Loading...
HomeMy WebLinkAboutBLD2001-01319 Gas - BLD Permit / Conditions - 12/27/2001 Inspection Line (360)427-7262 MASON COUNTY DEPT. OF COMMUNITY Phone: (360)427-9670, ext. 352 DEVELOPMENT Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Shelton, WA 98584 MECHANICAL PERMIT BLD2001-01319 OWNER: DON GAVIN CONTRACTOR: C & S DEVELOPMENT RECEIVED: 12/27/2001 SITE ADDRESS: 1470 E SHELTON SPRINGS RD SHELTON ISSUED: 12/27/2001 PARCEL NUMBER: 420122200180 EXPIRES: 6/27/2002 LEGAL DESCRIPTION: TR 18 OF NW NW SEE SUR 18/136 PCL 2 OF BLA#96-73 #636014 PROJECT DESCRIPTION: DIRECTIONS TO SITE: NATURAL GAS SHELTON SPRINGS ROAD TO ADDRESS General Information Mechanical Fixtures FEES Type of Use: SF Insp. Area: OT Type Qty. Type By Date Amount Receipt Type of Work: MEC Fire Dist.: 11 Gas Outlets 1 Mechanical Fee N IP 1)n7ignn (z1n Fc; SR19,) Mechanical Base Fee N IP l)n7i,>nn on Sn rAvig Total $34.15 I I a / 3 lie BLD2001-01319 Please refer to the following pages for conditions of this permit. 1 of 2 CASE NOTES FOR B LD2001-01319 CONDITIONS FOR BLD2001-01319 1) In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly visible and legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner and/or contractorfail to post the address on site prior to requesting inspections. X 2) The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the Uniform Codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building X spector shall be made prior to requesting additional inspections. 3) Fuel piping shall be inspected after the installation of gas piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the time of inspection the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel piping system sh,WU-riot be used until the final inspection has been performed and approved by a Mason County building inspector. X' �- 4) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason-Gounty ordinances and building regulations. X This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at anytime after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building ran-iYe occupied. OWNER OR AGENT: 'tc,�� c \ < <._ DATE: BLD2001-01319 Please refer to the following pages for conditions of this permit. 2 of 2 t CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date by Foundation Walls date by Set Up date by INSULATION date by ' BGISLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING Attic OTHER Groundwork date b date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by t 1. W E