Loading...
HomeMy WebLinkAboutBLD2000-00122 Mobile Home - BLD Permit / Conditions - 2/15/2000 Inspection Line (360)427-7262 MASON COUNTY PERMIT ASSISTANCE CENTER Phone: (360)427-9670, ext. 352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 N $ Shelton, WA 98584 1 RESIDENTIAL BUILDING PERMIT BLD2000-00122 OWNER: SCOTT JOHNSON 426-7064 CONTRACTOR: RECEIVED: 2/10/00 SITE ADDRESS: ISSUED: 2/15/00 PARCEL NUMBER: 420182490001 EXPIRES: 8/15/00 LEGAL DESCRIPTION: E 1/2 SE NW, S OF MATLOCK ROAD PERMIT PROJECT DESCRIPTION: DIRECTIONS TO SITE34ULL & VOiD BY EXPIRATION MOBILE HOME STORAGE ONLY- MOVE TO PROPERTY TO REPAIR FOLLOW SHELTO _C_KR_D_7 /B11gIlE R OF FIRE DAMAGE HIGHLAND RD IN D� OL T PAST INTERSECTION 300' ON LEFT. -5.03 VJ General Information Construction & Occupancy Information Square Footage Information No. of Bedrooms: 3 Type of Constr.: Type of Use: ? Insp. Area: 2 No. of Bathrooms: 2 Occ. Group: Lot Size: Deck: Type of Work: ? Fire Dist.: 16 No. of Stories: 1 Occ. Load: Building: Valuation: $42 Building Height: Occ. Status: Basement: Manufactured Home Information Setback Information Shoreline& Planning Information Make REDMOND Length: 66 Ft. Front: Ft Shoreline: Ft. Water Body: Rear: Ft. Slope: Ft. SEPA?: Model:RIDGEDAL Width: 28 Ft. Side 1: Ft. Shoreline Desig.: Year:1998 Serial No.: 11825323AB Side 2: Ft. I Com . Plan Desi .: Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Plan Check Fee KLW 2/10/00 $42.00 52668 Total $42.00 BLD2000-00122 Please refer to the following pages for conditions of this permit. 1 of 3 CASE NOTES FOR BLD2000-00122 CONDITIONS FOR BLD2000-00122 1) Proposed structure or any portion thereof greater than 30" in height from d i�must maintain a minimum of 5' setback from all property lines, easements and 10' from all County and State Road right of ways. X 2) This permit is being issued to the applicant to allow the moving of this mobile home onto his/her private property to perform the necessary corrections to this unit to bring it into compliance with HUD Standards, and get the unit recertified by the State of Washington Department of Labor and Industries. This unit is not to be occupied. No utilities are to be connected. No permanent set up is to begin. This permit is valid for sixty (60)days only. No extensions will be granted. Any violation of the conditions of this permit or the denial of a permanent installation permit will result in the determination that the unit must ed from the property at the expense of the owner. X 3) PURSUANT TO 1997 UNIFORM BUILDING CODE, ALL SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY. MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A REINSPECTION FEE, BASED ON RATES AS ADOPTED-BY-THE JURISDICTION AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST DDAESS ON SITE PRIOR TO REQUESTING INSPECTIONS. X 4) he approved plot plan is required to be on-site for inspection purposes. If inspectioalled for and plot plan is not on site, Approval WILL NOT be granted. In addition, a Re-Inspection fee in the amount of$42.00 per hour( ini 1 hour)will be charged and must be collected by this department prior to any further inspections being performed or approval granted. X 5) Applicant acknowledges that in the process of applying for a permanent building permit that the mobile home unit may need to be relocated to comply with ou ty and Critical Area Ordinances. X 6) upland areas disturbed or ne c y construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X 7) A LETTER OF EXEMP N OR A PERMIT FROM LABOR AND INDRUSTIES MUST BE SUBMITTED BEFORE A PERMIT FOR PERMANET PLACEMENT CAN BE OBTAINED. x BLD2000-00122 Please refer to the following pages for conditions of this permit. 2 of 3 This permit becomes null and void if work or construeion authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenc Eence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be o upie�!' OWNER OR AGENT: DATE: BLD2000-00122 Please refer to the following pages for conditions of this permit. 3 of 3 j CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING Attic OTHER Groundwork date b date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by t^vI l V 1 0- V J Snn 'J i