DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-340)
SEP2012-00055
Description of Proposal: Repair and extend existing concrete bulkhead. Add 16 feet of new
bulkhead to North end to protect residence from wave caused
erosion. Extend existing bulkhead footing into beach a minimum
of 3' to protect the bulkhead from erosion of beach to prevent
failure. Possible future expansion of the bulkhead to property line
if Ayock Point continues to erode away and threaten the property.
Proponent: ROBERT THOMPSON
Location of Proposal: 250 N AYOCK BEACH DR LILLIWAUP
Parcel Number: 323035001012
Legal Description: AYOCK BEACH BLK: 1 LOT: 12 & 11-A
Directions to Site:
Lead Agency: Mason County
The Lead Agency for this proposal has determined that it does not have a probable significant
adverse impact on the environment. An Environmental Impact Statement (EIS) is not required
under RCW 43.21 C.030(2)(c). This decision was made after review of a completed
Environmental Checklist and other information on file with the Lead Agency. This information is
available to the public upon request.
Please contact Grace Miller at ext. 360 with any questions. This DNS is issued under WAC
197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown
below, when the determination is final. Comments must be submitted to Dept. of Community
Development, P.O. Box 279, Shelton WA 98584 by 7/27/2012. Appeal of this determination
must be filed within a 14-day period following this final determination date, per Mason County
Code Chapter 15.11 Appeals.
Authorized Local Government Official D to
(le ` ::Der [emu/L 5 WMr5H-/71a4e r
10DW a5lil-Kor IMpuma T
MASON CO. ENVIROMENTAL CHECKLIST
A. BACKGROUND
1. Name of proposed project, if applicable:
Robert Thompson Bulkhead
2. Name of applicant:
Robert Thompson Japhet Bulkheading Inc
3. Address and phone number of applicant and contact person:
Owner: Robert Thompson Agent: Japhet Bulkheading Inc
Po Box 569. 1407 Summit Lk Sh Rd NW
Chehalis, WA 98296 Olympia WA 98502
4. Date checklist prepared:
07-2-12
5. Agency requesting checklist
Mason County
6. Proposed timing or schedule (including phasing, if applicable):
summer 2012 , Must be done between 7-15-2012 and 9-15-2012 ( Fish
window)
7. Do you have any plans for future expansion, or further activity related to or
connected with this
proposal: If yes, explain.
No
8. List any environmental information you know about that has been prepared, or
will be
prepared, directly related to this proposal.
None
9. Do you know whether applications are pending for governmental approvals of
other proposals
directly affecting the property covered by your proposal? If yes, explain.
No
10. List any government approvals or permits that will be needed for your
proposal, if known.
HPA ,Shoreline Exemption, Building Permit
i
Mason County Environmental Checklist Page 2
11. Give a brief, complete description of your proposal,including the proposed
uses and the size of the project and site. There are several questions later in this
checklist that ask you to describe certain aspects of your proposal. You do not
need to repeat those answers on this page. (Lead agencies may modify this form
to include additional specific information on project description.)
Add 16 feet of new bulkhead to North end of existing bulkhead to protect
home and property. Extend existing bulkhead footing into beach minimum
of 3' to protect the bulkhead from erosion of beach as the beach has
lowered and is placing the bulkhead in danger of failure. Possible future
expansion of bulkhead to property line if Ayock point continues to erode
away and threaten the property. Wish to permit for remainder of bulkhead if
possible at this time.
12. What is the location of the proposal? Give sufficient information for a person
to understand the precise location of your proposed project including a street
address, if any, and section, township, and range, if known. If a proposal would
occur over a range of area, provide the range or boundaries of the site(s).
Provide a legal description, site plan, vicinity map, and topographic map, if
reasonably available. While you should submit any plans required by the
agency, you are not required to duplicate maps or detailed plans submitted with
any permit applications related to this checklist.
250 N Ayock Beach
Lilliwaup Wa
B. ENVIRONMENTAL ELEMENTS:
1. EARTH:
a. General description of the site (circle one): Flat, rolling, hilly, steep slopes,
mountainous, other
Flat
b. What is the steepest slope on the site (approximate percent sloe
0
P P ( PP P P )�
0/o
c. What general types of soils are found on the site for example, clay, sand
9 YP ( P Y, ,
gravel, peat, muck)?
If you know the classification of agricultural soils, specify them and note any
prime farmland.
sand, gravel
d. Are there surface indications or history of unstable soils in the immediate
vicinity: If so,
describe.
None
Mason County Environmental Checklist Page 3
e. Describe the purpose, type, and approximate quantities of any filling or grading
proposed. Indicate source of fill.
None
f. Could erosion occur as a result of clearing, construction, or use: If so, generally
describe.
No
g. About what percent of the site will be covered with impervious surfaces after
project constructions (for example, asphalt or buildings)?
None
h. Proposed measures to reduce or control erosion, or other impacts to the earth,
if any
None
2. AIR
a. What types of emissions to the air would result from the proposal (i.e. dust,
automobile, odors, industrial wood smoke) during construction and when the
project is completed? If any,
generally describe and give approximate quantities, if known.
None
b. Are there any off-site sources of emissions or odor that may affect your
proposal? If so, generally describe.
None
Mason County Environmental Checklist Page 4
c. Proposed measures to reduce or control emissions or other impacts to air, if
any:
None
3 WATER:
a. Surface:
1) Is there any surface water body on or in the immediate vicinity of the site
(including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)?
If yes, describe type and provide names. If appropriate, state what stream or river
it flows into.
Yes , Hood Canal
2) Will the project require any work over, in, or adjacent to (within 200 feet) the
described waters? If yes, please describe and attach available plans.
Yes, See Plans
3) Estimate the amount of fill and dredge material that would be placed in or
removed from surface water or wetlands and indicate the area of the site that
would be affected. Indicate the source of fill material.
None
4) Will the proposal require surface water withdrawals or diversions? Give
general description, purpose, and approximate quantities if known.
No
Mason County Environmental Checklist Page 5
5) Does the proposal lie within a 100-year floodplain? If so, note location on the
site plan.
No
6) Does the proposal involve any discharges of waste materials to surface
waters? If so, describe the type of waste and anticipated volume of discharge.
No
b. Ground:
1) Will ground water be withdrawn, or will water be discharged to ground water?
Give general description, purpose, and approximate quantities, if known.
No
2) Describe waste material that will be discharged into the ground from septic
tanks or other sources, if any (for example; domestic sewage, industrial,
containing the following chemicals..., agricultural, etc.). Describe the general size
of the system, the number of such systems, the number of houses to be served
(if applicable), or the number of animals or humans the system(s) are expected
to serve.
None
c. Water runoff (including storm water):
1) Describe the source of runoff (including storm water) and method of collection
and disposal, if any (include quantities, if known). Where will this water flow? Will
this flow into other waters? If so, describe.
Storm water only, will run directly into hood Canal as it does now
2) Could waste materials enter ground or surface waters: If so, generally
describe.
No
Mason County Environmental Checklist Page 6
d. Proposed measures to reduce or control surface, ground, and runoff water
impacts, if any:
None
4. PLANTS:
a. Check or circle types of vegetation found on the site:
deciduous tree: alder, maple, aspen, other
evergreen tree: fir, cedar, pine, other
X_ shrubs
X_ grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
None
b. What kind and amount of vegetation will be removed or altered?
None REOEJ`--,TD
1.�
c. List threatened or endangered species known to be on or near the site.
�T
None
d. Proposed landscaping, use of native plants, or other measures to preserve or
enhance vegetation on the site, if any:
None
Mason County Environmental Checklist Page 7
5. ANIMALS
a. Circle any birds and animals which have been observed on or near the
site or are known to be on or near the site:
b.
Birds: hawk, heron, eagle, songbirds, other Gulls ,Ducks_.
Mammals: deer, bear, elk, beaver, other
Fish: bass, salmon, trout, herring, shellfish, other
b. List any threatened or endangered species known to be on or near the site.
Don't Know
c. Is the site part of a migration route? If so, explain.
Don't Know
d. Proposed measures to preserve or enhance wildlife, if any.-
None
6. ENERGY AND NATURAL RESOURCES:
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used
to meet the completed project's energy needs? Describe whether it will be used
for heating, manufacturing, etc.
N/A
b. Would your project affect the potential use of solar energy by adjacent
properties: If so, generally describe.
No
c. What kinds of energy conservation features are included in the plans of this
proposal? List other proposed measures to reduce or control energy impacts, if
any.-
None
Mason County Environmental Checklist Page 8
7. ENVIRONMENTAL HEALTH:
a. Are there any environmental health hazards, including exposure to toxic
chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur
as a result of this proposal? If so, describe.
No
1) Describe special emergency services that might be required.
None
2) Proposed measures to reduce or control environmental health hazards, if any:
b. Noise.
None
1) What types of noise exist in the area which may affect your project (for
example: traffic, equipment, operation, other)?
None
2) What types and levels of noise would be created by or associated with the
project on a short-term or a long-term basis (for example: traffic, construction,
operation, other)? Indicate what hour's noise would come from the site.
None
3) Proposed measures to reduce or control noise impacts, if any:
None
8. LAND AND SHORELINE USE:
a. What is the current use of the site and adjacent properties?
Family residence
Mason County Environmental Checklist Page 9
b. Has the site been used for agriculture? If so, describe.
No
c. Describe any structures on the site.
House
d. Will any structures be demolished? If so, what?
No
e. What is the current zoning classification of the site?
Don't Know
f. What is the current comprehensive plan designation of the site?
Don't Know
g. If applicable, what is the current Shoreline Master Program designation of the
site?
Don't Know
h. Has any part of the site been classified as an "environmentally sensitive" area?
If so, specify.
Don't Know
i. Approximately how many people would reside or work in the completed
project?
None
j. Approximately how many people would the completed project displace?
None
k. Proposed measures to avoid or reduce displacement impacts, if any:
None
Mason County Environmental Checklist Page 10
I. Proposed measures to ensure the proposal is compatible with existing and
projected land uses and plans, if any:
None
9. HOUSING:
a. Approximately how many units would be provided, if any? Indicate whether
high, middle, or low-income housing.
None
b. Approximately how many units, if any, would be eliminated? Indicate whether
high, middle, or low-income housing.
None
c. Proposed measures to reduce or control housing impacts, if any:
None
10. AESTHETICS:
a. What is the tallest height of any proposed structure(s), not including antennas;
what is the principal exterior building material(s) proposed?
N/A
b. What views in the immediate vicinity would be altered or obstructed?
None
c. Proposed measures to reduce or control aesthetic impacts, if any:
None
Mason County Environmental Checklist Page 11
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day would it
mainly occur? None
b. Could light or glare from the finished project be a safety hazard or interfere
with views?
No
c. What existing off-site sources of light or glare may affect your proposal.-
None
d. Proposed measures to reduce or control light and glare impacts, if any:
None
12. RECREATION:
a. What designated and informal recreational opportunities are in the immediate
vicinity?
All types of water sports
b. Would the proposed project displace any existing recreational uses? If so,
describe.
No
c. Proposed measures to reduce or control impacts on recreation, including
recreation opportunities to be provided by the project or applicant, if any:
None
Mason County Environmental Checklist Page 12
13. HISTORIC AND CULTURAL PRESERVATION:
a. Are there any places or objects listed on, or proposed for, national, state, or
local preservation registers known to be on or next to the site? If so, generally
describe.
None
b. Generally describe any landmarks or evidence of historic, archaeological,
scientific, or cultural importance known to be on or next to the site.
None
c. Proposed measures to reduce or control impacts, if any:
None
14. TRANSPORTATION
a. Identify public streets and highways serving the site and describe proposed
access to the existing street system. Show on site plans, if any.
Us Highway 101
b. Is site currently served by public transit? If not, what is the approximate
distance to the existing street system? Show on site plans, if any.
Don't Know
c. How many parking spaces would the completed project have? How many
would the project eliminate?
None
d. Will the proposal require any new roads or streets, or improvements to existing
roads or streets, not including driveways? If so, generally describe (indicate
whether public or private).
No
Mason County Environmental Checklist Page 13
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe.
No
f. How many vehicular trips per day would be generated by the completed
project: If known, indicate when peak volumes would occur.
None
g. Proposed measures to reduce or control transportation impacts, if any:
None
15. PUBLIC SERVICES:
a. Would the project result in an increased need for public service (for example:
fire protection, police protection, health care, schools, other)?
If so, generally describe:
No
b. Proposed measures to reduce or control direct impacts on public services, if
any:
None
Mason County Environmental Checklist Page 14
16. UTILITIES:
a. Circle utilities currently available at the site: electricity, natural gas, water,
refuse service, telephone, sanitary sewer, septic system, other:
b. Describe the utilities that are proposed for the project, the utility providing the
service, and the general construction activities on the site or in the immediate
vicinity which might be needed.
None
Signature:
The above answers are true and complete to the best of my knowledge. I
understand that the lead a cy is relying on them to make its decision.
Signature: 4
Date submitl:4- Ir
P2,,,� di"
Mason County Environmental Checklist Page 15
ESA LISTED SALMONIDS CHECKLIST
Applicant Information Project Information
Name Name
Phone Location
Description
This worksheet was designed to help project proponents, and government agencies,
identify when a project needs further analysis regarding adverse effects on ESA
(Endangered Species Act) listed salmonids. Salmonids bare salmon, trout and chars, e.g.
bull trout. For our purposes, "ESA Listed Salmonids" is defined as fish species
listed as endangered, threatened or being considered for listing.
If ESA listed species are present or ever were present in the water shed where your
project will be located, your project has the potential for affecting them, and you need to
comply with the ESA. The questions in this section will help determine if the ESA
listings will impact your project.
The Fish Program Manager at the appropriate Department of Fish and Wildlife(DFW)regional office can
provide information for the
following two questions.
1. Are ESA listed salmonids currently present in the watershed in which your project will
be located?
YES NO Please describe.
2. Has there ever been an ESA listed salmonid stock present in this watershed?
YES NO Uncertain Please describe.
If you answered "yes" to either of the above questions,you should complete the
remainder of this
checklist.
April 2003
Mason County Environmental Checklist Page 16
PROJECT SPECIFICES: The questions in this section are specific to the project
and vicinity.
1. Name of watershed:
2. Name of nearest waterbody:
3. What is the distance from this project to the nearest body of water:
. Often a buffer between the project and a
stream can reduce the chance of a negative impact to fish.
4. What is the current land use between the project and the potentially affected water
body (parking lots,farmland,etc.)?
5. Is the project above a:
* natural permanent barrier(waterfall) YES NO
* natural temporary barrier(beaver pond) YES NO
* man-made barrier(culvert, dam) YES NO
* other(explain):
6. If yes, are there any resident salmonid populations above the blockage?
YES NO Don't know
7. What percent of the project will be impervious surface (including pavement&roof
area)?
Mason County Environmental Checklist
Page 17
FISH MIGRATION: The following questions will help determine if this project
could interfere with
migration of adult and juvenile fish.
Both increases and decreases in water flows can affect fish migration.
1. Does the project require the withdrawal of:
a. Surface water?YES NO
Amount
Name of surface water body
b. Ground water? YES NO
Amount
From where
Depth of well
2. Will any water be rerouted: YES NO
If yes,will this require a channel change?
3. Will there be retention or detention ponds? YES NO
If yes,will this be an infiltration pond or a surface discharge to either a municipal storm
water system or a surface water body?
If to a surface water discharge,please give the name of the waterbody.
4. Will this project require the building of new roads?YES NO
Increased road mileage may affect the timing of water reaching a stream and may impact fish habitat.
5. Are culverts proposed as part of this project?YES NO
6. Will topography changes affect the duration/direction of runoff flows?
YES NO If yes, describe the changes.
7. Will the project involve any reduction of the floodway or floodplain by filling or other
partial blockage of flows? YES NO If yes, how will the loss of flood
storage be mitigated by your project?
Mason County Environmental Checklist Page 18
WATER QUALITY: The following questions will help determine if this project
could Adversely impact water quality. Such impacts can cause problems for listed
species.
Water quality can be made worse by runoff from impervious surfaces,altering water temperature,discharging
contaminants,etc.
1. Do you know of any problems with water quality, in any of the streams, within this
watershed? YES NO If yes, describe.
2. Will your project either reduce or increase shade along or over a waterbody?
YES NO
Removal of shading vegetation or the building of structures such as docks or floats often results in a change in shade.
3. Will the project increase nutrient loading or have the potential to increase nutrient
loading or contaminants (fertilizers, other waste discharges,or runoff)to the waterbody?
YES NO
4. Will turbidity be increased because of construction of the project or during operation
of the project?
YES NO
In-water or near water work will often increase turbidity.
5. Will your project require long term maintenance, i.e. bridge cleaning, highway salting,
and chemical
sprays for vegetation management, clearing of parking lots?
YES NO If yes, please describe.
Mason County Environmental Checklist Page 19
VEGETATION: The following questions are designed to determine if the project
will affect riparian vegetation, thereby, adversely impacting salmon.
1. Will the project involve the removal of any vegetation from the stream banks:
YES NO
If yes,please describe the existing conditions, and the amount and type of vegetation to
be removed.
2. If any vegetation is removed, do you plan to re-plant?
YES NO If yes, what types of plants will you use?
SEPA Contact List J
MASON COUNTY DCD
Sent SEPA to(check all that apply)on c�;ncL 'C't irl
Skokomish Tribal Nation WA Department of Ecology
Natural Resources Dept. Environmental Review Section
ATTN: Rand Lum er
Y P PO BOX 47703
N 541 Tribal Center Rd. Olympia,W--A 985.E_7703
Skokomish Nation,WA 98584 sepaunit@ecy.wa.gov`, cJ icy, .- l"V
rlumper@skokomish.org
MV U.S.Army Corps of Engineers
Tribal Historic Preservation Officer SEPA Reviewer-John Pell L�ti1y?`{] �, � gSeZC6,A"IrAy
ATTN: Kris Miller PO Box C-3755 r •irli/ /
80 N Tribal Center Rd Seattle,WA 98124
Skokomish Nation,WA 98584 111
shlanay1 @skokomish.org WA Dept. of Fish and Wildlife
ATTN: Margie Schirato (saltwater)
Quinault Indian Nation 2391 W Deegan Rd.
ATTN: Mark Mobbs Shelton,WA 98584
PO Box 189 schirmms@dfw.wa.gov
Tahola,WA 98587
mmobbs@quinault.org WA Dept. of Fish&Wildlife
ATTN: Gloria Rogers,Area Habitat Biologist
Squaxin Tribal Nation 48 Devonshire Rd
Natural Resources Dept. Montesano,WA 98563-9618
2952 SE Old Olympic Highway gloria.rogers@dfw.wa.gov
Shelton,WA 98584
jdickison@squaxin.nsn.us 1:3 WA Dept.of Transportation
ATTN: Dale Severson
The Confederated Tribe of the Chehalis P.O. Box 47440
ATTN: SEPA Reviewer-Glen Connelly Olympia,WA 98504-7440
420 Howanut Rd.
Oakville,WA 98568 City of Shelton
gconnelly@chehalistribe.org 525 West Cota St.
Shelton,WA 98584
WA DNR, South Puget Sound Region jasond@ci.shelton.wa.us
ATTN: Shannon Soto
950 Farman Avenue North Port of Shelton
Enumclaw,WA 98022-9282 ATTN: Brandon Palmer
shannon.soto@dnr.wa.gov 21 West Sanderson Way
Shelton,WA 98584
WA ATTN: Elizabeth Ellis DNR,Aquatic Resources BrandonP@portofshelton.com
AT
PO BOX 47027 Office of Archaeology&Historic Preservation
Olympia, WA 98504-7027 ATTN: Lance Wollwage
elizabeth.ellis@dnr.wa.gov P.O. Box 48343
Olympia,WA 98504-8343
WA DNR, SEPA Center Lance.Wollwage@dahp.wa.gov
ATTN: External Coordinator
PO BOX 47015 Tacoma Public Utilities
Olympia, WA 98504 --70iS Real Property Services
sepacenter0dnr wa goy ATTN: Dave Letterman
3628 S 35th St
Olympic Region Clean Air Agency Tacoma, WA 98409-3192
ATTN: John Kelly dletterm@cityoftacoma.org
2940-B Limited Ln. NW
Olympia,WA 98502 School District:
John.Kelly@orcca.org Mason Cty P.W. ATTN:
Mason Cty E.H.ATTN:
Mason County Transit PO Box 1880 Mason County Bldg Attn:
Shelton,WA 98584 R Applicant:
JRosapepe@masontransit.org Agent:
�v� i.-�♦-�-.i . .-:i' �i i-ice-i ti i� jt}a+--e w Z i t���t=+iS '".' .�.;a it t ++� tr t '-`
♦ ���� ♦ Jt* t.jt � is L. i4
�
��w aJ•.i1•t►..}-*a F.!
4 r q♦.t-+�....�iyr-7-+..s.t t� at-*�.►. i ��
�{-,;►.w,.� S. Y{♦sJ..f-/'Z.M'►'t-i^.J. a. Y A♦.rv�"f •.•-.
1,=1�"1 t.4.t n�L.'-h:..s..i.�.J ��l.�i...�. :..L hia,-l-...L► .M,.-.n..a*Av.I.t..L �w..i.•M.t -h. +.Yw
Skokomish Indian Tribe
Natural Resources Department (360) 877-5213
i. 541 Tribal Center Road Fax(360)877-5148 Skokomish Nation,WA 98584
May 15, 2009
Environmental Review Application.No.: SEP2012-00055
Project Name: Robert Thompson Bulkhead
Description of Proposal: Repair and extend existing concrete bulkhead. Add 15 feet of
new bulkhead to North end to protect residence from wave caused erosion. Extend
existing bulkhead footing into beach a minimum of 3' to protect the bulkhead from
erosion of beach to prevent failure. Possible future expansion of the bulkhead to property
line if Ayock Point continues to erode away and threaten the property.
Location: 250 N Ayock Beach Dr.
Lilliwaup WA,98555
Proponent: Robert Thompson
Dear Grace,
It has been determined that the above project will have negative environmental
impacts to the Skokomish Tribe and/or their resources. As such the Skokomish Tribe
disagrees with your mitigated determination of non-significance.
No geo-technical report was provided to support the claim that this type(i.e. hard
armoring)of bulkhead repair and additions are needed to protect the property. Just
because the site demonstrates erosion in one small spot does mean that the shoreline will
continue to erode and the additional armoring is needed. The possible future expansion
of the bulkhead needs to permitted.separately. It is not appropriate to permit the 50'+
additional feet of bulkhead via this permit as it would more than likely qualify as a new
bulkhead and not a repair and thus may not be exempt and at the very least needs to go
through appropriate environmental review. More than likely there are types of soft
annoring that can meet the proponent's needs on this repair and the future extension of
the bulkhead if needed, and would eliminate the need for the proponent to extend the
footing a minimum of 3' water ward.
In recent years, scientists and resource managers have expressed concerns about
the impact of traditional erosion control measures such as bulkheads,on near shore
environments(Canning and Shipman, 1995). Armoring deprives beaches of their natural
sources of sediment degrading the ecological functions of the shoreline,which include
but are not limited to impacts to salmonids(i.e. loss of shading,places to hide from
predators), as well as impacts to shellfish, herring,and surf smelt from beach scouring
and erosion. The cumulative impacts of numerous concrete bulkheads along a reach of
shoreline may be long term(i.e. irreversible loss of habitat and increased erosion on the
SEP2012-00055 Robert Thompson Bulkhd. I
Prepared by Randy Lumper Environmental Planner for the Skokornish Tribe
property of others). One result of this is that resource agencies are carefully scrutinizing
erosion control proposals in order to evaluate their potential environmental impacts;
however Mason County currently does no do this at a level that is satisfactory to protect
and sustain environmental processes.
Property owners need to be aware there are structural alternatives that can address
erosion that might be more economical,aesthetically pleasing and environmentally
sound. Hybrid structures are another alternative that works in most cases. Hybrid
structures combine vegetative plantings and hard structural control. More specifically,a
rock bulkhead would be constructed at or above ordinary high water mark and would be
partially buried and further protected by the addition of anchored beach logs, sand, gravel
and cobbles placed as beach nourishment. The benefits of a hybrid system are that they
partially mimic natural coastal processes while providing a high level of erosion control
due to the rock structure. The Skokomish Tribe requests that Mason County require the
proponent to use a hybrid alternative to hard armoring such as concrete. We also request
that the Skokomish Tribe be made aware of any decision that you make regarding this
permit(SEP2012-00055)and any other permit which may affect the tribe.
The Skokomish"Tribes"tribal Historic Preservation Officer may be providing
comment as to the potential cultural impacts of this SEPA and you should not move
forward with the above project until you receive those comments. Thank you for
including the Skokomish Tribe in the planning process, if you have any questions about
the comments provided herein please contact Randy N. Lumper(Environmental Planner)
at 1-360-877-5213 ext# 508 or email them to rlumper askokomish.org.
Sincerely,
Joseph.Pavel
Director
Skokomish Natural Resources Department
SEP2012-00055 Robert Thompson Bulkhd. 2
Prepared by Randy Lumper Environmental Planner for the Skokomish 'Tribe
��soN co- MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning Shelton(360)427-9670
Mason County Bldg.1 Belfair(360)276-4467
411 N 6th Street Elma(360)482-6269
PO Box 279
Shelton,WA 98684
1854 HOME PAGE-www.co.mason.wa.us
August 15,2012
Randy Lumper
Skokomish Tribe
N 541 Tribal Center RD
Shelton,WA 98584
RE: SEPA Comments for Robert Thompson Bulkhead#SEP2012-00055
Dear Mr.Lumper:
Thank you for your comments regarding the SEPA Determination made by Mason County for the Robert Thompson
bulkhead located at 250 N Ayock Beach Drive. Staff requested a response from the applicant regarding your
recommendation that they use an alternate material than concrete for the proposed 16' extension of the existing
concrete bulkhead with footings repairs.
Staff wanted to let you know that the applicant has explored an alternate method than concrete for erosion control.
Their next door neighbor worked with the Planning Department in the past to install soft armoring on their shared
shoreline. The applicants witnessed the neighbors installation using logs and other natural materials to armor their
shoreline.The soft armoring on the neighbor's property failed after a month's time.Apparently,there is too much
open water,about 12 miles from the Southwest such that the waves caused by the wind,are so violent,anything
other than a solid structure will be destroyed. Soft armoring will not work as it has been tried and failed next door.
The beach grade has lowered at least 4' in the past 5 to 6 years to the point at the bottom of the footing and if the
footing is not extended into the beach,the existing bulkhead will fail.
Your comments also mentioned that there would be a need for the applicant to extend waterward a minimum of
three feet for current and future expansion of the bulkhead. The applicants verified that there would be no need for
an extension 3'waterward of the OHWM for the new 16' of new bulkhead.In addition,thee County has
deteremined that potential future expansion of a new 50'bulkhead will need to be reviewed separately.
In summary,your letter requested that the County notify the Tribe of actions taken on the applications.At this time,
the County is prepared to issue a Building Permit with Conditions to the applicant.I have attached the conditions
that the Planning Department has placed on the permit approval for your information.Please let me know if you
have any questions.Thank you.
Sincerely,
�U N
Grace Miller,Planner
DEPT OF COMMUNITY DEVELOPMENT
CC:Jim Japhet
Robert Thompson
t
eY.
:as^
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
PO Box 47775 •Olympia, Washington 98504-7775 •(360)407-6300
711 for Washington Relay Service •Persons with a speech disability can call 877-833-6341
July 27, 2012
Ms. Grace Miller Your address
Mason County is in the
Department of Community Development
Skokonish
Planning Division Dose # lips
PO Box 279 - watershed
Shelton, WA 98584
Dear Ms. Miller:
Thank you for the opportunity to comment on the determination nonsignificance for the Robert
Thompson Bulkhead project(SEP2012-00055)located at 250 North Ayock Beach Drive in
Lilliwaup as proposed by Robert Thompson. The Department of Ecology(Ecology) reviewed
the environmental checklist and has the following comment(s):
SEPA REVIEWER: Sonia Mendoza
WATER QUALITY CONTACT: Deborah Cornett(360) 407-7269
Erosion control measures must be in place prior to any clearing, grading, or construction.
These control measures must be effective to prevent soil from being carried into surface
water by stormwater runoff. Sand, silt,clay particles,and soil will damage aquatic habitat
and are considered pollutants when discharged to waters of the state.
Any discharge of sediment-laden runoff or other pollutants to waters of the state is in
violation of Chapter 90.48, Water Pollution Control,and WAC 173-201A, Water Quality
Standards for Surface Waters of the State of Washington,and is subject to enforcement
action.
During construction, all releases of oils,hydraulic fluids, fuels,other petroleum products,
paints, solvents, and other deleterious materials must be contained and removed in a manner
that will prevent their discharge to waters and soils of the state. The cleanup of spills should
take precedence over all other work on the site.
Proper disposal of construction debris must be on land in such a manner that debris cannot
enter Hood Canal or cause water quality degradation of state waters.
All trenches,depressions, or holes created in the intertidal area shall be backfilled prior to
inundation by tidal waters.
All stormwater discharges must be constructed in a manner that will not cause scouring on
the beach.
July 27,2012
Page 2
Fresh uncured concrete in direct contact with the water is toxic to aquatic life. All concrete
shall be poured in the dry and allowed to cure a minimum of seven(7)days before contact
with water.
Shoreline armoring(e.g., hardening with rock)can result in adverse impacts to the natural
character of the shoreline,but can be avoided. Ecology recommends the applicant use
appropriate plantings of native vegetation to stabilize shorelines,rather than hardening them
with rock or concrete. Ecology can provide further information on request. Applicants
should consider that placement of a bulkhead may in some cases accelerate erosion of the
beach. Bulkheads are not truly permanent, and may require expensive maintenance,
especially after storm events.
Per Chapter 90.58 RCW(WA State Shoreline Management Act), local governments must
also consider the cumulative impacts of armoring large stretches of currently natural
shoreline.
Ecology's comments are based upon information provided by the lead agency. As such,they
may not constitute an exhaustive list of the various authorizations that must be obtained or legal
requirements that must be fulfilled in order to carry out the proposed action.
If you have any questions or would like to respond to these comments,please contact the
appropriate reviewing staff listed above.
Department of Ecology
Southwest Regional Office
(SM:12-3523)
cc: Deborah Cornett, WQ
Robert Thompson(Applicant)