HomeMy WebLinkAboutSHX2012-00041 JARPA - SHX Inspections - 7/13/2012 sTA MASON COUNTY �P c DEPARTMENT OF COMMUNITY DEVELOPMENT o A N Planning Division r'- o N Z P O Box 279, Shelton, WA 98584 7 N Y Y (360)427-9670 OJ �O 1864 Exemption from Shoreline Management Act Case No.: SHX2012-00041 Substantial Development Permit Requirement The Proposal By: ROBERT THOMPSON 250 N AYOCK BEACH DR LILLIWAUP, WA 98555 To undertake the following development: REPAIR BULKHEAD FOOTING & EXTEND BULKHEAD TO PROPERTY LINE. Within HOOD CANAL and/or its associated wetlands is exempt from the requirement of substantial development because the development is categorized under WAC 173-27-040(2) as being category D-emergencv construction Please contact Grace Miller at ext 360 if you have any questions. Issued: 7/13/2012 4L A WAF Expires: 7/13/2014 Authorized Local Government Official M. APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL --------------------------------------- AGENCY USE ONLY MDate received: WASHINGTON STATE US,eDw Agency reference Joint Aquatic Resources Permit Application (DARPA) Form'°2 Tax Parcel#(s): USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW. ----------------------------- ----- Part 1—Project Identification 1. Project Name (A name for your project that you create. Examples:Smith's Dock or Seabrook Lane Development) hel Robert Thompson Bulkhead Part 2—Applicant The person and/or organization responsible for the project. h[ elp] 2a. Name (Last, First, Middle) Jim Japhet 2b. Organization (If applicable) Japhet Bulkheading Inc. 2c. Mailing Address (Street or PO Box) 1407 Summit Lake Shore RD NW 2d. City, State, Zip Olympia, WA 98502 2e. Phone(1) 2f. Phone(2) 2 . Fax 2h. E-mail ( 360)490-1369 ( ) (360)866-7702 jjaphet@comcast.net Additional forms may be required for the following permits: • If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of Engineers for application information(206)764-3495. • If your project might affect species listed under the Endangered Species Act,you will need to fill out a Speck Project Information Form(SPIF)or prepare a Biological Evaluation. Forms can be found at hftp://www.nws.usace.army.mil/PublicMenu/Menu.cfm?sitename=REG&pagename=mainpaoe ESA • Not all cities and counties accept the JARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate city or county government to make sure they accept the JARPA. 2To access an online JARPA form with[help]screens,go to hftp://www.epermifting.wa.gov/site/alias resourcecenterharoa iarpa form/9984harpa form.asox. For other help,contact the Governor's Office of Regulatory Assistance at 1-800-917-0043 or help(a-)ora.wa.aov. JARPA Revision 2012.1 Page 1 of 14 Part 3—Authorized Agent or Contact Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this application.) heI 3a. Name (Last, First, Middle) Japhet, Jim 3b. Organization (If applicable) Japhet Bulkheading Inc. 3c. Mailing Address (Street or Po Box) 1407 Summit Lake Shore RD NW 3d. City, State, Zip Olympia, WA. 98502 3e. Phone(1) 3f. Phone(2) 3 . Fax 3h. E-mail ( 360)490-1369 ( ) (360)866-7702 jjaphet@comcast.net Part 4—Property Owner(s) Contact information for people or organizations owning the property(ies) where the project will occur. Consider both upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. nei ❑ Same as applicant. (Skip to Part 5.) ❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.) ❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for each additional property owner. ❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know, contact the DNR at (360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E to apply for the Aquatic Use Authorization. 4a. Name (Last, First, Middle) Thompson, Robert 4b. Organization (If applicable) 4c. Mailing Address (Street or Po Box) PO Box 569 4d. City, State, Zip Chehalis, WA 98532 4e. Phone(1) 4f. Phone(2) 4 . Fax 4h. E-mail (360)748-3351 ( 360)877-5829 ( ) JARPA Revision 2012.1 Page 2 of 14 Part 5—Project Location(s) Identifying information about the property or properties where the project will occur. [help] ❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA Attachment B for each additional project location. 5a. Indicate the type of ownership of the property. (Check all that apply.) hf e1A X Private ❑ Federal ❑ Publicly owned (state, county, city, special districts like schools, ports, etc.) ❑ Tribal ❑ Department of Natural Resources (DNR) — managed aquatic lands (Complete JARPA Attachment E) 5b. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5p.) hel 250 N Ayock Beach DR. 5c. City, State, Zip (If the project is not in a city or town, provide the name of the nearest city or town.) hel Lilliwaup, WA 98555 5d. County hel Mason 5e. Provide the section, township, and range for the project location. hel '/4 Section Section Township Range 3 23N 3W 5f. Provide the latitude and longitude of the project location. hel • Example: 47.03922 N lat. /-122.89142 W long. (Use decimal degrees- NAD 83) 47.506944N Lat / 123.0541657 W Long 5g. List the tax parcel number(s) for the project location. hem • The local county assessor's office can provide this information. 32303-50-01012 5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.) Iku Name Mailing Address Tax Parcel # (if known) Martin Trust 240 N Ayock Beah Dr Lilliwaup, WA98555 32303-50-01013 Robert Thompson PO Box 569 32303-50-01011 Chehalis WA 98532 JARPA Revision 2012.1 Page 3 of 14 Si. List all wetlands on or adjacent to the project location. hf elpJ None 5j. List all waterbodies (other than wetlands) on or adjacent to the project location. hf eM Hood Canal 5k. Is any part of the project area within a 100-year floodplain? hei ❑ Yes X No ❑ Don't know 51. Briefly describe the vegetation and habitat conditions on the property. hei Shrubs and grass 5m. Describe how the property is currently used. hei Family Residence 5n. Describe how the adjacent properties are currently used. hei Family Residence 5o. Describe the structures (above and below ground) on the property, including their purpose(s) and current condition. hei Home and bulkhead 5p. Provide driving directions from the closest highway to the project location, and attach a map. of elPl US 101 North to Ayock beach on Rt. JARPA Revision 2012.1 Page 4 of 14 Part 6—Project Description 6a. Briefly summarize the overall project. You can provide more detail in 6b. hl pm Extend footing of existing bulkhead into the beach to protect against erosion. Add 16' of new concrete to the North end of the existing concrete bulkhead as per plans 6b. Describe the purpose of the project and why you want or need to perform it. hf eM The beach has lowered due to extreme weather and waves. The bulkhead is being placed in danger due to the lowering of the beach. The bulkhead footing must be extended into the beach to protect the bulkhead from failure. Also the bulkhead must be extended a minimum of 16' on the North end to protect the residence and property. There may need to be additional expansion of the bulkhead to the North if the erosion of Ayock Point continues, but is not necessary at this time. Also wish to place a few large granite rocks on the beach to break up the wave action at the base of the bulkhead. 6c. Indicate the project category. (check all that apply) hf e ❑ Commercial X Residential ❑ Institutional ❑ Transportation ❑ Recreational ❑ Maintenance ❑ Environmental Enhancement 6d. Indicate the major elements of your project. (check an that apply) [help] ❑ Aquaculture ❑ Culvert ❑ Float ❑ Retaining Wall ❑ Bank Stabilization ❑ Dam /Weir ❑ Floating Home (upland) ❑ Boat House ❑ Dike / Levee /Jetty ❑ Geotechnical Survey ❑ Road ❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific Measurement Device ❑ Boat Lift ❑ Dock / Pier ❑ Marina / Moorage ❑ Stairs j ❑ Bridge ❑ Dredging ❑ Mining ❑ Stormwater facility X Bulkhead ❑ Fence ❑ Outfall Structure ❑ Swimming Pool ❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin ❑ Utility Line ❑ Channel Modification ❑ Fishway ❑ Raft ❑ Other: DARPA Revision 2012.1 Page 5 of 14 6e. Describe how you plan to construct each project element checked in 6d. Include specific construction methods and equipment to be used. hf eU • Identify where each element will occur in relation to the nearest waterbody. • Indicate which activities are within the 100-year floodplain. All work to be done at periods of low tide Equipment used will be a small excavator and hand tools. 6f. What are the anticipated start and end dates for project construction? (MonthNear) [he�ji • If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or stage. Start date: ASAP after 7-15-2012 End date: before 9-15-2012 ❑ See JARPA Attachment D 6g. Fair market value of the project, including materials, labor, machine rentals, etc. hf elal 6h. Will any portion of the project receive federal funding? hel • If yes, list each agency providing funds. ❑ Yes X No ❑ Don't know Part 7—Wetlands: Impacts and Mitigation ❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area. (If there are none, skip to Part 8.) LheM 7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. hel X Not applicable 7b. Will the project impact wetlands? hel ❑ Yes ❑ No ❑ Don't know JARPA Revision 2012.1 Page 6 of 14 7c. Will the project impact wetland buffers? hel ❑ Yes X No ❑ Don't know 7d. Has a wetland delineation report been prepared? hel • If Yes, submit the report, including data sheets, with the JARPA package. ❑ Yes X No 7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating System? hel • If Yes, submit the wetland rating forms and figures with the JARPA package. ❑ Yes X No ❑ Don't know 7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? hel • If Yes, submit the plan with the JARPA package and answer 7g. • If No, or Not applicable, explain below why a mitigation plan should not be required. ❑ Yes ❑ No X Not applicable 7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was used to design the plan. [wd N/A 7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a similar table, you can state (below) where we can find this information in the plan. hel Activity (fill, Wetland Wetland Impact Duration Proposed Wetland drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area flood, etc.) rating ft. or type (sq. ft. or category2 Acres) acres) If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such as a wetland delineation report. 2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System. Provide the wetland rating forms with the JARPA package. 3 Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent"if applicable. 4 Creation(C), Re-establishment/Rehabilitation(R), Enhancement(E), Preservation(P),Mitigation Bank/In-lieu fee(B) Page number(s) for similar information in the mitigation plan, if available: JARPA Revision 2012.1 Page 7 of 14 7i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic yards that will be used, and how and where it will be placed into the wetland. nel 7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in cubic yards you will remove, and where the material will be disposed. MU Part 8—Waterbodies (other than wetlands): Impacts and Mitigation In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) nel ❑ Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) 8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment. Le ❑ Not applicable The project will not have an impact to the aquatic enviroment 8b. Will your project impact a waterbody or the area around a waterbody? nel ❑ Yes X No JARPA Revision 2012.1 Page 8 of 14 8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland waterbodies? !I • If Yes, submit the plan with the JARPA package and answer 8d. • If No, or Not applicable,explain below why a mitigation plan should not be required. ❑ Yes ❑ No X Not applicable 8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was used to design the plan. • If you already completed 7g you do not need to restate your answer here. Lbelp 8e. Summarize impact(s) to each waterbody in the table below. of elPl Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or dredge, fill, pile name' location of impact3 (cubic yards) to be linear ft.) of drive, etc.) placed in or waterbody removed from directly affected waterbod If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided. 2Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent, provide the distance between the impact and the waterbody and indicate whether the impact will occur within the 100-year flood plain. 3 Indicate the days, months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable. 8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards) you will use, and how and where it will be placed into the waterbody. heI JARPA Revision 2012.1 Page 9 of 14 8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging, type and amount of material you will remove, and where the material will be disposed. h� eM Part 9—Additional Information Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of this section as you can. It is ok if you cannot answer a question. 9a. If you have already worked with any government agencies on this project, list them below. h[ elo Agency Name Contact Name Phone Most Recent Date of Contact 9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington Department of Ecology's 303(d) List? hel • If Yes, list the parameter(s) below. • If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at: http://www.ecy.wa.gov/programs/wq/303d/. X Yes ❑ No Hood Canal 9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? LheM • Go to http://cfpub.epa.gov/surf/locate/index.cfm to help identify the HUC. 17110018 9d. What Water Resource Inventory Area Number (WRIA#) is the project in? h( elpl • Go to http://vvww.ecy.wa.gov/services/gis/maps/wria/wria.htm to find the WRIA#. 16 JARPA Revision 2012.1 Page 10 of 14 9e. Will the in-water construction work comply with the State of Washington water quality standards for turbidity? hel • Go to http://www.ecy.wa.gov/programs/wq/swgs/criteria.html for the standards. ❑ Yes ❑ No X Not applicable 9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline environment designation? hf eM • If you don't know, contact the local planning department. • For more information, go to: http://www.ecy.wa.gov/programs/sea/sma/laws rules/173-26/211 designations.html. X Rural ❑ Urban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other 9g. What is the Washington Department of Natural Resources Water Type? [hel • Go to http://www.dnr.wa.gov/BusinessPermitsfTopics/ForestPracticesApplications/Pages/fp watertyping.aspx for the Forest Practices Water Typing System. X Shoreline ❑ Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal 9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater manual? hf eM • If No, provide the name of the manual your project is designed to meet. X Yes ❑ No Name of manual: 9i. Does the project site have known contaminated sediment? [hel • If Yes, please describe below. ❑ Yes X No 9j. If you know what the property was used for in the past, describe below. hel 9k. Has a cultural resource (archaeological) survey been performed on the project area? LheM • If Yes, attach it to your JARPA package. ❑ Yes ❑ No JARPA Revision 2012.1 Page 11 of 14 91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project area or might be affected by the proposed work. hel Chinook & Chum Salmon 9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and Species List that might be affected by the proposed work. hf eM Project will have no affect on endangered species Part 10—SEPA Compliance and Permits Use the resources and checklist below to identify the permits you are applying for. • Online Project Questionnaire at http://apps.ecy.wa.gov/opas/. • Governor's Office of Regulatory Assistance at (800) 917-0043 or help(&-ora.wa.gov. • For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA. 10a. Compliance with the State Environmental Policy Act (SEPA). (check all that apply.) h[ ela] • For more information about SEPA, go to www.ecy.wa.gov/programs/sea/sepale-review.htmi. ❑ A copy of the SEPA determination or letter of exemption is included with this application. ❑ A SEPA determination is pending with (lead agency). The expected decision date is ❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 1 ob.) of elpl ❑ This project is exempt (choose type of exemption below). ❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt? ❑ Other: ❑ SEPA is pre-empted by federal law. JARPA Revision 2012.1 Page 12 of 14 10b. Indicate the permits you are applying for. (Check all that apply.) hel LOCAL GOVERNMENT Local Government Shoreline permits: ❑ Substantial Development ❑ Conditional Use ❑ Variance X Shoreline Exemption Type (explain): Bulkhead Other city/county permits: ❑ Floodplain Development Permit ❑ Critical Areas Ordinance STATE GOVERNMENT Washington Department of Fish and Wildlife: X Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption —Attach Exemption Form Effective July 10, 2012, you must submit a check for $150 to Washington Department of Fish and Wildlife, unless your project qualifies for an exemption or alternative payment method below. Do not send cash. Check the appropriate boxes: ❑ $150 check enclosed. (Check# ) Attach check made payable to Washington Department of Fish and Wildlife. ❑Charge to billing account under agreement with WDFW. (Agreement# ) ❑ My project is exempt from the application fee. (Check appropriate exemption) ❑ HPA processing is conducted by applicant-funded WDFW staff. (Agreement # ) ❑ Mineral prospecting and mining. ❑ Project occurs on farm and agricultural land. (Attach a copy of current land use classification recorded with the county auditor, or other proof of current land use.) ❑ Project is a modification of an existing HPA originally applied for, prior to July 10, 2012. (HPA# ) Washington Department of Natural Resources: ❑ Aquatic Use Authorization Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources. Do not send cash. Washington Department of Ecology: ❑ Section 401 Water Quality Certification FEDERAL GOVERNMENT United States Department of the Army permits (U.S. Army Corps of Engineers): ❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters) United States Coast Guard permits: ❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects) JARPA Revision 2012.1 Page 13 of 14 Part 11—Authorizing Signatures Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form, project plans, photos, etc. hf eM 11 a. Applicant Signature (required) hel I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work only after I have received all necessary permits. I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this application. (initial) By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the permitting agencies entering the property where the project is to ted to inspect the project site or any work related to the project. (initial) Jim Japhet/Japhet Bulkhead .�J 07-02-2012 Applicant Printed Name A plicant i at Date 11 b. Authorized Agent Signature hf elpl I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to c ry ut the proposed activities and I agree to start work only after all necessary permits have be n iss ed. Jim Japhet 07-02-2012 Authorized Agent Printed Name A h ze nt Signature Date 11 c. Property Owner Signature (if not applicant). hf eM Not required if project is on existing rights-of-way or easements. I consent to the permitting agencies entering the property where the project is located to inspect the project site or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the landowner. �' B��'� 07-02-2012 Property Owner Pri ed Name Property Owner Signature Date 18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies,conceals, or covers up by any trick,scheme, or device a material fact or makes any false,fictitious,or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false,fictitious, or fraudulent statement or entry, shall be fined not more than$10,000 or imprisoned not more than 5 years or both. If you require this document in another format,contact the Governor's Office of Regulatory Assistance(ORA)at(800)917-0043. People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call(877)833-6341. ORA publication number: ENV-019-09 rev.06-12 JARPA Revision 2012.1 Page 14 of 14 Section Scalel/2"=1 ' 0 #4 Gr.60 A. 12.OC Horiz. #4 Gr.60 B"OC Vert 7'-0" 14.4'Tidal level Beach mat. kJD sand&gravel -- 2"Drain 8'OC i 4'-0" Notes: Property owner: Concrete: Cys 6 sack to the yard mix Robert Thompson Concrete below MHHW: Cys Po Box 569 Reinforcement: All #4 Gr.60 , 2.5" min. coverage Chehalis, WA 98532 Wall: 8" OC vert. 12" OC horiz. Footing: 8" OC cross 12" OC run Site: Drains: 2" drain 8' OC entire length 250N Ayock Beach Dr. Top of footing min. 18" below beach grade Lilliwaup WA 98555 fj ,ZQ12 All work to be done at periods of low tide County of Mason No construction debris will be left on beach State of WashingtoniA, -(�1, HOOD CANAL Lat. N47.30.43 Long. W123.03.24 Par# 323035001012 Applicant/Contractor: Japhet Bulkheading Inc. 1407 Summit Lake Shore Rd. Nw. Olympia, Wa. 98502 Ph. (360) 866-0377 Fax (360)866-7702 Lic.# JAPHEB1168LH Section Scale 1/2"=1 ' �o o e Beach grade North end of bulkhead 2007 #4 Gr.60 12'OC Horiz. #4 Gr.60 8'OC Vert. 5'-0' Beach grade South end of bulkhead 2007 2'Drain 8'OC present beach grade 4'-0' Proposed concrete footing repair approximatly 3' into beach Property owner: Robert Thompson Po Box 569 Chehalis, WA 98532 Notes: Site: Concrete: Cys 6 sack to the yard mix 25ON Ayock Beach Dr. Concrete below MHHW: Cys Lilliwaup WA 98555 Reinforcement: All #4 Gr.6O , 2.5" min. coverage County of Mason Wall: 8" OC vert. 12" OC horiz. State of Washington Footing: 8" OC cross 12" OC run HOOD CANAL Drains: 2" drain 8' OC entire length Lat. N47.30.43 Top of footing min. 18" below beach grade Long. W123.03.24 All work to be done at periods of low tide Par# 323035001012 No construction debris will be left on beach Applicant/Contractor: Japhet Bulkheading Inc. 1407 Summit Lake Shore Rd. Nw. Olympia, Wa. 98502 Ph. (360) 866-0377 Fax (360)866-7702 Lic.# JAPHEB1168LH Ayock Beach Rd `\t S. Prop Line N.Prop Line Robert Thompson Existing Concrete Po Box 569 Bulkhead Chehalis Wa 98532 Site 250 N Ayock Beach Lilliwaup,WA Par#323035001012 Hood Canal Granite rocks to House break up waves 64' —w Extend footing into Ex isting Concrete i j beach along entire Bulkhead tJ 4. length of bulkhead as shown on section Proposed 16'new r , view bulkhead to be built f y �_`,A` Q�r� ti now o { {`+ Owner: `—+- ` Robert Thompson Po Box 569 7r 50'+/: to be built Chehalis, WA 98532 later if needed Snohomish WA 98296 OHW 2012 Site: 250N Ayock Beach Dr. Ayock Point OHW 2007 Lilliwaup WA 98555 County of Mason Site Plan State of Washington scale 1"=30' HOOD CANAL Lat. N47.30.43 Long. W 123.03.24 N , Par# 323035001012 Purpose: Beach erosion is threatening the residence Proposed: Install a concrete bulkhead to protect the APPROVED residence MASON COUNTY DCD PLANNING Contractor/Agent: JapheSITE PLAN REOUI QED TO BE ON SITE 1407 ummitBulkhea k.S Inc. 1407 Summit Lk.Sh.Rd.NW CHANGES SUBJECT TO APPROVAL OlymPia,WA 98502 360-866-0377 By—"`43 — D--A Lic.#JAPHEB1168LH EXP. 6-12-05 alea A, S. Prop Line wAONddv r,,.l. S39NVHO ails NO 3a O1 3t:1nb321 Nv-id nis ONINNd­I(II ctC:' /�ii MOO NOSdW Q� ��!/ Robert Thompson `L:oncrete Po Box 569 Bulkhead Chehalis Wa 98532 Site 250 N Ayock Beach Lilliwaup, WA Par#323035001 012 Hood Canal New Bulkhead installed 2007 16' section proposed new bulkhead to install 2012 ------ Future bulkhead if Ayock point House continues to wash away 64' Large granite rocks to break up waves Ayock Point balance of beach does not require bulkhead and will N remain natural y =' D New OHW shoreline after Ayock OHW shoreline 2007 Point has washed away due to winter storms and beach has lowered � mot.• � tL1 4roposed new 16' section �` Plot Pan of bulkhead to be built 2012 future bulkhead if point continues to wash away. Would like to permit scale 1/16"=1' at preasent time for future construction. i Y A Opp- a♦ y.. ° W y A• .; 4 -777 Awl 46. .: - - - � -AA 4 4 At •y � 4 ��r• r ;w _ Ir - i k f � • �a e A a . ,. 4 '