HomeMy WebLinkAboutBLD2003-01112 Final -Expired - BLD Permit / Conditions - 8/12/2003 Inspection Line(360)327-7262
toMASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. 3 426 W. Cedar P.O. Box 186
too Shelton,WA 98584
o RESIDENTIAL BUILDING PERMIT BLD2003-01112
OWNER: OWEN HAUGEN RECEIVED: 8/11/2003
CONTRACTOR: LICENSE: EXP: ISSUED: 8/12/2003
SITE ADDRESS: 150 E MAIN ST UNION EXPIRES: 2/12/2004
PARCEL NUMBER: 322325001109
LEGAL DESCRIPTION: UNION HOOD CANAL LAND & IMP CO BLK: 11 LOTS: 9-10
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
FINAL EXPIRED PERMIT
General Information Construction &Occupancy Information Square Footage Information
No.of Bedrooms: Type of Constr.:
Type of Use: MH Insp.Area: No.of Bathrooms: Occ. Group: Lot Size: Deck:
Type of Work: NEW Fire Dist.: 6 No.of Stories: Occ. Load: Building:
Valuation: Building Height: Occ. Status: Basement:
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body:
Rear: Ft. Slope: Ft. SEPA?:
Model: Width: Ft. Side 1: Ft. Shoreline Desig.:
Year: Serial No.: Side 2: Ft. Comp. Plan Desig.:
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Final Expired Permit KS 8/11/2003 $56.80 S12003
Total .80
BLD2003-01112 Please refer to the following pages for conditions of this permit. 1 of 2
CASE NOTES FOR
BLD2003-01112
CONDITIONS FOR
B LD2003-01112
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied.
OWNER OR AGENT: DATE:
BLD2003-01112 Please refer to the following pages for conditions of this permit. 2 of 2
e
r.
o CONCRETE MECHANICAL MANUFACTURED HOIvT
0
Footings / Setbacks Date By Ribbons
0
Date By Gas Piping Date By
►v Foundation Walls Date By Set-up
Date By INSULATION Date By
13 G / Slab Insulation Floors Final
Date By Date By Date jz °3 By 1-61 —
FRAMING Walls FIRE DEPT
Date By Date By Date By
PLUMBING Attic OTHER
Groundwork Date By
Date By WALLBOARD NAILING
D.W.V. Date By
Date By FINAL INSPECTION
Water Line Date By
:2 Date By e Date By
a
Ajh' �-,a piss Gait— -Perr+--t AJO—f cjytiec�l c�CX
rr
a
0
v
an
CD
a
8
a
o
r
y
O
CD
N
El O
W
o O
N
0