Loading...
HomeMy WebLinkAboutSEP94-00082 - SEP Determinations - 5/5/1994 MASON COUNTY �3 DEPARTMENT OF COMMUNITY DEVELOPMENT Planning-Landfill-Utilities MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) Description of Proposal: GRADING: 3000 cubic yards including driveway access. GO-CART TRACK: Construction of recreational go-cart track, 1400 feet in length. Proponent: MERVYN SETTLE Location of Proposal: W 1401 DEEGAN RD SHELTON PARCEL#:420244300100 S1/2 SE SW SE FS 18664 : 67 1401 Deegan Road E. Lead Agency: MASON COUNTY The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43 .21C. 030 (2) (c) . This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. MITIGATION MEASURES ARE ATTACHED. This DNS is issued under 197-11-350 (2) , the Lead Agency will not act on this proposal for 15 days from the date below. Comments must be submitted by 05/21/94 . DATE: 05/06/94 Signatur reoponsible official Date Responsible Official : Gary Yando Director of Community Development 426 W. Cedar, PO BOX 578 Shelton, WA 98584 (206) 427-9670 MIT_DNS, rev: 07/07/92 I CC: WDOE, TADW, DD:R, USACOE, WDOT, EDC, OAPCA, Squaxin Tribe, City of Shelton, Fire District, MCPW, (Site) , Applicant. Mitigation Measures Mervyn Settle: SEP94-0082 W. 1401 Deegan Rd. 1. Stormwater system shall be designed such that the direction of flow is to the southeast. No direct flow to creek westward of track shall be allowed. 2 . Stormwater system shall include biofiltration swales to carry track runoff toward southeast. 3 . Stormwater system shall otherwise meet the requirements of the Mason County Public Works Department. 4 . Go-cart maintenance area shall be paved and sloped such that minor spills of oil and gas can be collected and disposed of in accordance with applicable regulations. 5 . A minimum of one handicap parking stall shall be designed according to the requirements outlined in the Mason County Parking Ordinance #815 . 6 . Parking stalls shall be clearly delineated on the site to prevent random parking. 7. A maximum of 5 gallons of used oil may be stored on the site at any one time. Il r MASON COUNTY - '`�`Q".f ENVIRONMENTAL CHECKLIST F F B 1994 A. BACKGROUNIl LJ. PLANNING DEPT. 1. Name of proper-ed project, if applicable: Ans: S & H Co Carts 2. Name of applicant: Ans: Mery Settle and Nora Haugan. Address & phone number of applicant & contact person: Ans: 111 E. Railroad, Shelton, Wa., 98584. (206) 426-9 r 63. Mery Settle. 4. Date checklist.prepared: Ans: h/1' 93, updated l/12/94. 5. Agency requesting checklist: Ans: Mason County Planning Department 6. Proposed tithing or schedule: Ans: Checklist completed: January 1, 1994. Track completed: May,1994. Track open: May, 2 9, 1994. 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal? Ans: A storage & repair area for the carts is planned. A food service and/or restroom facilities would be considered. 8. List any environmental information you know about that has been prepared, or �ndll be prepared, directly related to this proposal. Ans: Maps showing project location and relationship to Highway 101, and land contour depicting storm water runoff flow direction. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? Ans: Does not apply. 11), List any government approvals or permits that will be needed for your proposal, if known. Ans: None known. /LI(4504 �v - LAw M00, 77C H. Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site, There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. M e u'ri mD c�� Ans: The project is to prepare a paved ml track for a commercial go cart opperation, The project calls for tin go carts initially, with five future purchases for back-up. The txack (approximately 1400 feet in length) will be surrounded by two lagers of used tires to act as a buffer. The entire track and buffer will be surrounded by a four foot fence to keep by- standers off the track (in compliance with insurance requirementsO. There will be a separate entrance and exit to accommodate traffic. There is enough parking space available for more than siA, 7 vehicles. 12 'Rhat is tie location of the proposal? Give sufficient information for a person to understand the precise location of your proposed project, including a. street address, if any, and section, township, and range, if known. If a, proposal would occur over a range of area, provide the range of boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to theis checklist: Ans: The project location is 1401 Deegan Road E., Shelton, Wa., 98c84, Th; legal description is S 1I2 SE-SIF-SE, 42024-43-00100. ¢. EN ILROi•MEI'dTU ELEMENTS- 1 E P TH: a General description of the site. Ans: The area ;hrhere the track and parking is located is flat, however, mere is a steep ravine west of the track area. The ravine t"ders the property and Highway 101, b. What is the steepest:lope on the site? Anw: The steepest slope is the ravine. On the flat area, along the ravine is a raised edge about three feat higher than the lowest point of the flat area: The ground slopes east for 100 yards, then starts to slope south for 100 more yards. J i c, What general types of soils are found on the site? If you knew the classification of agricultural soils, specify them and not any pr irne f armlarid. Ans: Me ground is gravelly dirt. d. Are there surface indications or history of unstable soils in the immediate vicinity? Ans: Does not apply. e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. Ans: No fill is necessary. Any grading will be to smooth the track bed, or to enhance the direction of storm water runoff. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. Ans: The land is clear, and has been for many years, erosion should not be a problem. g. About what percent of the site wi11 be covered with impervious surfaces after project constructions. Ans: After the track is completed 2.4% of the site will covered ,%r.th impervious surfaces, including existing structures. h. Proposed measures to reduce or control erosion, or other impacts to the erarth, if any. Ans: If necessary, the track will be laid at a slope to allow run-off a maximum distance for flow, thus minimizing potential effects of erosion. 2, AIR: a. What types of emissions to the air would result from the proposal during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. Ans: Dust shrill be emitted •,mien grading commences. It should take no more than two days to complete the grading (if necessary). There will be fumes from the asphalt during the paving stage. When the track is in full operation, it is estimated that the go carts, in full operation, will emit no more than a new Honda car (Pete Crumb, FYL Carts, Ontario, Canada). b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. Ans: With the site in such close pro2dmity to Highway 141, it will be difficult to quantifiably measure the carts emmissions in comparison to the traffic on the highway. C. Proposed measures to reduce or control emissions or other impacts to air, if any. Ans: Negligible impact. 2. WATER: a. SURFACE: I. Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, v*tlands)? If appropriate, state what stream or river it flows into. Ans: There is no surface water on the site. There are springs on adjacent property to the south./ YPc'�_ 2. Will the project require any work over, in, or adjac6 � nt to within 244 feet) of the described waters? Ans: Does not apply. 3. Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that woould be affected. Indicate the source of dill material. Ans: Does not apply. 4. Will the proposal require surface water grithdrawals or diversions? ��a Ans: Does not apply. �. Does the proposal lie within a 1 OG-year floodplain? Ans: Dogs not apply. �' 6. Does the proposal involve any discarges of waste materials to surface graters? Ans: Does not apply. 4 r— b. GROUND: W111 grO-Und wa:tor be withdrawn; cir will water ba discharged to ground water? Ans: Does riot apply. 2. Describe Tvaste. material that will be discharged into the ground from septic Lands or other sours, if any. Ans: Restroom facilities to be provided by cr)mmercial portables. c, T ATER RUNOFF : 1. Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this ,water flow into other waters? If so, describe. Ans: The only runoff for the site is from storm water. This water eventually joins Coffee Creek. Runoff will be controlled according to county specifications. 2. Could waste materials enter ground or surface ;,,raters? Ans: Does not apply. �E5 - wig} /� c r71,_T-e47-1arJ S�r'pu d. Proposed measures to reduce or control surface, around, and Tc, wc--7L�r ri,noff water impacts, if any. o GZez- Ans: The track will be sloped in such a way that storm Water will have to travel the greatest distance, before reaching the southern most point of the site. . PLANTS: a. Types of vegetation faun on the site: Ans: There are two large fir txees on the site, and the;7 will remain. There are alder and willow lining the ra.vina. There are some wild grass, other types of weeds and g yp , scotchbroom plant,. b. What kind and amount of vegetation ,vvill be removed or altered? Ans: Does riot apply. c. List threatened or endangered species known to be on or near the sitf,- Ans: Does not apply. 1 i d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegatation on the site, if any. Ans: Wild grass and other native ground cover will be planted in and around the buffer tires. 5. ANIMALS: a. Identify any birds and animals which have been observed on or near the site, or are known to be on it near the site. Ans: Does not apply. I b. List any threatened or endangered -species known to be on or near the site. Ans: Does not apply. C. is the site part of a migration route? Ans: Does not apply. d. Proposed meeasures to preserve or enhance wildlife, if any. Ans: Dees not apply. �< 6. ENERGY and NATURAL RESOURCES: a. That kinds of energy will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. Ans: Gasoline is the only energy source used at the site, for the project. Operations will be during daylight hours. Air, for air tools, will be provided by a portable, gas powered compressor. b. Would your project affect the potential use of solar energy by adjacent properties? Ans: Does not apply. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any. Ans: Does not apply. 6 7. ENVIRONMENTAL HEALTH: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. Ans: There are two areas of potential hazard. One is gasoline storage, the other is used oil from oil changes. 1. Describe special emergency services that might be required. Ans: Does not apply. Proposed measures to reduce or control environmental health hazards, if any. Ans: Gasoline will not be stared in unsafe containers, or in large amounts. The gasoline kept on the premises will to, for daily use, in three five gallon containers. The carts only have a one gallon gas tank, and hold only 1.5 quarts of oil. Oil changes will occur about once every two weeks. Used oil will be disposed of through a local auto service facility, it will be collected on the premises in safe containers, and 'will be disposed of after two oil changes (five gallons). b NOI SE: 1. What types of noise e7dsts in the area which may affect your project? Ans: There is considerable noise generated from the highway parallelling the site. 2. 37171hat types of levels of noise v7ould be created by or associate.d with the prof ect on a. short-term or a. long-term basis? Indicate what hours noise would ramie from the site. Ans: There will be increased noise during the grading and paving stages. There will be increased traffic during operating hours. Operating hours will be from 12:00 pm to 0-:00 pm, five to seven days a week. If five days, it will be Thursday through Monday. Ten carts registrar 51 decibles at 750 feet (statictics from FKL Carts, Ontario, Canada). The closest neighbor is l 100 feet w,,a.y. . Proposed measures to reduce or control noise impacts, if any, Ans: Does not apply. 7 6. LAND and SHORELINE USE: a. What is the current use of the site and adjacent properties? Ans: The property has a residence on it, otherwise the site is unused. The properties on the other sides are woodlands to the north and south, and a residence north and east of the property the site is on. To the west is Highway 10 1. b. Has the site been used for agriculture? Ans: Does not apply. C. Describe any structures on the site. Ans: There is a house and a garage. d. Will an,r structures be demolished? Ans- No- e. What is the current zoning classification of the site. Ans: None. f. That is the current comprehensive plan designation of the site? Ans: Not known. g. If applicable, what is the current shoreline master program designation of the site? Ans: Does not apply. h. Has any part of the site been classified as an "environmentally sensitive" area? Ans: No. i. Approximately how many people would reside or work in the completed project? Ans: Two full time workers. j. Approximately how many people would the completed project displace? Ans: None. k. Proposed measures to avoid or reduce displacement,impacts. Ans: Does not apply. 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: Ans: Extensive conversations with local agencys to assess comFratability. 9. HOUSING: a. Approtmately how many units, if any, would be provided? Ans: Does not apply. b. Approximately how many units, if any, would be eliminated? Ans: Does not apply. C. Proposed measures to reduce or control housing impacts, if any. Ans: Does not apply. 10. AESTHETICS: a. What is the tallest height of any proposed structure, not including antennas; ' That is the principal exterior building material proposed? Ans: Four feet for the chain-link fence. b. 'ghat views in the immediate vicinity would be altered or obstructed? Ans: Does not apply. C. Proposed measures to reduce or control aesthetic impacts. Ans: Does not apply. 11. LIGHT and GLARE: a. What type of light or glare will the proposal produce? What time of day would it mainly occur? Ans: None. Operations will be in the daytime. b. Could light or glare from the finished project be a safety hazard or interfere "./Ath views? Ans: Does riot apply. C. What exdsting off-site sources of light or glare may affect your proposal? Ans: Does not apply. c� d. Proposed measures to reduce or control light and glare impacts. Ans: Does not apply. 12. RECREATION: a. What designated and informal recreational opportunities are in the immediate vicinity? Ans: None. b, mould the proposed project displace any existing recreational uses? Ans: No. C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any. Ans: This project will add a tourist orientated recreational facility to the community. It will be the only one of its kind in the county. 13. HISTORIC and CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site's Ans: Does not apply. b. Generally describe any landmark or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. Ans: Does not apply. C. Proposed measures to reduce or control impacts, if any. Ans: Does not apply. 14. TRANSPORTATION: a. Identify public streets and highways serving the site and describe proposed access to the eidsting street system. Show on site plans, if any. Ans: The site is located on Deegan Road. Deegan Road meets Railrod Avenue near Highway 101 N, at the Shelton-Matlock exit. The site is approximately 3/4 mile 10 I south on Deegan road. There are two driveways on the site, suitable to sorva- as an entrance and an eat, for traffic control. b. Is site currently served by public transit? If not, what is the approidmate distance to the existing street system. Show on site plans, if an . Ans: The site can be served by public transit, because Mason County has a. dial-a-ride service. C. How many parking spaces would the completed project have? How many would the project eliminate? Ans: There is enough space to provide for silty, plus parking spaces. Ido e:dsting parking will be eliminated. d.. '1fill the proposal require any new roads or streets, or improvements to eiisting roads or streets, not including drive;,%ra,v ? Ans: The e2dsting road is adequate to serve the site. e. Will the project use for occur in the immediate vicinity of) T/-?.ter, rail, or air transportation? Ans: No. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. Ans: Based on observed traffic patterns of another go cart track, vehicular traffic is 1/4 of go cart rides. It is estimated that, for ten opperational go carts-, the rides generated ;1,till be 250 on peak days factual counts for 5 go casts were 160 rides max and 20 vehicles for one day;. Average is 56 cars per day. Peak volumes Twill occur on Saturdays, with Fridays and Sundays being tied for second high volume. Ridership is most active in the late afternoon to early evening. Traffic peaks about 5:00 pm to :0 J prn, 'aa1t11 about j0 of the daily traffic. Tyra 1 equates to about 2 7 vehicles over a three hour period. g. Proposed measures te) reduce or control transporta_.tion impacts. Ans: since the driveways are divided by about 300 feet, and the exit is south of the traffic source, eydtirip-, traffic 11 will not have to cross in front of entering traffic., trrius it's not necessary to make any changes to the existing road. PUBLIC SERVI4ES: a. Would the project result in an increased need for public service fie, fire or polite protection, health care, schools, etd? Ans: It has been observed that go cart tracks are riot a. likely source of increased criminal activity, therefore no additional police services will be needed. Employment will be served by the existing local work force, and will riot cause an influx of workers and their families, thus it will not affect local schools, housing, or health care. b. Proposed measures to reduce or control direct impacts on public services, if any. Ans: Does not apply. 16. UTILITIES: a. What utilities are currently available at the site? Ans: Utilities already at the site are electricity, •vrater, refuse collection, telephone, and septic system. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Ans: Does riot apply. C. SIGNATURE: The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Date Submitted: 17 4 ?4) r , �))11t r•:�1 I D�.r�1F+l1 Q.l'E,l'._ �rG(� 9�2� . /U d Z IJ�Laa 2ostL_ OceGAA/ Raga E. JL i GfOkt^a JTk 0 �. �•s �_ t 1 S r4r.+rf IN, � 9 } Y lot 7Y Nt<.+<!i r„�a irk rf s Pit 1 - VIC, w _ ——-- f—� ✓�I �� FprOundi Water dnk / .t° f Lase , .l• I �Iji--•.weu x 'Wn V— Shelton I �,— / , / ✓" + Springsto I ( I f --`— - 66.E { �� •ter/ I ♦ ` ! � I. ��� -' I 14 _ J�.. SHFI.TON _dos s _� — /_.�. I / 12/ ,90 ,00 Y '�? scri _ ._ .moo l h� I 1 `;•��' /� � _` �^ � i" =,�k� i.>� T Tank j o 1 r �,� I Lam\ /" 1 ( . .� ' .�f � tom,--�-.�• « -�:�'=: AA v 29 .1 i •`fir O, - �i '/ �8 7 I / am J3 0 •�