HomeMy WebLinkAboutFIR2009-00018 - FIR Permit / Conditions - 5/4/2011 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262
Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670, ext. 352
Shelton, WA 98584
P14
FIRE PROTECTION PERMIT FIR2009-00018
APPLICANT: DWIGHT MCKAY RECEIVED: 4/13/2009
CONTRACTOR: LICENSE: EXP: ISSUED: 5/4/2011
SITE ADDRESS: 1436 E SHELTON SPRINGS RD SHELTON EXPIRES: 11/4/2011
PARCEL NUMBER: 420122190004
LEGAL DESCRIPTION: LOT: 4 OF SP#2413
PROJECT DESCRIPTION: Fire Alarm System
GENERAL INFORMATION System Information
Type of Use: COMM Sprinkler Heads: Audible Switches: Pull Stations:
Fire District: 4 Flow Switches: Visual Devices: Door Releases:
Hood&Duct?: N Pressure Switches:: Smoke Detectors: Duct Detectors:
Dry Chemical?:
Wet Chemical?: Zones: Heat Detectors:
Sprinkler?:
Standpipe?: SQUARE FOOTAGE FEES
Monitoring Company: First Floor: Type Amount Due Amount Paid
Monitoring Phone No.:() - Second Floor: Auto. Fire Alarm Permit Fe $251.25 $251.25
Auto Fire Alarm?: Third Floor;:
Auto. Fire Alarm Plan Chec $163.31 $163.31
Total: $414.56 $414.56
FIR2009-00018 Please refer to the following pages for conditions of this permit. Page 1 of 4
y CASE NOTES
FIR2009-00018
CONDITIONS FOR
FIR2009-00018
1.) Per section 901.2.1 of the 2006 International Fire code, Statement of Compliance.
Before requesting final approval of the installation, the installing contractor shall furnish a written statement to the fire code official that the subject fire
protection system has been installed in accordance with the approved plans and has been tested in accordance with the manufactures specifications and
the appropriate installation standard. Any deviations from the design standards shall be noted and copies of the approvals for such deviations shall be
attached to the written statement.
x �f k_
2.) The fire alarm system is required to be fully monitored by a UL certified monitoring system.
x a. k
This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time
after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied.
Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants
employees of Mason County access to the above described property and structure for review and inspection.
OWNER OR AGENT: DATE:
DATE:
i
FIR2009-00018 Please refer to the following pages for conditions of this permit. Page 2 of 4
2 oisMASON COUNTY FIRE MARSHAL
Mason County Bldg. III 426 W Cedar St
PO BOX 186 Shelton,WA 98584
(360)427-9670 Ext.273
Permit# ri Z)'66 l -boc)
Mason County Fire Protection System Permit Application
Incomplete application will not be acce Led
Owner: Phone#: C 3(OC�) 42to-- 5 -7
�c.
Mailing Address: �Cp _� .� am ity: }� Stat4AAZip: .l'x�
Site Address: 1036 r�Sk l lov►c>yawc6City: 5 ke_1 VvtA State: �� Zip: 57Q
�7.O12. 2.( c100oy L.of- y oI SP 8- x-113
Parcel #: Legal Description:
Lien/Title Holder: N „
Address: City: State: Zip:
Contractor: pC�-�o�n��s+-elfin ���r-�a-Secuc���,L Phonek 3bb--440AZ-32_
Address: V D do-f tgc)3 City: Sal ve State:(_04 Zip: g$5y(o,
Contractor Registration#: pC TZp5F q'7 b Expiration Date: 11-317-0
(pOD _31COOD 3.50 Z)
Building Square Footage(existing & proposed): / / 30 /
b 3 3 00
Building Use: e Occupancy Classification: Construction Type:
Type of System: Type of Work: 1-`VIC 0�c alll
Sprinkler: Wet Dry New System:
Standpipe: Wet Dry Modification:
AFA:
Hood & Duct:
Dry Chem:
Wet Chem:
Fire Pump:
UL certified Monitoring company: Phone #: l Foa U2,41-$176
Contractors Bid Price: $ JIQ(jrj
11CLUSTERI HOME_SERVERUiOME1COMMONIBUILDING\Fire Protection System Permit Application doc
Plan Submittal Requirements
Your plan submittal shall include the following;
• Plans shall be on standard 24" x 36"paper, drawn to scale with dimensions and north arrow.
• Site and Floor plan with cross sectional and exterior elevations.
• Location of occupancy and/or area separation walls, partitions, stairway enclosures, concealed spaces, etc.
• Cut sheets and/or references for all new devices.
• Location/description of all new and existing devices.
• Battery calculations.
• Wiring diagrams per floor or zone overlaid on an accurate floor plan.
• Electrical riser diagram showing all zones, circuits, devices, and end—of—line resistors.
• Hydraulic calculations.
• Copy of Contractors bid.
Fees
The permit fee will be assessed based on the submitted contractor bid for the project or a minimum of$157.50.
A plan review fee will be calculated at 65%of the permit fee and is due upon submittal of permit application.
Contractor's Affidavit
I certify that I am a currently registered contractor in the State of Washington. I am aware of the ordinance requirements regulating
the work for which the permit is issued and certify that all work will be in compliance with this ordinance. No changes will be made
without first obtaining approval from the Mason County Fire Marshal.
By:-- e 4"' t - Date: J