Loading...
HomeMy WebLinkAboutMIS99-0341 Automatic Fire Alarm - MIS Permit / Conditions - 7/16/1999 MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 MIS99 0341 PARCEL :322334460000 Pt A i JOB ADDRESS , 7550 E STATE ROUTE 1O6 L�Iti1 t r APPLICANT : ST . ANDRFWS HOUSE. OWNER : ST . ANDREWS HOUSE: LEGAL. : 1112 11112 1112 LOT 1 Ili 669C-7 1 611-C-- 2 PROJECT DESCRIPTION : AUTOMATIC f I RE AUARM PROJECT i_OCATION : 1 /4 MILE EAST OF AL DFABROOK INN ON IfWY 106 PROJECT NOTES : ..._t-,a.•�9:z:s.:.scr._.�vcnr.*rscs.rx^wr>_�s^ac.._.�-�-s:-.aarr,:.xm::rs:.st�cnr- TYPE AMOUNT BY DATE RECEIPT FIR2 3, 100 .00 KS 07/ 16/99 121 'TOTAL : 100 .00 OWNER OR AGE 'VATT YIS_PONT, rev! 0011112 r CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING Attic OTHER Groundwork date date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 MIS99-0341 PARCEL :322334460000 PLAT : DIV : BLK : LOT : JOB ADDRESS : 7550 E STATE ROUTE 106 UNION APPLICANT : ST . ANDREWS HOUSE OWNER : ST . ANDREWS HOUSE LEGAL : 1112 1112 E112 LOT 1 1 I! 669C-2 d 683-C- 2 PROJECT DESCRIPTION : AUTOMATIC FIRE ALARM PROJECT LOCATION : 1 /4 MILE EAST OF ALDERBROOK INN ON HWY 106 PROJECT NOTES : TYPE AMOUNT BY DATE RECEIPT FIR2 $ 100 .00 KS 07/ 16/99 121 TOTAL : 100 .00 OWNER OR AGE ATE MIS—PAMT, rev: 04101192 Alk - - 1 MASON COUNTY FIRE MARSHAL FI LE COPY Mason County Bldg. III 426 W. Cedar !J.1kI `) -, P.O. Box 186 Shelton,Washington 98584 (206)427-9670 CODE ENFORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PUBLIC EDUCATION PERMIT NO. mPs11_03y MASON COUNTY FIRE PROTECTION SYSTEM PERMIT APPLICATION NOTE: This application must be completed and accompanied by a minimum of three (3) copies of plans, specifications and applicable calculations per Mason County Fire Protection Standards and brought to the office of the Mason County Fire Marshal . This is not a permit, and failure to submit all necessary information will cause a delay and/or rejection of your submittal. When a permit has been issued, you will be notified. PLEASE PRINT #1 OWNER f -,4- � i� �} PHON> 2 SITE ADDRE$ c) FIRE DIST. CITY a-lyl-3 /QI STATE ZIP- DIRECTIONS TO-JOB SITE OWNER MAILING ADDRESS CITY STATE ZIP LIEN/TITLE HOLDER ADDRESS CITY 2 CONTRACTO54D/l/ rj n,��-/ g�r ,��i, ONTRACTOR REG ADDRESS EXP. DATE CITYS'�}�L1) STATE ZIP #3 PARCEL # n33 - qq _ UJ do LEGAL DESCRIPTION #4 BLDG. SQ. FT (EXISTING/PROPOSED) 1ST FL / / 2ND / 3RD / BASEMENT / DECK / #BR #BATH GARAGE / CARPORT / ENCL ATTIC: Y N OTHER SQ FT USE OF BUILDING _ /V���w� �, -�I-- #5 DESCRIPTION OF WORK: SPRINKLER: WET DRY STANDPIPE: WET DRY AUTOMATIC FIRE ALARM CORRIDOR SMOKES HOOD & DUCT DRY CHEAICAL WET CHEMICAL HALON NEW SYSTEM MODIFICATION NUMBER OF NEW DEVICES C MONITORING STATION � PHONE ��"'7 #6 DOES YOUR SUBMITTAL INCLUDE: 1. DIMENSIONS, SCALE, NORTH ARROW? YES NO 2 . FLOOR PLAN AND CROSS SECTIONAL ELEVATION? YES NO_ 3 . ALL CONCEALED SPACES (LABELED COMBUSTIBLE AND NON-COMBUSTIBLE) ? YES , NO 4 . ALL AREAS ON OPPOSITE SIDE OF NEW WALLS? YES , NO 5 . CUT SHEETS OR REFERENCES FOR ALL 'NEW DEVICES? YES NO- 6 . LOCATION/DESCRIPTION OF ANY EXISTING DEVICES YESXNO 7 . BATTERY CALCULATIONS FOR FIRE ALARM SYSTEMS? YES N 8 . RISER/WIRING DIAGRAM FOR FIRE ALARM SYSTEMS? YES NO 9 . HYDRAULIC CALCULATIONS FOR SPRINKLER SYSTEMS? YES N NOTE: WORK MAY PROCEED ONLY IN ACCORDANCE WITH A VALID FIRE PROTECTION SYSTEM PERMIT ISSUED BY THE MASON COUNTY FIRE MARSHAL. A VALID PERMIT AND AN APPROVED SET OF PLANS MUST BE ON THE JOB SITE DURING CONSTRUCTION AND MUST REMAIN THERE UNTIL A FINAL INSPECTION IS DONE BY THE MASON COUNTY FIRE MARSHAL. FAILURE TO OBTAIN A VALID PERMIT PRIOR TO WORKING ON A FIRE PROTECTION SYSTEM AND/OR FAILURE TO PROVIDE THESE PLANS AND PERMIT FOR THE MASON COUNTY FIRE MARSHAL MAY RESULT IN A CITATION AND FINE. OWNERS AFFIDAVIT I certify that I am exempt from the requirements of the Contrac- tors Registration Law RCW 18 .27, and am aware of the Mason County ordinance requirements for which this permit is issued and that all work will be done in conformance therewith. No changes will be made without first obtai 'n approval from the Mason County Fire Marsh 0 DA E 6 f CONTRACTORS AFFIDAVIT I certify that I am a currently registered contractor in the State of Washington and I am aware of the ordinance requirements regulating the work for which the permit is issued and all work done will ' e in conformance therewith. No changes will be made without 'rst obtaining approval from the Mason County Fire ` ' Mar c Y ct DATE / LirE CRA MASON COUNTY FIRE MARSHAL Mason County Bldg, III 426 W. Cedar P.O. Box 186 Shelton,Washington 98584 (206)427-9670 CODE ENFORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PUBLIC EDUCATION March 13, 2000 Burt Duncan St. Andrews House 7550 East Highway 106 Union, WA 98592 Burt: wanted to confirm my understanding that there are two issues to be completed regarding the fire alarm system in your building. There are three bell circuits and three initiating circuits that are not supervised. I have been advised that the parts are on order and that these repairs should be made by the end of the week. Please advise when these corrections are completed. If you have any questions, please contact me. Bes Regards, 0-r Dave Salzer Fire Marshal fa� ��f. C ric�7e 's Re#lcec 0 v �� Owned and operated by the Diocese of Olympia /n (,� ' 1 E.7550 Highway 106 �Q D�-- l Y (/ Union,Washington 98592 Telephone(360)898-2362 To: Bradley- Lauderback Construction Re: Lodge Remodel - Completion Punch .List Prep: B. Duncan Date: 3/12/00 1 ) 2 switch plates chapel - Remove unused switches add new face plate 2 ) Key alike all exterior doors, ( 3 ) 2nd floor west wing closets, 1st floor laundry & kit. cafe door. 3 ) Install missing door handels . 4 ) Complete Bldg. Inspectors punch list. 5) Obtain final occupancy permit. 6) Add necessary zones to smoke-heat detection panel to accomplish supervision. 7) Remove ladders etc. . B ) Strike dining storage door. 9 ) Install chapel-sun rooms furnace & thermos . for radiant heat. 10 ) Chk me out w/ sun room exaust fan. 11 ) Location of water shutoff valves & waste plumbing clean-outs. Put on site drawings. 12 ) Locate west septic tank clean-out & mark decking on the north edge of 2"x4"s. 13) Remove construction sigh the week after open house. 13) I believe there are 2 missing window screens. We need a walk thru. 14 ) Remove burn pile. We need to agree on dollar reserve to finish exterior painting to be done latter as weather permits. (over) Items requested on Project Managers punch list to be done at extra cost and will not affect final draw dollars. B r 1 ) Install concrete walks, steps & hand rails. Rails tolpainted iron like the one installed next to chapel. 2 )replace kitchen screen door 3 )We need to talk about a 1 "x6" wainscoat board chapel walls 4 )Rework 4"x6" beam under :mgrs house dining room kitchen area. I would also like you to look at the construction of a Garden - Garbage shed to be located next to driveway. I will have a design for this & the construction propane costs later this week. i I I RA,.d J(Q.u6e Owned and operated by the Diocese of Olympia E.7550 Highway 106 Union,Washington 98592 Telephone(360)898-2362 Dave Salzer Mason County Fire Marshal 426 West Cedar St. Shelton, Wa. 98584 Re: Lodge Firehood Date: 11 /3/99 Dear Dave; our contractor; Bradley- Louderback, contacted a sheetmetal company to extend the firehood flue thru our new addition. He felt the existing firehood did not meet fire code. I A new firehood is expensive and is not bud5eted. Even so, should it be necessary, we would find some way to install one. I do not believe a new firehood is necessary. OWith the question raised, we felt the need to contact you. The firehood and flue, constructed of continuous welded stainless steel and galvanized sheetmetal , was installed in 1988 . Included was an approved fire suppression system , a spring-loaded fuseable link flue damper and a mechanical gas shut off should the system W111, tAA be activated . In 1994 you issued a permit for a fire alarm system in the sleeping areas, furnace areas and to connect the existing firehood into the overall system. After installation, you personally inspected, tested and approved all systems. This did not cover the entire complexin the fire alarm system. You agreed to this situation with the understanding with the then future remodeling the system would be completed. This is now being done together with your other recommendations; 1 ) Removal of the cedar paneling and 5/8' fire-rock installed on all walls and ceilings in the sleeping areas . 2) Fire-stops in the exterior balloon framed walls. With our current remodeling, Hultz/BHC Inc. , Mike Taglis Engineer 1326 Tacoma Ave. S Tacoma, Wa. 98402 ( 253-383-3257) designed our mechanical systems and called for the flue raceway from the firehood out thru the roof to be lined with two layers of 5/8" fire-rock. As of this date the area is open ready for work St. Andrew' s House Re: Lodge Firehood Date: 11 /3/99 Pg. 2 to be done. The engineer also relocated the gas shut-off valve. This has been accompished with a new hook-up to the range. No other retrofit was required and is so indicated on the approved drawings . The system has been and of course continue to be inspected twice a year, first by the fire extinguisher company and again by the systems monitoring company. What do I need from you? Possibly a note that you concure with the recommendations of mechanical engineer and if properly installed and with the appropriate inspections you would approve the system as designed should all systems work on final inspection. Or some such- Again, the existing firehood is not being altered. We are only extending the exaust duct up thru the 2nd floor. T ou nk fo your help Burton E. Duncan Jr Project Manager cc; Iraaley-z.audervacl� Const. Denny Bacon Treas . Diocese of Olympia fR& , Jlauee Owned and operated by the Diocese of Olympia E.7550 Highway 106 try Union,Washington 98592 Telephone(360)898-2362 D ' E Dave Salter AUG 2 7199 Fire Marshal - Mason County PERMIT ASSISTANCE CENTER P.O. Box 186 PERMIT Shelton, Wa. 98584 Dear Dave; Pursuant to our phone conversation Wednesday 8/25/99, I am requesting permission to leave the St. Andrew's House Smoke Detection System disconnected until the end of November or until we are ready for occupancy. We are in the process of a major remodeling. There is not nor will there be any guests, sleeping or otherwise, until this project is completed. Because the lodge is so open, the only exception is the Washington State Brown Bat. You know the one the governor ' s family likes so well. In the sleeping areas we have removed all the interior cedar paneling to install fire stops, insulation, thermopane windows and -% fire rock. The dining room is being enlarged to meet code space requirments . The existing chapel will become two handiecap bedrooms . A new chapel will be in the east lawn. Some by design xTid some because of construction, much of the electrical wiring, heating system, all the plumbing and a portion of the existing Smoke Detection System will be redone. Of course this time when finished the entire building will be under the Smoke Detection System. Thank you for your concerns . Inc rly _ urt Duncan Project Manager MASON COUNTY FIRE MARSHAL Mason County Bldg, III 426 W. Cedar P.O. Box 186 Shelton,Washington 98584 (360)427-9670 Ext.273 CODE ENFORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PUBLIC EDUCATION August 30, 1999 Burt Duncan, Project Manager St. Andrews Retreat House E 7550 Highway 106 Union, WA '98592 Mr. Duncan: Pursuant to your letter of 8/25/99, 1 am confirming your request to leave the St. Andrews Retreat House automatic fire alarm system out of service until your remodeling is done. I am also confirming that, except for contractors, there will be no occupancy of the building until the remodeling is completed and the automatic fire alarm system is back in service. At that time. it is my expectation that prior to occupancy, you will contact the Alarm Center, Inc., in Lacey, to re-establish monitoring. If you have any questions, please contact me. Be a ards, 5Salze Fire Marshal cc: FD 6 Alarm Center, Inc. Mason County Building Department MASON COUNTY FIRE MARSHAL Mason County Bldg, III 426 W. Cedar P.O. Box 186 Shelton,Washington 98584 (360)427-9670 Ext.273 CODE ENFORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PUBLIC EDUCATION August 30, 1999 Burt Duncan, Project Manager St. Andrews Retreat House E 7550 Highway 106 Union, WA 98592 Mr. Duncan: Pursuant to your letter of 8/25/99, 1 am confirming your request to leave the St. Andrews Retreat House automatic fire alarm system out of service until your remodeling is done. am also confirming that, except for contractors, there will be no occupancy of the building until the remodeling is completed and the automatic fire alarm system is back in service. At that time. it is my expectation that prior to occupancy, you will contact the Alarm Center, Inc., in Lacey, to re-establish monitoring. If you have any questions, please contact me. Bes a ards, Salze Fire Marshal cc: FD 6 Alarm Center, Inc. Mason County Building Department