Exemption from Shoreline Management Act
Case No.: SHX2012-00041 Substantial Development Permit Requirement
The Proposal By: ROBERT THOMPSON
250 N AYOCK BEACH DR
LILLIWAUP, WA 98555
To undertake the following development:
REPAIR BULKHEAD FOOTING & EXTEND BULKHEAD TO PROPERTY LINE.
Within HOOD CANAL and/or its associated wetlands is exempt from the requirement of substantial development
because the development is categorized under WAC 173-27-040(2) as being category
D-emergencv construction
Please contact Grace Miller at ext 360 if you have any questions.
Issued: 7/13/2012 4L A WAF
Expires: 7/13/2014 Authorized Local Government Official
M. APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL
---------------------------------------
AGENCY USE ONLY
MDate received:
WASHINGTON STATE US,eDw
Agency reference
Joint Aquatic Resources Permit
Application (DARPA) Form'°2 Tax Parcel#(s):
USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW.
-----------------------------
-----
Part 1—Project Identification
1. Project Name (A name for your project that you create. Examples:Smith's Dock or Seabrook Lane Development) hel
Robert Thompson Bulkhead
Part 2—Applicant
The person and/or organization responsible for the project. h[ elp]
2a. Name (Last, First, Middle)
Jim Japhet
2b. Organization (If applicable)
Japhet Bulkheading Inc.
2c. Mailing Address (Street or PO Box)
1407 Summit Lake Shore RD NW
2d. City, State, Zip
Olympia, WA 98502
2e. Phone(1) 2f. Phone(2) 2 . Fax 2h. E-mail
( 360)490-1369 ( ) (360)866-7702 jjaphet@comcast.net
Additional forms may be required for the following permits:
• If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of
Engineers for application information(206)764-3495.
• If your project might affect species listed under the Endangered Species Act,you will need to fill out a Speck Project Information Form(SPIF)or
prepare a Biological Evaluation. Forms can be found at
hftp://www.nws.usace.army.mil/PublicMenu/Menu.cfm?sitename=REG&pagename=mainpaoe ESA
• Not all cities and counties accept the JARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate city or county
government to make sure they accept the JARPA.
2To access an online JARPA form with[help]screens,go to
hftp://www.epermifting.wa.gov/site/alias resourcecenterharoa iarpa form/9984harpa form.asox.
For other help,contact the Governor's Office of Regulatory Assistance at 1-800-917-0043 or help(a-)ora.wa.aov.
JARPA Revision 2012.1 Page 1 of 14
Part 3—Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this
application.) heI
3a. Name (Last, First, Middle)
Japhet, Jim
3b. Organization (If applicable)
Japhet Bulkheading Inc.
3c. Mailing Address (Street or Po Box)
1407 Summit Lake Shore RD NW
3d. City, State, Zip
Olympia, WA. 98502
3e. Phone(1) 3f. Phone(2) 3 . Fax 3h. E-mail
( 360)490-1369 ( ) (360)866-7702 jjaphet@comcast.net
Part 4—Property Owner(s)
Contact information for people or organizations owning the property(ies) where the project will occur. Consider both
upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. nei
❑ Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for
each additional property owner.
❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know,
contact the DNR at (360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E
to apply for the Aquatic Use Authorization.
4a. Name (Last, First, Middle)
Thompson, Robert
4b. Organization (If applicable)
4c. Mailing Address (Street or Po Box)
PO Box 569
4d. City, State, Zip
Chehalis, WA 98532
4e. Phone(1) 4f. Phone(2) 4 . Fax 4h. E-mail
(360)748-3351 ( 360)877-5829 ( )
JARPA Revision 2012.1 Page 2 of 14
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. [help]
❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA
Attachment B for each additional project location.
5a. Indicate the type of ownership of the property. (Check all that apply.) hf e1A
X Private
❑ Federal
❑ Publicly owned (state, county, city, special districts like schools, ports, etc.)
❑ Tribal
❑ Department of Natural Resources (DNR) — managed aquatic lands (Complete JARPA Attachment E)
5b. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5p.) hel
250 N Ayock Beach DR.
5c. City, State, Zip (If the project is not in a city or town, provide the name of the nearest city or town.) hel
Lilliwaup, WA 98555
5d. County hel
Mason
5e. Provide the section, township, and range for the project location. hel
'/4 Section Section Township Range
3 23N 3W
5f. Provide the latitude and longitude of the project location. hel
• Example: 47.03922 N lat. /-122.89142 W long. (Use decimal degrees- NAD 83)
47.506944N Lat / 123.0541657 W Long
5g. List the tax parcel number(s) for the project location. hem
• The local county assessor's office can provide this information.
32303-50-01012
5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.) Iku
Name Mailing Address Tax Parcel # (if known)
Martin Trust 240 N Ayock Beah Dr
Lilliwaup, WA98555 32303-50-01013
Robert Thompson PO Box 569 32303-50-01011
Chehalis WA 98532
JARPA Revision 2012.1 Page 3 of 14
Si. List all wetlands on or adjacent to the project location. hf elpJ
None
5j. List all waterbodies (other than wetlands) on or adjacent to the project location. hf eM
Hood Canal
5k. Is any part of the project area within a 100-year floodplain? hei
❑ Yes X No ❑ Don't know
51. Briefly describe the vegetation and habitat conditions on the property. hei
Shrubs and grass
5m. Describe how the property is currently used. hei
Family Residence
5n. Describe how the adjacent properties are currently used. hei
Family Residence
5o. Describe the structures (above and below ground) on the property, including their purpose(s) and current
condition. hei
Home and bulkhead
5p. Provide driving directions from the closest highway to the project location, and attach a map. of elPl
US 101 North to Ayock beach on Rt.
JARPA Revision 2012.1 Page 4 of 14
Part 6—Project Description
6a. Briefly summarize the overall project. You can provide more detail in 6b. hl pm
Extend footing of existing bulkhead into the beach to protect against erosion. Add 16' of new
concrete to the North end of the existing concrete bulkhead as per plans
6b. Describe the purpose of the project and why you want or need to perform it. hf eM
The beach has lowered due to extreme weather and waves. The bulkhead is being placed in
danger due to the lowering of the beach. The bulkhead footing must be extended into the beach
to protect the bulkhead from failure. Also the bulkhead must be extended a minimum of 16' on
the North end to protect the residence and property. There may need to be additional expansion
of the bulkhead to the North if the erosion of Ayock Point continues, but is not necessary at
this time. Also wish to place a few large granite rocks on the beach to break up the wave action
at the base of the bulkhead.
6c. Indicate the project category. (check all that apply) hf e
❑ Commercial X Residential ❑ Institutional ❑ Transportation ❑ Recreational
❑ Maintenance ❑ Environmental Enhancement
6d. Indicate the major elements of your project. (check an that apply) [help]
❑ Aquaculture ❑ Culvert ❑ Float ❑ Retaining Wall
❑ Bank Stabilization ❑ Dam /Weir ❑ Floating Home (upland)
❑ Boat House ❑ Dike / Levee /Jetty ❑ Geotechnical Survey ❑ Road
❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific
Measurement Device
❑ Boat Lift ❑ Dock / Pier ❑ Marina / Moorage
❑ Stairs j
❑ Bridge ❑ Dredging ❑ Mining
❑ Stormwater facility
X Bulkhead ❑ Fence ❑ Outfall Structure
❑ Swimming Pool
❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin
❑ Utility Line
❑ Channel Modification ❑ Fishway ❑ Raft
❑ Other:
DARPA Revision 2012.1 Page 5 of 14
6e. Describe how you plan to construct each project element checked in 6d. Include specific construction
methods and equipment to be used. hf eU
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-year floodplain.
All work to be done at periods of low tide Equipment used will be a small excavator and hand tools.
6f. What are the anticipated start and end dates for project construction? (MonthNear) [he�ji
• If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or
stage.
Start date: ASAP after 7-15-2012 End date: before 9-15-2012 ❑ See JARPA Attachment D
6g. Fair market value of the project, including materials, labor, machine rentals, etc. hf elal
6h. Will any portion of the project receive federal funding? hel
• If yes, list each agency providing funds.
❑ Yes X No ❑ Don't know
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.) LheM
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. hel
X Not applicable
7b. Will the project impact wetlands? hel
❑ Yes ❑ No ❑ Don't know
JARPA Revision 2012.1 Page 6 of 14
7c. Will the project impact wetland buffers? hel
❑ Yes X No ❑ Don't know
7d. Has a wetland delineation report been prepared? hel
• If Yes, submit the report, including data sheets, with the JARPA package.
❑ Yes X No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? hel
• If Yes, submit the wetland rating forms and figures with the JARPA package.
❑ Yes X No ❑ Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? hel
• If Yes, submit the plan with the JARPA package and answer 7g.
• If No, or Not applicable, explain below why a mitigation plan should not be required.
❑ Yes ❑ No X Not applicable
7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was
used to design the plan. [wd
N/A
7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the
impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a
similar table, you can state (below) where we can find this information in the plan. hel
Activity (fill, Wetland Wetland Impact Duration Proposed Wetland
drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area
flood, etc.) rating ft. or type (sq. ft. or
category2 Acres) acres)
If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such
as a wetland delineation report.
2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System. Provide the wetland
rating forms with the JARPA package.
3 Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent"if applicable.
4 Creation(C), Re-establishment/Rehabilitation(R), Enhancement(E), Preservation(P),Mitigation Bank/In-lieu fee(B)
Page number(s) for similar information in the mitigation plan, if available:
JARPA Revision 2012.1 Page 7 of 14
7i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic
yards that will be used, and how and where it will be placed into the wetland. nel
7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. MU
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) nel
❑ Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
Le
❑ Not applicable
The project will not have an impact to the aquatic enviroment
8b. Will your project impact a waterbody or the area around a waterbody? nel
❑ Yes X No
JARPA Revision 2012.1 Page 8 of 14
8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? !I
• If Yes, submit the plan with the JARPA package and answer 8d.
• If No, or Not applicable,explain below why a mitigation plan should not be required.
❑ Yes ❑ No X Not applicable
8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was
used to design the plan.
• If you already completed 7g you do not need to restate your answer here. Lbelp
8e. Summarize impact(s) to each waterbody in the table below. of elPl
Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or
dredge, fill, pile name' location of impact3 (cubic yards) to be linear ft.) of
drive, etc.) placed in or waterbody
removed from directly affected
waterbod
If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided.
2Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent, provide the distance between the impact and the waterbody and
indicate whether the impact will occur within the 100-year flood plain.
3 Indicate the days, months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable.
8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards)
you will use, and how and where it will be placed into the waterbody. heI
JARPA Revision 2012.1 Page 9 of 14
8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. h� eM
Part 9—Additional Information
Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of
this section as you can. It is ok if you cannot answer a question.
9a. If you have already worked with any government agencies on this project, list them below. h[ elo
Agency Name Contact Name Phone Most Recent
Date of Contact
9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington
Department of Ecology's 303(d) List? hel
• If Yes, list the parameter(s) below.
• If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at:
http://www.ecy.wa.gov/programs/wq/303d/.
X Yes ❑ No
Hood Canal
9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? LheM
• Go to http://cfpub.epa.gov/surf/locate/index.cfm to help identify the HUC.
17110018
9d. What Water Resource Inventory Area Number (WRIA#) is the project in? h( elpl
• Go to http://vvww.ecy.wa.gov/services/gis/maps/wria/wria.htm to find the WRIA#.
16
JARPA Revision 2012.1 Page 10 of 14
9e. Will the in-water construction work comply with the State of Washington water quality standards for
turbidity? hel
• Go to http://www.ecy.wa.gov/programs/wq/swgs/criteria.html for the standards.
❑ Yes ❑ No X Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? hf eM
• If you don't know, contact the local planning department.
• For more information, go to: http://www.ecy.wa.gov/programs/sea/sma/laws rules/173-26/211 designations.html.
X Rural ❑ Urban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other
9g. What is the Washington Department of Natural Resources Water Type? [hel
• Go to http://www.dnr.wa.gov/BusinessPermitsfTopics/ForestPracticesApplications/Pages/fp watertyping.aspx for the Forest
Practices Water Typing System.
X Shoreline ❑ Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal
9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? hf eM
• If No, provide the name of the manual your project is designed to meet.
X Yes ❑ No
Name of manual:
9i. Does the project site have known contaminated sediment? [hel
• If Yes, please describe below.
❑ Yes X No
9j. If you know what the property was used for in the past, describe below. hel
9k. Has a cultural resource (archaeological) survey been performed on the project area? LheM
• If Yes, attach it to your JARPA package.
❑ Yes ❑ No
JARPA Revision 2012.1 Page 11 of 14
91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. hel
Chinook & Chum Salmon
9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. hf eM
Project will have no affect on endangered species
Part 10—SEPA Compliance and Permits
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at http://apps.ecy.wa.gov/opas/.
• Governor's Office of Regulatory Assistance at (800) 917-0043 or help(&-ora.wa.gov.
• For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA.
10a. Compliance with the State Environmental Policy Act (SEPA). (check all that apply.) h[ ela]
• For more information about SEPA, go to www.ecy.wa.gov/programs/sea/sepale-review.htmi.
❑ A copy of the SEPA determination or letter of exemption is included with this application.
❑ A SEPA determination is pending with (lead agency). The expected decision date is
❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 1 ob.) of elpl
❑ This project is exempt (choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
❑ Other:
❑ SEPA is pre-empted by federal law.
JARPA Revision 2012.1 Page 12 of 14
10b. Indicate the permits you are applying for. (Check all that apply.) hel
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development ❑ Conditional Use ❑ Variance
X Shoreline Exemption Type (explain): Bulkhead
Other city/county permits:
❑ Floodplain Development Permit ❑ Critical Areas Ordinance
STATE GOVERNMENT
Washington Department of Fish and Wildlife:
X Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption —Attach Exemption Form
Effective July 10, 2012, you must submit a check for $150 to Washington Department of Fish and Wildlife,
unless your project qualifies for an exemption or alternative payment method below. Do not send cash.
Check the appropriate boxes:
❑ $150 check enclosed. (Check# )
Attach check made payable to Washington Department of Fish and Wildlife.
❑Charge to billing account under agreement with WDFW. (Agreement# )
❑ My project is exempt from the application fee. (Check appropriate exemption)
❑ HPA processing is conducted by applicant-funded WDFW staff.
(Agreement # )
❑ Mineral prospecting and mining.
❑ Project occurs on farm and agricultural land.
(Attach a copy of current land use classification recorded with the county auditor, or other proof of current land use.)
❑ Project is a modification of an existing HPA originally applied for, prior to July 10, 2012.
(HPA# )
Washington Department of Natural Resources:
❑ Aquatic Use Authorization
Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources.
Do not send cash.
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects)
JARPA Revision 2012.1 Page 13 of 14
Part 11—Authorizing Signatures
Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form,
project plans, photos, etc. hf eM
11 a. Applicant Signature (required) hel
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work
only after I have received all necessary permits.
I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this
application. (initial)
By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the
permitting agencies entering the property where the project is to ted to inspect the project site or any work
related to the project. (initial)
Jim Japhet/Japhet Bulkhead
.�J 07-02-2012
Applicant Printed Name A plicant i at Date
11 b. Authorized Agent Signature hf elpl
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to c ry ut the proposed activities and I agree to start work
only after all necessary permits have be n iss ed.
Jim Japhet 07-02-2012
Authorized Agent Printed Name A h ze nt Signature Date
11 c. Property Owner Signature (if not applicant). hf eM
Not required if project is on existing rights-of-way or easements.
I consent to the permitting agencies entering the property where the project is located to inspect the project site
or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the
landowner.
�' B��'� 07-02-2012
Property Owner Pri ed Name Property Owner Signature Date
18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies,conceals, or covers up by any trick,scheme, or device a material fact or makes any false,fictitious,or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false,fictitious, or fraudulent statement or
entry, shall be fined not more than$10,000 or imprisoned not more than 5 years or both.
If you require this document in another format,contact the Governor's Office of Regulatory Assistance(ORA)at(800)917-0043.
People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call(877)833-6341.
ORA publication number: ENV-019-09 rev.06-12
JARPA Revision 2012.1 Page 14 of 14
Section
Scalel/2"=1 '
0
#4 Gr.60
A. 12.OC Horiz.
#4 Gr.60
B"OC Vert
7'-0"
14.4'Tidal level
Beach mat. kJD
sand&gravel -- 2"Drain 8'OC
i 4'-0"
Notes: Property owner:
Concrete: Cys 6 sack to the yard mix Robert Thompson
Concrete below MHHW: Cys Po Box 569
Reinforcement: All #4 Gr.60 , 2.5" min. coverage Chehalis, WA 98532
Wall: 8" OC vert. 12" OC horiz.
Footing: 8" OC cross 12" OC run Site:
Drains: 2" drain 8' OC entire length 250N Ayock Beach Dr.
Top of footing min. 18" below beach grade Lilliwaup WA 98555 fj ,ZQ12
All work to be done at periods of low tide County of Mason
No construction debris will be left on beach State of WashingtoniA, -(�1,
HOOD CANAL
Lat. N47.30.43
Long. W123.03.24
Par# 323035001012
Applicant/Contractor:
Japhet Bulkheading Inc.
1407 Summit Lake Shore Rd. Nw.
Olympia, Wa. 98502
Ph. (360) 866-0377
Fax (360)866-7702
Lic.# JAPHEB1168LH
Section
Scale 1/2"=1 '
�o o
e
Beach grade North
end of bulkhead 2007
#4 Gr.60
12'OC Horiz.
#4 Gr.60
8'OC Vert.
5'-0'
Beach grade South
end of bulkhead 2007
2'Drain 8'OC
present beach grade
4'-0'
Proposed concrete footing repair
approximatly 3' into beach
Property owner:
Robert Thompson
Po Box 569
Chehalis, WA 98532
Notes: Site:
Concrete: Cys 6 sack to the yard mix 25ON Ayock Beach Dr.
Concrete below MHHW: Cys Lilliwaup WA 98555
Reinforcement: All #4 Gr.6O , 2.5" min. coverage County of Mason
Wall: 8" OC vert. 12" OC horiz. State of Washington
Footing: 8" OC cross 12" OC run HOOD CANAL
Drains: 2" drain 8' OC entire length Lat. N47.30.43
Top of footing min. 18" below beach grade Long. W123.03.24
All work to be done at periods of low tide Par# 323035001012
No construction debris will be left on beach
Applicant/Contractor:
Japhet Bulkheading Inc.
1407 Summit Lake Shore Rd. Nw.
Olympia, Wa. 98502
Ph. (360) 866-0377
Fax (360)866-7702
Lic.# JAPHEB1168LH
Ayock Beach Rd
`\t
S. Prop Line N.Prop Line
Robert Thompson
Existing Concrete Po Box 569
Bulkhead Chehalis Wa 98532
Site 250 N Ayock Beach
Lilliwaup,WA
Par#323035001012
Hood Canal
Granite rocks to House
break up waves
64'
—w
Extend footing into Ex isting Concrete i j
beach along entire Bulkhead tJ 4.
length of bulkhead
as shown on section Proposed 16'new r ,
view bulkhead to be built f y �_`,A`
Q�r�
ti now
o { {`+ Owner: `—+-
` Robert Thompson
Po Box 569
7r 50'+/: to be built Chehalis, WA 98532
later if needed Snohomish WA 98296
OHW 2012 Site:
250N Ayock Beach Dr.
Ayock Point OHW 2007 Lilliwaup WA 98555
County of Mason
Site Plan State of Washington
scale 1"=30' HOOD CANAL
Lat. N47.30.43
Long. W 123.03.24
N , Par# 323035001012
Purpose:
Beach erosion is threatening the residence
Proposed:
Install a concrete bulkhead to protect the
APPROVED
residence
MASON COUNTY DCD PLANNING Contractor/Agent:
JapheSITE PLAN REOUI QED TO BE ON SITE 1407 ummitBulkhea k.S Inc.
1407 Summit Lk.Sh.Rd.NW
CHANGES SUBJECT TO APPROVAL OlymPia,WA 98502
360-866-0377
By—"`43 — D--A Lic.#JAPHEB1168LH
EXP. 6-12-05
alea A, S. Prop Line
wAONddv r,,.l. S39NVHO
ails NO 3a O1 3t:1nb321 Nv-id nis
ONINNdI(II ctC:' /�ii MOO NOSdW
Q� ��!/ Robert Thompson
`L:oncrete Po Box 569
Bulkhead Chehalis Wa 98532
Site 250 N Ayock Beach
Lilliwaup, WA
Par#323035001 012
Hood Canal
New Bulkhead installed 2007
16' section proposed new bulkhead
to install 2012
------ Future bulkhead if Ayock point House
continues to wash away
64'
Large granite rocks
to break up waves Ayock Point
balance of beach
does not require
bulkhead and will N
remain natural y
='
D New OHW shoreline after Ayock
OHW shoreline 2007 Point has washed away due to winter
storms and beach has lowered
� mot.• �
tL1 4roposed new 16' section
�` Plot Pan
of bulkhead to be built 2012 future bulkhead if point continues
to wash away. Would like to permit scale 1/16"=1'
at preasent time for future construction.
i
Y
A
Opp-
a♦
y.. ° W
y A• .;
4
-777
Awl
46.
.: - - - �
-AA
4 4
At
•y � 4
��r• r
;w _ Ir -
i
k
f �
•
�a
e
A
a .
,. 4 '