Loading...
HomeMy WebLinkAboutBLD2015-00921 Air Handler and Heat Pump - BLD Permit / Conditions - 10/27/2015 Inspection Line (3(iU)42/-/2ti2 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. III t 426 W. Cedar Shelton, WA 98584 1854 RESIDENTIAL BUILDING PERMIT BLD2015-00921 OWNER: HARRY IBSEN RECEIVED: 10/27/2015 CONTRACTOR: SUNSETAIR INC. 360.456.4956 LICENSE: SUNSEA*220CM EXP: 2/3/2016 ISSUED: 10/27/2015 SITE ADDRESS: 6500 ESTATE ROUTE 106 UNION EXPIRES: 4/27/2016 PARCEL NUMBER: 322325010515 LEGAL DESCRIPTION: UNION HOOD CANAL LAND & IMP CO TRS 6 &6-A OF BLKS 105-106 PCL 1 OF BLA#97-68#656590 PROJECT DESCRIPTION: DIRECTIONS TO SI TE: AIR HANDLER & HEAT PUMP FOLLOW ST RT 106 TO SITE ADDRESS ON THE LAND SIDE General Information Construction&Occupancy Information Square Footage Information No. of Bedrooms: Type of Constr.: Type of Use: SF Insp. Area: No. of Bathrooms: Occ. Group: Lot Size: Deck: Type of Work: MEC Fire Dist.: 6 No. of Stories: Occ. Load: Building: Valuation: Building Height: Occ. Status: Basement: Manufactured Home Information Setback Information Shoreline& Planning Information Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body: S E PA?: Model: Width: Ft. Rear: Ft. Slope: Ft. g Side 1: Ft. Shoreline Desi : Year: Serial No.: Side 2: Ft. Comp. Plan Desig.: Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Furnace<100K 1 Building Special inspection GMM 10/27/201 $73.00 S2201500000001 Heat Pump 1 Mechanical Base Fee GMM 10/27/201 $28.50 S2201500000001 Mechanical Permit Fee GMM 10/27/201 $36.50 S2201500000001 Total $138.00 BLD2015-00921 Please refer to the following pages for conditions of this permit. Page 1 of 4 CASE NOTES FOR BLD2015-00921 CONDITIONS FOR BLD2015-00921 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800- 8 . The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X i 2) Owner M is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X •�' / 3) ALL FURNACE INSTALLATIONS SHALL MEET THE MINIMUM EFFICIENCIES SET FORTH IN THE CURENT EDITION OF THE WASHINGTON STATE EN�GY CODE (WSEC). ANY PORTION OF THE MECHANICAL SYSTEM THAT IS ALTERED OR REPLACED SHALL MEET THE MINIMUM STA SET FORTH IN THE WSEC AND INTERNATIONAL MECHANICAL CODE. X 4) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Wa§hin ton. Occupancy is limited to the approved and permitted classification. An non-approved change of use or occupancy 9 P Y PP P Y PP 9 c pancy would result in perrr�i ation. X 4 B�D2015-00921 Please refer to the following pages for conditions of this permit. Page 2 of 4 . J) II IJIdiIdUVlIV] 111--CILIIIY tquil./111C1 LIT I d JIIIYIC-IdI I I I Iy ICSIUen(;e Srlall rueet ule requirements OT ine current it:L;u/vvb Lu K41LI.j, appncal)le sections Ot the IRC, and IMC. Heating equipment shall be sized in accordance to ICC/WSEC, Section R403.6. Heating and design load calculations for the purpose of sizing HVAC ` systems are required and shall be calculated in accordance with accepted practice, including infiltration and ventilation. Design calculations shall be available for inspection during inspection. Referencing IRC M1601.4, all ducts, air handlers, filter boxes, and building cavities shall be sealed. All joints of duct systems and seams shall be made substantially air tight by means of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Closure systems used with rigid fibrous glass ducts shall comply with UL181A and shall be marked 181A-P for pressure-sensitive tape, 181A-M for mastic or 181 A-H for heat-sensitive tape. Closure systems used with flexible air ducts and flexible air connectors shall comply with UL181 B and shall be marked 181 B-FX for pressure-sensitive tape or 181 B-M for mastic. Duct connections to flanges of air distribution system equipment or sheet metal fittings shall be mechanically fastened. Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181 B and shall be marked 181 B-C. Crimp joints for round metal ducts shall have a contact lap of at least 1-1/2 inches (38 mm) and shall be mechanically fastened by means of at least three sheet-metal screws or rivets equally spaced around the joint. Closure systems used to seal metal ductwork shall be installed in accordance with the manufacturer's installation instructions. Duct tape is NOT permitted as a sealant on any ducts. When ducts are located in unheated spaces the ducts hall be insulated to R-8 DUCT TIGHTNESS TESTING shall be conducted by person(s) trained to perform such testing. A signed affidavit documenting test results in accordance to IECC/WSEC Section R403.2.2 shall be provided to the Mason County Building Department prior to the final occupancy inspection. Affidavit forms are available on at the WSU-Energy Program website titles, "Duct Leakage Affidavit" or"Duct Leakage Testing Results (Existing Construction)." Duct tightness te sting is not required if the air handler and all ducts are located within the heated space. L X 6) The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency(ORCAA). It is unlawful for any person to cause or allow the demolition (or major renovation) of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or opera obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org X 7) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to RPOty final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Ma ordinances and building regulations. X 8) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for actioe period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holdprevented action from being taken. No more than one extension may be granted. X BLD2015-00921 Please refer to the following pages for conditions of this permit. Page 3 of 4 OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s) for review and inspection. This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if construction work iopspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMITC N OF 180 DAYS WILL INVALIDATE THE APPLICATION. l Signature Date OWNER - REPRESENTATIVE5:] ONTRACTO Print Name (Circle one to indicate) BLD2015-00921 Please refer to the following pages for conditions of this permit. Page 4 of 4 co oN CONCRETE MECHANICAL MANUFACTURED HOME W N R Date By m Footings 1 Setbacks Ribbons cn Gas Piping Z o interior Date By Interior-Date By Date By = N Exterior Date By Exterior-Date B Set-up > Point Load!Isolated FootingsINSULATION Da_ B e Y BG i SLAB INSULATION Date By Data BY FIRE DEPARTMENT _ Foundation Wails Floors Date By Date By Data By DECKS FRAMING Walls Date By Date By Data By PROPANE TANKS PLUMBING vault Date By Date By OTHER Groundwork Attic Data By Date By Type. Date By D.W.V DRYWALL. Type- -0 Date By Int Brace Wall Date By W (D Date By a) FINAL INSPECTION Cn Water Line Fire Separation N m CD CD Date By Date By Date By ib I f T s Pass or Request Inspect. c 40 5 Type of Insp. Fail Date Date Done By Comments W CD 0 0 0 n o' N O S N fD N (L] M _T M