HomeMy WebLinkAboutBLD2016-00590 Heat Pump - BLD Permit / Conditions - 6/27/2016r
Inspection Line (360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352
Mason County
615 W Alder St
Igloo Shelton, WA 98584
MECHANICAL PERMIT BLD2016-00590
OWNER: LARRY GOLDBERG RECEIVED: 6/27/2016
` CONTRACTOR: SUNSETAIR INC. 360.456.4956 LICENSE: SUNSEA*220CM EXP: 2/4/2018 ISSUED: 6/27/2016
SITE ADDRESS: 5051 E STATE ROUTE 106 UNION EXPIRES: 12/27/2016
PARCEL NUMBER: 322325002005
LEGAL DESCRIPTION: UNION HOOD CANAL LAND & IMP CO BLK: 2 LOTS: 4-5 &TAX 1023 &VAC CANAL
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
DUCTLESS HEATPUMP ST RT 106 TO SITE ADDRESS ON THE LEFT SIDE
General Information Setback Information
Front: Ft. Shoreline: Ft.
Type of Use: SF Insp.Area:
Rear: Ft. Slope: Ft.
Type of Work: MEC Fire Dist.: 6
Side 1: Ft.
Valuation:
Side 2: Ft.
Mechanical Fixtures FEES
Type Qty. Type By Date Amount Receipt
Heat Pump 1 Building Special inspection GMM 6/27/2016 $73.00 S120160000(
Mechanical Permit Fee GMM 6/27/2016 $18.20 S120160000(
Mechanical Base Fee GMM 6/27/2016 $28.50 S120160000(
Total $119.70
BLD2016-00590 Please refer to the following pages for conditions of this permit. Page 1 of 4
CASE NOTES FOR
BLD2016-00590
CONDITIONS FOR
BLD2016-00590
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-80Q,647-p982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
x TJ
2) ALL FURNACE INSTALLATIONS SHALL MEET THE MINIMUM EFFICIENCIES SET FORTH IN THE CURENT EDITION OF THE WASHINGTON
STATE ENERGY CODE (WSEC). ANY PORTION OF THE MECHANICAL SYSTEM THAT IS ALTERED OR REPLACED SHALL MEET THE MINIMUM
XTANDDARAS SET FORTH IN THE WSEC AND INTERNATIONAL MECHANICAL CODE.
KI
3) To perform an inspection the Mason County Building Inspector will need to access the interior of the structure. An electrical permit completed and
approved by Washington State Labor& Industries must be available on-site during the inspection.
The Mason County Building Inspector will inspect the following:
Verify that the system is installed in accordance with manufacturer specifications;
The inspector will check to make sure that the exterior unit is permanently installed and supported,
the exterior unit complies with required setbacks to property lines,
fuel tanks are located at least 10-ft from the system, a source of ignition,
all exterior penetrations are properly sealed,
condensate lines are installed and are properly supported, including proper material, slope, and that the condensate line terminates to a proper location
outside of the foundation,
copper refrigerant lines are insulated with '/2" thick continuous closed-cell foam insulation or better,
indoor units are located at least 3-ft from smoke and carbon monoxide alarms,
and that modifications made to the structure, to install the unit, does not affect existing structural members.
x Mrs
BLD2016-00590 Please refer to the following pages for conditions of this permit. Page 2 of 4
4) Installation of heating equipment in a single-family residence shall meet the requirements of the current IECC/WSEC R403, applicable sections of the
IRC, and IMC.
Heating equipment shall be sized in accordance to ICC/WSEC, Section R403.6. Heating and design load calculations for the purpose of sizing HVAC
systems are required and shall be calculated in accordance with accepted practice, including infiltration and ventilation. Design calculations shall be
available for inspection during inspection.
Referencing IRC M1601.4, all ducts, air handlers, filter boxes, and building cavities shall be sealed. All joints of duct systems and seams shall be made
substantially air tight by means of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Closure systems used with rigid fibrous
glass ducts shall comply with UL181A and shall be marked 181A-P for pressure-sensitive tape, 181A-M for mastic or 181 A-H for heat-sensitive tape.
Closure systems used with flexible air ducts and flexible air connectors shall comply with UL181 B and shall be marked 181 B-FX for pressure-sensitive
tape or 181 B-M for mastic. Duct connections to flanges of air distribution system equipment or sheet metal fittings shall be mechanically fastened.
Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181 B and shall be marked 181 B-C. Crimp joints for round metal
ducts shall have a contact lap of at least 1-1/2 inches (38 mm) and shall be mechanically fastened by means of at least three sheet-metal screws or
rivets equally spaced around the joint. Closure systems used to seal metal ductwork shall be installed in accordance with the manufacturer's installation
instructions.
Duct tape is NOT permitted as a sealant on any ducts. When ducts are located in unheated spaces the ducts hall be insulated to R-8
DUCT TIGHTNESS TESTING shall be conducted by person(s)trained to perform such testing. A signed affidavit documenting test results in
accordance to IECC/WSEC Section R403.2.2 shall be provided to the Mason County Building Department prior to the final occupancy inspection.
Affidavit forms are available on at the WSU-Energy Program website titles, "Duct Leakage Affidavit"or"Duct Leakage Testing Results (Existing
Construction)." Duct tightness testing is not required if the air handler and all ducts are located within the heated space.
X Mm N
5) The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA).
It is unlawful for any person to cause or allow the demolition (or major renovation) of any structure unless all asbestos containing materials have been
identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or
operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org
^
X iv��
6) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason Po nXy ordinances and building regulations.
X �l�, ?.l
7) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
hold have prevented action from being taken. No more than one extension may be granted.
X
BLD2016-00590 Please refer to the following pages for conditions of this permit. Page 3 of 4
r
OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by
signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the
work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property
and structure(s) for review and inspection. This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if
construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS
PER4ure
ATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
A 7 l
Sign Date
r7l, JJ Y Ir t S OWNER - REPRESENTATIVE - CONTRACTOR
Prinf Name (Circle one to indicate)
BLD2016-00590 Please refer to the following pages for conditions of this permit. Page 4 of 4
MASON COUNTY PERMIT NOJt?4.d MtV -00i540
's
DEPARTMENT OF COMMUNITY DEVELOPMENT
BUILDING•PLANNING.FIRE MARSHAL
WWW.CO.MASON.WA.US (360)427-9670 Shelton ext.352
__— Mason County Bldg.III,426 West Ceder Street (360)275-4467 Belfair ext.352
rx_u PO Box 279, Shelton,WA 98584 (360)482-5269 Elma ext.352
PLUMBING & MECHANICAL PERMIT APPLICATION
► OWNER INFORMATION: CONTRACTOR INFORM TION:
NAME: NAME: +
MAILING AD SS: MAILING ADDRESS: S
CITY: Lin i IYl STATE:_ZIP:.qA5q I , CITY: STA :W ZIP:_
PHONE: 0 CELL: PHONE: - CELL:
EMAIL: EMAIL : r,
1 com-
L&I REG#&VnIG- 2a01 Pf'1. EXP.
PARCEL INFORMATION:
PARCEL NUMBER(12 DIGIT NUMBER): 3 AA 3 a,- SO O- nCD S_
LEGAL DESCRIPTION(.4BB VIATED): -
SITE ADDRESS: b-05 { 4i CITY: Y�� -
DIRECTIONS TO SITE ADDRESS:
TYPE OF JOB
NEW ADD ALT REPAIR OTHER USE OF BUILDING
LOCATION OF FIXTURBS/UNITS—1 sT FLOOR 2ND FLOOR BASEMENT GARAGE_OTHER
PLUMBING FIXTURES(SHOW NUMBER OF EACH) MECHANICAL TS
Type of Fixture No.of Fixtures Fees Fuel Type:Electric)�PG�Natural Gas—Ductless_
Toilets Type of Unit No.of Units Fees
Bathroom Sink Furnace
Bath Tubs Heat PumpD"5
Showers Spot Vent Fan
Water Heater Propane Tank
Clothes Washer Gas Outlets
Kitchen Sinks Wood/Gas/Pellet Stove
Dishwasher Kitchen Exhaust Hood
Hose bibs Dryer Vent
Other Solar Panel
Other
Base Fee Base Fee
TOTAL PLUMBING TOTAL MECHANICAL,
OWNER/BUILDER acknowledges submission of inaccurate Information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or contractor.I further declare
that I am entitled to receive this permit and to do the work as proposed.1 have obtained permission from all the necessary parties,including
any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is
accurate and grants employees of Mason County access to the above described property and structure(s)for review and Inspection.This
permit/application becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is
suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION.INACTIVITY OF THIS
PER PLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. I
f X (��I��
} Si ture f ApplicaUt Date
i
X � Owner/Owners Representative/Contractor
P ' t ame (indicate which one)
i DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS
BUILDING DEPARTMENT
kI PLANNING DEPARTMENT
f FIRE MARSHAL
J