Loading...
HomeMy WebLinkAboutBLD2015-00682 ReRoof SFR - BLD Permit / Conditions - 8/10/2015 Ifl5Pel;t1U11 Lllle tJOVJ4L/-/LOL corA MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. III 426 W. Cedar Shelton, WA 98584 IRi4 RESIDENTIAL BUILDING PERMIT BLD2015-00682 OWNER: PATRICIA ORR RECEIVED: 8/10/2015 CONTRACTOR: CLASSIC CARPENTRY 360 490-4993 LICENSE: CLASSC*962KR EXP: 6/12/2016 ISSUED: 8/10/2015 SITE ADDRESS: 80 E MASON AVE UNION EXPIRES: 2/10/2016 PARCEL NUMBER: 322325010307 LEGAL DESCRIPTION: UNION HOOD CANAL LAND & IMP CO BLK 103, W 10' OF 29 & LOTS 30 & 31 PROJECT DESCRIPTION: DIRECTIONS TO SITE: RE-ROOF SFR, COMP TO COMP - USING EXISTING SHEATHING AND INSULATION General Information Construction&Occupancy Information Square Footage Information No. of Bedrooms: Type of Constr.: Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Group: Lot Size: Deck: Type of Work: RR Fire Dist.: 6 No.of Stories: Occ. Load: Building: Valuation: Building Height: Occ. Status: Basement: Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body: Rear: Ft. Slope: Ft. SEPA?: Model: Width: Ft. Side 1: Ft. Shoreline Desig.: Year: Serial No.: Side 2: Ft. Comp. Plan Desig.: Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Building State Fee JBN 8/10/2015 $4.50 S2201500000001 Re-Roof Fee JBN 8/10/2015 $ 117.50 S2201500000001 Total $ 122.00 BLD2015-00682 Please refer to the following pages for conditions of this permit. Page 1 of 3 I CASE NOTES FOR BLD2015-00682 CONDITIONS FOR BLD2015-00682 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-80 . he person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. 9' 2) Owner/Agen is res onsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 3) Single rafter joist roof replacepapt shall be insulated to a minimum of R-38 allowing for a minimum of one-inch continuous vented airspace above the level of insulation. X 4) Existing roof deck shall be insulated to a minimum of R-38 if: The roof is un-insulated or existing insulation is removed to the level of the sheathing, OR All insulation in the ro ceiling was previously installed exterior to the sheathing or non-existent. X 5) WIND LOADS - Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. X 6) REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. (IRC 2012 R905.2.8.5) X 7) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in Xermit revocation_--, 13LD2015-00682 Please refer to the following pages for conditions of this permit. Page 2 of 3 .d) 1 ne oemolition ana aisposai or aeons must meet the reguiations or mason county ana Olympic Kegion Llean Air Agency (UHUAA). It is unlawful for any person to cause or allow the demolition (or major renovation) of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org X 9) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall-be ruade prior to requesting additional in spections. X 10) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County orgiaqnces and building regulations. X _4;:? 11) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit (older have pr� tion from being taken. No more than one extension may be granted. 71- OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s) for review and inspection. This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. SignaVdre Date OWNER - REPRESENTATIVE - CONTRACTOR Print Name (Circle one to indicate) BLD2015-00682 Please refer to the following pages for conditions of this permit. Page 3 of 3 co r o CONCRETE MECHANICAL O CD HOME _w._ _ __ Date By __, : M U, Footings /Setbacks Gas piping Ribbons o Interior Date By Interior By Date By N Exterior Date By Exterior-Date B Set-up ,� Point Load 1lsolated Footings INSULATION ��- Date _n Date B BG!SLAB INSULATION By n Y Data By FIRE DEPARTMENT Foundation Walls Floors Date By Date By. Data By DECKS FRAMING Walls Date By Date By Data By' PROPANE TANKS PLUMBING Vault Data By Date By OTHER Groundwork Attic Date By Date By Type: Data By O.W.V DRYWALL Type_ Date 8 Int Brace Wall Date By W y y tFire By FINAL INSPECTION p co Water Line Seperation NDate gy By Date i7 �� By Co s Pass or Request Inspect. be s Type of Insp. Fail Date Date Done By Comments o, o co evi LAX— CDy O 0 O 7 a O 7 N O r Er N (D 3 v cn cD 0