HomeMy WebLinkAboutBLD2002-00866 Garage with Shed - BLD Permit / Conditions - 8/28/2002 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. 3 426 W. Cedar P.O. Box 186
11 Shelton,WA 98584
014
RESIDENTIAL BUILDING PERMIT BLD2002-00866
OWNER: CLARE BOUCHEY 426-8438 RECEIVED: 7/2/2002
CONTRACTOR: B&P CONSTRUCTION 360-978-5969 LICENSE:BPCON&044BD EXP: 1/2/2004 ISSUED: 8/28/2002
SITE ADDRESS: 380 W GOLDSBOROUGH DR SHELTON EXPIRES: 2/28/2003
PARCEL NUMBER: 420177500060
LEGAL DESCRIPTION: TR 6 OF SURVEY 27/159
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
GARAGE W/SHED TAKE SHELTON MATLOCK RD GO 1.4 MILES CROSS TRACKS ON RIGHT
GO 30'TAKE LEFT GO TO END OF CULDESAC
General Information Construction &Occupancy Information Square Footage Information
No.of Bedrooms: Type of Constr.: V-N
Type of Use: SF Insp.Area: No.of Bathrooms: Occ. Group: U-1 Lot Size: Deck:
Type of Work: ACC Fire Dist.: 16 No.of Stories: 1 Occ. Load: Building: Garage-Attached 768
Valuation: $24,227 Building Height: 25 Occ. Status: Basement: carport 568
Manufactured Home Information Setback Information Shoreline& Planning Information
Make: Length: Ft. Front: S 58.0 Ft. Shoreline: Ft. Water Body:
Rear: Ft. Slope: Ft. SEPA?: No
Model: Width: Ft. N 10.0 P Shoreline Desi .:
Side 1: E 10.0 Ft.
9
Year: Serial No.: Side 2: W 45.0 Ft. Comp. Plan Desig.: LTCFL
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Plan Check Fee KLW 7/2/2002 $236.11 59791
EH Plan Review CEW 7/10/2002 $35.00 60374
Adjust Plan Check Fee RLS 8/23/2002 $18.20 60374
Building State Fee RLS 8/23/2002 $4.50 60374
Building Permit Fee RLS 8/23/2002 $391.25 60374
Total $685.06
BLD2002-00866 Please referto the following pages for conditions of this permit. 1 of 4
CASE NOTES FOR
BLD2002-W866
CONDITIONS FOR
BLD2002-00866
1) This application is subjec Buf r and Landscaping requirements as established under Mason County Ordinance
1.03.036.X
2) Contractor registration laws a e governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647-09�. Th person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
3) The use, handling and storage of hazardous m ri or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of
the Mason County Fire Marshal. X
4) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located wit 2 'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your project.
X
5) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. X
6) All construction and demolition debris must be removed from the beach after project completion. Proper d' sal construction debris must be on land
in such a manner that debris cannot enter or cause water quality degredation of State waters. X
7) Approved per dimensions and setbacks on submitted site plan. X
8) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. U
, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Department pri urther inspections being performed or approvals granted.
X
BLD2002-00866 Please referto the following pages for conditions of this permit. 2 of 4
9) In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly visible and
legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to calling for any site
inspections. A r spection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner and/or
contractor fail t st a address on site prior to requesting inspections.
X
10) The plan review c4eck list and corrections, along with the Energy Compliance Worksheet (when applicable)are part of the approved plans and must
remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they
shall not be cha g or Itered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of
plans on site fo d tion of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections.
X
11) This structure is ap oved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use
permit shall be ed r, reviewed and approved prior to the change.
X
12) THE FOUNDATIO SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X
13) The"approved" plot plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" plot plan is not on site, then
approval will not Unrior
nted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Dep to any further inspections being performed or approvals granted.
X
14) This structure lite to U-1 use only(private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the Uniform
Building Code M on County Regulations unless a "Change of Use" permit is applied for, reviewed and approved.
X
15) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building
Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached
thereto. If docu s a e removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be
charged ands I e llected by the Building Department prior to any further inspections being performed or approvals granted.
X
16) All construction must meet or exceed all local ordinances and the 1997 Uniform Building Code requirements as adopted and amended by Mason County
and the State of hin ton. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would
result in permit ca ' n.
X
17) All changes to" pro d" building plans that effect compliance with the Uniform Codes as amended and adopted, or any other Mason County ordinance
or regulation st b reviewed and approved by Mason County prior to construction.
X
18) The construction Zhe permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the Unifor odes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector sh ade prior to requesting additional inspections.
X
BLD2002-00866 Please referto the following pages for conditions of this permit. 3 of 4
19) All property lines shall be clearly identified at the time of foundation inspection. X .9L
20) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request at f inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason Co rd' ances and building regulations.
X
21) All permits expi a 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a perio tje��ceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prev ection from being taken. No more than one extension may be granted.
X
This permit becomes null and void if work orconstruction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of con' tion of wok is a progress inspection within the 180 day period. Final inspection
must be approved before building can be occupied.
OWNER OR AGENT: DATE: Z—
BLD2002-00866 Please referto the following pages for conditions of this permit. 4 of 4
PERMIT NO.: BLD�
MASON COUNTY tti�
BUILDING PERMIT APPLICATION
426 W.Cedar/P.O.Box 186,Shelton,WA 98584
Shelton 360 427-9670 Belfair 360 275-4467 Elma 360 482-5269 Seattle 206 464-6968
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner Contractor Name
Mailing ddWsYMailing Address
City State ip Code City{r.Yl//�,!A a St a e 4,tlA Zip Code 70
Phone( Other Ph.( Ph.( 712n )1?7? A9 Other Ph.
f Lien/Title Holder Contractor Reg. #
Address Expiration 7
SEPTIC/WATER SYSTEM INFORMATION-Connect to New Septic Existing Septic Connect to Sewer
System Name of Sewer System Well Water System Name of
Water System
PARCEL INFORMATION-12 digit Tax Parcel No / / 0 Fire District
Legal Description
Site Address(Please include st e ,I name, street m e nd city) U
Directions o site •
Will timber be cut and !ford in arcel preparatio ? (Yes/No)
Is your property within 200' of the following: Body of Water (Name) Saltwater
Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or
Bluffs
PERMANENT RESIDENCEU SEASONAL RESIDENCE❑
TYPE OF JOB New X Add Alt Repai Other Us of Buildin
Describe Work
No. of Bedrooms No. of BathroorOs SQUARE FOOTAGE-1st Floor 2nd Floor
3rd Floor loft Basement Deck Other sq. ft.
Garage &Wtached Detached Carport t1t.Attached Detached
MOBILE HOME INFORMATION-Make Model Model Year
Length Width Serial No. No. of Bedrooms No. of Bathrooms
Type of Heat Purchase Price $ Replacement Unit ?(Yes/No)
Installer Name Certification No.
NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF
CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED.
PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the
information provided is accurate and grants employees of Mason County access to the above described property and structures for review and
inspection of this project. Acknowledgment of such is by signature below:
OWNER AFFIDAVIT-I certify that I am exempt from the requirements of the CONTRACTOR'S AFFIDAVIT-I certify that I am currently registered as a
Contractor Registration Law RCW 18.27 and am aware of the ordinance contractor in the State of Washington and that I am aware of the ordinance
requirements for which this permit is issued and that all work will be done in requirements regulating the work for which this permit is issued and all work
conformance therewith. No changes shall be made without first obtaining shall be done in conformance therewith. No changes shall be made without
approval. first obtaining approval.
X Date .Z X Date
IIt
FOR OFFICIAL USE BEYOND THIS POINT��
Accepted by Date ubmittal Amount Du Receipt No
DEPARTMENTAL R VIFW APPROVED NIED CONDITION CODES
Building Department „a.
Occ Group - Type constr.
Planning Department WW
Environmental Health Department
Public Works Department
i
Fire Marshal
I
Valuation $
I
FEES
Building Permit Fee Site Inspection
Plan Review Fee EH Review Fee
Plumbing& Base Fee Planning Review Fee
Mechanical& Base Fee Other
i
Wood/Gas/Pellet Stove Fee State Fee
Violation Fee Pre-Paid at Submittal ( )
TOTAL FEES