HomeMy WebLinkAboutBLD2017-00023 ReRoof SFR - BLD Permit / Conditions - 1/12/2017 Inspection Line (360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352
Mason County
615 W Alder St
Shelton, WA 98584
1854 RESIDENTIAL BUILDING PERMIT
BLD2017-00023
OWNER: TED & NANCY JOHNSON RECEIVED: 1/11/2017
CONTRACTOR: COGENT CONSTRUCTION 360-427-3162 LICENSE: COGENC1931 R6 EXP: 12/26/2017 ISSUED: 1/12/2017
SITE ADDRESS: 221 E FOURTH ST UNION EXPIRES: 7/12/2017
PARCEL NUMBER: 322325017001
LEGAL DESCRIPTION: UNION HOOD CANAL LAND & IMP CO BLK: 17 LOTS: 1-4 -DPC#07-05-
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
RE-ROOF SFR, TORCHDOWN TPO (FLAT ROOF) AT INTERSECTION OF E 4TH ST AND E ALDER ST IN UNION
General Information Construction&Occupancy Information Square Footage Information
No. of Bedrooms: Type of Constr.:
Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Group: Lot Size: Deck:
Type of Work: RR Fire Dist.: 6 No. of Stories: Occ. Load: Building:
Valuation: Building Height: Occ. Status: Basement:
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body:
Rear: Ft. Slope: Ft. SEPA?:
Model: Width: Ft. Side 1: Ft. Shoreline Desig.:
Year: Serial No.: Side 2: Ft. Comp. Plan Desig.:
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Building State Fee JBN 1/11/2017 $4.50 S1201700000001
Re-Roof Fee JBN 1/11/2017 $ 117.50 S120170000000i
Total $ 122.00
BLD2017-00023 Please refer to the following pages for conditions of this permit. Page 1 of 3
CASE NOTES FOR
BLD2017-00023
CONDITIONS FOR
BLD2017-00023
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647r0982,�e person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X �._�
2) Owner/Agent iS,r�sponsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
X (�
3) Single rafter joist roof re aceDa nt shall be insulated to a minimum of R-38 allowing for a minimum of one-inch continuous vented airspace above the
level of insulation. X
4) Existing roof deck shall be insulated to a minimum of R-38 if: The roof is un-insulated or existing insulation is removed to the level of the sheathing, OR All
insulations in thh of/ceiling was previously installed exterior to the sheathing or non-existent.
X l _ n
5) WIND LOADS - Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85
MPH.
X L �
6) REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the
manufacturer's installation instructions.
A drip edge shall be provided at eaves and gables of shingle roofs. (IRC 2012 R905.2.8.5)
X
7) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocation.
X
BLD2017-00023 Please refer to the following pages for conditions of this permit. Page 2 of 3
i
8) The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA).
It is unlawful for any person to cause or allow the demolition (or major renovation) of any structure unless all asbestos containing materials have been
identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or
operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org
X L
9) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
X spector hall�e�made prior to requesting additional inspections.
t
10) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County grr,�iFyjances and building regulations.
X ( 1
11) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prev d action from being taken. No more than one extension may be granted.
X l n
12) ALL SURFACE WATER AND POTENTIAL RUNOFF WILL BE CONTROLLED ON SITE AND SHALL NOT ADVERSLY AFFECT ANY ADJACENT
PROPERTIES NOR INCREASE THE VELOCITY FLOW ENTERING OR ABUTTING TO ANY STATE OR COUNTY CULVERTING/DITCHING SYSTEM
OR ROAD W�
X
OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by
signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the
work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property
and structure(s) for review and inspection. This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if
construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS
PERMI APPLIC=DAYS WILL INVALIDATE THE APPLICATION.
I -- 12 - 11
nu Date
� OWNER - REPRESENTATIVE - CONTRACTOR
Print Name (Circle one to indicate)
BLD2017-00023 Please refer to the following pages for conditions of this permit. Page 3 of 3
ptq °�U� MASON COUNTY BLD20 -�y _2
3
DEPARTMENT OF COMMUNITY DEVELOPMENT
Mason County Bldg. III, 426 West Cedar Street
PO Box 279, Shelton, WA 98584
,8u www.co.mason.wa.us (360)427-9670 Belfair(360)275-4467 Elma (360)482-5269
NON STRUCTURAL RE-ROOF APPLICATION
APPLICANT INFORMATION:
Owner 2 .11�_.i i P c� t (��_Mailing Address ��l ULI V E D
City a,CR� cnYN State Vj--kA ZipCde Phone
JAN 11 2017
Cell Email
CONTRACTOR INFORMATION: 615 W. Alder Street
Company Name QQeoar Mailing Address S�U L� U-tj
CAN, State kx�)G,- Zip Code Q�'S'A
Other Ph. Contractor Reg. # �Cj-'SkVU. Exp.
PARCEL INFORMATION:
Site_address City_ 11"or I
Tax Parcel Number(twelve number) —
STRUCTURE INFOJZN ON:
Roof Slope:(pitch) &V ��
Old Roof 1N4ate ial: Comp.❑ Metal 0 S I.,es e Hot Map 0 ,M,Z
New Roof Material: Comp.0 Metal❑ Shingles 0 Tile 0 Hot Mop❑ 6tsz
Sheathing: Nesv O(Size ) Existing%Skip Sheathing0
Existing Insulation: Yeso No❑ °1TT
New Insulation or Vaulted Ceiling See Below IECC 101.4.3 �1tz
Use of Structure(s)-(i.e.garage,dwelling,etc.):�,,.N-C-1 °fly
Roof Slope:IRC section R904.1
Roof slope must be indicated to ensure selected roof covering is Insulation:IECC 101.4.3 exception#5
allowed on designed pitch. Roofs without insulation in the cavity and where the
sheathing or insulation is exposed during re-roofing shall be
Roof Covering:IRC section R905&907 insulated either above or below the sheathing.Insulation is not
Selected rcx-tf covering must be installed in accordance with required for roofs where neither the sheathing nor the insulation is
manufacturer's specifications and IRC requirements. A dri2 cdgg exposed.(Refe+rurr IECCI IFISEC R701.4.3)
,hal]be provided at eaves and gables of shingle roofs.
Attic Ventilation:IRC section R806
ndosed attic and rafter area shall be supplied with cross-ventilation.The net area shall not be less than 1/150 of the area of the space to be
ventilated.if?0%and not more than 80%,of the ventilating area is provided from the upper portion of the space to be ventilated,then 1/300 is
allowed.
OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or contractor. I further
declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary
parties,including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that
the information provided is accurate and grants employees of Mason County access to the above described property and
structure(s)for review and inspection.This permitlapplication becomes null&void if work or authorized construction is not
commenced within 180 days or if construction work is suspended for a period of 180 days.PROOF OF CONTINUATION OF WORK IS
BY MEANS OF INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
X ► -1l-1 `1 -
Signature of Applica{t Date
X fC OWNER!REPRESENTATIV !CONTRACT
Print Name (CIRCLE TO INDICA
V�
RECEIVED D6I ��D��z�
COGENT JAN 11 2017
CONSTRUCTION INC 615 W. Alder Street
,QMMMCIAL AND RMDEMIAL J]WDMDQ- Date Estimate
PO BOX 67S
Union WA 98692 4872
Lie#COG ENC1931 R6
Phorm.360.427.3162 Fax:360-427.43177
Email.Inf*@CogentCoristruct`scninc.coin
Web:www.CctgentCortstruct'oP[nc.com
0191
pevO
Name I Address
Te ai f &Nancy John.wo
221 E 4th A
Minion Wa 98592
PO Box 115
Union.'QNIA 98592 i P.O.No. Project
Description Total
Routoval of all(orchdown on wind damaged areas and re roof with new torchdowA.Remove and dispose of all debris.
{)ption to wpi!cc v!tU)new 60 MIL FPO membrane,over 1,12"fanliold insulation will be the same price,
(Recomrmnded)
Option w re roof front area of house same as above will be an additional X—
OpTion to upgrade to i6"standing scam metal roofing will be an additional$ X-------
This eqtirnate includes all ventftiot,pipe J)uots.flashing andilur tiny other roof related components.
Repiscen-lent,ormly rotten Sheeting will be an additional charge at --pert;quare foot.
"*ptcase initial()ptioos you would like to proceed with'**
Any estimate over St 5,000-00 still require
1/2 flown payment upon material delivery with b2lance due upon COMPletIOB.
C,ogont Construction Irm.roquirel signature and date on Estirnae ror acceptame of contract-PuMh&SCr etas UP to 24 hours
For recision of 0 contract
,ntir, olurnct less deposit.Recision of con t after 24 hours will hold purchaser llablz t;x 33%of entire
contract along with Any wquired fees OT cuts&c.5ociated with said prcjtxt.Ali mateliai is guilrauttod to be as specified.
Ali work-shall be completed in a quality marater in accordance with industry standards.
A"j,F_STIMATE.PRICES ARE,f)P3-Ck)UNNTEj)RAISED ON CASH OR CHEC'K PA4IVIEN1,
CREDITCARD PAYMFN'J'S ARFSUBJECT TO A3%MERCHAN CHARCE� I
Fees,Permits and Washington State Sales tax
are not included in this estimate:
yyt
Customer Signature
Date