Loading...
HomeMy WebLinkAboutBLD2010-00213 Cancelled ATF-Shop - BLD Permit / Conditions - 7/15/2013 inspection Llfle tJUV)4L/-/LUL MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. III 426 W. Cedar P.O. Box 279 Shelton, WA 98584 r too RESIDENTIAL BUILDING PERMIT BLD2010-00213 OWNER: JOE WILSON RECEIVED: 3/26/2010 CONTRACTOR: LICENSE: EXP: ISSUED: 7/15/2013 SITE ADDRESS: 230 E MAIN ST UNION EXPIRES: 1/15/2014 PARCEL NUMBER: 322325020028 LEGAL DESCRIPTION: UNION HOOD CANAL LAND & IMP CO PCL 4 OF BLA#07-11 PTN BLK 20 S 12/201 S 33/62 PROJECT DESCRIPTION: DIRECTIONS TO SITE: ATF-SHOP ADDITION General Information Construction &Occupancy Infor ion Square Footage Information No. of Bedrooms: Type of Const .: )riv B Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Grou t Size: Deck: Type of Work: ACC Fire Dist.: 6 No. of Stories: 1 Occ. Loa uilding:126 Valuation: $ 4,771.E Building Height: 13 Occ. Statu asement: Manufactured Home ififormationN Setback ormat n Shoreline& Planning Information Make: Le the Ft. OSid nt: Ft. S reli Ft. Water Body: ar: Ft. e: Ft. SEPA?: No Model: W the Ft. Shoreline Desig.: Not Applicable 1: 5.0 Ft.Year: Serial o.: 2: 13.0 Comp. Plan Desig.: Rural UNft-le BLD2010-00213 Please refer to the following pages for conditions of this permit. Page 1 of 5 Plumbing Fixtures mechanical rixtures r-tta Type Qty. Type Qty. Type By Date Amount Receipt Kitchen Sink 1 Dryer Vent Plan Check Fee TW 3/26/2010 $60.00 S120110000000( Clothes Washer 1 Ventilation Fan 2• Plan Check Fee TW 3/26/2010 $ 13.00 S120110000000( Showers 1 Planning Review Fee TW 3/26/2010 $ 13.80 S1201200000001 Water Closets (Toilets) 1 Planning Review Fee TW 3/26/2010 $40.00 S1201200000001 Lavatories 1 Planning Review Fee TW 3/26/2010 $40.00 S1201200000001 Planning Review Fee TW 3/26/2010 $40.00 S1201300000001 Planning Review Fee TW 3/26/2010 $40.00 S2201300000001 Planning Review Fee TW 3/26/2010 $31.20 S1201300000001 Building State Fee LDK 4/13/2010 $4.50 S120110000000( BLD Vio. Investigation Fee LDK 4/13/2010 $40.00 S120110000000( BLD Vio. Investigation Fee LDK 4/13/2010 $33.00 S120110000000( Mechanical Permit Fee LDK 4/13/2010 $ 18.00 S120110000000( Mechanical Base Fee LDK 4/13/2010 $4.50 S120110000000( Mechanical Base Fee LDK 4/13/2010 $20.00 3120110000000( Mechanical Base Fee LDK 4/13/2010 $4.00 S120110000000( Plumbing Permit Fee LDK 4/1 312 01 0 $40.00 S120110000000( Plumbing Permit Fee LDK 4/13/2010 $3.50 S120110000000( Plumbing Base Fee LDK 4/13/2010 $3.50 S120110000000( Plumbing Base Fee LDK 4/13/2010 $20.00 S120110000000( Plumbing Base Fee LDK 4/13/2010 $ 1.20 S120110000000( Building Permit Fee LDK 4/13/2010 $40.00 S120110000000( Building Permit Fee LDK 4/13/2010 $34.80 S120110000000( Building Permit Fee LDK 4/13/2010 $40.00 S1201200000001 Building Permit Fee LDK 4/13/2010 $26.20 S1 2 01 20 0000001 Total $ 611.20 CASE NOTES FOR BLD2010-00213 CONDITIONS FOR BLD2010-00213 1) Own g nt is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X r 2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800- 7 982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X BLD2010-00213 Please refer to the following pages for conditions of this permit. Page 2 of 5 3) All approved plans are required to be on-site Tor inspection purposes. iT an inspection is caiied Tor ano plans are not avaiiame on site, tnen approval wiii not be grgntpd. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and must be collected by the Building Depart prior to any further inspections being performed or approvals granted. X 4) Own nt is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 5) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. )-he permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or remov approved documents will result in failure of required building inspections. X 6) All slabs within the heated space shall be insula minimum R-10 for at least 24". Monolithic slabs shall be insulated around the perimeter from the top of the slab to the bottom of the footing X 7) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOI 8) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the "approved" site plan is not on site, then approval ill not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Build artment prior to any further inspections being performed or approvals granted. X 9) Washington State Energy Code Compliance has been approved using the following: Heat Type: Electric or other fuels, Compliance Method: Prescriptive option IV, Window(Max U-Factor):0.35, Skylight(Max U-Factor):0.58, Doors (Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-38 (see exception), Slab Insulation R-10. Exceptio -30 insulation may be installed, up to 500 sq. ft., in single rafter or joist vaulted ceilings where the distance of the top of the ceiling and the und:V the roof sheathing is less than 12-inches and there is 1-inch vented airspace above the insulation. X 10) Per IRC - ECTION R905 - REQUIREMENTS FOR ROOF COVERINGS - R905.1 Roof covering application. Roof coverings shall be applied in accor with the applicable provisions of this section and the manufacturer's installation instructions. X 11) This structure has NOT been reviewed or approved as an Accessory Dwelling Unit(ADU): cond dwelling unit detached from an existing single-family dwelling for use as a completely independent or semi-independent unit with provisions oking, eating, sanitation and sleeping. ADUs are required to meet the requirements under Mason County Development Regulations 17.03.029. 12) Owner/builder assumes all responsibility if drainfield/reserve area is encumbere . A. Drainfield/ Reserve requires a 10ft setback from all footing/foundations. B. Sep ' to k(s) requires 5ft setback from all footing/foundations. C. N ation drains within 30ft, down gradient of drainfield/reserve area. X BLD2010-00213 Please refer to the following pages for conditions of this permit. Page 3 of 5 13) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other Of vertical ncrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). 14) This str a is limited to U-occupancy use only (private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the intern I codes and Mason County Regulations unless a"Change of Use" permit is applied for, reviewed and approved. X 15) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in perm cation. X 16) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to b ted within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your pr X 17) All changes o "approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordina r regulation, must be reviewed and approved by Mason County prior to construction. X 18) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The constru tion of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with th It rnational codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Insp hall be made prior to requesting additional inspections. X 19) All property lines shall be clearly identified at the time of foundation inspection. X 20) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to requ st final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mas my ordinances and building regulations. X BLD2010-00213 Please refer to the following pages for conditions of this permit. Page 4 of 5 :el) All permits expire iuu gays arter permit issuance, or iou nays alter me Iasi InspeuimI acUVlly Is Pei IUliIIdU. I Ile DUIIUIfly VIIlUldI fflay exlellu Ule llllle IUI action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit hold e prevented action from being taken. No more than one extension may be granted. 22) (res'sure tr ated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, con o , and flashing. Install metal connectors approved for contact with the new types of pressure treated material. X 23) etaining walls needed to support a sur such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall. 24) By definitio , propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan" to ensure these ru tures meet the setback conditions listed. 25) Landin s d stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Ap v Site Plan" to ensure these structures are shown and meet the setback conditions listed. 26) ALL SURFACE WATER AND POTENTIAL RUNOFF WILL BE CONTROLLED ON SITE AND SHALL NOTADVERSLY AFFECT ANYADJACENT PROPERTtES NOR INCREASE THE VELOCITY FLOW ENTERING OR ABUTTING TO ANY STATE OR COUNTY CULVERTING/DITCHING SYSTEM O R WAY. 27) n analysis of the foundation prepared by aVbof ton Licensed engineer, may be required to determine the adequacy of the foundation, concrete and reinforcement placed without a pre-pour inspection. Photos showing formwork and reinforcement placement may be an acceptable substitute for the analysis. 28) Approve r dimensions and setbacks on e plan submitted Nov. 8, 2010 showing south sideyard setback of 5 feet to property line. Setbacks are mess from the furthest projection of the structure. X This permit becomes null and void if work orgonstruction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evid tinuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of o i eans of a progress inspection.The owner or the agent on he owners behalf, represents that the information provided is accurate and grants employees ess to the above described property and structure for revie and inspection. OWNER OR AGENT: DATE: BLD2010-00213 Please refer to the following pages for conditions of this permit. Page 5 of 5 o CONCRETE MECHANICAL MANUFACTURED HOME r o Date B y o Footings/Setbacks Ribbons to Gas Piping 0 o Interior Date By Interior-Date By Date By Z N w Exterior Date By Exterior-Date B Sat-up C— INSULATION O Point Load!Isolated Footings Date By M BG J SLAB INSULATION - Date By Data By FIRE DEPARTMENT Foundation Walls Floors Date By Date By Data By DECKS FRAMING Walls Date By Date By Date By PROPANE TANKS PLUMBING Vault Date By Date By OTHER _ Groundwork Attic Date By Date By Type_ Dale By DRYWALL RYWALL Type- DateInt.Brace Wall Date By a) By Date By m FINAL INSPECTION p v y Water Line Fire Separation N � Date By Date By Date By C O s Pass or Request Inspect. c Type of Insp. Fail Date Date Done By CommentsCD N o w s v N O n O 7 Q O 7 N O S N CD CD I 3 N LQ fD 0 FORM MUST BE COMPLETED IN INK MASON COUNTY PERMIT NO.�tr.Y GhJ t J PLEASE PRESS HARD BUILDING PERMIT APPLICATION 426 W. Cedar• P.O. Box 186, Shelton, WA 98584 Shelton (360) 427-9670 • Belfair (360) 275-4467 • Elma (360) 482-5269 �� On the web www.co.mason.wa.us APPLICA T INFOR CONTRACTOR INFORMATION Owner e° " 'L - Company Name Mailing Address 4 '2 Mailing Address City h i St te,ia Zip Code 2— City State Zip Code Phone i'h `= �'`- Other Ph. Phone Other Ph. Lien/Title Holder Contractor Reg. # Exp. E mail address E Mail Address Drivers Lic.# DOB Drivers Lic.# DOB SEPTIC /WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic Connect to Water System Name of Water System Well Sewer System Name of Sewer System PARCEL INFORMATION - 12 Digit Parcel No — Fire District Legal Description Site Address (Please include street name, street number and city) Directions to site Will timber be cut and sold in parcel preparation?Yes/No Is property within 200' of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No TYPE OF JOB --New Ad=Alt Repair spt��er PR�M ARY�E IDEN EQg ASONAL ❑ Use of Building Describe Work�r-`r-► rZ 1 Q�`-` � No. of Bedrooms No. of Bathrooms Square Footage- 1 st Floor 2nd Floor 3rd Floor Basement Deck.Covered Deck Other Sq. ft. Garage-- Attached Detached Carport Attached Detached MANUFACTURED HOME INFORMATION - Make Model Year Length Width Serial No. No. of Bedrooms No. of Bathrooms Type of Heat Purchase Price $ Replacement Unit? Yes/ No Installer Name Certification No. OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative, or the contractor. I further declare that I am entitled to receive this permit and to do the work as proposed in the application. I declare that I have obtained the permission from all the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners ehalf, represents that the information provided is accurate and grants employees of Mason County access to the above described prop�rfy and st for review and inspection. This permit/application becomes null & void if work or authorized construction is not comm ed within 1 s or if construction work is suspended for a period of 180 days-'PRO F OF CONTINUATION OF WORK IS BY -F M PRQGR S ECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 18 /AYS ILL INVALIDATE THE APPLICATION. X - Date: /Gl Owner/Owners Representa e/Contractor (indicate which one) !� F61k OFFICIAL USE BEYOND THIS POINT Accepted by"rf?-157' Date DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Planning Department "f- I Environmental Health Department Fire Marshal FEES Building Permit Fee Site Inspection Plan Review Fee EH Review Fee Plumbinq & Base Fee Planning Review Fee Mechanical & Base fee Other Wood /Gas/ Pellet Stove Fee State Fee Violation Fee Pre-Paid at Submittal Valuation $ TOTAL FEES I l ) I 3� ��� �� Owner: Joseph J. Wilson I I I Abbreviated 3Z�3.�_50 legal: 4-7/ - Ptn. Lots 23-26 Blk. - _ 20, Hood Canal Land & - Improvement Co. - - - (Result. Pcl.3 of BLA No. 07-11 ) Ptn. Lots 26-31 , Blk. "aI�GG�J 20, Hood Canal`.Land & Improvement Co. l Result. Pcl. 4 of LA N o. 0 7-1 1 ) 3aa3a-50 _ ZoJ PPPR®VED 3 MA`�ON CC''NTY DCD PLA.' . SI TE PLAN REQUIRED TO BE Cr t CHAN ES SUBJECT TO APPRC,. �2 By Date _ j 1 ,a � y 3