Loading...
HomeMy WebLinkAboutBLD2013-00992 Heat Pump - BLD Permit / Conditions - 11/12/2013 (2) Linder, Greg #5675 8-2-77 Vacated 3rd Street , Seattle St. & Alley adj . Blk 48, Lots 50-53 Plat of Union. Red house on right at 3rd street below fire hall. Garage, shop & storage $4,966.00 1 1 i BUILDING PERMIT APPLICATION MASON COUNTY z32s 3 0) 0 P.O. Box 186 Shelton, Washington 98584 / DATE ISSUED �/ �� 11717 PERMIT NO. 7`5' OWNER NAME _ MAIL ADDRESS CITY&STATE ZIP PHONE ZAW DIRECTIONS TO JOB SITE fF 0A1y1 JA/ LEGAL (❑ SEE ATTACHED SHEET) DESCR. am CONTRACTOR NAME MAIL ADDRESS CITY 8 ST E L CEN E NO. PHONE ` USE OF BUILDING ��� — 5&010, f r"'4 'g�,4f Class of work: NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE Describe work: Lv NFL ritvLrvl'E CF r &0L,-1VjM T/ Valuation of work: $ PLAN CHECK FEE �p PERMIT FEE `?6; � v v �� /� � 2- SPECIAL CONDITIONS: APPLICATION ACCEPTED BY PLANS CHECK BY APPf10VED FOR ISSUANCE Type Occupancy Division > / BY � Const�1� Group J Size of Bldg. No. of Max. (Total) Sq. Ft. 76!� Storles / Occ. Load CONTRACTOR AFFIDAVIT PERMANENT SEASONAL E.D.NUMBER I certify that I am a currently registered contractor in RESIDENCE the State of Washington and I am aware Of the MOBILE HOME ordinance requirements regulating the work for which the permit is issued and all work done will be in Special Approvals Required Received Not Required conformance therewith. ZONING HEALTH DEPT. Firm PUBLIC WORKS By ROAD DEPT. Lic. No. Date OWNERS AFFIDAVIT I certify that I am exempt from the requirements of the N O T I C E contract or registration law RCW 18.27, and am aware of the Mason County ordinance requirements for SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. which this permit is issued and that all work done will be in conformance therewith. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUCTION OR WORK IS � 2 �l SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER Owner�!*"'Y �°'f'r 2 Date, / WORK IS COMMENCED. OLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION A C K.,I M.O. CASH