HomeMy WebLinkAboutBLD2003-00472 - BLD Engineering / Geo-tech Reports - 5/27/2003 e
MASON COUNTY
PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER
Shelton,Wmhington 98584
DATE: MU 27 h, 2003
INTER-DEPARTMENTAL COMMUNICATIONS
TO: Scott Longanecker, DCD-Planner
FROM: Alan A. Tahja, P/W - Co. Hydr. Engr. WO# PLG-03
SUBJ: Geo-Tech Assessment Review NAME: Cook SFR(a, 150 W Pyramid Court
BLD2003-00472
Scott,
The geotechnical assessment prepared for the proposed Keith Cook Single Family Residence
(SFR)to be constructed at 150 West Pyramid Court,has been received and reviewed by Public
Works.
The assessment appears to dispel the need for further geotechnical investigation, conforms to
standards of engineering principles and practices for this time and place,and appears to conform
to the minimum requirements of DCD for geotechnical assessment reporting. The evaluation
raises no issues or concerns, and appears acceptable for the level of reporting required.
Recommendations contained in the report should be incorporated into the site's development.
The applicant and his contractor to should be alerted to their responsibility to protect neighboring
properties during and after construction, from adverse stormwater runoff impacts.
Please feel free to contact me at County extension 461 if you have any questions regarding these
comments, or if you feel any features need further discussion or attention.
Si cerely,
�an . Tahja
File:H:IWPIGEOL&sessmentslCook.doc
WOrkOrder
PERMIT M. =?3 —oD L(—J 2 Number ,-,
Requested by: 1.141I"-f —5-- L_ / y
Authorized by: Date:
Type of Work:
CHARGE TO:
NAME
AGENCY/COMPANY
BILUNG ADDRESS
PHONE (:
Pub. Works Person In Charge:
tc) Project Time Une. (from to dat
Project Start date: Estkrsated Finlsh Date: TO
APProxhade haws: ESTIMATED TOTAL i'S: ','�
COST ESTIMATE
(D) P3t! _ Emp1oY« Lliit! U29M BOW Etitms� __TOTAL=
5 27/03 c l -�_�� �`3,( ' �r _. Sty
l�fI TOTAL t5
EQUIPMENT USED: BAD
FAATERL 6L USED:
i
_ �.-....-
.
(� Actual Cost = BARS: PROJ#.
DATE
WORKED Name Hours "4U1 ErInoe% TOTAL$
i
i
EQUIPMENT USED: atu4 gal£ TOTAL SS
MATERIAL USED:
TOTAL ALL
(G) BILLED DATE INV i PAID DATE REC.s
CFC>r
Lcook]
��; Y
C'1 � Bradley-Noble Geotechnical Services
A Division of The Bradley Group, Inc.
PO Box 12267, Olympia WA 98508-2267
Phone 360-357-7883 • FAX 360-867-9307
20 Ma 2003
y R
TPA 47
MAY 212003
Mr. Keith Cook
700 East Hiawatha Boulevard
Shelton, Washington 98584
Subject: Geotechnical assessment of slope
stability at your new residence site,
150 West Pyramid Court, Mason County Tax
Parcel Number 420187500020 , BLD
2003-00472 .
Dear Mr. Cook:
As requested, we have visited the above site in order
to observe site conditions and to prepare a report
addressing slope stability and its probable long-term
effect on your proposed construction. This letter
will present the results of our reconnaissance level
survey and our research, and our opinion on the
stability of the slope.
At the time of our site visit, the site had been
cleared and the building corners staked. Test pits
for drain field design wE�re open, and we were able to
observe the near-surface soils .
The project site is located on a low, north-facing
ridge above Egypt Valley. This slope has been
modified in this development as the slope has been
cleared of stumps, and only grasses are growing on the
slope. Measuring slope angles using a Brunton Pocket
Transit, we found the slope angles to average less
than 22 degrees or 40% slope. Examination of the
g P
slope face at this lot and in front of adjacent lots
did not indicate that erosion or geomorphic features
associated with mass wasting events are present. The
slope as it exists at this time appears to be stable.
To verify our understanding of the area geology, we
review Plate 1 of Water-Supply Bulletin 29 , Geology of
Southeastern Mason County Washington by John B. Noble
03050601
Page 1 of 3
_� �
03050601
Page 2 of 3
and Dee Molenaar. This area is mapped as Qvt, Vashon
subglacial till . We also reviewed the Geologic Map of
the South Half of the Shelton and South Half of the
Copalis Beach Quadrangles, Washington compiled by
Robert L. Logan, Open File report 87-9 , 1987 (Revised
Dec . 1987 ) and published by the Washington Division of
Geology and Earth Resources . This area is mapped as
Qdvt, Vashon subglacial till . No landslides or areas
of mapped mass wasting events are indicated on either
of these maps for this general area.
In the drainfield test pits, we found in the exposed
trench walls sands and gravels associated with Vashon
recessional outwash Qvr. We expect that the outwash
deposits mantle the upland and slope area at this site
and that subglacial till underlies these soils .
The upper soils of Vashon recessional outwash are
granular and have densities in the firm to dense
range . Using Table 3-2 in Bowles Foundation Analysis
and Design, 3rd edition estimated angles of internal
friction are presented. For these soils in a medium
dense range, angles of internal friction from 30 to 35
degrees is indicated. With good internal drainage
characteristics and slope angles less than the
expected angle of internal friction, slope stability
is inferred.
The underlying Vashon subglacial till is a highly
overconsolidated soil unit. Subglacial till was
deposited at the base of the advancing ice sheet and
is a mixture of silt, sand, and small gravels . The
grain size distribution and loading by the ice sheet,
thought to have been about one-half to one mile thick
in this area has created a soil unit with many
engineering properties similar to those of lean
concrete. This soil unit can stand steeply with
apparent stability and only slow erosion occurring on
its surface .
The soil units at this site are not prone to deep
rotational type of failure. We expect that the only
active erosional process working on the slope is soil
creep, the slow downslope movement of the near surface
active soil zone due to saturation and freeze thaw
cycles .
03050601
Page 3 of 3
At the indicated setback of the residence from the top
of slope, the setback will meet the minimum
requirement of the Uniform Building Code for setback
from descending slopes . We consider the setback to be
reasonable and prudent. Soil creep will not have an
impact on foundation soil support at this setback.
Ground water will not have an adverse effect on the
proposed development. The outwash sands and gravels
are expected to infiltrate water rapidly. Flows of
ground water may develop on the surface of the
subglacial till as it is for all practical purposes
impermeable. This flow will not affect the proposed
development unless foundations extend into the
subglacial till. In that event, good perimeter
drainage will be required to intercept this flow to
aid in ensuring dry crawl spaces .
Water from roofs should not be directed towards the
slope. Concentrated flows of water can create areas
of localized saturation and induce slope erosion. We
recommend that the roof rain leaders be collected into
a tightline system with the water conveyed towards the
road area on the south side of the residence for
infiltration.
Based on our site visit and research, it is our
opinion that this site is not a landslide or erosion
hazard area. Construction of this residence at the
indicated setback is at no greater risk than the
existing residences to the west of this lot in this
development.
If you have any questions, or if we may be of
additional service to you on this project, please
contact us at our Olympia office.
Cordially,
BRADLEY-NOBLE GEOTECHNICAL SERVICES
° Wash/n
� �e 90
?David C. S rong, L.E.G.
1
'c 1129
e'7Sed Ge°\off
DAVID C. STRONG