Loading...
HomeMy WebLinkAboutBLD Letters / Memos - 2/24/1998 j, ` DEPARTMENT OF COMMUNITY DEVELOPMENT MEMORANDUM DATE: February 24, 1998 TO: Grace Miller FROM: Hugo R. Flores RE: MERV SETTLE"S RESTORATION PROJECT GRACE: - According to the restoration proposal, the wetlands that were affected had the following functions: OVERALL FUNCTION: Water quality remediate functions due to the adjacent location to the seasonal creek. Remediate functions consist of a) some type of biofiltration/bioremediation due to the existence of dense vegetation within the wetlands; and b) short-term water storage capacity. (It seems that in the past the wetlands were able to reduce peak flows. I believe this function was lost long time ago). Another function mentioned was long-term water storage for base flow continuation of Goldsborough Creek. OVERALL VALUES: High value for perched ground water discharge. The primary source of hydrology for the wetlands is from springs and seeps from lateral ground water flow from the hillside to the east. The report mentions that the wetlands do not appear to have a deeper ground water recharge functions because most of the water exits the wetland through surface connections to the creek. The potential habitat value is moderate to high due to the association with the riparian connection with the creek. (I think that we could make a general assessment of the existing conditions of the riparian corridor, and if we feel the need for more mitigation, we could request restoration of this area or more buffer). THINGS TO SEE WHEN ON SITE: I guess the only function and value that we can visually assess is the revegetation of affected areas. Try to make a determination of density and variety. Also, check if required buffer areas are vegetated; and general status of the condition of buffer areas adjacent to the creek and wetland to the north. GRADING PLAN: Grace; see attachment 1. This is the removal of fill. This will occur on both areas identified for restoration (see map Attachment 1). Fill will be removed to lower . topography to 1:5 ft. The side slopes of both areas must not exceed a 3:1 horizontal to vertical ratio. Also, some type of topsoil mix must be on place to provide suitable substrate for native plants. (Unless hydric soils were identified by biologist). Grace: I guess you could check if these conditions are present. r HYDROLOGY PLAN: (ATTACHMENT 2). The main point is to bring back the hydrology to affected areas. According to the report, flow should be restored from surface and lateral flow (perched areas). Direction of flow should be the same as surface flow (see my notes on Attachment 2). Grace; you could take a look at the hydrology conditions of the restored areas. PLANTING PLAN: (ATTACHMENT 3). Restoration of facultative forested wetland community, including both trees and shrubs. Grace refer to Table 1; Goals and Performance Standards. I hope these notes will help you. You could also mention to him that he needs to follow tip with the monitoring plan. We could ask him to present a written assessment of the goals that have bee achieved according to Table 1. DEPARTMENT OF COMMUNITY DEVELOPMENT MEMORANDUM DATE: August 25, 1997 TO: GUY GRAYSON FROM: HUGO R. FLORES RE: CLOSURE/POST CLOSURE PERMIT SW93-014 Guy: Attached is a copy of SW93-014, issued to Mr. Settle in 1993. Mr. Settle is now proposing a RV Park on site (along the northern segment of his property). I went to the site back in 1995 with Don Brush. The intention of our visit was to indicate to Mr. Settle how far he could go filling the area in relation to a wetland found on site. I have a couple of questions related to the Closure/ Post Closure Permit: Page #2 PERMIT CONDITIONS #9. Have you received or seen an annual report? or Do you have copies of these reports? I would like to know if Mr. Settle has reported the type of solid waste he has been receiving throughout these years. Please let me know If you have any information related to this case that you think may be helpful. Thank you. HUGO ext. 295 g4trWA 4�Z FA/7 64911,Lf GARY YANDO,DIRECTOR t P�oN.STgTFo c A o DEPARTMENT OF COMMUNITY DEVELOPMENT U o T i PLANNING -SOLID WASTE - UTILITIES z� N Y Y BLDG. I • 411 N. 5TH ST. • P.O. BOX 578 of `'�1864 SHELTON, WA 98584 • (360) 427-9670 April 3 , 1996 Mery Settle E470 Clay RD Shelton, WA 98584 RE: Proposed RV and Mobile Home Park Permit Location: 1401 Deegan RD East, Parcel #42024 43 00100 Dear Mr. Settle: On March 14, 1996 County staff conducted a preliminary proposal meeting with you regarding your proposed RV and Mobile Home Park. Present at the meeting, representing the department of Community Development were Director, Gary Yando and myself. Mike Byrne was there on behalf of the Building Department. Allan Tahja on behalf of the Public Works Department. Carolyn Jensen and Jim Tobey were there from the Environmental Health Department. Paul Rogerson was there from the City of Shelton. Staff will attempt to summarize comments made or issues which will need to be addressed in applications that were brought up by the various staff during the meeting. This summary is not all inclusive. Please contact the appropriate staff person with questions. Jim Tobey made some comments regarding the septic system requirements . Jim said that you would need to show surface water with all setbacks to drainfield. It is not advisable to run dump station into the septic drainfield. Jim discussed the possibility of potential City sewer line and impact that may have on project. He noted that you will need to have an engineer or septic designer design the septic system and submit an application for a permit. Mike Byrne, Building Director noted that Building Permits will be required for the mobile homes and any accessory building such as a deck or carport will need building permits and will need to meet the setbacks and separations required by the Building Code. As owner, you will need to control the Building Permits necessary by the tenants at this density. Mike also mentioned that Dave Salzer, the Fire Marshall will need you to address access and getting equipment in and out to fight fires and fireflow. Carolyn Jensen noted that you will need to work with an engineer for a Group A Water System. A Group A Water System must be approved by the State Department of Health. Carolyn also stated that the Community well will need to be located at least 1000 feet from any landfill . Recycled q;'y Paul Rogerson, City of Shelton, stated that the property is located within the Urban Growth Area. What you will need to do if you ever need services out there either through annexation or with a Contract with the City you could get services without annexing. Gary Yando noted that you will need to decide if "P" sites, on the site plan, are permanent or not. He also noted that everyone from City and County could work with you to make sure proposal is compatible with the Comprehensive Plan. You need to look at installing water lines that would be agreeable to the City so that of at some time City water is provided, the applicable lines would be available. Paul Rogerson mentioned that the City line gets to the church. They would have to have work done with the City Engineers . Upgrade the line closer to the City. The City requirements for hydrants require engineering.recreational use does not seem to be in the Comprehensive Plan. You might be interested in participating in the Public Hearings to assure this recreational use be incorporated into the Zoning Code as it gets amended. Allan Tahja of the Public Works Department questioned whether your engineer can use greenbelt for setbacks and septic systems. Allan also noted that Access Permits off the County road are required. Staff noted that you will need to show the creek, springs and wetlands on the site plan and that setbacks for the proposed park can be met from them. The RV Park and Mobile Home Ordinance has established setbacks from wetlands. Staff also noted that a wetland delineation must be completed by a qualified wetland biologist and gave you a list of wetland biologists to choose from. Staff noted that the grading and filling that was observed on the site on March 13 , 1996 by myself and Dan Watts was a violation of the Mason County Interim Resource Ordinance Wetland Chapter and notified you on the site that work must stop until an adequate wetland delineation and plan for development with appropriate Mason Conditional Environmental Permit applications have been submitted. Dan Watts, Solid Waste Division if the Environmental Health department summarized his Department' s requirements in a letter dated March 13th which staff gave to you at our meeting on March 14th. Staff hopes the above information is useful to you and will look forward to your response regarding the proposed resolution to the violation within the wetland on the property. Thank you. Sincerely, t Grace Miller, Planner DEPT.OF COMMUNITY DEVELOPMENT MASON COUNTY DEPARTMENT of HEALTH SERVICES Shelton,Washington 98584 F 1 (360)427-9670• Belfair:275-4467 ENVIRONMENTAL HEALTH PERSONAL HEALTH WATER QUALITY P.O. BOX 1666 303 N. FOURTH P.O. BOX 1666 DATE: MARCH 13 , 1996 TO: GRACE MILLER, COMMUNITY DEVELOPMENT, PLANNER FROM: DAN WATTS, ENVIRONMENTAL HEALTH, SOLID WASTE RE: MERV SETTLE'S PROPOSED RV PARK The proposed RV park would be located on a demolition landfill that is currently under a closure permit with the Solid Waste section of Environmental Health. Mr. Settle must complete the items that are outlined in the compliance schedule of his solid waste permit. These items are as follows; 1. The facility must record with the County Auditor. This will include the types of materials deposited and the locations of where the materials were deposited. 2 . The facility must submit documents from a professional engineer that water drainage paths are not currently impeded by the landfill deposits and that the perimeter deposits are stable and are projected to remain stable. 3 . The facility must submit analytical results from water samples taken from surface water bordering the landfill. The sampling must comply with WAC 173-304-490, Ground water monitoring requirements. If you have any questions regarding this site, please call me at ext. 279 . Sincerely, Dan Watts Environmental Health Specialist O Recycled GARY YANDO,DIRECTOR N.srgt P o A°u DEPARTMENT OF COMMUNITY DEVELOPMENT o T ? PLANNING -SOLID WASTE -UTILITIES Z� N Y 4 BLDG. I • 411 N. 5TH ST. • P.O. BOX 578 1864 SHELTON,WA 98584 • (360) 427-9670 March 11, 1996 TO: Joe Williams, City of Shelton Gary Yando, DCD Bob Fink, DCD Mike Byrne, Bldg Dept . Jim Tobey, Environmental Health Dept . Carolyn Jensen, Env. Health Dept . Dan Watts, Env Health Dept. Allan Tahja, Public Works Dept . Dave S!/alzer, Fire Marshall FROM: Grad -Mf�`er, Planner, DCD RE: Mery Settle' s Proposed RV Park - "Settle Inn RV Park" Attached please find a preliminary site plan for Mery Settle' s proposed RV Park to be located at W14101 West Deegan Road, Shelton. The proposal is located within the Interim Urban Growth Area. I have a call in to the surveyor to verify that the parcel is the one highlighted on the attached section map. The meeting to discuss the proposal with the applicant, Mery Settle, will be held in the upstairs conference room of BLDG III, on this Thursday, March 14 at 2 : 00 p.m. . If you have any questions, please give me a call at 427-9670, ext 360. Thank you. Recycled GARY YANDO,DIRECTOR ypN_srgtFo P 'c o A DEPARTMENT OF COMMUNITY DEVELOPMENT U 2 0 T z PLANNING -SOLID WASTE -UTILITIES .0J N Y boy BLDG. I • 411 N. 51 ST. a P.O. BOX 578 1864 SHELTON,WA 98584 • (360)427-9670 February 28 , 1996 Mery Settle E470 Clay RD Shelton, WA 98584 RE: Proposed RV Park and Preliminary Proposal Meeting Dear Mr. Settle: A Preliminary Proposal Meeting to discuss your proposed RV Park off Deegan Road has been scheduled for Thursday, March 14 at 2 : 00 . The meeting will take place in the upstairs conference room of Building III at 426 West Cedar Street in Shelton. Please submit a proposed preliminary site plan prior to that date so that Planning staff can distribute it to the different departments that will be attending the meeting. Dave Salzer, Fire Marshall, will not be available on that date. You will need to schedule a separate appointment with Dave to discuss the Fire Code requirements for the proposal . The Fire Code requirements are important during the Planning phase of such a development . If you have any questions or need to change the date of the meeting please contact me. Thank you. Sincerely, Grace Miller, Planner DEPT. OF COMMUNITY DEVELOPMENT isc C Phone 427-9670 Ext. 450 Jerry W.Hauth,PE,PLS MArea Code(206) Director A 0 S V DEPARTMENT OF PUBLIC WORKS ON COURTHOUSE BLDG 1, 411 NORTH 5TH STREET TP.O.BOX 1850 SHELTON,WASHINGTON 98584 N Y June 28, 1994 MIKE BYRNE General Services Director GARY YANDO Department of Conramity Development Director Mason County P.O. Box 1850 Shelton, VA 98584 RE: Mervyn Settle GO-CART TRACK Dear Sirs, I have reviewed the information contained in the Mervyn Settle file regarding the development of a go-cart track located on the West Deegan Road, including the SEPA checklist, and agree with the mitigation measures attached to the DNS. The permanent stormwater plan for this site will be required to be designed to commercial site standards which in the extreme requires infiltration of all waters shed from impervious surfaces. In areas where infiltration is impossible or impracticable, stormwater discharge from the site may be allowed, but under strict Puget Sound Water Quality Authority Standards. An engineer's seal will be required on the drainage plans. The proponents' answers to the SEPA checklist suggests that the proponent is under some misconception that stormwater may simply be collected and delivered to any convenient location that will accept it. The stormwater plan for this site will need to address runoff from both the track area and the parking area and both areas will require some treatment of the stormwater discharged from these areas. An Erosion and Sediment (E&S) control plan should also be prepared for this proposal and implemented prior to earth disturbing activities. 41yerelALAN , Ztit � A. TARJA, r F_ Mason County Hydraulic Engineer File: H:\WP\LETTERS\GO-CART.LTR A w.'�sty y i CERTIFICATE OF RESIDENTIAL USE hereby acknowledge, that the residence located on Mason County Assessor' s Parcel Number .40 o LS-Zo - ey v v has no more than V _bedrooms. I understand that my on-site sewage disposal system was designed and my building permit was issued on the basis of this number of bedrooms, and use of additional rooms in the residence as bedrooms could result in overload and premature failure of my on-site sewage disposal system. Furthermore, I understand that usage of additional rooms in the residence as bedrooms could result in Mason County taking steps to cause the vacation of said premises. Prior to remodeling or replacement of said residence, I agree to obtain the appropriate permits for expanding my on-site sewage disposal system. DATED this day of /�j��i/ 1992. Legal Owner of cperty On this day personally appeared before me 90o44<-P G. (16yG645% to me known to be the individual described in and who executed the within and foregoing instrument, and acknowledged that hEcrs signed the same as H15 free and voluntary act and deed, for the uses and purposed therein mentioned. GIVEN under my hand and official seal this l 9 Tt day of 4Pie,c. 199 4-. PE .W �Q�y P;,,,••TF Notary ublic -* SION c••.Qs0 �V ��TgRy�'�; Expiration Date: �- Z� _ SS • C(P * ' PUBL * County residing in 44'so„/ Ocl FWA