washington State Patrol tower established at the Academy in 1983. No suitable communication site is available within the area. Page 1 of 2 Washington State Patrol 155' Tower Replacement Special Use Permit Application Relocating radio equipment and securing another communication site to Washington State Patrol standards would jeopardize the completion of this project because of available funds. G 1) Proposed tower height is 155' 2) Residential structures are over 750' away from the tower and across Dayton- Airport road 3) Adjacent properties are Washington State Department of Transportation, Port of Shelton Sanderson Field 4) The State Patrol Academy operations daily as the site is treed and landscaped. The replacement tower will be constructed is between buildings. 5) Surroundings tower topography is relative flat and level. 6) The tower is a three legged lattice structure; it has a galvanized coating which is light gray in color. 7) Ingress and egress to the tower is by the Academy's private roadway. 8) No existing suitable towers are within the area. Costs to relocate WSP's existing radio equipment, other users and secure another site to Washington State Patrol standards would jeopardize the project completion. H See attached Environmental Checklist and Determination of Nonsignificance I See attached Adjacent Property Owner list t Page 2 of 'A�� MASON COUNTY Shelton (360) 427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 Planning Elma (360) 482-5269 Mason County Bldg. 1 411 N.5th P.O.Box 279 Shelton,WA 98584 NOTICE OF APPLICATION FOR SPECIAL USE PERMIT AND NOTICE OF PUBLIC HEARING Notice is hereby given that Timothy Chan for Washington State Patrol has filed an application for a Special Use Permit number DDR2004-00168 for the replacement of an existing 100-foot communication tower with a 155-foot self-supporting 3-legged tower. The existing microwave dishes and antennas from the existing tower will be relocated to the new tower. This Special Use Permit is required because the communications tower exceeds the height limit of 150 feet for three users per section 4 (b)(1) of Mason County Ordinance 5-98, Standards for Telecommunications Antennas and Towers. Site Address and Project Location: 631 W Dayton-Airport Rd, Shelton, WA 98584. TR 1 of N 1/2 SW 631 W Dayton-Airport Rd Parcel Number: 42002-32-60010 Date of Application: September 2, 2004 The proposed development is reviewed as a Special Use Permit under Section 6 of the Standards for Telecommunication Antennas and Towers (Mason County Ord. 5-98). Review of this development requires a public hearing. A PUBLIC HEARING will be held by the Mason County Hearings Examiner regarding the proposed project on October 12, 2004 at 1:00 pm, in the Commissioners Chambers, Bldg. I, 411 North Fifth St, Shelton WA. If special accommodations are needed, contact the Commissioners' Office, (360) 427-9670. Any person desiring to express their views or to be notified of the action taken on the application should come to the public hearing on October 12, 2004 or mail comments to Bob Fink, Planning Manager, Mason County Department of Community Development, PO Box 279, Shelton, WA 98584. A SEPA Mitigated Determination of Nonsignificance was issued by the Washington State Patrol on June 18, 2004. No comments were included with the SEPA determination. Please contact Tammi Clark of the Mason County Dept. of Community Development at h r with questions regarding this (360) 427 9670 ext. 295, or at the address listed above, t quest o s egard g permit application. ��h�bL 5 TO BE KEPT IN TFIrE PARCEL FILE Affidavit of Publication AI alp �u'T� Cvnrl NO $PQDL7�IFTc�rAcnX� Notice is hereby given that Timothy STATE OF WASHINGTON, I SS. Chan for Washington State Patrol has COUNTY OF MASON filed an application for a Special Use Permit number DDR2004-00168 for the replace- ment of an existing 100-foot communication tower with a 155-foot self-supporting 3 Julie G. Orme being first duly swom legged tower The existing microwave dish- es and antennas from the existing tower will on oath deposes and says that she is the r-1 er k be relocated to the new tower. This Special of THE SHELTON-MASON COUNTY JOURNAL,a weekly newspaper.That said news- Use Permit w required because the commu- nications is a legal newspaper and it is now and has been for more than six months prior to the nications tower exceeds the height limit of paper g 150 feet for three users per section 4(b)(1) date of the publication hereinafter referred to,published in the English language continu- of Mason County Ordinance 5-98, Stan- ously as a weekly newspaper in SHELTON,Mason County,Washington,and it is now Bards for Telecommunications Antennas and during all of said time was printed in an office maintained at the aforesaid place of and Towers. publication of said newspaper.That the said SHELTON-MASON COUNTY JOURNAL Site Address and Project Location: 631 was on the 9th day of August,1941,approved as a legal newspaper by the Superior Court W Dayton-Airport Rd,Shelton,WA 98584. of said Mason County. TR 1 of N 1/2 SW 631 W Dayton-Airport Rd Parcel Number:42002-32-60010 That the annexed is a true copy of a Noti eP of App1 _ For Date of Application:September 2,2004 Special Use Permit and Notice of The proposed development is reviewed as a Special Use Permit under Section 6 of the Standards for Telecommunication An- Public Hearing — Timothy Chan — WSP tennas and Towers (Mason County Ord. 5- as it was published in regular issues(and not in supplement form)of said 98). Review of this development requires a public hearing. newspaper once each week for a period of one A PUBLIC HEARING will be held by the consecutive weeks,commencing on the Mason Count Hearings Examiner regarding Y 9 9 9 the proposed project on October 12, 2004 16th day of September 20 04 ,and ending on the at 1:00 pm, in the Commissioners Cham- bers, Bldg. I, 411 North Fifth St, Shelton WA. If special accommodations are needed, 16th day of September ,20 0 4 ,both dates inclusive, contact the Commissioners' Office, (360) and that such newspaper was regularly distributed to its subscribers during all of the said 427-9670. period.That the full amount of the fee charged for the Any person desiring to express their views or to be notified of the action taken on foregoing publication is the sum of$ 54 . 38 the application should come to the public hearing on October 12, 2004 or mail com- ments to Bob Fink, Planning Manager, Ma- son County Department of Community De- velopment, PO Box 279, Shelton, WA Subscribed and swom to before me this 1 jet b ` daW ftf„/' 98584. No significancelwa was sled bylthelon ofWash. Sen emb r ,20 04 ���```��I N Dpdd�,,��� ington State Patrol on June 18, 2004. No ` � 1-0 comments were included with the SEPA de termination. NotariPublic in and for the State of Washington_ NOTARY Please contact Tammi Clark of the Ma- Residing at Shelton,Washington son County Dept. of Community Develop- ment at (360) 427-9670 ext. 295, or at the V8 AL address listed above, with questions regard My commission expires 1 i ,20 O� ?`.' ing this permit application. 9/16 1t fW 11S"`o�`�� aye MASON COUNTY PLANNING DEPARTMENT Mason County Building 1 411 N. 5th St. P.O. Box 578 Shelton,WA 98684 (360) 427-9670 FAX (360) 427.8425 LAND USE PLANNING SHORELINES CODE ENFORCEMENT FIRE PROTECTION PLANNING TO: THE MASON COUNTY JOURNAL FROM: MASON COUNTY PLANNING DEPARTMENT STAFF DATE: O- ©L Please publish the attached On the following day(s) () - I ( U L Please keep the Affidavit of Publication for the Mason County Planning Department to pick up from your office and send copies to the following: g� � 3 Q,►'m s ins n � Please send a bill for publication costs to: Thank you, Mason County Planning Staff STATE o� � 4 O y G S n � I889 STATE OF WASHINGTON WASHINGTON STATE PATROL 8623 Armstrong Road SW • P.O. Box 42626 • Olympia,Washington 98504-2626 June 18, 2004 Subject: SEPA Threshold Determination DNS & EC Washington State Patrol Academy 155' Tower Replacement In accordance with State Environmental Policy Act(SEPA) regulations WAC 197-11- 340, transmitted for your review and comments are the SEPA Determination of Non- significance (DNS) and Environmental Checklist (EC) that was prepared by the Washington State Patrol for the subject project. SEPA regulations require the DNS and EC be circulated to agencies with jurisdiction. The Washington State Patrol is proposing to replace a communications tower at the Washington State Patrol Academy located at 631 W Dayton-Airport Road, Shelton, WA. This tower will improve public safety radio communications in the Mason County area. Please submit written comments on the proposed project no later than July 2, 2004. After the review period has lapsed, all comments received will be evaluated and the DNS will be retained, modified, or withdrawn as required by SEPA regulations. If you have any comments concerning the proposed project, contact Mr. Timothy Chan, at 360-596-6011. CHIEF LOWELL M. PORTER es to Property Management Division LSB:mje Attachments (2) cc: Mr. Timothy K. Chan, Facilities Section Mr. Thomas G. Lindahl, Facilities Section WAC 197-11-970 Determination of nonsignificance(DNS). DETERMINATION OF NONSIGNIFICANCE Description of proposal Replace an existing 100 foot communication tower with a 155 foot self-supporting 3-leg tower. Proponent Washington State Patrol Location of proposal,including street address,if any 631 Dayton-Airport Road, Shelton, WA, 98584-8945. Washington State Patrol parcel number: 42002 32 60010 Leadagency Washington State Patrol The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement(EIS)is not required under RCW 43.21 C.030(2xc). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. ❑ There is no comment period for this DNS. ❑ This DNS is issued after using the optional DNS process in WAC 197-11-355. There is no fiuther comment period on the DNS. I This DNS is issued under WAC 197-11-340(2);the lead agency will not act on this proposal for 14 days from the date below. Comments must be submitted by... .. .. . ... July 2, 2004. Responsible official L1._�S 1?rCx I- Position/title �; ter. � N Phone- Address- 3 /47 C zz ra c ke, S l y Date.1, ?kq Signature (OPTIONAL) ❑You may appeal this determination to(name) at(location) no later than(date) by(method) ........................................................... You should be prepared to make specific factual objections. Contact to read or ask about the procedures for SEPA appeals. ❑There is no agency appeal. ENVIRONMENTAL CHECKLIST A. BACKGROUND 1. Name of proposed project, if applicable: Washington State Patrol Academy 155' Tower Replacement 2. Name of applicant: Washington State Patrol 3. Address and telephone number of applicant and contact person: Applicant: Washington State Patrol Property Management Division 8623 Armstrong Road PO Box 42626 Olympia, WA 98405-2626 (360)596-6000 Contact: Timothy Chan Washington State Patrol Property Management Division 8623 Armstrong Road PO Box 42626 Olympia, WA 98405-2626 (360)596-6011 4. Date Checklist Prepared: June 15, 2004 5. Agency requesting checklist: Mason County DDES 6. Proposed timing or schedule (including phasing,if applicable): To begin construction in Fall 2004 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, please explain. None anticipated. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal? None. Environmental Checklist 9. Do you know whether applications are pending for governmental,approvals of other proposals directly affecting the property covered by your proposal? If yes, please explain. None known. 10. List any government approvals or permits that will be needed for your proposal, if known. Mason County Department of Community Development Special Use and Building Permit 11. Give a brief,complete description of your proposal,including the proposed uses and size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. The proposal is to replace an existing 100 foot communication tower with a 155- foot self-supporting 3-leg tower. Relocate existing microwave dishes and antennas from existing tower to new.tower. 12. Location of the proposal. Give sufficient information fora person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range of area, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. The site address is 631 W Dayton-Airport RD, Shelton, WA 98584-8945. The parcel number is 42002 32 60010 and located in the N 112 of SW, Section 2, T. 20, R. 4, W.M.. The site is a training facility for the Washington State Patrol. The proposed tower is located 814 feet from Dayton-Airport Rd. See attached plan. B. ENVIRONMENTAL ELEMENTS 1. EARTH a. General description of the site (circle one): flat, rolling, hilly, steep slopes, mountainous, other Flat b. What is the steepest slope on the site (approximate percent slope)? The tower location is level. C. What general types of soils are found on the site(for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Sandy Gravel Page 2 Environmental Checklist d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. No indication or history of unstable soils in the vicinity. e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate sources of fill. The tower foundation requires excavating 43 cubic yards of spoils. The spoils will be re-compacted around the new tower foundation. No additional fill material is required for this project. f. Could erosion occur as a result of clearing,construction, or use? If so, generally describe. Erosion would be insignificant. Approximately 43 cubic yards will be excavated for the foundation. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? The current percentage of impervious surface on the site is unknown. With the proposed tower, the added impervious surface is approximately 60 square feet. The total impervious surfaces percentage increase will be insignificant. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: No measures are anticipated to be necessary due to the limited area covered by the proposal. However, typical construction methods such as careful placement and covering of stockpiles will be used. 2. AIR a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors, industrial wood smoke)during construction and when the project is completed? If any, generally describe and give approximate quantities if known. Light vehicular traffic during the 4 to 6 weeks of construction. During construction, a small amount of dust may result from construction activities at the site. Once operational, the facility will be unmanned and will not generate emissions to the air. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. None anticipated. C. Proposed measures to reduce or control emissions or other impacts to air, if any: Page 3 Environmental Checklist None are anticipated to be necessary due to the limited amount of omissions during construction and project type proposed. 3. WATER a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds,wetlands)? If so, describe type and provide names. If appropriate, state what stream or river it flows into. No. 2) Will the project require any work over,in, or adjacent to (within 200 feet)the described waters? If yes,please describe and attach available plans. No. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. None. 4) Will the proposal require surface water withdrawals or diversions? Give general description,purpose, and approximate quantities if known. None. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. No. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. None. b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities if known. None. The existing facility is unmanned, no water or sanitary sewage system is proposed or required. Page 4 Environmental Checklist 2) Describe waste material that will be discharged into ground from septic tanks or other sources, if any(for example: domestic sewage; industrial containing the following chemicals ...; agricultural; etc.). Describe the general size of the system,the number of such systems,the number of houses to be served(if applicable), or the number of animals or humans the system(s) are expected to serve. The facility is unmanned. There will be no discharges to a septic or sewer system. C. Water runoff(including storm water): 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Negligible runoff will result from the addition of the approximate 16 square feet of impervious surface created by the tower. The minimal amount of runoff is anticipated to be absorbed into the surrounding soils. 2) Could waste materials enter ground or surface waters? If so, generally describe. No. No waste materials will be generated from this proposal. 3) Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: None anticipated being necessary. 4. PLANTS a. Check or circle types of vegetation found on the site: _ deciduous tree: alder, maple, aspen,other X evergreen tree: fir, cedar,pine, other shrubs X grass pasture crop or grain wet soil plants: cattail, buttercup,bulrush, skunk cabbage, other _ water plants: water lily, eelgrass, milfoil, other X other types of vegetation b. What kind and amount of vegetation will be removed or altered? The proposed tower location is gravel. One fir tree maybe removed pending immediate utilities locations to accommodate the new communications tower. C. List threatened or endangered species known to be on or near the site. None known. Page 5 Environmental Checklist d. Proposed landscaping, use of native plants,or other measures to preserve or enhance vegetation on the site. None anticipated being necessary. S. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, ongbir s other:Raven mammals: deer bear, elk,beaver, other: fish: bass, salmon, trout, herring, shellfish, other: b. List any threatened or endangered species known to be on or near the site. None known. C. Is the site part of a migration route? If so, explain. No. d. Proposed measures to preserve or enhance wildlife, if any: None anticipated. 6. ENERGY AND NATURAL RESOURCES a. What kinds of energy (electrical, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs. Describe whether it. will used for heating, manufacturing, etc. Electrical. The electronic equipment will require electrical service for power and air conditioning. Telephone service will be required for the electronic equipment. These services are already in place for the current tower. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. The proposed communications tower will not affect the potential solar energy to neighboring properties. C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: None. The proposal is to construct a communication tower; communication equipment is not a heavy user of energy. Page 6 Environmental Checklist 7. ENVIRONMENTAL HEALTH a. Are there any environmental health hazards,including exposure to toxic chemicals,risk of fire and explosion, spill, or hazardous waste,that could occur as a result of this proposal? If so, describe. No materials that would cause fire or explosion are known. Radio power density levels are regulated by the Federal Government(FCC)to prevent any potential environmental concern. 1) Describe special emergency services that might be required. None are anticipated to be necessary. 2) Proposed measures to reduce or control environmental health hazards,if any: None are anticipated to be necessary. b. Noise 1) What types of noise exist in the area which may effect your project (for example: traffic, equipment, operation, other)? None. This facility is unmanned so that noise from the area would not affect the operation of this facility. 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. There will be some additional traffic and construction equipment noise during the 4 to 6 week construction period. The completed project would not generate any additional noise. Existing air conditioner unit is already in operation. There will be some infrequent site visits to check the operation of equipment. 3) Proposed measures to reduce or control noise impacts, if any: None proposed nor anticipated to be needed. 8. LAND AND SHORELINE a. What is the current use of the site and adjacent properties? The site is owned by the Washington State Patrol and is a Training Facility, neighbors include, Washington Department of Transportation, an airport and a tree farm. Page 7 Environmental Checklist b. Has the site been used for agriculture? If so,describe. No. C. Describe any structures-on the site. The site includes an existing development. See response to question 8 a. d. Will any structures be demolished? If so, what? No. e. What is the current zoning classification for the site? None f. What is the current comprehensive plan designation of the site? Shelton Urban Growth Area g. If applicable, what is the current shoreline master program designation of the site? N/A. h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. No i. Approximately how many people would reside or work in the completed project? The site is unmanned. One employee will visit the site for maintenance purposes up to two times per month. j. Approximately how many people would the completed project displace? None. k. Proposed measures to avoid or reduce displacement impacts, if any: None anticipated. 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: The site is currently used by Washington State Patrol as a training facility. This proposal will not increase traffic, noise or restrict adjoining site uses. The appearance of the proposed changes would not significantly impact the adjoining properties. Page 8 Environmental Checklist 9. HOUSING a. Approximately how many units would be provided, if any? Indicate whether high,middle, or low-income housing. N/A. b. Approximately how many units, if any, would be eliminated? Indicate whether high,middle, or low-income housing. N/A. C. Proposed measures to reduce or control light and glare impacts, if any: -- - N/A. 10. AESTHETICS a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s)proposed? The proposed I55 foot self-supporting lattice communications tower is made of galvanized steel and is naturally a gray color as to blend with the sky background. b. What views in the immediate vicinity would be altered or obstructed? The proposed communication tower is located behind existing buildings and will not block any views in the immediate vicinity. C. Proposed measures to reduce or control aesthetic impacts, if any: None, the galvanized metal communications tower is a factory-finished, naturally graying to blend in with the sky background. 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? The FAA is requiring an obstruction light mounted on top of the tower. b. Could light or glare from the finished project be a safety hazard or interfere with views? No. C. What existing off-site sources of light and glare may effect your proposal? None. Page 9 Environmental Checklist d. Proposed measures to reduce or control light and glare impacts, if any: None are anticipated to be necessary. 12. RECREATION a. What designated and informal recreational opportunities are in the immediate vicinity? Not known b. Would the proposed project displace any existing recreational uses? If so, describe. No. C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: None proposed or anticipated to be necessary. 13. HISTORIC AND CULTURAL PRESERVATION a. Are there any places or objects listed on, or proposed for,national, state, or local preservation registers known to be on or next to the site? If so, generally describe. None known. b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. None known. C. Proposed measures to reduce or control impacts,if any: None proposed or anticipated to be necessary. 14. TRANSPORTATION a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. Immediate site access is from the Dayton-Airport Rd..A private roadway provides access to the tower site. b. Is the site currently served by public transit? If not,what is the approximate distance to the nearest transit stop? Not Applicable Page 10 Environmental Checklist • C. How many parking spaces would the completed project have? How many would the project eliminate? No parking spaces will be eliminated as a result of this proposal. d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). No new roads or streets will be required for this proposal. e. Will the project use (or occur in the immediate vicinity of)water, rail, or air transportation? If so, generally describe. No. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. Approximately 10 constructions vehicle trips per day during the 4 to 6. week construction period. Once operational, the facility may generate up to 2 vehicle trips per month for normal maintenance. g. Proposed measures to reduce or control transportation impacts, if any: None anticipated to be necessary. 15. PUBLIC SERVICES a. Would the project result in increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. No. b. Proposed measures to reduce or control direct impacts on public services, if any: None will be required as a result of the proposal. .16. UTILITIES a. Circle utilities currently available at the sites a ectricI atural gas at e use servic elephone sanitary sewer eptic syste of er. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. No new utilities are needed for this proposal. C. SIGNATURE Page 11 • Environmental Checklist The above answers are true and complete to the best of my knowledge Signature: t lAIVII CAAIN Date Submitted: ' LO :i Page 12 Jun 21, 2004-1:22pm W:\AutoCAD Drawings\ACADEMY\towbr\03 tower.dwg • is ;v r'9 O X f�r1X 0 "4 Z N Z m Z r O N R1 Z7 o = 0 a C � � o $ < °o N z � z Z LOST LAKT m $ D m m 0 o D z " m D Z m o z m D Z 4 n m ll �. z ~ Q Do F 10L AAH ONY NOLl3HS WASHINGTON STATE PATROL um WASHINGTON STATE PATROL NEW COMMUNICATION TOWER PROPERTY MANAGEMENT DIVISION SITE PLAN 23 AIWSNO RO P.O. BOX 42626 - OLYNPU, WA - 985O4-2626 Hz (360 566- FAX: (360) 366-6040 `--.+ SHELTON, WA AMP 0 LSI Adapt, Inc. ~ 615 Eighth Avenue South Seattle,Washington 98104 Tel(206)654-7045 Fax(206)654-7048 www.isiadapt.com Adapt'.". July 9.2004 Adapt Project No. WA04-11543-GEO Radian Communication Services,Inc. 22125 17th Avenue Southeast, Suite 117 Bothell,Washington 98021 Attention: Mr.Lowrie Ruddell Subject: Geotechnical Engineering Evaluation Shelton WASP Academy Tower Site 631 West Dayton Airport Road Shelton,Washington 98584 Dear Mr. Ruddell: Pursuant to your request, LSI Adapt (Adapt) is pleased to submit this report describing our recent geotechnical engineering evaluation for the above-referenced site. The purpose of this study was to interpret general surface and subsurface site conditions, from which we could evaluate the feasibility of the project and formulate design recommendations concerning site preparation, equipment pad and tower foundations, structural fill, and other considerations. Our scope of services consisted of a surface reconnaissance, a subsurface exploration, geotechnical analyses, and report preparation. Authorization to proceed was given by Mr. Lowrie Ruddell of Radian Communication Services, Inc. (Radian), on behalf of Washington State Patrol(WASP) This report has been prepared for the exclusive use of Radian, WASP and their agents, for specific application to this project in accordance with general accepted geotechnical engineering practice. Use or reliance upon this report by a third party is at their own risk. Adapt does not make any representation or warranty,.express or implied,to such other parties as to the accuracy or completeness of this report or the suitability of its use by such other parties for any purpose whatever,known or unknown,to Adapt. i 3 1 � • LSI Adapt, Inc. r We appreciate the opportunity to be of service to you. If you have any questions, or if we can be of further assistance to you,please contact us at(206)654-7045. Respectfully submitted, LSI Adapt,Inc. Thomas S.Doran Project Manager -r �O ,p 31760 GS Rolf B. Iyllseth,P.E.,L.G. �s ONALL Senior Geotechnical Engineer EMAES 0 S K.V.Le ,P.Eng. Senior eotechnical Engineer Senior Reviewer TSD/rbh Attachments: Figure 1-Location Map Figure 2-Site&Exploration Plan Boring Log B-1 Radian Communication Services,Inc. July 9,2004 LSI Adapt Project No.WA04-11543-GEO Page 2 LSI Adapt, Inc. 615 Eighth Avenue South Seattle,Washington 98104 Tel(206)654-7045 Fax(206)654-7048 A d a p t Tr www.isladapt.COM Radian Communication Services, Inc. Geotechnical Engineering Evaluation Shelton WASP Academy Shelton, Washington WA04-11543-GEO July 2004 LSI Adapt, Inc. PROJECT DESCRIPTION The host parcel is located at 631 West Dayton Airport Roads Shelton, Washington, as shown on the Location/Topographic Map(Figure 1). The proposed lease area is located on a relatively level area of the host parcel. We understand that current development plans call for -construction of a lattice communication tower. The project site and surrounding area are shown on the attached Site & Exploration Plan(Figure 2). - It should be emphasized that the conclusions and recommendations contained in this report are based on our understanding of the currently proposed utilization.of the project site, as derived from written and verbal information supplied to us by Radian. Consequently, if any changes are made to the project, we recommend that we review the changes and modify our recommendations, if appropriate, to reflect those changes. EXPLORATORY METHODS We explored surface and subsurface conditions at the project site during a site visit on July 1, 2004. Our surface exploration consisted of a visual site reconnaissance. Our subsurface exploration consisted of advancing one boring (designated B-1) to a maximum depth of approximately 30.0-feet below existing ground surface (bgs) within an accessible area in the vicinity of the proposed location of the tower site. The procedures used for soil exploration are presented in the following report sections. The boring was completed using a truck-mounted, hollow-stem auger drill rig, which was operated by an independent company working tinder subcontract to Adapt. A geotechnical representative of Adapt was on-site to observe the boring,obtain representative soil samples,and log the subsurface conditions. After the boring was completed,the borehole was backfilled with a mixture of soil.cuttings and bentonite chips. The location of the boring advanced for this study is shown on the attached Figure 2. The specific location and depth of the exploration performed was selected in relation to the proposed site features, under the constraints of budget and site access. The boring location and other features shown on Figure 2 were obtained by hand taping from existing site features; as such, the exploration location shown should be considered accurate only to the degree implied by the measuring methods used. During drilling, soil samples were obtained at 2.5 to 5.0-foot depth intervals using the Standard Penetration Test(SPT)procedure (ASTM: D 1586). This test and sampling method consists of driving a standard 2-inch-outside diameter (OD) split-barrel sampler a distance of 18 inches into the soil with a 140-pound bammer, free-falling a distance of 30 inches. The number of blows required to drive the sampler through each of the three, 6-inch intervals is noted. The total number of blows struck during the final 12 inches of penetration.is considered the Standard Penetration-Resistance,or"blow count". If 50 or more blows are struck within one 6-inch interval, the driving is ceased and the blow count is recorded as 50 blows for the actual number of inches of penetration. The resulting Standard Penetration Resistance values provide a measure of the relative density of granular soils or the relative consistency of cohesive soils. Radian Communication Services, Inc. July 9,2004 LSI Adapt Project No.WA04-11543-GEO Page 4 LSI Adapt, Inc. The exploration log attached to this report indicate the .vertical sequence of soils and materials encountered in each exploration, based primarily on our field classifications and supported by our subsequent laboratory examination and testing, if applicable. Where a soil contact was observed to be ` gradational or undulating; our logs indicate the average contact depth. Our boring log also graphically indicate the SPT blow count, sample type, sample number, and approximate depth of each soil sample obtained from the exploration. If any groundwater was encountered in an ekploration, the approximate groundwater depth is depicted,on the exploration logs. It should be realized that the explorations performed for this evaluation reveal subsurface conditions only at discrete locations across the project site and that actual conditions in other areas could vary. Furthermore, the nature and extent of any local variations would not become evident until additional explorations are performed or until construction activities have commenced. If significant variations are observed at that time, we may need to modify our conclusions and recommendations contained in this report to reflect the actual site conditions. SITE CONDITIONS The following sections describe our observations, measurements, and interpretations concerning surface, soil,groundwater,and seismic conditions at the project site. Surface Conditions The proposed lease area is located on a relatively level area of the host parcel. Surface conditions consist of a gravel parking area. Subsurface Conditions At the boring location, near-surface soil conditions consisted of about 6 to 12-inches of gravel. mantling loose, fine to coarse sand with gravel and cobbles. Below these surficial soils at a depth of roughly 3.5- feet bgs, our boring encountered medium dense,-grading to dense, fine to coarse sand with gravel and cobbles, which extended the full depth explored of approximately 30.0-feet bgs. Groundwater was not encountered at the, time of drilling. Throughout the year; groundwater levels would likely fluctuate in response to changing precipitation.patterns,off-site construction activities,and changes in site utilization. Seismic Conditions Based on our analysis of subsurface exploration-logs and our review of published geologic maps, we interpret the on-site soil conditions to correspond to seismic soil profile type SD, as defined by Table,.l 6-J of the 1.997 Uniform Building Code and Table 161.5.1.1 of the 2000 International Building. Code. This soil profile is characterized by stiff soil profile with an average SPT blowcount ranging from 15 to 50 blows per foot within the upper 100 feet bgs. Current(1996)National Seismic Hazard Maps prepared by the U.S. Geological Survey indicate that.a peak bedrock site acceleration coefficient of about 0.30 is appropriate for an earthquake having a 10-percent probability of exceedance in 50 years(corresponding to a return interval of 475 years). According to Figure 16-2 of the 1997 Uniform Building Code,the site lies. Radian Communication Services,Inc. My g,2004 LSl Adapt Project No_WA04-11543-GEO Page 5 LSI Adapt Inc. within Seismic Risk Zone 3. For purposes of seismic site characterization, the observed soil conditions were extrapolated below the exploration termination depth, based on a review of geologic maps and our knowledge of regional geology. CONCLUSIONS AND RECOMMENDATIONS Current development plans call for the construction of a lattice communication tower within the proposed lease area. Based on the subsurface conditions revealed by our exploration, we recommend that the proposed telecommunication tower be supported on drilled pier foundations. Design criteria for compressive, uplift and lateral support of a drilled pier are presented below. Our specific recommendations concerning site preparation, tower foundations, access driveway, and structural fill are presented in the following sections: Site Preparation Preparation of the tower lease area for construction should involve clearing, grubbing, stripping, cutting, filling, dewatering, and subgrade preparation. The following comments and recommendations apply to site preparation: Clearing and Stripping: After surface and near-surface water sources have been controlled, the construction areas should be cleared and stripped of all surface organics and debris, if present. Our exploration and visual site observations indicate that an average thickness of about 6-inches of gravel will be encountered across the tower lease area, but significant variations could exist. It should also be realized that if the stripping operation proceeds during wet weather, a generally greater stripping depth might be necessary to remove disturbed, surficial, moisture-sensitive soils; therefore, stripping is best performed during a period of dry weather. Backfill materials, where required, should be placed and compacted according to the recommendations presented in the Structural Fill section of this report. Subuade Preparation: Exposed subgrades for shallow footings, mat foundations, slabs-on-grade, roadway sections and other structures should be compacted to a firm, unyielding state, if required to achieve adequate density and warranted by soil moisture conditions. Any localized zones of loose, granular soils observed within a subgrade area should be compacted to a density commensurate with the surrounding soils. In contrast, any uncontrolled fill material or organic, soft, or pumping soils observed within a subgrade should be overexcavated and replaced with a suitable structural fill material. It should be noted that the near-surface bearing soils at this site are anticipated to consist of medium dense, fine to coarse sand with gravel, which are generally considered to exhibit relatively low moisture sensitivity to minimize disturbance and subsequent need for recompaction. We nevertheless, generally recommend that all bearing subgrade areas be excavated with a smooth-edged bucket. Frozen Subgrades: If earthwork takes place during freezing conditions, we recommend that all exposed subgrades be allowed to thaw and be recompacted prior to placing subsequent lifts of structural fill. Radian Communication Services,Inc. July 9,2004 LSI Adapt Project No.WA04-11543-GEO Page 6 LSI Adapt, Inc. Access Driveway Based on our site reconnaissance visit, it does not appear to be necessary to construct a new access road to the proposed lease area. However,if needed,we recommend that the subgrade for any access roadway be prepared in accordance with the Site Preparation section of this report. For planning purposes, we anticipate that 6 to 12-inches of"clean" sand and gravel subbase material and a minimum 3-inches of crushed rock surfacing will be required to create a stable gravel roadway surface at this site. Adapt can provide additional subgrade stabilization or gravel road section recommendations based on observed field conditions at the time of construction. Where cuts and fills are required,they should be accomplished in accordance with the recommendations provided in the Site Preparation and Structural Fill sections of this report. Tower Drilled Pier Foundations Based upon the subsurface soil and groundwater conditions observed in our test boring, we recommend that the proposed tower be supported on drilled pier foundations. The following recommendations and comments are provided for purposes of drilled pier design and construction: End Bearing Capacities: We recommend that the drilled pier penetrate at least 15-feet below the ground surface. For vertical compressive soil bearing capacity, we recommend using the unit end bearing capacity presented in Table 1 below. This allowable end bearing capacity includes a minimum safety factor of 1.5. Table 1 Allowable End Bearing Capacity e�} ► e�t� AtIb1 l;t ) eaiirlh 7apa (afsi Lthlrfixtg>E�o rif Ri si t txc is 15-30 2 D/B 5 Frictional Capacities: For frictional resistance along the shaft of the drilled piers, acting both downward and in uplift, we recommend using the allowable skin friction value listed in Table 2. We recommend that frictional resistance be neglected in the uppermost 2 feet below the ground surface. The allowable skin friction values presented includes a minimum safety factor of 1.5. Radian Communication Services,Inc. July 9,2004 LSI Adapt Project No.WA04-11543-GEO Page 7 LSI Adapt, Inc Table 2 Allowable Skin Friction Capacities Depth (feet) Allowable Slid Frictiptw (tsf) 0-2 0.0 2-5 0.05 5-12 0.10 12-30 0.20 Lateral Capacities: Drilled pier foundations for communication monopole towers are typically rigid and act as a pole, which rotates around a fixed point at depth. Although more complex and detailed analysis are available, either the simplified passive earth pressure method or the subgrade reaction method is typically used to determine the pier diameter and depth required to resist groundline reaction forces and moments..,These methods are described below. Passive Earth Pressure Method: The passive earth pressure method.is a simplified approach that is generally used to estimate an allowable lateral load capacity based on soil wedge failure theory. Although the lateral deflection associated with the soil wedge failure. may be estimated, design lateral deflections using the passive earth pressure method should be considered approximate, due to the simplified nature of the method. According to the NAVFAC Design Manual 7.02 (1986), a lateral deflection equal to about 0.001 times the pier length would be required to mobilize the allowable passive. pressure presented below; higher deflections would mobilize higher passive pressures. Our recommended passive earth pressures for the soil layers encountered at this site are presented in Table 3 and incorporate a safety factor of at least 1.5, which is commonly applied to transient or seismic loading conditions. These values are expressed as an equivalent fluid unit weight to reflect the linear increase with depth and may-be assumed to act over an area measuring two pier diameters wide by eight pier diameters deep: Table 3 Allowable Passive Pressures Depth(feet) Allowable'Passive" ressurejoe'f) 0-2 0 2-5 280 5-12 300 12-30 350 Subgxade Reaction Method: 'The subgrade reaction method is typically used to compute lateral design loads based on allowable lateral deflections. Using this method, the soil Radian Communication Services,Inc. July 9,2004 LSI Adapt Project No.WA04-11.543-GEO Page 8 LSI Adapt, Inc. reaction pressure(p)on the face of the'-pier is related to the lateral displacement(y) of the pier by the horizontal subgrade modulus(kb); this relationship is expressed as p=4y. Because soil modulus values are based on small scale, beam load test data, and are usually reported as a vertical subgrade modulus(k,),they must be converted to horizontal subgrade modulus values representative for larger scale applications (such as large pier diameters)-by means of various scaling factors, as discussed below. In addition to the scaling and loading orientation, the soil=pier.interaction governing kh is also affected by the soil type,as follows: • SAND and Soft CLAY: For cohesionless soils (sand, non-plastic silt) and soft cohesive soils (clay, cohesive silt), the horizontal subgrade modulus (kh) increases linearly with depth (z). This relationship is expressed as kh=nhz(1/B), where nh is the coefficient of horizontal subgrade reaction and(I/B)is the scaling factor.' • Stiff or Hard CLAY: For stiff or hard cohesive soils (clay, cohesive silts), the horizontal subgrade modulus(kh)is essentially the same as the vertical subgrade modulus(k,.)and is considered constant with depth. This relationship is expressed as kh=k„[1(ft)/1.5B], where[1(ft)/1.5B] is the scaling factor(B is expressed in feet). Our recommended values for the coefficient of horizontal subgrade reaction(nh) and the vertical subgrade modulus (k„) for the soil layers encountered at this site are presented in Table 4 below. These values do not include a factor of safety since they model the relationship between contact pressure and displacement. Therefore, the structural engineer or monopole manufacturer should select an appropriate allowable displacement for design,based on the specific requirements of the communication equipment mounted on the tower. Table 4. Recommended Horizontal Subgrade Reaction Values Depth Interval:.. nh (feet) (per) 0-2 0 N/A 2-5 8 N/A 5-12 25 N/A 1.2-30 50 N/A Coefficient of Horizontal kl,nh(z/B) kh=k,,/(1,51 ) Subgrade Reaction(pci) (Sand-&Soft Clay) (Stiff Clay) Construction Considerations: Our exploration revealed the site soils to consist of loose to medium dense, sand with gravel and cobbles. Groundwater seepage was not encountered at the time of drilling. Radian Communication Services,Inc. July 9,2004 LSI Adapt Project No.WA04-11543-GEO Page 9 L.SI Adapt, Inc. Therefore, dewatering will not likely be required, depending on the actual depth and time of year of drilled pier construction. The foundation-drilling contractor should be prepared to case the excavation to prevent caving and raveling of the pier shaft sidewall, if necessary due to unanticipated soil or excessive groundwater seepage conditions. Should unanticipated heavy groundwater inflow be encountered during drilling, it may be necessary to pump the accumulated groundwater prior to pier concrete placement. Alternatively,the use of bentonite slurry could be utilized to stabilize the drilled pier excavation. Drilled Pier Excavation Conditions: The drilling contractor should be prepared to clean out the bottom of the pier excavation if loose soil is observed or suspected, with or without the presence of slurry or groundwater. As a minimum,we recommend that the drilling,contractor have a cleanout bucket on site to remove loose soils and/or mud from the.bottom of the pier. If groundwater is present and abundant within the pier hole, we recommend that the foundation concrete be tremied from the bottom of the hole to displace the water and minimize the risk of contaminating,the concrete mix. The-Drilled Shaft Manual published by the Federal Highway Administration recommends that concrete be placed by tremie methods if more than 3 inches of water has accumulated in the excavation. Structural Fill The following comments, recommendations, and conclusions regarding structural fill are provided for design and construction purposes: Materials: Structural fill includes any fill materials placed under footings, pavements, driveways, and other such structures. Typical materials used for structural fill include: clean, well-graded sand and gravel (pit-run); clean sand; crushed rock; controlled-density fill (CDF); lean.-mix concrete; and.various soil mixtures of silt, sand, and gravel. Recycled concrete, asphalt, and glass, derived from pulverized parent materials may also be used as structural fill. Placement and Compaction: Generally, CDF, and lean-mix concrete do not require special placement and compaction procedures. In contrast, pit-run, sand, crushed rock, soil mixtures, and recycled materials should be placed in horizontal lifts not exceeding 8 inches in loose thickness, and each lift should be thoroughly compacted with a mechanical compactor. Using the modified Proctor maximum dry density (ASTM:D-1557) as a standard,we,recommend that structural fill used for various on-site applications be compacted to the following minimum densities: Fill Application Minimum Compaction Slab/Footing subgrade 90.percent Gravel drive subgrade(upper I foot) 95 percent Gravel drive subgrade(below I foot) 90 percent Subgrades and Testing: Regardless of location or material, all structural fill should be placed over firm, unyielding subgrade soils. We recommend that a representative from Adapt be retained-to observe the condition of subgmde soils before fill placement begins, and to perform a series of in-place density tests Radian Communication Services,Inc. July 9,2004 LSI Adapt Project No.WA04-11543-GEO Page 10 • LSI Adapt, Inc. during soil fill placement. In this way, the adequacy of soil compaction efforts may be evaluated as earthwork progresses. Fines Content: Soils used for structural fill should not contain individual particles greater than about 6 inches in diameter and should be free of organics, debris, and other deleterious materials. Given these prerequisites,the suitability of soils used for structural fill depends primarily on the grain-size distribution and moisture content of the soils when they are placed. When the "fines" Content (that soil fraction passing the U.S. No. 200 Sieve) increases, soils become more sensitive to small changes in moisture content. Soils containing more than about 5 percent fines (by weight) cannot be consistently compacted to a.firm, unyielding condition when the moisture content is more than about 2 percentage points above optimum. The near-surface and deeper,sand with gravel and cobbles may be considered relatively "clean" soil, exhibiting low moisture sensitivity. The use of"clean" soil is necessary for fill placement during wet-weather site work, or if the in-situ moisture content of the sandy site soils is too high to allow adequate compaction. Clean soils are defined as granular soils that have a fines content of less than 5 percent(by weight)based on the soil fraction passing the U.S. 3/4-inch Sieve. CLOSURE The conclusions and recommendations presented in this report are based, in part,on the explorations that we performed for this study. If variations in subsurface conditions are discovered during earthwork, we may need to modify this report. The future performance and integrity of the tower foundations will depend largely on proper initial site preparation, drainage, and construction procedures. Monitoring by experienced geotechnical personnel should be considered an integral part of the construction process. We are available to provide geotechnical engineering services during the earthwork and foundation construction phases of the project. If variations in the subgrade conditions are observed at that time, we would be able to provide additional geotechnical recommendations,thus minimizing delays as the project develops. We are also available to review preliminary plans and specifications before construction begins,and to provide geotechnical inspection and testing services during construction. Radian Communication Services,Inc. July 9,2004 LSI Adapt Project No.WA04-11543-GEO Page 11 ' j � �H r '.� .°� ��1:,��. � .wwf(�7b'MRyr.�lit.Mr«w - 4" �'� .. �•"` .• a .tom Y�y,�`�,�. •, i �' `�a, � ...+ �� �` •yam^ .� (...r-„ �,.. �•tr �i t,� 'i'!,e- .r''. j .... �,.. �1 !R"-. AM. r� x i 9 ff , J"jr,... `. y��air �.-'•}(f'- ^„ ``,7�! t t • '�^ x► •tea •.�. i , i ^� _r,,.•' .f I Z( t .•'^' ,t• ---...� (r �.,. ✓t'I «, ,Ar,� dlY i.Okl.o.F ..f.� r t +n�"`' s«._-.« ; ..y,-,rom#I'e,5.• j i7s.s'W" dG'.r..- tl f i I • y .r,.Y[� +�'",c ' ; ' Vol C_ +. r w _ .. 4 ��'" wt► « R'� Pi f y,,yy wa=Frgr7i, •i ( •14 - +� t1kilGl�I1CYt.(ZNtla{ �� • '/ �•-_ ��. 1 1 i il!LG �� �� 2 y, ', W - %--�y..a:fir. S .�.,�i __—_�..�.. f1 - •''���- � le 1 r, y/� F � r' !_,}${$ `� �. mil.' `r� _.�.'ti'k1 I.`� �`'v}�✓' f m a cam Jon Mfll;f Pdatd'r_ta TOP��!�.0�tktoci Cc:t;w:�HolditA:rrr+�pop:cam; LSI ADAPT, INC. FIGURE 1 - Location/Topographic Map 615 Sth Ave:-,ue South, Project :She!t(,n WASP Accoemy Seattle, VVash�n Location : ,St `v4't'st Go•iTon Airport Road gtor- 981+011 sflk'.if,i3n, §w;;S.h.iryton 9??5t?i4. Client Rlad or Comrnur Catior Sep.ces. no Ph 206.654.!c045 F_ox . ?06.65,4,7 ^- Date 0_ Job t WrA--u4—,15q 3-GE:.7 EXISTING EXISTING ROADWAY ROADWAY (TOWER F ING EXISTING IOMAINTENANCE SHOP ING EXISTING i SHED ` I EXISTING ` FUEL TANK i } TREE CLUSTER r � r LEGEND: _ B 1 - BORING NUMBER AND APPROXIMATE LOCATION NOT TO SCALE LS1 ADAPT FIGURE 2 - Site Plan 615 8th Avenue South Project :Shelton WASP Academy Seattle, Washington 98104 Location :631 West Dayton Airport Road Shelton, Washington 98584 Ph 206.654.7045 Fax 206.654.7048 Client : Radian Communication Services, Inc. Date 07/09/04 Job # S—WA-04-11543—GEO LSI ADAPT RING L O 615 eth Avenue South 4� Seattle, Washington 98104 TEL.:206.654.7045 FAX:206.654,7048 PROJECT : Shelton WASP Academy Job Number : WA04-11543-GEO Boring No. : B-1 LOCATION : 631 West Dayton Airport Road Shelton, Washington 98584 Radian Communication Services, Inc. Ground Surface Elevation: N/A Elevation Relerence: N/A age 01 of 01 SOIL DESCRIPTION a6 g COMMENTS O �� vgiz my a¢ c`o73 Gravel parking lot 2 s1 2 L---------------- -- Loose, moist, brown-black, fine to coarse SAND 4 with gravel and cobbles Becoming medium dense S-2 7 13 5 10 l 4 10 6 Becoming dense 8-4 1t Blowcount possibly overstated on 22 15 39 rock. S-5 4 13 20 16 5 6 11 16 25 16 ----------------- Becoming medium dense 5-7 10 13 3 30 14 Boring terminated at 30.0 feet bgs LEGEND T 2-Irgh O.D.Split-Spoon Sample Sample not Rem W d V 8I.0.Water Level at Milling nNo�w Type of Analyllcal Testing Perlarmed Grain Size Analysts r�. ,,,"� � �h floes s'ro+m} 3 114-inch O.D.Dames a Moore Sample �� — Static Wet&Leal 11 I� 1 Groh sannplo-(Sa C'Angs) DATE NR No Recovery z Shelby Tuba San* III���t JJ Perched Groundwater 200 Wash ATD At Time of 0r111in0 �a ('�fines shown) li Start Date: 07/01/04 Completion Date: 07/01/04 Logged By: T.S.D. r t ✓;.J _ ^411 y.y e yid .. • . ,� ,� -'t ��`, - � � � _ .r .. ,. i y� _ ,l. ..� • r s,} n l �� .. �+ m 4 �� ��i`r �,i ��^.. �!!!"'� ` r'�,�.. L P:, .t ,:. _'.� t � �.�, �'� .,. �t'1 d �� ` � "� �'�,' -.,� \5J :i�- � `4 k �F r ..., J9 { y� � � �4` *Z e�� j � t - - :.:� �,��� =yam• -... �. x �Tarfti Clark - MVC-003S.JPG Page 1J or 11/19/03 RED 12:31 TEL 9997055780 WA STATE PATROL E.S.D 444 ESD TARS Z001 Federal Aviation Administration all" Aeronautical Study NoNMNorthwest Mountain Regional Office 2003-A -2079-OE 1601 Lind Avenue SW-AW-520 0 Renton, WA 96055-4056 Issued Dace: 11/17/2003 John L. Woodcock Washington State Patrol, Electronic Services Div 2803 156th Ave SE Bellevue, WA 98007 ;�► DETERMINATION OF NO HAZARD TO AIR NAVIGATION +• The Federal Aviation Administration has completed an aeronautical study under the proviGions of 49 U.S.C. , Section 44716 and, if applicable, Title 14 of the Code of Federal Regulations, part• 77, concerning: Structure Type: Antenna Tower Location: Shelton, WA Latitude: 47-14-5*9.4 NAD 83 Longitude: 123-9-32.4 Heights: 155 feet above ground level (AGL) 417 feet above mean sea laval (AMSL) Thig aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(o) , if any, ig(are) met: As a condition to this Determination, the structure should be marked and/or lighted in accordance with FAA Advisory Circular 70/7460-1 AC70/7460-1K, Obstruction Marking and Lighting, red lights - Chapters 4,5(Red) ,&12. This determination expires on 5/17/2005 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and az: application for a construction permit hag been filed , an required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. This determination is based, in part, on the foregoing dc-scription Which includes specific coordinates, heights, frequency(ies) and power. Any 'changes in coordinates, heights, and frequencies s qu or use of greater power will void this determination. Any future construction or alteration, including increase to heights, power, or the addition of other transmitters, requires separate notice to the FAA_ This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structuro. However, thin equipment shall not exceed the overall heights as indicated above. Page 1 L 11/19/03 WED 12:32 TEL 9997055786 WA STATE PATROL E.S.D. 444 ESD TARS 002 Equipment which has a height g greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. A copy of this determination will be forwarded to the Federal Communications commission if the structure is subject to their licensing authority. if we can be of further assistance, please contact our office at (425)227-2538. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2003-ANM-2079-OE. ,Signature Control No: 359074-230835 (DNE) James D Lambert Specialist Attachments) Frequency Data 1 fio �D ttJ a r CJ l W Page 2 l