HomeMy WebLinkAboutMIS99-0341 Automatic Fire Alarm - MIS Permit / Conditions - 7/16/1999 MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
MIS99 0341 PARCEL :322334460000 Pt A i
JOB ADDRESS , 7550 E STATE ROUTE 1O6 L�Iti1 t r
APPLICANT : ST . ANDRFWS HOUSE.
OWNER : ST . ANDREWS HOUSE:
LEGAL. : 1112 11112 1112 LOT 1 Ili 669C-7 1 611-C-- 2
PROJECT DESCRIPTION :
AUTOMATIC f I RE AUARM
PROJECT i_OCATION :
1 /4 MILE EAST OF AL DFABROOK INN ON IfWY 106
PROJECT NOTES :
..._t-,a.•�9:z:s.:.scr._.�vcnr.*rscs.rx^wr>_�s^ac.._.�-�-s:-.aarr,:.xm::rs:.st�cnr-
TYPE AMOUNT BY DATE RECEIPT
FIR2 3, 100 .00 KS 07/ 16/99 121
'TOTAL : 100 .00 OWNER OR AGE 'VATT
YIS_PONT, rev! 0011112
r
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING Attic OTHER
Groundwork
date date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
MIS99-0341 PARCEL :322334460000 PLAT : DIV : BLK : LOT :
JOB ADDRESS : 7550 E STATE ROUTE 106 UNION
APPLICANT : ST . ANDREWS HOUSE
OWNER : ST . ANDREWS HOUSE
LEGAL : 1112 1112 E112 LOT 1 1 I! 669C-2 d 683-C- 2
PROJECT DESCRIPTION :
AUTOMATIC FIRE ALARM
PROJECT LOCATION :
1 /4 MILE EAST OF ALDERBROOK INN ON HWY 106
PROJECT NOTES :
TYPE AMOUNT BY DATE RECEIPT
FIR2 $ 100 .00 KS 07/ 16/99 121
TOTAL : 100 .00 OWNER OR AGE ATE
MIS—PAMT, rev: 04101192
Alk - -
1
MASON COUNTY FIRE MARSHAL
FI
LE COPY
Mason County Bldg. III 426 W. Cedar !J.1kI `) -,
P.O. Box 186 Shelton,Washington 98584
(206)427-9670
CODE ENFORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PUBLIC EDUCATION
PERMIT NO. mPs11_03y
MASON COUNTY FIRE PROTECTION SYSTEM
PERMIT APPLICATION
NOTE: This application must be completed and accompanied by a
minimum of three (3) copies of plans, specifications and applicable
calculations per Mason County Fire Protection Standards and brought
to the office of the Mason County Fire Marshal . This is not a
permit, and failure to submit all necessary information will cause
a delay and/or rejection of your submittal. When a permit has been
issued, you will be notified.
PLEASE PRINT
#1 OWNER f -,4- � i� �} PHON> 2
SITE ADDRE$ c) FIRE DIST.
CITY a-lyl-3 /QI STATE ZIP-
DIRECTIONS TO-JOB SITE
OWNER MAILING ADDRESS
CITY STATE ZIP
LIEN/TITLE HOLDER
ADDRESS
CITY
2 CONTRACTO54D/l/ rj n,��-/ g�r ,��i, ONTRACTOR REG
ADDRESS EXP. DATE
CITYS'�}�L1) STATE ZIP
#3 PARCEL # n33 - qq _ UJ do
LEGAL DESCRIPTION
#4 BLDG. SQ. FT (EXISTING/PROPOSED)
1ST FL / / 2ND / 3RD /
BASEMENT / DECK / #BR #BATH
GARAGE / CARPORT / ENCL ATTIC: Y N
OTHER SQ FT
USE OF BUILDING _ /V���w� �, -�I--
#5 DESCRIPTION OF WORK:
SPRINKLER: WET DRY STANDPIPE: WET DRY
AUTOMATIC FIRE ALARM CORRIDOR SMOKES
HOOD & DUCT DRY CHEAICAL WET CHEMICAL HALON
NEW SYSTEM MODIFICATION NUMBER OF NEW DEVICES C
MONITORING STATION � PHONE ��"'7
#6 DOES YOUR SUBMITTAL INCLUDE:
1. DIMENSIONS, SCALE, NORTH ARROW? YES NO
2 . FLOOR PLAN AND CROSS SECTIONAL ELEVATION? YES NO_
3 . ALL CONCEALED SPACES (LABELED COMBUSTIBLE
AND NON-COMBUSTIBLE) ? YES , NO
4 . ALL AREAS ON OPPOSITE SIDE OF NEW WALLS? YES , NO
5 . CUT SHEETS OR REFERENCES FOR ALL 'NEW DEVICES? YES NO-
6 . LOCATION/DESCRIPTION OF ANY EXISTING DEVICES YESXNO
7 . BATTERY CALCULATIONS FOR FIRE ALARM SYSTEMS? YES N
8 . RISER/WIRING DIAGRAM FOR FIRE ALARM SYSTEMS? YES NO
9 . HYDRAULIC CALCULATIONS FOR SPRINKLER SYSTEMS? YES N
NOTE: WORK MAY PROCEED ONLY IN ACCORDANCE WITH A VALID FIRE
PROTECTION SYSTEM PERMIT ISSUED BY THE MASON COUNTY FIRE
MARSHAL. A VALID PERMIT AND AN APPROVED SET OF PLANS MUST BE
ON THE JOB SITE DURING CONSTRUCTION AND MUST REMAIN THERE
UNTIL A FINAL INSPECTION IS DONE BY THE MASON COUNTY FIRE
MARSHAL. FAILURE TO OBTAIN A VALID PERMIT PRIOR TO WORKING ON
A FIRE PROTECTION SYSTEM AND/OR FAILURE TO PROVIDE THESE PLANS
AND PERMIT FOR THE MASON COUNTY FIRE MARSHAL MAY RESULT IN A
CITATION AND FINE.
OWNERS AFFIDAVIT
I certify that I am exempt from the requirements of the Contrac-
tors Registration Law RCW 18 .27, and am aware of the Mason County
ordinance requirements for which this permit is issued and that all
work will be done in conformance therewith. No changes will be
made without first obtai 'n approval from the Mason County Fire
Marsh
0 DA E 6 f
CONTRACTORS AFFIDAVIT
I certify that I am a currently registered contractor in the State
of Washington and I am aware of the ordinance requirements
regulating the work for which the permit is issued and all work
done will ' e in conformance therewith. No changes will be made
without 'rst obtaining approval from the Mason County Fire ` '
Mar
c
Y ct DATE /
LirE CRA
MASON COUNTY FIRE MARSHAL
Mason County Bldg, III 426 W. Cedar
P.O. Box 186 Shelton,Washington 98584
(206)427-9670
CODE ENFORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PUBLIC EDUCATION
March 13, 2000
Burt Duncan
St. Andrews House
7550 East Highway 106
Union, WA 98592
Burt:
wanted to confirm my understanding that there are two issues to be
completed regarding the fire alarm system in your building.
There are three bell circuits and three initiating circuits that are not
supervised. I have been advised that the parts are on order and that these
repairs should be made by the end of the week.
Please advise when these corrections are completed.
If you have any questions, please contact me.
Bes Regards,
0-r
Dave Salzer
Fire Marshal
fa� ��f. C ric�7e 's Re#lcec 0 v ��
Owned and operated by the Diocese of Olympia /n (,� ' 1
E.7550 Highway 106 �Q D�-- l Y (/
Union,Washington 98592
Telephone(360)898-2362
To: Bradley- Lauderback Construction
Re: Lodge Remodel - Completion Punch .List
Prep: B. Duncan
Date: 3/12/00
1 ) 2 switch plates chapel - Remove unused switches add new
face plate
2 ) Key alike all exterior doors, ( 3 ) 2nd floor west wing closets,
1st floor laundry & kit. cafe door.
3 ) Install missing door handels .
4 ) Complete Bldg. Inspectors punch list.
5) Obtain final occupancy permit.
6) Add necessary zones to smoke-heat detection panel to
accomplish supervision.
7) Remove ladders etc. .
B ) Strike dining storage door.
9 ) Install chapel-sun rooms furnace & thermos . for radiant heat.
10 ) Chk me out w/ sun room exaust fan.
11 ) Location of water shutoff valves & waste plumbing clean-outs.
Put on site drawings.
12 ) Locate west septic tank clean-out & mark decking on the
north edge of 2"x4"s.
13) Remove construction sigh the week after open house.
13) I believe there are 2 missing window screens. We need a
walk thru.
14 ) Remove burn pile.
We need to agree on dollar reserve to finish exterior painting
to be done latter as weather permits.
(over)
Items requested on Project Managers punch list to be done at
extra cost and will not affect final draw dollars. B
r
1 ) Install concrete walks, steps & hand rails. Rails tolpainted
iron like the one installed next to chapel.
2 )replace kitchen screen door
3 )We need to talk about a 1 "x6" wainscoat board chapel walls
4 )Rework 4"x6" beam under :mgrs house dining room kitchen area.
I would also like you to look at the construction of a
Garden - Garbage shed to be located next to driveway.
I will have a design for this & the construction propane
costs later this week.
i I
I
RA,.d J(Q.u6e
Owned and operated by the Diocese of Olympia
E.7550 Highway 106
Union,Washington 98592
Telephone(360)898-2362
Dave Salzer
Mason County Fire Marshal
426 West Cedar St.
Shelton, Wa. 98584
Re: Lodge Firehood
Date: 11 /3/99
Dear Dave;
our contractor; Bradley- Louderback, contacted a sheetmetal company
to extend the firehood flue thru our new addition.
He felt the existing firehood did not meet fire code. I
A new firehood is expensive and is not bud5eted. Even so, should
it be necessary, we would find some way to install one.
I do not believe a new firehood is necessary.
OWith the question raised, we felt the need to contact you.
The firehood and flue, constructed of continuous welded stainless
steel and galvanized sheetmetal , was installed in 1988 . Included
was an approved fire suppression system , a spring-loaded fuseable
link flue damper and a mechanical gas shut off should the system
W111, tAA be activated .
In 1994 you issued a permit for a fire alarm system in the
sleeping areas, furnace areas and to connect the existing firehood
into the overall system.
After installation, you personally inspected, tested and
approved all systems.
This did not cover the entire complexin the fire alarm system.
You agreed to this situation with the understanding with the
then future remodeling the system would be completed. This is
now being done together with your other recommendations;
1 ) Removal of the cedar paneling and 5/8' fire-rock installed
on all walls and ceilings in the sleeping areas .
2) Fire-stops in the exterior balloon framed walls.
With our current remodeling, Hultz/BHC Inc. , Mike Taglis Engineer
1326 Tacoma Ave. S Tacoma, Wa. 98402 ( 253-383-3257) designed
our mechanical systems and called for the flue raceway from the
firehood out thru the roof to be lined with two layers of 5/8"
fire-rock. As of this date the area is open ready for work
St. Andrew' s House
Re: Lodge Firehood
Date: 11 /3/99
Pg. 2
to be done. The engineer also relocated the gas shut-off valve.
This has been accompished with a new hook-up to the range.
No other retrofit was required and is so indicated on the
approved drawings .
The system has been and of course continue to be inspected twice
a year, first by the fire extinguisher company and again by
the systems monitoring company.
What do I need from you?
Possibly a note that you concure with the recommendations of
mechanical engineer and if properly installed and with the
appropriate inspections you would approve the system as
designed should all systems work on final inspection.
Or some such-
Again, the existing firehood is not being altered. We are only
extending the exaust duct up thru the 2nd floor.
T ou nk fo your help
Burton E. Duncan Jr
Project Manager
cc; Iraaley-z.audervacl� Const.
Denny Bacon Treas .
Diocese of Olympia
fR& , Jlauee
Owned and operated by the Diocese of Olympia
E.7550 Highway 106
try Union,Washington 98592
Telephone(360)898-2362 D ' E
Dave Salter AUG 2 7199
Fire Marshal - Mason County PERMIT ASSISTANCE CENTER
P.O. Box 186 PERMIT
Shelton, Wa. 98584
Dear Dave;
Pursuant to our phone conversation Wednesday 8/25/99, I am
requesting permission to leave the St. Andrew's House
Smoke Detection System disconnected until the end of November or
until we are ready for occupancy.
We are in the process of a major remodeling.
There is not nor will there be any guests, sleeping or otherwise,
until this project is completed. Because the lodge is so open,
the only exception is the Washington State Brown Bat. You know
the one the governor ' s family likes so well.
In the sleeping areas we have removed all the interior cedar paneling
to install fire stops, insulation, thermopane windows and
-% fire rock. The dining room is being enlarged to meet code
space requirments . The existing chapel will become two handiecap
bedrooms . A new chapel will be in the east lawn.
Some by design xTid some because of construction, much of the
electrical wiring, heating system, all the plumbing and a portion
of the existing Smoke Detection System will be redone. Of course
this time when finished the entire building will be under the
Smoke Detection System.
Thank you for your concerns .
Inc rly
_ urt Duncan
Project Manager
MASON COUNTY FIRE MARSHAL
Mason County Bldg, III 426 W. Cedar
P.O. Box 186 Shelton,Washington 98584
(360)427-9670 Ext.273
CODE ENFORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PUBLIC EDUCATION
August 30, 1999
Burt Duncan, Project Manager
St. Andrews Retreat House
E 7550 Highway 106
Union, WA '98592
Mr. Duncan:
Pursuant to your letter of 8/25/99, 1 am confirming your request to leave the
St. Andrews Retreat House automatic fire alarm system out of service until
your remodeling is done.
I am also confirming that, except for contractors, there will be no
occupancy of the building until the remodeling is completed and the
automatic fire alarm system is back in service. At that time. it is my
expectation that prior to occupancy, you will contact the Alarm Center, Inc.,
in Lacey, to re-establish monitoring.
If you have any questions, please contact me.
Be a ards,
5Salze
Fire Marshal
cc: FD 6
Alarm Center, Inc.
Mason County Building Department
MASON COUNTY FIRE MARSHAL
Mason County Bldg, III 426 W. Cedar
P.O. Box 186 Shelton,Washington 98584
(360)427-9670 Ext.273
CODE ENFORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PUBLIC EDUCATION
August 30, 1999
Burt Duncan, Project Manager
St. Andrews Retreat House
E 7550 Highway 106
Union, WA 98592
Mr. Duncan:
Pursuant to your letter of 8/25/99, 1 am confirming your request to leave the
St. Andrews Retreat House automatic fire alarm system out of service until
your remodeling is done.
am also confirming that, except for contractors, there will be no
occupancy of the building until the remodeling is completed and the
automatic fire alarm system is back in service. At that time. it is my
expectation that prior to occupancy, you will contact the Alarm Center, Inc.,
in Lacey, to re-establish monitoring.
If you have any questions, please contact me.
Bes a ards,
Salze
Fire Marshal
cc: FD 6
Alarm Center, Inc.
Mason County Building Department