Loading...
HomeMy WebLinkAboutBLD19413 SFR - BLD Permit / Conditions - 10/8/1986 TYPE RESIDENCE Permit No. 19413 No. Floors I — Sq Ftg 1350 Owner TOEBE, Rebecca S. TL-1 426-2179 Date 10-8-86 Address W 6151 Shelton Matlock Rd Shelton Zip Contractor Gary Martin Const Address W 3611 Little Egypt Rd Shelton Zip Legal Description 17-20-4 SE,Sh Direction to project site 6.15 miles out Shelton Matlock —_Rd on left side, Black mailbox (Red Rate) Plumbing _ x Mechanical Sewer Wood Stove Fireplace Deck Garage 550 Carport Basement Loft Other 3 bdrm L Shorelines: Plumbing: Setback: Mechanical: Special Interior: Conditions: FILL: Mobile Home: Smoke Detector: Remarks: Footing: Setback:' p/t /0- P Foundation Walls: Framing: PERMIT Fireplace: ATION Wood Stove: NULt. DATE / - - BY -- ----- BUILDING PERMIT APPLICATION MASON COUNTY DEPARTMENT of GENERAL SERVICES P.O. BOX 186 SHELTON, WASHINGTON 98584 426-5593 DATE ISSUED PERMIT NO. NAME MAILADDRESS CITY&STATE ZIP PHONE OWNER Rebecca S. Toebe W 6151 Shelton Matlock Road, Shelton, WA 98584 426-2179 DIRECTIONS TO JOB SITE 6 . 15 Miles out Shelton-Matlock Road on left hand side Black mailbox (Red gate) LEGAL DESCR. 17-20-4 SE 4; SE 4; Ex. Tracts & RR & W 265 ' NAME MAIL ADDRESS CITY&STATE LICENSE NO. ZIP PHONE CONTRACTOR Gary Martin Construction Co. W 3611 Little Egypt Rd, Shelton 426-9649 USE OF BUILDING Residence License # GARYMC*251NA ___T CLASS OF NEW ADDITION ALTERATION REPAIR MOVE REMOVE WORK ✓ XXX DESCRIBE WORK Construct Home and remove trailer on land. BEDROOMS__ DECKS CARPORT n/a NOTICE SEPARATE PERMITS ARE REQUIRED FOR PLUMBING, HEATING, VENTILATING OR AIR BATHROOMS 11, _ TOTAL SQ.FT. GARAGE 550 CONDITIONING. NO.OF STORIES 1 BASEMENT n/a ATTACHED X THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR TOTAL SQ.FT. 1350 FIREPLACE n/a DETACHED ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. PERMANENT X SHORELINE n/a SEASONAL OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT I CERTIFY THAT t AM EXEMPT FROM THE REQUIREMENTS OF THE CONTRACTORS I CERTIFY THAT I AM A CURRENTLY REGISTERED CONTRACTOR IN THE STATE OF REGISTRATION L RCW 18.27, AND AM AWARE OF THE MASON COUNTY ORDINANCE WASHINGTON AND I AM AWARE OF THE ORDINANCE REQUIREMENTS REGULATING THE REQUIREMENTS R WHICH THIS PERMIT IS ISSUED AND THAT ALL WORK DONE WILL BE WORK FOR WHICH THE PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN IN CONFORMA CE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT FIRST CONFORMANCE THEREWITH.NO CHANGES SHALL BE MADE WITHOUT FIRST OBTAINING OBTAINING AP OVAL FROM THE BUILDING DEPARTMENT. APPROVAL FROM THE BUILDING DEPARTTMMENNTT.. p q' XOWN R ,- %° DATE ���9<�'� XBY /2 , 2� �,, DATE - 2C? O� FOR OFFICE USE ONLY DEPARTMENT APPROVED DEPARTMENT APPROVED BUILDING VALUATION YES NO YES NO 75l C C' HEALTH PUBLIC WORKS FEE PLANNING FIRE BUILDING PERMIT ), c (� D.O.T. BUILDING `- PLAN CHECK C C SPECIAL CONDITIONS BUILDING GROUP PRE-INSPECTION Baseboard Heat SHORELINE Woodstove 15 . 00 PLUMBING , 4- MECHANICAL STATE BUILDING FEE 1. STATE SURCHARGE 15 . 0 APPLICATION ACCEPTED BY PLANS C CK BY APPROVED FOR ISS ANCE PERMIT VALIDATION .� A TOTAL C/ �,� BY CASH CK MO MASON COUNTY P.O. BOX 186 Shelton,Washington 98584 PLUMBING PERMIT APPLICATION IMPORTANT— Complete ALL items. Mark boxes where applicable. Name Mailing address—Number,street,city,and State Zip code Tel No. 1. Owner 2. Contractor The owner of this building and the undersigned agree to conform to all applicable laws of Mason County and State of Washington Signature of applicant Address Application date LEGAL DESCRIPTION Location Of Building NO. PLUMBING FIXTURES FEE WATER CLOSETS L 0 BASINS D BATH TUBS SHOWERS 2.2 WATER HEATERS Ci / AUTO.WASHERS SINKS C E' FLOOR DRAINS DRINKING FOUNTAINS LAUNDRY TRAYS Connect to City Sewer DISH WASHER C DISPOSAL URINAL (Show Street Names & Property Lines) INDICATE LOCATION OF MAIN SHUTOFF VALVE FOR WATER. PERMIT S SKETCH IN SEPTIC TANK & DRAIN FIELD LOCATION OR SUBMIT ON OTHER SKETCH. DO NOT WRITE IN THIS SPACE — FOR OFFICE USE Approved by Permit fee Date pemit issued Permit number Receipt No. $ S, 00 CHRISTMASTOWN PRINTING PREPARED BY: FOSTER AND WILLIAMS ASSOCIATES, P.S., ARCHITECTS ANALYST: G. Foster PROJECT: Toebe Residence PROJECT NO. : 86-15 DATE: 9-16-86 INTENT: Washington State Energy Code Conformance. NOTE: THIS BUILDING WAS NOT DESIGNED BY FOSTER AND WILLIAMS ASSOCIATES. THE ARCHITECT ASSUMES NO RESPONSIBILITY FOR STRUCTURAL INTEGRITY, NOR CODE COMPLIANCE BEYOND THIS ENERGY EVALUATION. SYSTEMS INCLUDED IN THIS PROJECT FLOOR 1 (372 S.F. ) r 2x10JSTS. , R-19 INS. , 5/8 CDX, -1/2 P. B., VINYL - FLOOR 2 (959 S. F. ) 2x10JSTS. , R-19 INS. , 5/8 CDX, 1/2 P.B. , CARPET FLOOR 3 (0 S.F. ) ROOF 1 (1331 S.F.) 2x4 TRUSS, R-38 INS., 5/8 G.W.B. ROOF 2 (0 S.F.) ROOF 3 (0 S.F. ) WALL 1 (1496 S.F. ) 2x6 STUDS, R-19 INS., 5/8 T-111 , 1/2 G.W.B. WALL 2 (0 S.F. ) WALL 3 (0 S.F. ) SKYLIGHT 1: (0 S.F. ) SKYLIGHT 2: (0 S. F. ) SKYLIGHT 3: (0 S.F. ) WINDOW 1 : (166 S.F.) U VALUE= 0.6 WINDOW 2: (0 S. F. ) WINDOW 3: (0 S. F. ) HEAT TYPE: ELECTRIC RESISTANCE HEATING ZONE: 1 BUILDING TYPE: RESIDENTIAL OUTSIDE WINTER DESIGN TEMPERATURE: 23 WINDOWS = 12. 5% OF GROSS FLOOR AREA i HEAT LOSS CALCULATION AND HEATING SYSTEM SIZE Toebe Residence COMPONENT AREA U VALUE DELTA T HEAT LOSS (Q=U A T) FLOOR 1 CAVITY 335 0.045 47 704.7 FLOOR 1 FRAMING 37 0.067 47 117.4 FLOOR 2 CAVITY 863 0.041 47 1665.3 FLOOR 2 FRAMING 96 0.059 47 266.4 FLOOR 3 CAVITY 0 0.000 47 0.0 FLOOR 3 FRAMING 0 0.000 47 0.0 ROOF 1 CAVITY 1251 0.025 47 1478.2 ROOF 1 FRAMING 80 0.162 47 609.3 ROOF 2 CAVITY 0 0.000 47 0.0 ROOF 2 FRAMING 0 0.000 47 0.0 ROOF 3 CAVITY 0 0.000 47 0.0 ROOF 3 FRAMING 0 0.000 47 0.0 WALL 1 CAVITY 1095 0. 047 47 2441 .0 WALL 1 FRAMING 193 0. 112 47 1013.4 WALL 2 CAVITY 0 0.000 47 0.0 WALL 2 FRAMING 0 0.000 47 0.0 WALL 3 CAVITY 0 0.000 47 0.0 WALL 3 FRAMING 0 0.000 47 0.0 WINDOW 1 166 0.600 47 4681 .2 WINDOW 2 0 0.600 47 0.0 WINDOW 3 0 0.600 47 0.0 DOOR 1 42 0.480 47 947.5 DOOR 2 0 0.480 47 0.0 DOOR 3 0 0.480 47 0.0 SKYLIGHT 1 0 0. 600 47 0.0 SKYLIGHT 2 0 0.600 47 0.0 SKYLIGHT 3 0 0.600 47 0.0 INFILTRATION =1 .1xVxT 47 6462.5 ( RATE =1 .0 FOR DOORS AND 0.5 FOR WINDOWS) SLAB AREA 0 @ 2 BTU/SF 47 0.0 SLAB EDGE 0 @ 11 BTU/SF 47 0.0 OTHER HEAT LOSS 47 OTHER HEAT LOSS 47 OTHER HEAT LOSS 47 OTHER HEAT LOSS 47 MISC. HEAT GAIN(PEOPLE,APPLIANCES,ETC. ) 47 -2200.0 OTHER HEAT GAIN 47 OTHER HEAT GAIN 47 OTHER HEAT GAIN 47 ------------------------------------------------------------------------- TOTAL HEAT LOSS 18186.9 MAXIMUM HEATING SYSTEM SIZE @ 150%: - ELECTRIC RESISTANCE: 8.0 KW OTHER: 27280 BTUH NOTES: 1 . WINDOW CRACK ESTIMATED AT 1 L.F./S.F. 2. DOOR INFILTRATION @ 1 CFM/S.F. RESIDENTIAL COMPONENT COMPARISON Toebe Residence ALLOWED AREA GR.AREA U VALUE Ux ACTUAL AREA GR,AREA U VAL. Ux RATIO ALLOWED RATIO RATIO ACTUAL RATIO ----------------------------------------------- ----------------------------------------- 22 FLOOR 1 372 0.089 0.055 0.005 22 FLOOR 1 372 0.089 0.047 0.004 FLOOR 2 959 0.231 0.055 Q. 013 FLOOR 2 959 0.231 0.043 0.010 FLOOR 3 0 0.000 0.055 0.000 FLOOR 3 0 0.000 0.000 0.000 ----------------------------------------------- ---------------------------------------- 23 ROOF 1 1331 0.320 0.026 0.008 23 ROOF 1 1331 0.320 0.033 0.011 ROOF 2 0 0.000 0.026 0.000 ROOF 2 0 0.000 0.000 0.000 ROOF 3 0 0.000 0.026 0.000 ROOF 3 0 0.000 0.000 0.000 ------------------ ---------------------------- ---------------------------------------- 24 WALL 1 1496 0.360 0. 144 0.052 24 WALL 1 1496 0.360 0.129 0.046 WALL 2 0 0.000 0. 144 0.000 WALL 2 0 0.000 0.000 0.000 WALL 3 0 0.000 0.144 0.000 WALL 3 0 0.000 0.000 0.000 ----------------------------------------------- --------------------------------------- 25 TOTAL 4158 Ut ALLOWED 0.078 25 TOTAL 4158 Ut ACTUAL 0.071 i - --------------------------------------------------- THIS BUILDING CONFORMS TO CHAPTER 4 OF THE WASHINGTON STATE ENERGY CODE. I i I i Uo CALCULATIONS FOR FLOORS f Toebe Residence FLOOR 1 SYSTEM R VALUES R VALUES FLOOR 1 AREA AREA U Ux HEATING 5 FRAMING CAVITY HEATING (S.F. ) RATIO VALUE RAT10 ----------------------------------------- ---------------------------------------------- I AIR FILM OUTSIDE 0.92 0.92 13 GROSS FLR. 372 XXXX XXXX XXXXX j 2 OUTER SURFACE 0.00 0. 00 14 OTHER 0 0.00 0.00 0.000 3 OUTER SHEATHING 0.00 0.00 15 OTHER 0 0.00 0.00 0.000 4 FRAMING 11 . 56 XXXXX 16 OTHER 0 0.00 0.00 0.000 5 CAVITY a)INSULATION XXXX 19.00 17 OTHER 0 0.00 0.00 0.000 6 b)AIR SPACE XXXX 0.00 18 OPAQUE FLR. 372 XXXX XXXX XXXXX 7 INSIDE SURFACE 0.78 0.78 19 FRA.MING 37 0.10 0.07 0.007 8 AIR FILM INSIDE 0.92 0. 92 20 CAVITY 335 0.90 0.04 0.040 9 OTHER a) 1/2 P.B. , 0.66 0.66 --------------------------------------------- 10 b) VINYL 0.05 0.05 21 Uo=TOTAL LINES 14 TO 20 0.047 11 Rt=TOTAL LINES 1-10 14.89 22.33 12 U=1/R TOTAL 0.067 0.045 j FLOOR 2 SYSTEM R VALUES R VALUES FLOOR 2 AREA AREA U Ux HEATING 6 FRAMING CAVITY HEATING (S.F. ) RATIO VALUE RATIa ----------------------------------------- ----------------------------------------------- 1 AIR FILM OUTSIDE 0.92 0.92 13 GRQSS FLR. 959 XXXX XXXX XXXXX j 2 OUTER SURFACE 0.00 0.00 14 OTHER 0 0.00 0.00 0.000 3 OUTER SHEATHING 0.00 0.00 15 OTHER 0 0.00 0.00 0.000 4 FRAMING 11 . 56 XXXXX 16 OTHER 0 0.00 0.00 0.000 5 CAVITY a)INSULATION XXXX 19.00 17 OTHER 0 0.00 0.00 0.000 6 b)AIR SPACE XXXX 0.00 18 OPAQUE FLR. 959 XXXX XXXX XXXXX 7 INSIDE SURFACE 0.78 0.78 19 FRAMING 96 0. 10 0.06 0.006 8 AIR FILM INSIDE 0.92 0. 92 20 CAVITY 863 0.90 0.04 0.037 9 OTHER a) 1/2 P.B. , 0.66 0.66 --------------------------------------------- 10 b) CARPET 2.08 2.08 21 Uo=TOTAL LINES 14 TO 20 0.043 11 Rt=TOTAL LINES 1-10 16. 92 24.36 12 U=1/R TOTAL 0.059 0.041 FLOOR 3 SYSTEM R VALUES R VALUES FLOOR 3 AREA AREA U Ux HEATING 0 FRAMING CAVITY HEATING (S.F. ) RATIO VALUE RATIO ----------------------------------------- --------------------------------------------- 1 AIR FILM OUTSIDE 9.00 0.00 13 GROSS FLR. 0 XXXX XXXX XXXXX 2 OUTER SURFACE 0.00 0. 00 14 OTHER 0 0.00 0.00 0.000 3 OUTER SHEATHING 0.00 0.00 15 OTHER 0 0.00 0.00 0.000 4 FRAMING - 0.00 XXXXX 16 OTHER 0 0.00 0.00 0.000 5 CAVITY a)INSULATION XXXX 0.00 17 OTHER 0 0.00 0.00 0.000 6 b)AIR SPACE XXXX 0.00 18 OPAQUE FLR. 0 XXXX XXXX XXXXX 7 INSIDE SURFACE 0.00 0.00 19 FRAMING 0 0.00 0.00 0.000 8 AIR FILM INSIDE 0.00 0.00 20 CAVITY 0 0.00 0.00 0.000 9 OTHER a) 0.00 0.00 --------------------------------------------- 10 b) 0.00 0.00 21 Uo=TOTAL LINES 14 TO 20 0.000 11 Rt=TOTAL LINES 1-10 0.00 0.00 12 U=1/R TOTAL 0.000 0.000 i I f Uo CALCULATIONS FOR ROOF Toebe Residence ROOF 1 SYSTEM R VALUES R VALUES ROOF 1 AREA AREA U Ux ! HEATING 2 FRAMING CAVITY HEATING (S.F. ) RATIO VALUE RATIO ----------------------------------- 1 AIR 2 OUT FILM OUTSIDE GROSS ROOF 133 OUTER SURFACE 0.00 O.GO 14 SKLIGHT 0 0.00 0.60 0.000 3 OUTER SHEATHING 0.00 0.00 15 SKYLIGHT 2 0 0.00 0.60 0.000 4 FRAMING 4.38 XXXXX 16 SCUPPER 0 0.00 0.60 0.000 5 CAVITY a)INSULATION XXXX 38.00 17 OTHER 0 0.00 0.00 0.000 6 b)AIR SPACE XXXX 0.00 18 OPAQUE ROOF 1331 XXXX XXXX XXXXX ! 7 INSIDE SURFACE 0. 56 0.56 19 FRAMING 80 0.06 0. 16 0.010 8 AIR FILM INSIDE 0.61 0. 61 20 CAVITY 1251 0. 94 0.03 0.024 9 OTHER a) 0.00 0.00 --------------------------------------------- 10 b) 0.00 0.00 21 Uo=TOTAL LINES 14 TO 20 0.033 11 Rt=TOTAL LINES 1-10 6. 16 39.78 12 U=1/R TOTAL 0. 162 0.025 ROOF 2 SYSTEM R VALUES R VALUES ROOF 2 AREA AREA U Ux HEATING 0 FRAMING CAVITY HEATING (S.F. ) RATIO VALUE RATIO ----------------------------------------- --------------------------------------------- 1 AIR FILM OUTSIDE 0.00 0.00 13 GROSS ROOF 0 XXXX XXXX XXXXX 2 OUTER SURFACE 0.00 0.00 14 SKYLIGHT* 0 0.00 0.00 0.00 3 OUTER SHEATHING 0.00 0.00 15 SCUPPER* 0 0.00 0.00 0.00 4 FRAMING 0.00 XXXXX 16 OTHER 0 0. 00 0.00 0.000 5 CAVITY a)INSULATION XXXX 0.00 17 OTHER 0 0.00 0.00 0.000 6 b)AIR SPACE XXXX 0.00 18 OPAQUE ROOF 0 XXXX XXXX XXXXX 7 INSIDE SURFACE 0.00 0.00 19 FRAMING 0 0.00 0.00 0.000 8 AIR FILM INSIDE 0.00 0.00 20 CAVITY 0 0.00 0.00 0.000 9 OTHER a) 0.00 0.00 --------------------------------------------- 10 b) 0.00 0.00 21 Uo=TOTAL LINES 14 TO 20 0.000 11 Rt=TOTAL LINES 1-10 0.00 0.00 12 U=1/R TOTAL 0.000 0.000 *INCLUDED IN ROOF 1 . ROOF 3 SYSTEM R VALUES R VALUES ROOF 3 AREA AREA U Ux HEATING 0 FRAMING CAVITY HEATING (S.F. ) RATIO VALUE RATIO ----------------------------------------- ---------------------------------------------- 1 AIR FILM OUTSIDE 0.00 0.00 13 GROSS ROOF 0 XXXX XXXX XXXXX 2 OUTER SURFACE 0.00 0.00 14 SKYLIGHT* 0 0.00 0.00 0.000 3 OUTER SHEATHING 0.00 0.00 1.5 SCUPPER* 0 0.00 0.00 0.000 4 FRAMING 0.00 XXXXX 16 OTHER 0 0.00 0.00 0.000 5 CAVITY a)INSULATION XXXX 0.00 17 OTHER 0 0.00 0.00 0.000 6 b)AIR SPACE XXXX 0.00 18 OPAQUE ROOF 0 XXXX XXXX XXXXX 7 INSIDE SURFACE 0.00 0.00 19 FRAMING 0 0.00 0.00 0.000 8 AIR FILM INSIDE 0.00 0.00 20 CAVITY 0 0.00 0.00 0.000 9 OTHER a) 0.00 0.00 --------------------------------------------- 10 b) 0.00 0.00 21 Uo=TOTAL LINES 14 TO 20 0.000 11 Rt=TOTAL LINES 1-10 0.00 0.00 12 U=1/R TOTAL 0.000 0.000 *INCLUDED IN ROOF 1 . i i III I� J r 1 Uo CALCULATIONS FOR WALLS Toebe Residence WALL 1 SYSTEM R VALUES R VALUES+ WALL 1 AREA AREA U Ux HEATING 1 FRAMING CAVITY HEATING (S.F. ) RATIO VALUE RATIO ----------------------------------------- --------------------------------------------- 1 AIR FILM OUTSIDE 0.17 0.17 13 GROSS WALL 1496 XXXX XXXX XXXXX 2 OUTER SURFACE 0.78 0.78 14 WINDOW 1 166 0. 11 0.60 0.067 3 OUTER SHEATHING 0.00 0.00 15 WINDOW 2 0 0.00 0.60 0.000 4 FRAMING 6.88 XXXXX 16 WINDOW 3 0 0.00 0.60 0.000 5 CAVITY a)INSULATION XXXX 19.00 17 DOOR 1 42 0.03 0.48 0.013 6 b)AIR SPACE XXXX 0.00 18 DOOR 2 0 0.00 0.48 0.000 7 INSIDE SURFACE 0.45 0.45 19 DOOR 3 0 0.00 0.48 0.000 8 AIR FILM INSIDE 0.68 0. 68 20 OPAQUE WALL 1288 XXXX XXXX XXXXX 9 OTHER a) 0.00 0.00 21 FRAMING 193 0.13 0. 11 0.014 10 b) 0.00 0.00 22 CAVITY 1095 0.73 0.05 0.035 11 Rt=TOTAL LINES 1-10 8.96 21 .08 ----------------------------------------- 12 U=1/R TOTAL 0. 112 0.047 Uo=TOTAL LINES 14 TO 20 0. 129 WALL 2 SYSTEM R VALUES R VALUES WALL 2 AREA AREA U Ux HEATING 0 FRAMING CAVITY HEATING (S.F. ) RATIO VALUE RATIO ---------------------------------- ------ --------------------------------------------- 1 AIR FILM OUTSIDE 0.00 0.00 13 GROSS WALL 0 XXXX XXXX XXXXX 2 OUTER SURFACE 0.00 0.00 14 WINDOW* 0 0. 00 0.00 0.000 3 OUTER SHEATHING 0.00 0.00 15 DOOR* 0 0.00 0.00 0.000 4 FRAMING 0.00 XXXXX 16 OTHER 0 0.00 0.00 0.000 5 CAVITY a)INSULATION XXXX 0.00 17 OTHER 0 0.00 0.00 0.000 6 b)AIR SPACE XXXX 0.00 18 OPAQUE WALL 0 XXXX XXXX XXXXX 7 INSIDE SURFACE 0.00 0.00 19 FRAMING 0 0.00 0.00 0.000 8 AIR FILM INSIDE 0.00 0.00 20 CAVITY 0 0.00 0.00 0.000 9 OTHER a) 0.00 0.00 --------------------------------------------- 10 b) 0.00 0.00 21 Uo=TOTAL LINES 14 TO 20 0.000 11 Rt=TOTAL LINES 1-10 0.00 0.00 12 U=1/R TOTAL 0.000 0.000 *INCLUDED IN WALL 1. WALL 3 SYSTEM R VALUES R VALUES WALL 3 AREA AREA U Ux HEATING 0 FRAMING CAVITY HEATING (S.F. ) RATIO VALUE RATIO ----------------------------------------- --------------------------------------------- 1 AIR FILM OUTSIDE 0.00 0.00 13 GROSS WALL 0 XXXX XXXX XXXXX 2 OUTER SURFACE 0.00 0.00 14 WINDOW* 0 0.00 0.00 0.000 3 OUTER SHEATHING 0.00 0.00 15 DOOR* 0 0.00 0.00 0.000 4 FRAMING 0.00 XXXXX 16 OTHER 0 0.00 0.00 0.000 5 CAVITY a)INSULATION XXXX 0.00 17 OTHER 0 0.00 0.00 0.000 6 b)AIR SPACE XXXX 0.00 18 OPAQUE WALL 0 XXXX XXXX XXXXX 7 INSIDE SURFACE 0.00 0.00 19 FRAMING 0 0.00 0.00 0.000 8 AIR FILM INSIDE 0.00 0.00 20 CAVITY 0 0. 00 0.00 0.000 9 OTHER a) 0.00 0.00 --------------------------------------------- 10 b) 0.00 0.00 21 Uo=TOTAL LINES 14 TO 20 0.000 11 Rt=TOTAL LINES 1-10 0.00 0.00 12 U=1/R TOTAL 0.000 0.000 *INCLUDED IN WALL 1. N I (^J\ 1 00 U , 6 U` � j s - /' m <�� a A tract of land in the Southeast quarter (SEV) of the Southeast �+ quarter (Sly/4) , Section seventeen (17) , Township twenty (20) North, Range four (4) West, W.M. , particularly described as follows: BEGINNING at a point which is 460 feet East from the West line of the Southeast quarter (SE3i) of the Southeast quarter (SEY4) and 755.00 _feet South of the North line of said -Southeast quarter (SEY4) of the Southeast quarter (SE1A) ; thence North, parallel with the West line of the Southeast quarter (SEg) of the Southeast quarter (SEA) , 755.00 feet, to the North line of said Southeast quarter (SEY4) of the Southeast quarter (SE',6) , and which point is on the center line of the Shelton-Matlock County Road; thence Southeasterly along said center line of said County Road 542 feet; thence Southwesterly 543 feet, more or less, to a point which is 140 feet East , parallel with the South line of the Southeast quarter (SEY4) of the Southeast quarter (SEO/a) , from the point of beginning; thence '+hest, parallel with the South line of the Southeast quarter (SE1i) of the Southeast quarter (SEY4) , 140 feet, more or less, to the roint of beginning, excepting therefrom road rights-of-way. Y