Loading...
HomeMy WebLinkAboutMIS99-0497 Spray Booth - MIS Permit / Conditions - 9/29/1999 T MASON COUNTY �\ Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 1 M I SCE L L A N E a U S P �l 11 T FOR INSPECTIONS CALL 427-9670 I MIS99-0497 PARCEL :42017241 }PLAT : DIV : BLK : LOT : JOB ADDRESS : 6651 W SHELTON MATLOCK RD SHELTON APPLICANT : KIRK PETERSEN 426-3082 OWNER : KIRK PETERSEN 426-3082 LEGAL : TR 1 OF SE NN PROJECT DESCRIPTION : SPRAY BOOTH PROJECT LOCATION : APPROX 5 MILES WEST OF FREEWAY EXIT ON LEFT . PROJECT NOTES : INSTALL PRE-FAB SPRAY BOOTH . i TYPE AMOUNT BY DATE RECEIPT PLCK $ 42 .00 KW 08/ 13/99 51201 PRMT $ 74 .75 KS 09/29/99 51737 STFE $ 4 .50 KS 09/29/ 99 51737 i /7� 7 PCFE $ 6 .59 KS 09/29/99 51737 TOTAL : 127 .84 OWNER K AGENT DATE MIS-PRMT, rev: 04101/92 COMPLIANCE TO ATTACHED CONDITIONS IS REQUIRED I MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 PERM I T C (DNL7 I T I ONS Case No . : MIS99-0497 For : KIRK PETERSEN Page : 1 I 1 ) Site is within a type III moderately susceptible aquifer area which is regulated by Mason��County ' s Resource Ordinance chapter 17 .01 .080, Critical Aquifer Recharge Areas . Storage or handling of hazardous materials needs to comply with these regulations . X 2 ) 1 . FIXED FIRE SUPPRESSION SYSTEM REQUIRED IN THE BOOTH . SEPARATE PLANS AND PERMIT REQUIRED . 2 . THE SPRAY BOOTH CAN BE LOCATED DIRECTLY AGAINST AN INTERIOR WALL THAT HAS A FIRE REST TANCE RATING OF NOT LESS THAN ONE HOUR . i X 3 ) All approved plans are required to be on-site for inspection purposes . If inspection is called for and plans are not on site , Approval WILL NOT be granted . In addition , a Re- Inspection fee in the amount of $42 .00 per hour (minimum 1 hour ) will be charged and must be collected by this department prior to any further inspections being performed or approval granted . X �/ i MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 4 ) PURSUANT TO 1997 UNIFORM BUILDING CODE ALL SITE MUST BE MARKED WITH APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY . MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A REINSPECTION FEE , BASED ON RATES ADOPTED FEE SCHEDULES AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS . X 5 ) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UBC RE(�I EMENTS X��� 6 ) THIS STRUCTURE IS CONSIDERED UNHEATED SPACE ( NOT TO EXCEED 1 WATT/SQUARE FOOT OR 3 .4 BTU/HR/SQUARE FOOT ) . AT SUCH TIME THIS CONDITION CHANGES, A CHANGE OF USE PERMIT AND A MECHANICAL PERMIT SHALL BE APPLIED FOR AND APPROVED PRIOR TO THE CHANGE . X 7 ) ALL FURNACE INSTALLATIONS SHALL MEET THE MINIMUM EFFICIENCIES SET FORTH IN THE 1994 WASHINGTON STATE ENERGY CODE (WSEC ) . ANY PORTION OF THE MECHANICAL SYSTEM THAT IS ALTERED OR REPLACED SHALL MEET T MINIMUM STANDARDS SET FORTH IN THE 1994 WSEC AND 1997 UNIFORM MECHANICAL CODE . X 8 ) CONSTRUCTION PROCESS TO BE FIELD CORRECTED - REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND UNIFORM BUILDING CODE . x 4�f U /71 -1 PLEASE PRESS HA PERMIT NO.: MASON COUNTY PLUNISM131MECHANICAL PERMIT APPLICATION $ i3 426 W.Cedar/P.O.Box 186,Sheitor.,WA 98584 r-rob�IG 9he1 lq it 360.276-4467 Elma 360 482-5269 Seattle 206 464.6968 CH APPL'CA T/INFO AT�ON CONTRACTa INFORMATION qqo-3cj-7 F Owner I RIc 11 rc Si Conl Name Mailing Address ✓L`-�r Mailing Address City ;� �+✓ StateW� Zip Code City State Zip Code Phone 3 Lo her Ph. i-, ` e Ph.(�� Other Ph.( A ddre i Holder Contractor Reg. # Addresss e Expiration SEPTIC INFORMATION-Connect to New Septic fisting Se a Connect to Sewer System Name of Sewer System PARCEL INFORMATION-1 2 digit Tax Parcel ND. Z 0 D Fire District Legal Description !2- I c.9 .S. ry ILI_ Site Address(Please Include street name,street number and city) 6,CBS L4. S•-K-L�:k-0-J veil, Directions to site ^ I� w es r A -e .L,,, lap Is your property within 200' of the following: Body of Water (Name) Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs TYPE OF JOB New Add Alt Repair Other Use of Building Location of Fixtures/Units 1st Floor 2nd Floor Basement Garage Closet PLUMBING FIXTURES(Show Number of each) MECHANICAL UNITS Fuel Type: Electric Type of Fixture No. of Fixtures Fes LPG Natural Gas Heatpump Toilets Type of Unit No. of Units Fees Bath Basins Furnace Bath Tubs Heatpumps_ Showers Ventfans �— Water Heater Propane Tank Laundry Wsher Gas Outlets Sinks Wood/Gas/Pellet Stove Dishwasher Dire Vent? Other Othe e-P 7-�_ Other Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL A FLOOR PLAN AND PLOT PLAN MAY BE REQUIRED DEPENDING ON THE TYPE OF FIXTUREIUNIT. NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structures for review and inspection of this project. Acknowledgment of such is by signature below: OWNER AFFIDAVIT-I certify that I am exempt from the requirements of the CONTRACTO 'S AFFIDAVIT-I certify that I am currently registered as a Contractor Registration Law RCW 18.27 and am aware of the ordinance contractor in th"tate of Washington and that I am aware of the ordinance requirements for which this permit is issued and that all work will be done in requirements regulating the work for which this permit is issued and all work conformance there 'h. No changes shall be made without first obtaining shall be done In conformance therewith. No changes shall be made without approval. first obtaining approval. X Date X Date FOR OFFICIAL USE BEYOND THIS POINT Accepted b" Da ` / / Submittal Amount Due Receipt No. 4Q,:�n/ Dk�Aft°CM ka1kE.: 1# ��B.,Id, Department "r— T I26 v Occ Groupt s�onstr. Planning Department Other Other Permit Fee Site Inspection Plan Review Fee , UFC Plan Review Fee Plumbing&Base Fee Other e� Mechanical&Base Fee Other Wood/Gas/Pellet Stove Fee Pre-Paid at Submittal ( I Violation Fee TOTAL FEES 7. 1 __—____.__-------------___-__ EXTERIOR BRACED 'Y'VAi L P.ANE'L----------'.__------__.__ 4 � 16" O.C. 2i:4 STUDS, SHr Ai;-t:'NG GE UtD AND SHEAR NAILED. P OSTi`v'i CONK. CTlONS AT TOP AND BOTTOM. "0-.9c k� . . EX TYPICAL 2X6 ® 24" O.C. o NOT TO EXCEED 10' 1N HEiG��T. F Q f pi -Mld,ki 0'0 T,bZ® O wi Q O; n W S3SSMU A008 Q3�13, iJi 13-'3�c 3 v ! W 4`:10 HEADER zoOr i o a :TTC ACCESS r- 22X30 MIN. in - - v a �I ,----- o v 11' HIGH CEILINGS 9909 ! i 2 HR. FIRE A!ALL SEE A 1 DETAIL. 1sx If 4X6 HE 1.5 HR FIRE DOOR. i X Z {{ I ! 15REMY 'PETERSEN V6G57 StfELTON MAT1.oC( ROAD I I - - -----_-------- .----, �, _'C O; I S T U C I O N SHEITOX WASHINGTON 98564 i I"1 O R i N FLOOR P LA! SCAM 8„— 1,—oti---- C O T41 AN Y TES.. =o) at-:5om � PLANS AND DETAILS � I ( i � I ® 8 "� I I T .A E LE . 9, C2, FIL E Cop 1 ,14 -4X9 FAINT WA 22 I 1 (2 . N-SCR NCZZLE 30 is DUCT- �_ 1Ica- .. 4 UCT -NCZZLE PIPING 5 PYRO CHEM- PCIX O X 25 6 MCH - MECHANICAL CQN7ROLHEAD 7 R M T- FULL STATION STANDARD INK DETFCTIONI 0 n 91 -TF T T O 101 1 3A"GA VANIZED PIPE _ 1` II I MT CONDUIT 7 _LL MICRO SWITCH - FAN SHUTDOWN 0 13 DUCT NOZZLES - 14 16 v 66'5I W SHE TON MA LG K RD, S ELTON KNIGHT FIRE PROTECTION, INC. JO. P E T E P S E N G A I3W E T S 6436 Mullen Road SE SHEET NO, Olympia, WA 98503 JON FAGERGREN 9-I-99 (360) 456-2162 FAX 456-2151 CALCULATED 9y DATE CHECKED By DATE SCALE NOT TO SCALE "QUALITY IS REMEMBERED LONG AFTER PRICE IS FORGOTTEN!" "ON GUARD 24 HOURS A DAY- LICENSE NO KNIGHFP044LK * s - -0';�N!S;-!P 2 0 i � i R A ND Si iERRY PE 901001049— oC P�.RCE!S1 A. \ D 2 I �j• I I' O WELL PROPOSED BU1LDif"1G NORTH of - -- 26' -1 - 20' - i ' in i SHELTON MATFLOCK ROAD ,i I----------- - JEREMY IDE-TERSFEN v6451 sHE1TON PIATLOCK ROAD SHEI-.TON. WASHINGTON 96564 CONSTRUCTION STE m_ ,i r I C O M i=1`''t N Y TEL (3L0) �f2L-�082 of S a►fi 3-to-97 -� -_-_- __�__ _ _ PLANS AND DETAILS �)S%10,99 12:09 film :30 u�8 STANDARD TOiiL C�j001in . ,,. TIN K: I I=✓j 1 ::► TOOLS AND EQUIPMENT CO. 4810 CLOVER RD, GREENSBORO, NC 27405 t INSTALLATION & MAINTENANCE MANUAL c -l """"DUSTRIAL PAINT WALk pp t [ r f Thoroughly Read Before Installing Your New Booth For questions or problems related to your new spray booth, call our Customer Service Department at 1-800-451-2425, Please have the ID number available when you tail. M1. Il NOTE State and local codes vary. All ry paint spray booths, , exhaust ducting, light fixtures, electrical motors and switches, and etc., should be installed to conform l with all applicable cedes for location of installation, r STANDARD TOOLS EQUIPMENT CO INDUSTRIAL PAINT WALL '` INDEX d • !f �� r .:I . . r�1 P3 � '•+• �� �".< ^r ±'� r f "s'Ffi►e Protecticin Notifi luOtiOn & ProcauEonsr .! I Instrucoons isotttPlcement k :i• ' ; s &-Assembly Mints Of�ls; ' ,� .L It:ter: �.� � ��. � .• 'S ,ham' �r_,,r 7... .: �: f• sserh AnIstrvctions •�; :': pr sd m. bly Se uence DravOng �sembly Sequence '=_`' ' '� '• lilt tt i j 'rr� .:fir.�'':•?' .. , ' � ! •yi ,t Y• n ' 08/10/99 12:10 V910 230 0384 STANDARD TOOL I�OQ� . q PLEASE READ CAREFULLY r �' National Fire Codes rewire a fire protection system to be installed in a paint spray area, e informatjon,,please refer to Cha ter f;z7 of the NFP P Y a. For mote r � p A-33 Standard for Spray Application. i I N(bAR 7!TOOLS ! } ' &EQUIPMENT CO. does not supply fire protection systems due to the ,ride' 'vanati.ans,of state and local codes. We recommend that the Purchaser contact a licensed Fire-Pratectioti x D System provider in the area where this equipment is to be installed. Should the Purchaser have&ether =.'gtt S0QP9 and/or requires additional assistance in AR prQCuring this equipment, please feel frec to eoritact - k.-S t� DI TOOLS & EQUIPMENT CO, Purchase.fr may also want to contact t government ofces and/or Fire Marshal in the local area for pplicable codes and regulations. lion city--or county i. �1. r 1` is r f•. y �.1� •. f :T ,i•li 64 Ar ' INDUSTRIAL PAINT WALL :]IN UODUCTION ; pry Booths equipped with filters are used to confine and limit the escape of spray,vapor,and residue,and safely collect or direct them to an exhaust,system. Paint Spray Booths are available J a ' Variety Of sizes(width, depth and height) and man different P gh} y types. The specific type depends on the amount and kind of material to be sprayed and the method of application. Yowhave purchased a Dry Type Spray Paint Wall designed for intermittent or limited paint spraying ing in locations where air filtration is of priority to the surrounding environment. This Paint Wall provides yopr personnel-with a Workstation,if properly constructed and maintained,will meet this objective. The?aint.Wall panel sections are manufactured from 1.8 GA galvanized steel and shipped with necessaryr hardware and components for easy construction. A Paint Wall package consist of materials and components that meet requirements of the Underwriters.Laboratories,National Board of Fire Underwriters,National Fire Protection Association{NFPA 33}, and NFPA's National Electric Code. if constructed zM:maintained properly,this equipment meets OSHA requirements as well as most of the ;..: codes,regulations and requirements of local and state fire, health and environmental agencies, It is the responsibility of the user to ensure that this equipment is installed and maintained in accordance with ,current local regulations. J3:. PRECAP TIONS € As per NFPA 33 there are precautions that should be observed when operating spray booths equipped with dry overspray collection filters- A. Precautions pertaining to materials and filters are as follows: 1. Filters should not be used when applying materials known to be highly susceptible to s � spontaneous heating or spontaneous ignition. 3 2. When replacing filters, only noncombustible type of materials should be used for supports ... and holders. 3. Fitters should not be alternately used for different types of coating materials if the j combinations of materials might result in spontaneous heating or ignition. ti 4. The same Paint Wall shall not be alternate) used for different f Y types of coating materials if, the combination of the materials is conducive to spontaneous ignition, unless all dCpcsits of the first-used coating material are removed from the walls and exhaust ducts prior to ,. spraying with the second coating. J. it B. General operating precautions are as follows: € 1. Do not erect and/or operate this spraying equipment near open flames, spark-producing equipment or other hazardous operations. Open flames, spark-producing equipment of .' other hazardous operations should be adequately partitioned from the spray area at a distance that is in compliance with local and state codes and regulations. .; 2. Spray area to be kept free of the accumulation of combustible residue deposits. To facilitate the cleaning overspray and impede corrosive action of the wall surfaces, one of several available commercial booth coatings should be applied to the interior of the booth. Due to potential fire hazards, the use of grease and paper are not recommended. 3. The exhaust fan filter system of the Paint Wall is designed to provide adequate airflow to t meet national standard. It is necessary that maintenance procedures be established to replace overspray collector filters before excessive restriction to airflow occurs. Periodically checking the draft gauge is recommended as an indicator for replacing;filters. Therefore it is essential to ensure that the draft gauge is installed properly and maintained as per the manufacturers instructions. HL ASSEMBLY INSTRUCTIONS r Asper NFPA33, here area few guidelines to aid in erecting this Paint Wall. It is advisable that a copy of the latest NFPA 33 Standard be acquired prior to erecting your Paint Wall, The address is National Fire . Protection Association, 1 Batterymarch Park, P.O. Box 9101, Quincy,M.A.02269-9101. To order, call i 800-344-3555. A. Booth Placement ' 1. Select an area to erect your Paint Wall having substantial floor and ceiling clearances. . sRemove all obstructions that may interfere with the exhaust fan and ducting. Depending, t on the constriction materials of the building that is to house this Paint Wall,the three enclosed sides should have at least 3 feet or more of clearance from nearest wall or partition. This clear space should be kept free of any storage or combustible constiuctio . 2. For closed-top,open-front Paint Wail, having clearance of 10 foot horizontally out from opening and 3 foot vertically, should satisfy most fire and electrical codes and standards. r It is owners' responsibility to check with local planning and development agencies to confirm all local and state codes and standards, f i 3. Floor surface of work area inside Paint Wall must be of noncombustible material_ i 4. After the floor space has been determined and meets all fire and safety criteria,use;a chalk t line and layout the outer perimeter of Paint Wall, .: . j. r ! f k � E 0811,1011 99 12:18 $910 230 0384 STANDARU TOOL WJUU.4 —r 3 � '• S B. Tools and Assembly Flints 1. Recommended tools include: chalk line, 3/8"screw gun, extension cord,minimum of ti .: "C"clamps, level,rubber hammer,drill and 3/16"masonry bit (to install Tapeons), G caulking gun,and two 8 ft. ladders. s 2. Begin the erection at the outside corner of the exhaust plenum wall with panels#land# . { . i, 3. Panels to be assembled by.fastening the flange joints(exterior) using Tek screws. Space J.. Tek screws approximately 8 to 12 inches apart. Use care in not stripping out screv(s whIu: assembling Note: This packet includes isometric drawings showing the Paint Wall assembled(see page 6) ant panl �. breakdown with its relationship to the adjoining panels (see page 7). Each panel is identified by numbed n the Industrial Paint Wall Assembly Se and corresponds to the Item No. listed oquence page(see;gage 8). On page 9 are the details that are referred to in the Direction of Assembly section of the Paint VSlal'1 s Assembly Sequence on page 8. Parts List on page 14 provides a listing of materials and hardwar 'that makes up a unit and also serves as the packing list A. Assembly Instruction ; 1, 1. Uncrate all components and stack panels of the same size together. As indicated oi,i page 8 (Industrial Paint Wall Assembly Sequence), size and description identify each pad"Iel. } Check inventory of all components prior to starting. l • c 4 1 2. Before starting, thoroughly review the drawings and instructions. Each component indicated on the drawing(page 7)corresponds to the Item No. listed on Industrial Paint Wall Assembly Sequence (page 8). These two pages will guide you through the assembling of the Paint Wall. 3 { a 3. Start the assembling by connecting Item No's. 1 &2 (Exhaust Plenum Walls) as shown ih 1 Detail II on page 9. This will be the right rear corner of the Paint Wall. Note,it is .eery , r important to stay on the chalk outline during the assembly process. 4. Space Tek Screws approximately 8•- 12 inches apart. l s i 5. Seal all panel joints with caulk(provided)after the Paint Wall has been completely. erected. Tighten all bolts and secure the booth to the floor. Seal all seams from the .. interior of the Paint Wall. t 6. Mount the exhaust fan and motor. Ensure that there are not obstructions inside the°fan unit. After the fan motor has been properly wired, check fan rotation as indicated by the label on the unit, N 9 ill 4 F 7. Install exhaust ducting. Where more than 25 feet of ducting is required,the statiq pressure t is increased so that air flow may he hindered whe %n M Y n using the standard exhaust unit ; .. J 11 recommended for this Paint Wall. Where a ducting arrangement of an unusual e 1 :4• employed or where two or more elbows are used,a similar condition may exist. Therefore, if either of these situations arise,contact your local distributor or the l manufacturer for correct recommendations_ . 8. STANDARD TOOLS &EQUIPMENT CO. does not provide an electrical packa a wit the unit. It is suggested that the owner contact a licensed electrical contractor to Wovidg services to do all wiring,hardware and components necessary to make the unit oprable ' p. 9. Manometer(draft gauge)setting: ; i a) Calibrate the gauge with the exhaust fan running and new exhaust filters in place. N06 F the height of the oil column (in inches of water)on the gauge. Mark this point,with piece oftape. t 1 L•. b) Take pieces of cardboard and partially cover the filter wall in a checkerboard f4shion.to simulate clogged filters. Add sufficient pieces of cardboard until the surface veilocity drops to the minimum allowable 100 feet r minute using a velour .r. Note t' . .� per g ete pe reading on the manometer and mark it with another piece of tape. This is the point t. (pressure measurement)at which to change out exhaust filters. Also the liquid in the� `t manometer should read approximately.75 iun.w.c. difference which is another n4ethod to use as an indicator to change out exhaust filters. . c) Upon removal of all cardboard,the pressure should return to its original point on the manometer marked with tape. d) The Paint Wall is now ready for operation. ' B. MAINTENANCE s Toe frequency of the following maintenance checks depends on the amount and kind of materials being C ` sprayed. Under all circumstances, however, these checks should be made at regular intervals to reduce fire hazards,to maintain the efficient of the Paint Wall,to prevent freshl • Y P y painted objects from becoming blemished and to impede rusting of the Paint Wall, r. .. Al: ! 1. Daily or when overspray accumulates--remove overspray and coating from the;Paint j :i I Wall interior, operator's floor area,baffles, fan and exhaust ducting. Use a non; t ferrous,non-sparking scraper to eliminate any possibilities of igniting combustible 1 material. To prevent'fire hazards do not allow overspray and piles of paint sweping5''' to accumulate in the Paint Wall ama. 2. When overspray accumulates—remove and clean the blade of the exhaust fan. 1. 3: Check belt tension on exhaust fan periodically, Fan and motor may bearings wear Y unnecessarily when belts are too tight. l „ *40001 �3> L LG9.9EE auoyd p :M Ptj Janv13 OTBil �a= + l SMl - IVIA juWd FLusnpul Efi f t£ j ZE SE -8 LI 9T SL CZ EZ Z L ZZ 5Z 4z iz ET Zi 11[77— rw.,ti..n.-•..r•�+•..:••+r. �� .� .. _.�•do-.a..si.w5...........ty...,._...,.<...a .,t,..r. -r--w. � ` �--.•i„ �' .. ...�:.. ♦ ......'..' • .... .... - _ - ___ � _5-".:.?t... ..- - -. .. . l.TT:7.1., .S`4i Y�%:—ar.}ey�1�j.:��.::.�Ott.`i.�:.:...�.:..-. -� � -i ..:• ..'-•si_.s. •�--�-�...�.'�{'Sr•:Y^Ziv.._.: :•t!'.+Y lam:tr�+ri+'t<F.^__vti..r,Fy...... _.-'... :. .. _. - war way i �+eFV�r�Yw�.ir+W:%.t0•w,.+iw.� '••�yj•.twn�'r.�.�YeY:•n✓wi•\t�...�•�wr�.r're�•J!+`YM.�.� ._ _ _ _ _ ilf_. .L�.L rn.- .r S •.r— ...: �:.5�..�. .. rae..n .�;-i.... .•�..,.r..< �....:.,<, r �...-;-• .._'a :....ter..-, .!p.-. - .,.. - . -� - ,..r.......,..... c - �:a•.•.v n.Lp::, :.•�, r . !1~' /t,. e::r,•�.'4 .. 4 =i*,`L'Y�ti1s7i ..."'("9'k>.FWW4s.e.ct��fiat,�•�t �,c.6�cn X��jt a.,.•a'. .. iE.dltti8tt8t01`9�•�a+ ..fn— ""•_�"'-Put't" 't-tIOI�''»r.-..v.r.,r,.r,.m _ - '' ,... .'.�.•-,• .r. :,,,�.-. .�. •.:. - . Wretticyn ofAlZett bf , ,... ,..,. ... `... nT. 1 25-1f2"x 109412" Exhaust Plenum vVal Overlap and connect to#2{smtyoth side;inward} 140" �tc,.lOg�.__.�.___ .�.-�_....�. •Ex1}oust=Pientrnr�it� . _...__...._�_.-_-.. -See`DE�-�I 3 40"x lb9 1/L" Exhaust Plenum Wall. Connect to#1 4 x 1097112- Exhaust Plenum-Wall Connect to#3 5 40"x log-*1/2" Exhaust Plenum Nail Connect to#4 6 25-1/2"x log-1/2" Exhaust Plenum Wall Connect to#5,Overlap_and connect to.#7 _ . 7 44"x 108". _. Exhaust Plenum Wall Connect to#6 8 24"x 84" Exhaust Filter Grid Square comer with and connect to#7&#12(smooth side inward) 9 24"x 84" Exhaust Filter Grid Connect to 48&#12 10 24" .x 84" Exhaust Filter Grid Connect to#9&#12 11 24"x 84" Exhaust Filter Grid Connect to#10&#12 12 24" s 84" Front Exhaust Plenum Square comer with and connect to#7(smooth sine outward) 13 24" x 84" Front Exhaust Plenum Square cornerwith and connect to#2(smooth side,outward) 14 24" x 84" Exhaust Filter Grid Connect to#11 j 15 24" x 84" Exhaust.Filter Grid: Connect to 414 16 i-1/2--x 1-1/2"x 103 Support:Tee wffoot Connect to 412 aitcl:-inner seam of.#9&#ll) 17 1-112"x 1-1/2"x 108" Support Tee wffoot Connect to#13 and inner seam of#14&115 . 18 24"x 84" Exhaust Filter Grid Connect to#18,square corner with and connect to#2 19 45"x 5T' Top Exhaust Plenum Connect edge flush to#1 &03,to ci of#2&#13- 20 45"x 57" Top Exhaust Plenum wJfan opening Connect edge flush to#3,#4&45,to top of#12&#13 21 45"x 57" Top Exhaust Plenum Connect edge flush to#5 A#6,to top of#7`8t#12 22 44' x 84' Side Wall Connect to#2 ! 23. 44f x 84" Side Wall Connect to 022 . . 24 - 44"x 84" Side Wall Connect to#7 25 44"x 84" Side Wall Conecct to#24 26 1-1/2"x 1-112"x 88" Formed Hip Angie Connect to.#27(see DET.IV) 27 34" x 88" Hi Panel. Connect to#22&#23(see DET. III)and#13 (Temp•support required) 28 -1-1/2"x 1-1)2' P x88" Formed Hip Angle Connect to#29(see DET-.IV) 29 "x 88" Hip Panel Connect to.#24&#25(see DET.III)and#12--(Temp support required) 30 44"x 120" Ceiling Panel with(2)Light Fixtures Connect to.#26.&#28(see DET.VI)and#12&#l3 31 1-1f2"x I-lfT'x 84" Door Jam Angle{with Gusset) Connect to#25 x 149r x•34" Door Jam Angle(with,Gasnt) lrotinectt6429 - 33 1-1J2"x 1-104-84 Door lam- le(with C,'usset) C'011neCt LO`#23. . �=1 �1 ; x ;•. Ioor'Jatn fie(wrth Gusset) Connect to:#27 35 1-1h z 1- 'i x 1 (}`' IaoocjamArtg�t"(Top) Connect to"#36. 36 . 44'- 120* CeilingPanel _ 'Connect to�#26:22 {see VET:YV`).�8c#30 'N'lN+osi.FAMM.sitaavMwi[•+IIM�� - - .. - r .. MUSTUAL PAINT WALL- PARTS LIST a' MAT- QTY. FINISHED SIZE DE CRIPTION : 2 26-1/2"x 109-112" Exhaust j2lenum waft f: 2 44"x 108" Exhaustplenum wall . 3 40"x 109-1/?' Exhaust lenum wall 7 24"x 48" Exhaust filter grid 2 24"x 48" Front exhaust plenum is 2 1-112"x 1-112"x 108-1/2" Support Tees with foot 2 441'x 5T Top exhaust plenum +, 1 44"x 57"with fart openln2 Top exhaust plenum t 4 44"x 84" Side walls 2 1-1/2"x 1-1/2"x 88" Farm hip angles 2 34'x 86' Hip panels 1 44"x 120"Might fixture openings Ceigng panel 6 1 44"x 120" Ceftq,panel t 2 1-1/2"x 1-1/2"x 34" Door' rn Angle withgusset) 2 1-1O x 1-1/Z'x M' Door jam Angle(with usset 3 Y 1 1-1/2"x 1-1/2"x 120" Door header Angle r A a. HaRDWAf2 t QTY. ITEM DESCRlPT14N i 2 47-$/4"x 23.1/2"x 1/4" Glass for light fixtures 1 2 24"x 48" Liolat fbdures t 58 CT-1012 Exhaust filter rids 28 GAt10 20"x 20" Exhaust filters 1 7F841 30"fan with 2 hp.Motor 500 14-:14 x 1"HWH TEK screws 4 5E079 cmlkin Tubes of caulkingI 1 2T650(Dwyer Mark 11 Model#25 Manometer E 25 1/4"x 1-1/4" (TH1412C) Concrete screws a con) fi ( � n 1 installation&Maintenance Manual 10 4 • .44C3 : . . E . Genetal IinstrUction$10 assemble 'Exhaust.Dluctwork Exhaust Duc orl: The following.is a suggested method to aid•in assembling air exhaust ductwork sections using the angle ring. *lace t ` an with the vertical]e u• on a Ievellurface. Take the pre-.rolled 48 inch-wide section of sheet metal and crap 1 ' ..p aroundthe vertical leg(outer surface)of the angle ring. It is suggested that a utility tie down(ratchet type)be user to draw ' thesheet•'metal tightly to the vertical Ieg'of angle ring, Once the sheet metal has been drawn to fit the outer diameter of the angtd ding,fasten the seam:of the.pre-rolled sheet metal;about three inches above the vertical ring's edge,'with..a TFK : screw. See Detail I, step— 1. At this point,remove the angle ring and turn the pre-rolled sheet metal section end'fQr.end: Again,dravuthe sheet metal tightly to the.veifical leg and place.a TEK screw about three inches above the ring's a ge. 'S ` is p .• I = Dorsal 1 ste 2. After completing this step;place TEK screws.about every six to eight inches apart along the searL See 1Jetata.Y; tep:3 Seal seams with duct tape. " Once all sections are completed,'Slip the angle ring back into one of the assembled duct sections and.TEK screw•tokthe i angle ring.;This section will then be fastened to the fan outlet. See'Detai1 l',step-4. € ' �'otfasten the ductwork sections together,insert the 4"wide Companion Band two inches into one end, clamp ir►.pl suds T] tow. See Detail 11. ` g ` ':.L. sseri .h�Weather lk'ead .:. .• F 14. Take a section of assembled duct(Detail I; Step-3),"C"clamp the''T Brackets(Detail 111)at 90 apart.and flush kith thg upper edge and;7EK screw into place(Detail IV). Place the two End.Caps(Detail V) ISO degrees apart and.midwd5y l between ihc"t"'Brackets with the flat side flush with the edge and secure with two TEK screws(Detail VI). PJacelFlappr3r F. Sections(Detail.�!1I)on the flat surface of End Caps;and TEK screw from underneath(Detail VIII). Next,"C"clams one,t . . t effd of trio 16 inch wide:pre=formed skirt to one of the'To brackets,form it around the remaining"Z"brackets.with,the j •bottom edge flush with.the Tower edge,of they"V'Brackets. Draw the skirt tight using a.utility tie down(ratchet type)and t seotir,r 44.TE K screws at each"T'Bracket(Detail TX). yk t Cut opening. roof approximately %:"largerin diameter than the RoofFlange duct, Install Roof Flange and.thoroughly caulk:(Detail £): Extend formed duct throu.lt the Roof Flange. Place a single 7%K screw in Rain Collar(Detail)i) as show in.beWJ XJZ. Slip the Rain Collar down over the extended duct,form a cone and secure both ends with TEK screws;; (Detai1X111): Slide the Rain Collar down to top ofRoofFlange duct and caulk(Detail X1V). Seepage 2 and 3'for Details.and Pictures to aid in assembling and installation of Ductwork +�•. .: 1 . � yi:•T y�. 1' k U.. - - -= uz.IV z4v uib14 STANDARD TOOL rcom STEP,- 2 4ING STEP - 3 ' 1 QRK 1tS STEP . 4' • ' DUB. IW�ANGLE RING BET- sTv DETAILj�p ]8'"CCs`!Z•.'H , : ° (2) END CAP F: k FLAPPER SUPPORTS END CAP DETAIL DETA r IV DETAIL V DETAIL VI .; !t - : FLAPPER. 36' Hlde CAULK `DETAIL ROOF F LASE a.'. V � RAW . DETAIL IX :. DETAIL DE ;• b r, CA GEiVER+4L . ' NST ` RUCTIONS Q } A`S'S ' iBLE EXHAUST AUS DUCT '•N . 1 1 FOR DU.CTWQRK INSTALLA "°Its .: r.' `• . . ° Clover G V15 or Moab Co. •�. 4810 E . 8 N6C9 717!30 Barnan 336-697- • 6 DETAIL "XIV I . Phon 800-451- ' . }.; 637- S� ;•� � , _,�'�r�. ��it e ;�: �M1�:i`�X'A ,. :� �- ��`r- • f_ � _ emu . ••rYS.r��i:l �� - p t I �e _ ti �= - ,.,�C• 4 +�J w+rw... ^fir F.. ,. �• - ,,,,r. ir' ''�r _`%ate.±• /Plot II yN. . tf, f t . ..... � r • 7 •� ♦!:w s� Il . �_ .. of ` .. � ti•i .''.?:i;'�r'."Y'�. "�-,•.y_ 44 �, - ,1• a +�• � ;.. } r i J +,t Pre-Engineered: -Fire Suppression Systems Report SERVICE COMPANY DATE OF SERVICE TIME A.M. P.M. Z -L8 / z /1100 X ANNUAL SEMI-ANNUAL RECHARGE INSTALLATION RENOVATION PIONEER '` LOCATION OF SYSTEM CYLINDERS UL 300 FIRE 9SECURITYINC. /f 5��� a -,p 300-�-L-7 YES RINO P 0 8 0 X 5 9 7 MANUFACTURER MODEL NUMBER WET DRY CHEMICAL EAST OLYMPIA WA 98540 pC� 360-491 -8141 �to Cl-e''t I` ,rye CYLINDER SIZE MASTER CYLINDER SIZE SLAVE CYLINDER SIZE SLAVE Z�_ W I SQ L,t3 SO L 4 3 z S 4 &( FUSE LINKS 360°F. FUSE LINKS 450°F. FUSE LINKS 500'F OTHER CUSTOMER 3 _ /6$ p Name 1` �C'�SC'✓1 CCob 1, t5 L 1 FUEL SHUT-OFF ELECTRIC GAS SIZE Address 7 5� l( U�t �a 1 �UL� �� Ye S SERIAL NUMBER LAST HYDRO TEST DATE LAST RECHARGE DATE City S e 1� 'State� ziP 958Y I R ?� MANUFACTURER'S MANUAL REFERENCE Telephone y 2-6-66 U Store No. PAGE NUMBER: DRAWING NUMBER: DATE Owner or Manager A-,'(h COOKING APPLIANCE LOCATIONS: LEFT TO RIGHT QOO1 L-. 1. A#4pp4apees properly covered w/correct nozzles �r 20. Replaced fuse links y 2. Duct and plenum covered w/correct nozzles 21. Check travel of cable nuts/S-hooks _ 3. Check positioning of all nozzles. 22. Piping&conduit securely bracketed 4. System installed in accordance w/MFG UL listing y 23. Proper separation between fryers&flame AIA 5. Hood/duct penetrations sealed w/weld or UL device 24. Proper clearance-flame to filters AI 4A 6. Check if seals intact,evidence of tampering TT� 25. Exhaust fan in operating order y- 7. If system has been discharged, report same 26. All filters in place y_ 8. Pressure gauge in proper range(If gauged) 27. Fuel shut-off in on position y _ 9. Check cartridge weight(If applicable) 28. Manual&remote set/seals in place V 10. Hydrostatic test date y 29. Replace systems covers y 11. 6 year maintenance date _- 30. System operational&seals in place V 12. Inspect cylinder and mount V 31. Slave system operational y 13. Operate system from terminal link Y 32. Clean cylinder&mount V 14. Test for proper operation from remote Y 33. Fan warning sign on hood IV4 15. Check operation of micro switch y_ 34. Personnel instructed in manual operation of system 16. Check operation of gas valve 35. Proper hand portable extinguishers y 17. Clean nozzles 36. Portable extinguishers properly serviced 18. Proper nozzle covers in place 37. Service&Certification tag on system 4__ 19. Check fuse links and clean N NOTE DISCREPANICES OR DEFICIENCIES BELOW k COMMENTS: 2 S� - S /5f�� We ed On this date, this pre-engineered fire suppression system was inspected and operationally tested in accordance with the fire suppression system requirements of NFPA17 or 17A, 96 and the manufacturer's manual with the results indicated above. X SERVICE TECH PERMIT NO. DATE: TIME: AM PM CUSTOMER'S AUTHORIZED AGENT The above ser vqke technician certifies that the system was personally inspected and found conditions to be as indicated on this report. AUTHORITY HAVING JU191SDICTION