Loading...
HomeMy WebLinkAboutSEP2012-00016 - SEP Determinations - 8/23/2012 QN-STAy, MASON COUNTY Mc y DEPARTMENT OF COMMUNITY DEVELOPMENT A°u = Planning Division Y �? P O Box 279, Shelton, WA 98584 (360)427-9670 1864 DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-340) SEP2012-00016 Description of Proposal: DAYTON AIRPORT RD WATER EXPANSION PROJECT Proponent: CITY OF SHELTON Location of Proposal: SHELTON SRINGS RD RIGHT AWAY Parcel Number: 420120060020 Legal Description: COUNTY R/W Directions to Site: SHELTON SPRINGS RD (CROSS RD OF TARAGON) TO US HWY 101 TO THE NORTH TO DAYTON AIRPORT RD (US HWY 102) TO STATE PATROL ACADEMY Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. Please contact Grace Miller at ext. 360 with any questions. This DNS is issued under WAC 197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, P.O. Box 279, Shelton WA 98584 by 9/6/2012. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. Authorized Local Government Official Date _ xl0-T-%( C�OFu/ uSA�oE SEPA CHECKLIST $385 - Single Family (Mason County Permit Center Use) $630 - Non-Single Family 0 to 9.99 Acres SEP O(,;? $755 -10 to 20 Acres $945- Over 20 Acres Date Rcvd: $2,525 + 70/hr- EIS (IDS) PN: Purpose of Checklist: The State Environmental Policy Act (SEPA), chapter 43.21 C RCW, requires all governmental agencies to consider the f environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal) and to help the agency decide whether an EIS is required. Instructions for Applicants: Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or "does not apply". Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. There is a fee required, for the processing of the checklist, see above for the appropriate fee. Please make your check payable to"Mason County Treasurer'. A. BACKGROUND 1. Name of proposed project: Dayton Airport Rd.Water Expansion Project 2. Name of applicant: City of Shelton Property owner: Mason County and Washington State 3. Applicant mailing address: Dennis McDonald, Public Works,525 W.Cota Street Shelton,WA 98584 Applicant phone numbers: (360)432-5167 4. Date checklist prepared: July 12,2012 5. Agency requesting checklist: Mason County Mason County SEPA Checklist 1 6. Proposed timing or schedule (including phasing, if applicable): It is anticipated that Schedule"A"and Schedule"C"will begin construction fall of 2012. (See Attachment A: Site Location Map showing locations of Schedules A,and C) 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal? If yes, explain. No 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. Storm Water Pollution Prevention Plan (SWPPP) Notice of Intent(N.O.I.) 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. Franchise Agreements with Mason County and W.S.D.O.T 10. List any government approvals or permits that will be needed for your proposal, if known. Franchise Agreement Approvals, Notice of Intent(N.O.I.) 11. Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) Schedule"A": Construct 12"watermain; Beginning at the intersection of Tarragon Ave.and Shelton Springs Road; Along Shelton Springs Road to US 101;Thence along USf101to SR 102;Thence along SR 102 to Washington State Patrol. Schedule"C": Construct 8"and 12"watermain within V�aAington State Patrol parcel. SIDE 12. What is the location of the proposal? Give sufficient information for a person to understand the precise location of your proposed project including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. Please see attached"Site Location Map"(Attachment A)and Site Plans. Mason County SEPA Checklist 2 B. ENVIRONMENTAL ELEMENTS 1. EARTH: a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other(explain). Flat to rolling, running along an existing Road Right of way,as described previously. b. What is the steepest slope on the site (approximate percent slope)? Less than 5% c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Carstairs gravelly loam; Gravel pit;Grove gravelly sandy loam;Lystair loamy sand;Shelton gravelly sandy loam None of these soil map units would be classified as prime farmland; none of the project area is used for agriculture. (See Attachment B: Soil survey map) d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. None observed or noted in the Mason County Natural Hazard Mitigation Plan,July,2010 Publication. e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. Grading is not anticipated for this Project. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. It is not anticipated that there will be any significant erosion associated with this Project. Erosion will be mitigated using BMP's specified in the SWPPP and Project Plans. g. About what percent of the site will be covered with impervious surfaces after project constructions (for example, asphalt or buildings)? This Project will not add impervious surfaces. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: The SWPPP and the Plans address erosion and specify applicable BMP's that will be implemented. 2. AIR: a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. During construction there may be minor amounts of dust as a result of trenching, loading and unloading of trucks. Construction equipment exhaust. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. None anticipated. Mason County SEPA Checklist 3 c. Proposed measures to reduce or control emissions or other impacts to air, if any: Water Trucks to settle dust. 3 WATER: a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds,wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. Schedule"A": Palustrine Emergent(PEM)Wetlands near the intersection of Tarragon Ave.and Shelton Springs Road(eastern end of project). Construction will traverse past Turtle Lake area between SR 102 and W.Sanderson Way within US 101 ROW. (See Attachment(s)C: Nearby Wetlands and Streams) 2) Will the project require any work over, in, or adjacent to (within 200 feet)the described waters? If yes, please describe and attach available plans. Construction will be adjacent to the known PEM wetland area and Turtle Lake mentioned in item#1 above. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. Construction will not fill or dredge either the PEM wetland area or Turtle Lake. All work adjacent to these areas will occur within the County or State right-of-way. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. No. Not according to FEMA Flood Map 530115 0190 C. (See Attachment(s)F) 1-3) 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No. b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. No. Mason County SEPA Checklist 4 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example; domestic sewage, industrial, containing the following chemicals..., agricultural, etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. N/A c. Water runoff(including storm water): 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this flow into other waters? Source of run-off will be from existing adjacent roadways. Runoff from these road systems is already collected in the existing road side ditches. Existing soils consist mostly of gravels and sand. Infiltration rates are high--do not promote runoff. 2) Could waste materials enter ground or surface waters: If so, generally describe. No. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: Applicable BMP's specified in the SWPPP and noted in the construction documents. 4. PLANTS: a. Check or circle types of vegetation found on the site: x deciduous tree: alder, maple, aspen, other x evergreen tree: fir, cedar, pine, other x shrubs x grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? Trees,Shrubs and grasses--mostly grasses;Whatever is growing along the public right of way in the waterline pathway Mason County SEPA Checklist 5 c. List threatened or endangered species known to be on or near the site. None Known(personal communication with DNR Natural Heritage Program staff). d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: Hydro seed disturbed areas. 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: Birds: hawk, heron, eagle, songbirds, other hawk,eagle(no nesting noted on PHS maps),songbirds Mammals: deer, bear, elk, beaver, other deer Fish: bass, salmon, trout, herring, shellfish, other b. List any threatened or endangered species known to be on or near the site. Mazama Pocket Gopher(candidate,threatened)and Streaked Horn Lark(candidate,endangered)mapped in Airport runway areas. (See Attachment E:WDFW Priority Habitats and Species(PHS)Maps) c. Is the site part of a migration route? If so, explain. Not according to WDFW-PHS maps d. Proposed measures to preserve or enhance wildlife, if any: None Proposed—no impacts anticipated from this project 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy (electric, natural gas, oil, wood stove, solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. Gasoline or diesel in trucks and excavators during construction; none after completion. b. Would your project affect the potential use of solar energy by adjacent properties: If so, generally describe. No. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: N/A Mason County SEPA Checklist 6 7. ENVIRONMENTAL HEALTH: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste that could occur as a result of this proposal? If so, describe. Refueling of construction equipment 1) Describe special emergency services that might be required. No special emergency services needed. 2) Proposed measures to reduce or control environmental health hazards, if any: Contractor will not be allowed to store fuel on Project. b. Noise. 1) What types of noise exist in the area that may affect your project(for example: traffic, equipment, operation, other)? None that will affect this Project. 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hour's noise would come from the site. Temporary equipment noise during the construction of the watermain--short term. Construction only expected to run during normal working hours. 3) Proposed measures to reduce or control noise impacts, if any: Set specific working hours. 8. LAND AND SHORELINE USE: a. What is the current use of the site and adjacent properties? Commercial, Industrial and Residential. b. Has the site been used for agriculture? If so, describe. No. c. Describe any structures on the site. Public infrastructure that includes but not limited to paved roads, underground and above grade utilities. d. Will any structures be demolished? If so, what? No. Mason County SEPA Checklist 7 e. What is the current zoning classification of the site? UGA, RR20, RC3, LTCF f. What is the current comprehensive plan designation of the site? City of Shelton UGA(Sch.A and C); g. If applicable, what is the current Shoreline Master Program designation of the site? None_________ h. Has any part of the site been classified as an"environmentally sensitive" area? If so, specify. The project may overlie standard wetland buffers,but falls entirely within the ROW--i.e., non-functional buffer. i. Approximately how many people would reside or work in the completed project? N/A____._._ j. Approximately how many people would the completed project displace? None k. Proposed measures to avoid or reduce displacement impacts, if any: N/A I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans: Watermain extension is in accordance with the City of Shelton Water Comp. Plan and provides potable water to essential State and County services. 9. HOUSING: a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. N/A b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. N/A c. Proposed measures to reduce or control housing impacts, if any: N/A 10. AESTHETICS: a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? N/A b. What views in the immediate vicinity would be altered or obstructed? None c. Proposed measures to reduce or control aesthetic impacts, if any: None Mason County SEPA Checklist 8 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? N/A-underground facility. b. Could light or glare from the finished project be a safety hazard or interfere with views? No. c. What existing off-site sources of light or glare may affect your proposal: N/A d. Proposed measures to reduce or control light and glare impacts, if any: N/A 12. RECREATION: a. What designated and informal recreational opportunities are in the immediate vicinity? Airport;skydiving; bird watching at wetlands,walking or running along road. b. Would the proposed project displace any existing recreational uses? If so, describe. No. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: N/A 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. None known i b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. None known c. Proposed measures to reduce or control impacts, if any: None Mason County SEPA Checklist 9 14. TRANSPORTATION: a. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans, if any. Shelton Springs Road, US 101 and SR 102--project is directly adjacent to or crosses these roads(See Attachment A) b. Is site currently served by public transit? If not,what is the approximate distance to the existing street system? Show on site plans, if any. Yes, US 101 and SR 102 are Dial-a-Ride(no bus shelters)Shelton Springs Road is Route 7 with stops at gas station, High School,or a safe place along Shelton Springs Road(no bus shelters). 0 c. How many parking spaces would the completed project have? How many would the project eliminate? No parking spaces created or eliminated d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). Repaving 1/2 of Shelton Springs Road lane from Tarragon to Hwy 101. e. Will the project use(or occur in the vicinity of)water, rail, or air transportation? If so, generally describe. Project is in the airport vicinity, but not expected to impact air transportation. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. N/A g. Proposed measures to reduce or control transportation impacts, if any: Temporary traffic control during construction 15. PUBLIC SERVICES: a. Would the project result in an increased need for public service(for example: fire protection, police protection, health care, schools, other)? If so, generally describe: No b. Proposed measures to reduce or control direct impacts on public services, if any: None 16. UTILITIES: a. Circle utilities currently available at the site: elec, ty, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other: All are available; none will be used for project. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity that might be needed. The City of Shelton proposes to extend watermain NW on Shelton Springs Road from Tarragon Avenue(Shelton City Limits), continuing on, Hwy 101 and SR 102 to WSP. The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Applicant Signature: Date: Mason County SEPA Checklist 10 ESA LISTED SALMONIDS CHECKLIST This worksheet was designed to help project proponents, and government agencies, identify when a project needs further analysis regarding adverse effects on ESA (Endangered Species Act) listed salmonids. Salmonids are salmon, trout and chars, e.g. bull trout. For our purposes, "ESA Listed Salmonids" is defined as fish species listed as endangered, threatened or being considered for listing. If ESA listed species are present or ever were present in the watershed where your project will be located, your project has the potential for affecting them, and you need to comply with the ESA. The questions in this section will help determine if the ESA listings will impact your project. The Fish Program Manager at the appropriate Department of Fish and Wildlife (DFW) regional office can provide information for the following two questions. 1. Are ESA listed salmonids currently present in the watershed in which your project will be located? YES FV1 NO F Please describe. Coho--Fed.Threatened.;Chinook-Fed.Candidate; Cutthroat-Fed.Threatened (See Attachment D[WDFW-PHS maps]and Attachment E[WDFW Basin Map]) 2. Has there ever been an ESA listed salmonid stock present in this watershed? YES❑✓ NO❑ Uncertain❑ Please describe. If you answered "yes" to either of the above questions, you should complete the remainder of this checklist. PROJECT SPECIFICES: The questions in this section are specific to the project and vicinity. 1. Name of watershed: WRIA--Kennedy Goldsborough(See Attachment F:WDFW Basin Map) Sch.A:John's Creek,Turtle Lake and PEM wetlands at Tarragon Avenue; Sch C: None 2. Name of nearest waterbody: 3. What is the distance from this project to the nearest body of water: Often a buffer between the project and a stream can reduce the chance of a negative im to fish. p � pact s Sch.A: 3000'to John's Ck.;75'to both Turtle Lake and PEM Wetlands;SCh C:about 400'to Turtle Lake. 4. What is the current land use between the project and the potentially affected water body (parking lots, farmland, etc.)? Between Sch.A and John's Ck.--3000 feet of undeveloped forest area; between Sch A and both Turtle PEM wetlands, f p —50-75 0 vegetated wetland buffer;will cross culvert flowing to west; Sch C: roadway and business park between C and Turtle Lake(no impacts from C expected). p 5. Is the project above a: • natural permanent barrier(waterfall) YES❑ NO W1 • natural temporary barrier(beaver pond) YES❑ NO J r l " man-made barrier(culvert, dam) YES I NO�• U • other(explain): 6. If yes, are there any resident salmonid populations above the blockage? YES❑ on now NO ✓ Don't k NA n U 7. What percent of the project will be impervious surface (including pavement& roof area)? None Mason Court SEPA Checklist 11 FISH MIGRATION: The following questions will help determine if this project could interfere with migration of adult and juvenile fish. Both increases and decreases in water flows can affect fish migration. 1. Does the project require the withdrawal of: a. Surface water? YES-0 NO Amount Name of surface water body b. Ground water? YES❑ NO PI Amount From where Depth of well 2. Will any water be rerouted. YES 0 NO❑✓ If yes, will this require a channel change? 3. Will there be retention or detention ponds. YES❑ NO ✓❑ If yes, will this be an infiltration pond or a surface discharge to either a municipal storm water system or a surface water body? If to a surface waterbody, please give the name of the waterbody. YES❑ NO M 4. Will this project require the building of new roads? YES❑ NO ✓❑ Increased road mileage may affect the timing of water reaching a stream and may impact fish habitat. 5. Are culverts proposed as part of this project? YES❑ NO❑✓ 6. Will topography changes affect the duration/direction of runoff flows? YES❑ NO ✓❑ If yes, describe the changes. 7. Will the project involve any reduction of the floodway or floodplain by filling or other partial blockage of flows? YES❑ 1 NO 21 If yes, how will the loss of flood storage be mitigated by your project? WATER QUALITY: The following questions will help determine if this project could adversely impact water quality. Such impacts can cause problems for listed species. Water quality can be made worse by runoff from impervious surfaces, altering water temperature, discharging contaminants, etc. 1. Do you know of any problems with water quality, in any of the streams, within this watershed? YES❑ NO ❑✓ If yes, describe. The watershed is huge and includes some developed areas that may or may not have water quality problems, but local water quality will not be impacted b this project. q tY P Y P J I Mason County SEPA Checklist 12 Ili 2. Will your project either reduce or increase shade along or over a waterbody? YES F] NO_ • ] If yes, describe. Removal of shading vegetation or the building of structures such as docks or floats often results in a change in shade. l 3. Will the project increase nutrient loading or have the potential to increase nutrient loading or contaminants (fertilizers, other waste discharges, or runoff)to the waterbody? If yes, describe. YES NOV 4. Will turbidity be increased because of construction of the project or during operation of the project. YES F] NO 5- 1 I In-water or near water work will often increase turbidity. I 5. Will your project require long-term maintenance, i.e. bridge cleaning, highway salting, and chemical sprays for vegetation management, clearing of parking lots? I YES F NO n If yes, please describe. VEGETATION: The following questions are designed to determine if the project will affect riparian vegetation, thereby, adversely impacting salmon. 1. Will the oroiect involve the removal of any vegetation from the stream banks.. YES NOV If yes, please describe the existing conditions, and the amount and type of vegetation to be removed. 2. If any vegetation is removed, do you plan to re-plant? YES NOS If yes, what types of plants will you use? Any disturbed soil surfaces along the waterline alignment will be revegetated by hydroseeding(pre-existing vegetation in the road side area is mostly grass). The above answers are true and complete to the best o my knowledge. I understand that the lead agency is relying on them to make its decisi Applicant Signature: Date: 13 Mason County SEPA Checklist 13 x qdb° o ID 00 o = n Johns Lako : V W � --- -W EELLS H LL RD__ n a ' W BUSINESS PARK RD� Iva _E FARFELD CT� Ep ff C ~ W44 11DeftO.VN11Y 'P $� co�,oaD _-- Schedule A A.Wwwom W, Schedule C �.. Cpk�ap.----- I ® 0 37848 Attachment A: Site Location Map, and depictions of Schedule A and C. 1f6724 (Gh r 1 san& LAIr [0669 INI r T 7391 f Ce ���BWC" _ 2d8 3 G* ' 1968 td 4cf 0t4 (ff85 (CC �0 AGM Jo�ariraMv Sande Posm. I""' �ran3uadrerrrcS'�ee �.. 33.4 F �384 �d :ranfsa IROY)O am Qta3 3?? ,h', r ;tr rpm Darn inro tB 1 � r'do�rna zR la►m O:a 3 r'- r r t f<y --F- li3 I'atm r o30r t �Sa2B4 P 7 S lOf �'ocR ma°e'ty loam 0'.a 3 Schedule A 3 4 GI r f Schedule C .. 32 x Qom' Y"IV.�is_Fw �r �2 7 f LC .. S a .'acedgi-i")°-r�Q : I04 I - Attachment B: Soil Survey Map of the Project area, showing Schedule A and C subareas A k 791700 791702 9 4 791708 791708 1 802 791806 721808 + + + rr Tv rtl ' See detail in ! Attachment C-3 s Island Lake 790780 +907 790784 +90786 +90788 +90880 _ +-790M 7 908H 8 ¢ 0 4^� See detail in Attachment C-2 190760 790762 720704 76 7 788 790860 790802 790866 0868 720960 9+ y + + + + + 4- U + 10 11 X 12 7 2 � F � 4 790740 +9074 +907 4 +90748 790T48 7 90842 + 9084490848 + 940 Schedule A =� �, F V F N Schedule C ��low s<isee— Ks 790720 _N +e722 + 724 +90728 +90820 +90822 790 7908 + 28 790920 15 F .14,IF F FF 13 790700 i 9D z y 90 so6 i 90708 i 9o8oa az o o 790 - Attachment C-1: Wetlands adjacent to pipeline alignment in Sch. A include Turtle Lake and PEM wetland system draining under the road toward Goose Lake at the southeast corner of the project area. NEIGHBORk CIJ CS L11'E TRAFFIC 1 r' Sch.A • rh J W 101 End of Project at _ lit Tarragon Avenue PEM wetlands ti flowing SW toward Goose Lake R 1 101 Attachment C-2: PEM wetlands adjacent to Schedule A alignment is � ,.i k+i� '••• .• LN H��•.•.ay.P;.Y.Lu��u ` :� � L�H�L2-.r,�'-'� • Turtle Lake '�rss Pad RQ . (y M ' I �r•.�� 1 Schedule A Iwo wOp ---Aj Attachment C-3: Turtle Lake adjacent to Schedule • alignment a i NA—too far from project to impact `* Schedule A Schedule C M.�.. 1` 1 �q �y r Mazama Pocket gopher (Candidate,threatened) habitat mapped through the airport; i Mappeda Palustrine WL habitat-no E&T spp; Streaked horned lark(Candidate, endangered) breeding habitat P mapped in southern majority of airport. 3. Attachment E: Schedule A and C: WDFW Priority Habitats and Species (PHS) maps. WDFW staff indicated no expected impacts from this ROW project. rr f 'f/.` , .\ r P 4.� is i .1 ry4 !/�1.• l i f l l; ,> i s Project area r' .; t (�:• , 6 iut 16 WRIA Kennedy Goldsborough Creek a + 16 k 141f ? .- r of 14� 1 ns P. r 4$L A G"rC N ' t r ,`a J` 31sQn m ij; Attachment F: WRIA Kennedy Goldsborough Creek from WDFW PHS maps KEY TO MAP 500•Y141 Flood Boundary- - f ZONE Et 'I ZTE:l IN FEET100•Year Flood Boundary Schedule A: Northwest extent ,000 Zone Designations : :DO-Yaar Flood Boundary a.X ZONE B 5DO-Year Flood Boundary - NATIONAL F1000 INSgRANCE PROGRAM I Base flood Elevatior Ltie - W'i;h Elevation In Fee[•' Base Flood Elevation in Feet (EL 9871 Where Uriform Within Zont'• '�,I� FIRM Elevation Re'el Mark RM7x F1000 INSURANCE RATE MAP Zorc D Boundary--- ----- R,ver hide cl I, 3lASON COUNTY. --Referenced to the National Geodetic Vertical Datum of 1929 WASIUNGTON EXPLANATION OF ZONE DESIGNATIONS (UNINCORPORATED AREAS) ZONE EXPLANATION A Areas of TOO-year flood;base flood elevations and Schedule C 1, PANEL 190 OF 300 flood hazard factors not detelm:ned. AO Areas of TOOrytar shallow flooding where depths to rw�ae......... .or.nvteo: are between one(1)and three(3)feet;average depths of inundation arc shown,but no flood hazard factors are determined. AM Areas of TOO-year shallow flooding where depths are between one(1)and three(3)`tut;base food elevations are shown, but no flood hazard factors arc determined. A,-A30 Areas of 100-year flood;base flood elevations and flood hazard factors determined. A99 Area, of 100•year rood to be protected by flood COMMUNITY-PANEL NUMBER protection system under construction; base flood 5301150190C elevations and flood hmrd factors not determined- 0 Areas between l:mib of the 104year Flood and S00- year flood;or certain areas subject to 100•year flood• EFFECTIVE DATE: thewith average depths lea than one(th foot or where MAY 11,1988 me contributing drainage anal is Itss man one sauce ZONE C mile;or areas protected by levees from the base flood, (Medium shading) C Areas of minimal Rooding.(No shading) D Areas of undetermined,but possible,flood hazards. IL FWe,al Emergence MaPagrment Agerssy V Areas of 100-yea:coastal:flood with velocity(wave -- action);base flood elevations and Rood hazard factors ;r.s s err oelelal copy ma porn—err the R not determined. nc,ed vainq/arm e�-L,w. ,N.map wte r,u realer,cru,q.t amend " which may Yore peen meOr suliliil to the dnt-t•e Vt•V30 Are.of 100-war coastal need with velocity fwave od•n-v For the laeeet Product'Alawut u.eonr Filed 1—new 0 n P r ,am e000 moda caeca the ll Fiaod Map Stop an www.mee.htma gov Attachment F-1: Western end of Schedule A, and Schedule C FEMA map. KEY TO MAP Soo-Year I"Boundary ZONE 8 APPROXIMATE SCALE IN FEET 100•Year Flood Boundary—-__- 1000 0 1000 Zone Designations �. 100•Year Flood Boundary -;3 ZONE B 500.Ytar Flood Boundary fca;M III iIONII FLOOD INSURANCE PROORAY Be%Flood Elevation Line 513 _ -With Elevation In Foot— _ Base Flood Elevation In Feet (EL 9871 ZONE A _ r✓ III FIB Where Uniform Within Zone** a D Elevation Reference Mark RM7x FLOOD INSURANCE RATE MAP 2 x 'r' 4 zone DBoundary _ } TURTLE LAKE RivcrMdc e101.5 ;MASON COUNTY. **Referenced to the National Geodetic Vertical Datum of 1979 WASHINGTON EXPLANATION OF ZONE DESIGNATIONS (UNINCORPORATED AREAS) I � I ZONE EXPLANATION Schedule A: Central extent A Areas of 100•yoar flood;base flood elevations and flood hazard factors not determined. PANEL 190 OF�0 AO Areas of 100-year shallow flooding where depths ' eta w•.�.wrc•oe raMau wt.nwna are between one(1)and three(3)feet;average depths ZONE C of inundation are shown,but no flood hazard factors Am determined. AH Areas of 100-year shallow flooding where depths are between one(1)and three(3)feet;base flood elevations are shown, but no flood hazard factors are determined. At-A30 Areas of 100•yeu flood;base flood elevations and flood hazard factors determined. -\ A99 Area of 100•year flood to be protected by flood COMMUNITY-PANEL NUMBER protection system under construction; base flood 530115 0190 C elevations and flood hazard factors not determined. e Area between limits of the 100-year flood and 500• O \ EFFECTIVE DATE; year flood;or certain area subject to 100•year flood- in with average depths ge the none(1)footorwhere O 1 MAY 17,198$ the contributing drainage area Is less than one s0uut mile-or areas protected by levees from the bass flood. (Medium shading) C Areasof minimal flooding.(No shading) D Area of undetermined,but possible,flood hazards. '. Federal Emergetrcy Management Agency V Aram of lMyear coastal flood with velocity(wave SHELTON - action);base flood elevations and flood hoard factors AIRPORT t" a,asur copy or a peraen a:ne aeb,rcrbeneea n—ma, e not determined. was ekneasa,nnp Fan on.a.ne tN.map oow floc-elect eranya amergmem.wnch may nave been mace.seee�m r`tar me an ere V1-V30 Area of 1 a r coastal flood with velocity wa,e cane bock. Fpr lM 1-1 product NOrnee-abet.Recent R000 ll..ranGe = Program eooe map.cn.ck:ne FEw.F o0o Map Stare rt vw.w'.ms:.re-'a 9w Attachment F-Z: Central section of Schedule A FEMA map. LAKE _ KEY TO MAP ZONE C e 1 SOO-Year Flood Boundary ZONE 8 APPROXIMATE SCALE IN FEET 1DO-Year Flood Boundary Joao 0 1000 Zone Designations M �'—F—� Schedule A: Eastern extent 1DO-Ye2r Flood Boundary d ZONE[! v S00-Year Flood Boundary O NATIONAL FLOOD INSRRANCE FRBRRAIR 4 hi i 'I Sax Flood Elevatior Lana With Elevation In Feet.• O Base Flood Elevation in Feet (EL 9871 I� Where Uriform Within Zones- �I -Ii FIPA Elevation Reference Mark RM7x = I,j f1000 INSURANCE RATE MAP Zone D Boundary River M le -M1.5 ON —Referenced to the Naiiona''Geodetic Vertical Datum of 1929 �MASON COUNTY, WASHINGTON EXPLANATION OF ZONE DESIGNATIONS 12 (UNINCORPORATED AREAS) I — ZONE EXPLANATION ZONE A A Areas of 100-year flood;base flood elevations and flood hazard factors not determined. PANEL 190 OF 300 AO Areas of 100-year shallow flooding where depths ; s¢.0�noea roe...aA aor.ansrzol are between one(1)and three(3)feet;average depths I of inundation are shown,but no flood hazard factors are determined. r AM Areas o1 100-Year shallow flooding where depths ". are between one(1)and three(3)feet;base flood J l� elevations are shown, but no flood hazard factors a re determined. ZONE A A7-A30 Areas of 100-year flood;base flood elevations and flood harard factor determined. A99 Areas of ]DO-year sold to be protected by flood COMMUNITY-PANEL NUMBER Protection system under construction; base *food .-.. elevations and flood hazard factors not determined. -"yj',k4a?- 530115 0190 C 8 Areas between Lmits of the 100-year flood and 500• year flood;or certain areas subject to 100-year flood. v. "'+' Eire'. EFFECTIVE DATE: with averse d< the le ss than one 1 foot r who end P o n the conVrbuun drainage area I i h MAY 17 1988 H S•SS i>n one Souue 8 in or area protected by levees from[he bast flood, �- }m- Med�um shading) I , R \ I C Areas of minimal flooding,(No shading) D Areas of undetermined,but possible,flood hazards. ~ ._�``` / '� Fe4e.1 F—jency Mamgemens Aaen V Areas of I00-year coasts:flood with velocity(wave actionJ;base flood elevations and Rood hazard factors u.r not determined. `� F- rns le an ornc�a perry pro Harem der t.,c ahnv.srra�csa npoe moo. n Q V1 V30 <�ro Fuarr 0 - the mp uve J oo Areas of 100-year clattal flood with velocitv(waveo emA have lin made —,s to me aae der sne 10 City of rig.pock Fa the lretret product b nVhm oar 1-.1 Arad MNa ce VrOPyn lox maps eYck tM FEI.N Flood Mep Store der www nnp.M1ma pw Attachment F-3: Eastern end of Schedule A FEMA map. PORTIONS OF SEC. 1, 2, 3,4, 9, 11 & 12,T. 20 N., R. 4 W.,W.M. PROJECT LOCATION �� T ® Department of , 2 Corrections raceixiA c•m DAYTON AIRPORT ROAD CITY OF SHELTON WATERMAIN EXTENSION SCHEDULE "A VICINITY MAP SCHEDULE•B"#4 SCHEDULE"R � NS T 12. $ K 1 WES EELLS HIL ROAD R 102 ?� SR 02 AIRPORT ASHI GTON AIRPORT RD.) SHEET-INDEX STATE L CO STRUCT 12• ISLAND 1. COVER SHEET //�� WA ERMAIN LAKE 2. LAYOUT SHEET ,PORT OF d 3. LEGEND&ABBREVIATIONS SHELTO� 4. WATERMAIN EXTENSION STATION 121+33.42 TO 128+30.16(STATE ROUTE 102) 5. WASHINGTON STATE PATROL SERVICE AND CONNECTION SITE PLAN p 6. WATERMAIN EXTENSION STATION 128+30.16 TO 139+50(STATE ROUTE 102) 7. WATERMAIN EXTENSION STATION 139+50 TO 151+10(STATE ROUTE 102) 1 B. WATERMAIN EXTENSION STATION 151+10 TO 161+31.34(STATE ROUTE 102) CONSTRUCT 12" 9. WATERMAIN EXTENSION STATION 58+69.21(US 101)TO 69+10(US 101) WATERMAIN 10. WATERMAIN EXTENSION STATION 69+10 TO 78+50(US 101) 11. WATERMAIN EXTENSION STATION 78+50 TO 88+21.24(US 101) f N•l•Qp 0.O�5tAS'0 P'o� 13. WATERMAIN EXTENSION STATION 12. WATERMAIN EXTENSION STATION 10+10 TO 20+90(SHELTON SPRINGS.24 TO 10+10(SHELTON ) +90(SHELTON SPRINGS) It r\Skv OF GOB SANDERSON SyFIT ® 15. WATERMAIN EXTENSION STATION 30+90 TO 414. WATERMAIN EXTENSION STATION 20+90 TO 1+0(SHELTON SPRINGS) qIt' E FIELD � O.l. 16, WATERMAIN EXTENSION STATION 41+10 TO 49+00(SHELTON SPRINGS) j OEQ N0. sA17.ti CONTROL DETAILS 18. TREEN CH RESTORATIONDETAILS RESTORATION DETAILS 20. WATER DETAILS 21. WATER DETAILS 22. WASHINGTON STATE PATROL SERVICE AND CONNECTION DETAILS i! MASON COON / FAIRGROUNDS 1 � PROJECT DATUMS: w a•rt�zaxc SCALE 1-• FEET' tSl+ncµ ppnM auusxr craven�a�wra surz � o � « w ••••w�A�a w.•��a 90%DRAWINGS (n[rw m rvw+a•sort IeS�CMawaaal f WL MIIr NL uNwm= f 110M rofwmr"as w.emi,.m�iou"x�o u.l w m�swCaui x�wae n"w m wn �2 ua'.r i-soo-•t.-nro NO DATE BY APPx MUMS Approved By DAYTON AIRPORT RD WATERMAIN EXTENSION Civil•Municipal•Geotechnical•Land Surveying DAYTON AIRPORT RD SCHEDULE"A" Jerome W. Morrissette & Associates Inc., P.S. mz Cover Sheet oo r CITY OF SHELTON 1700 Cooper PI.Road S.W.i8.2,Olympia,Wa.98502-1110 Ph 360.352.9456 Fa 360.352.9990 +.•+" SHEET .1 PORTIONS PRO E LOC 10 N'S L E S E WES DA IRPORT RO D/SR 102 SHEET 6 SHEET 7 - SHEET SHEET 8 5 U LE WASHINGTON LA . STATE TROL VICINITY MAP OPORT OF SHELTON ISLAND ...a LAKE �5 J 2 E y Y 7^s hFT A e OG� N o O t F�7S 5� SANDERSON S FIELD S 1 F ��•i..n.gmn sun same m.r, 1 r.crox�o•�Ois.ni".Y.n wan ux io wri s.�afua rrq a.<n•. ioran oxnu 4 •q[ r•nK WSrZ gv9n pMM nK qr fxGwnav ffi F 0 250 5�'� •;>�.���xq„q.m.q�gsrgf :.`�`5•.'f '".,q�"."�w';"wi��nn�>>A���f��•`�"gR•f 90%DRAWINGS ���s i �a a b.:C.WK n.f NO DATE BY APPR " 'b''�s°��'�"• REVISIONS ur Civil-Municipal•Geotechnical Land Surveying Approved By }, DAYTON AIRPORT RD WATERMAIN EXTENSION ° F Jerome W. DAYTON AIRPORT RD Morrissette & Associates Inc., P.S. o�•. SCHEDULE"A" 1700 Cooper Pt.Road S.W.fB-2,Olympia,Wa.98502-1110 Ph 360.352.9456 Fx 360.352.9990 sorgsm ar CITY OF SH ELTON Layout Sheet 9 q u::n,...ww m.or o�A..•,mr,..,n.....yr,..,,,,,n�, �...wxm.�..Hn.,.,,.�a,,,n,,,,,• SHEET 2.OF yL PORTION OF SEC. 2,T. 20 N., R.4 W.,W.M. I- - I ' WASHINGTON ' -"-"- "' PORT OF STATE SHELTON DEPARTMENT OF TRANSPORTATION II — — —•— — —' I i I 1 � �� SHEET 24 0 _ 8 ---�• — o`er •�,` SHEET J E / /•• S EET2 �•��+ -CAL �a0 0 ��• SHEET 1 — — i SHEEII `� _ •— _ _ n�"° "i.Kn. !� L 0 WASHINGTON E • III�IIII '1 4 I STATE PATROL I Y N o •q ;!i ! �=—1 I ¢ I i 3I SHE•25 JI I • E 1 E s I " B ' I SHEET 21 IIE SHEET 22 SHEET 23 S II IIE j � E 1 � i; IIE � E . EN 30%DRAWINGS a me.wro.awm. _ 1— meiwi°(') NO DATE BY APPR REVISIONS Approved By DAYTON AIRPORT RD WATERMAIN EXPANSION PROJECT Civil-Municipal•Geotechnical-Land Surveying DAYTON AIRPORT RD SCHEDULE"C" r VAIE Jerome W. Morrissette & Associates Inc., P.S. "°' CITY OF SHELTON Layout Sheet 990 1700 Cooper Pt.Road S.W.•13-2,Olympia,Wa.98502-1 E ID Ph 360.352.9456 Px 360.352.9 °tm"r °'� w �°+`^•'� "•�``��� SHEET 1,Q OF JL Case Number: SEP2012-00016 MEP/SEPA for City of Shelton "Dayton-Airport Water Expansion Project" City of Shelton Responses to REQUEST FOR ADDITIONAL INFORMATION Project Description Clarification What is the project the City is asking for Environmental Review? The City is acting on behalf of the Washington State Patrol(WSP),and Washington Department of Corrections(DOC)to design and construct Phase II of the Shelton Area Regional Plan Dayton Airport Road Water Expansion(DA 99 Project. The original instructions from state partners were to design the water main extension from a City source to the WSP Academy ("Schedule A")and DOC Washington Correctional Center(described in earlier paperwork as "Schedule B");with the understanding that"Schedule A"will be constructed as soon as possible, and"Schedule B"drawings would be put"on the shelf'for future use. Concurrently,WSP secured additional design funds and decided to include Academy property"offite"water system improvements(new"Schedule C"). State legislature has authorized construction funds for Schedules A and C,to be completed by June 30,2013. THEREFORE:the City is submitting forms for Mason County environmental review only for the construction of Schedules A and C(see Project Site Map). "Schedule B"construction timing is unknown. For that reason,the City has removed"Schedule B"from this SEPA review process and will submit new forms to Mason County when DOC decides and secures funding for constructing"Schedule B". This is intended to simplify and clarify"what is the project"and the area being considered for environmental considerations. Response to Request#1: • Mason County Environmental Permit(MEP)-Application was not included with the original City submittal. This was an oversight and not intended to `piggy-back' or be confused with Case #PAR2007-00018. The 2007 pre-application noted is related to the previous City's sewer and reclaimed water conveyance pipelines project already constructed. Please see the attached MEP for the new City's potable water expansion project. • Critical Aquifer Recharge Area No impacts are anticipated to the Critical Aquifer Recharge Area due to the fact that all surface and stormwater runoff will be managed and treated as required under the Mason County Drainage and Erosion Control Manual. Potential for impacts from this project are minimal to begin with,but by applying stormwater management BMPs required by existing law,the possibility of impact is significantly reduced. • Wetlands-The City acknowledges that the water line project runs adjacent to wetland areas along Shelton Springs Road,and falls within what is already a non-functional portion of a wetland buffer(i.e.,managed road-side area);but,there will be no direct impacts to the wetlands. Conversations with County staff indicated Right-of-Way(ROW)projects do not require assessment of wetland(or stream)buffer impacts as long,as there were no direct critical area impacts from the project. • Wetland-Turtle Lake has not been rated. Turtle Lake is on the opposite side of State Route 101 from the water main construction,and did not anticipate seeking rating information for an offsite Shelton Responses—Page 1 wetland. The design consultant determined an approximate size using Google Earth measurements;the lake edge is 150-200 feet away from the ROW project and on the opposite side of the road.Turtle Lake was determined to be too small to be regulated as a lake(Shoreline), and therefore,falls under wetland regulatory rules. It is likely to rate as a Category II system with buffers between 110-150 feet. The water line project impacts would be at the far outside edge of the lake system buffer. • Threatened or Endangered Species-Other nearby wetlands adjacent to the water line project have low to moderate habitat values—75-110 ft buffers are anticipated.The water line project impacts would be within approximately 50 feet of these other systems.As mentioned above,the area being impacted is a managed road-side zone—not a functional wetland buffer. Conditions in that area will be the same before and after this project is completed,and due to specified project requirements for the application of stormwater BMPs,no water quality impacts are expected. The design consultant is providing Priority Habitats and Species maps from the WDFW database in the SEPA Checklist;no impacts are anticipated. Responses to Request#2: • Stormwater Permit Application-Runoff is not"directed"to Turtle Lake. Some project runoff occurs within those sub-basins,but all water will be managed as required by the Mason County Stormwater Manual rules. • Goldsborough Creek is more than a half mile away from the proposed construction project. As described above,the project has been reduced to what will actually be constructed,and "Schedule B"is no longer being assessed. The currently proposed Shelton waterline connection extends only to the WSP Academy,and therefore consideration of potential impacts to Goldsborough Creek are not necessary. Responses to Request#3: • Geotechnical Report-The Project description in the Geotechnical report is for"Schedule A" only;the City is providing soils descriptions for the relatively small"Schedule C"area from the Soil Survey as an attachment to the revised SEPA Checklist.The"Schedule C"areas are flat with relatively coarse-textured soils. Responses to Request#4: • Site Plan—Site Plans for"Schedule A"(Shelton City limits to WSP Academy)and"Schedule C"(WSP Academy onsite water system)are included Responses to Request#5: • Title Notification of Aquifer Recharge Area—Copy of the signed and Recorded Title Notification is included. Shelton Responses—Page 2 Page 1 of 1 Grace Miller- FW: SEPA for City of Shelton From: "Rogers, Gloria S (DFW)" <Gloria.Rogers@dfw.wa.gov> To: "Skriletz, Jeffrey K (DFW)" <Jeffrey.Skriletz@dfw.wa.gov> Date: 8/23/2012 4:26 PM Subject: FW: SEPA for City of Shelton CC: Grace Miller<Gbm@co.mason.wa.us> Attachments: 20120823153354168.pdf Hello Jeff, Could you please help me with this one. Area may have pocket gophers. Thanks Gloria Rogers Washington Department of Fish and Wildlife 48 Devonshire Rd Montesano, WA 98563 3 60-249-1293 This e-mail and your response may be subject to public disclosure. PS. I'll be on vacation 8/29—9/3. Yeah!!!!! From: Grace Miller [mailto:Gbm@co.mason.wa.us] Sent: Thursday, August 23, 2012 3:30 PM To: Rogers, Gloria S (DFW) Subject: SEPA for City of Shelton Attached is SEPA for City of Shelton water line. Not sure who, other than you at Wildlife, to send this to? Please forward if should go to someone else. Thank you. file://C:\Documents and Settings\gbm\Local Settings\Temp\XPgrpwise\503659CAMason... 8/23/2012 Page 1 of 1 Grace Miller-Re: SEPA for Cite of Shelton water expansion project A From: Cindy Waite To: Grace Miller Date: 8/23/2012 3:57 PM Subject: Re: SEPA for City of Shelton water expansion project Attachments: Cindy Waite.vcf No comments.Cindy Waite >>>Grace Miller 8/23/2012 3:34 PM>>> Attached for your comment is SEPA for City of Shelton water expansion project file:HCADocuments and Settings\gbm\Local Settings\Temp\XPgrpwise\503652DCMason... 8/23/2012 1 4 � r<y a• STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775 •Olympia, Washington 98504-7775 •(360)407-6300 711 for Washington Relay Service -Persons with a speech disability can call 877-833-6341 September 6, 2012 Ms. Grace Miller Your address Mason County is in the Department of Community Development Kennedy' Planning Division Goldsborough PO Box 279 watershed Shelton, WA 98584 Dear Ms.Miller: Thank you for the opportunity to comment on the determination of nonsignificance for the Dayton Airport Road Water Expansion project(SEP2012-00016) located in Shelton as proposed by Dennis McDonald, City of Shelton Public Works. The Department of Ecology(Ecology) reviewed the environmental checklist and has the following comment(s): TOXICS CLEANUP: James DeMay(360)407-6316 The proposed SEPA action is within a quarter mile of a known or suspected contaminated site. The site is Port of Shelton All Star Aero(FS ID# 1187). To search and access information concerning these sites,visit Ecology's Facility/Site database at: http://www.ecy.wa. og v/fs/and the Cleanup Site Search at: https://fortress.wa. og v/ecy/gsn/SiteSearchPage.aspx. If contamination is suspected, discovered, or occurs during the proposed SEPA action,testing of the potentially contaminated media must be conducted. Contact the Environmental Report Tracking System Coordinator at the Southwest Regional Office at(360)407-6300. For assistance and information about subsequent cleanup and to identify the type of testing that will be required, contact James DeMay with the Toxics Cleanup Program at the phone number given above. SEPA REVIEWER: Sonia Mendoza WATER QUALITY CONTACT: Deborah Cornett(360)407-7269 Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48 RCW, Water Pollution Control,and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington,and is subject to enforcement action. Erosion control measures must be in place prior to any clearing, grading,or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or stormdrains that lead to waters of the state. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered to be pollutants. a/ September 6, 2012 Page 2 Proper disposal of construction debris must be on land in such a manner that debris cannot enter water of the state and stormdrains draining to waters of the state or cause water quality degradation of state waters. Ecology's comments are based upon information provided by the lead agency. As such,they may not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments,please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (SM:12-4128) cc: Deborah Cornett,WQ James DeMay, TCP Dennis McDonald, City of Shelton Public Works(Applicant) Page 1 of 1 Grace Miller - Shelton Water Project From: "Dennis McDonald" <Dennis@ci.shelton.wa.us> To: "Grace Miller" <Gbm@co.mason.wa.us> Date: 11/16/2012 9:02 AM Subject: Shelton Water Project Attachments: DOC111612.pdf Grace Shelton Dayton-Airport Road Water Expansion Project Mason County SEPA SEP2012-00016 Attached is the project's Construction Stormwater General Permit# WAR-126187 for your files. Contact me if you have any questions or comments. I hope this makes SEPA complete. Thank you Dennis McDonald, MA-ABS, PMP Regional Project Manager City of Shelton (360) 432-5167 dennis@ci.shelton.wa.us file:///C:/Users/gbm/AppData/Local/Temp/XPgrpwise/50A60134Masonmai1100167376E... 11/16/2012 STATf•o� ok, ��y� 1889 a�Y STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47600 o Olympia, WA 98504-7600 O 360-407-6000 711 for Washington Relay Service Persons with.a speech disability can call 877-833-6341 October 25, 2012 Dennis McDonald City of Shelton 525 W Cota St Shelton, WA 98584-2239 * ow RE: Coverage under the Construction Stormwater General Permit Permit number: WAR-126187 Site Name: Dayton Airport Road Water Expansion Project Location: Dayton Airport Rd, Shelton Springs Rd,US 101 Shelton County: Mason Disturbed Acres: 2.54 } Dear Mr. McDonald: The Washington State Department of Ecology(Ecology)received your Notice-of Intent for coverage under Ecology's Construction Stormwater General Permit(permit). This is your permit coverage letter. Your permit coverage is effective on October 25,2012. Please retain this permit coverage letter with your permit(enclosed),stormwater pollution prevention plan(SWPPP),•and site'log book. These materials are the official record of permit coverage for your site. Please take time to read the entire permit and contact Ecology if you have any questions: Appeal Process You have a right to appeal coverage under the general permit to the Pollution Control Hearing Board (PCHB)within 30 days of the date of receipt of this letter. This appeal is limited to the general permit's applicability or non-applicability to a specific discharger. The appeal process is governed by chapter 43.21B RCW and chapter 371-08 WAC. ".Date of receipt" is defined in RCW 43.21 B.001(2). I � Dennis McDonald October 25, 2012 Page 2 To appeal, you must do the following within 30 days of the date of receipt of this letter: • File your appeal and a copy of the permit cover page with the PCHB (see addresses below). Filing means actual receipt by the PCHB during regular business hours. • Serve a copy of your appeal and the permit cover page on Ecology in paper form- by mail or in person (see addresses below). E-mail is not accepted. You must also comply with other applicable requirements in chapter 43.21B RCW and chapter 371- 08 WAC. Address and Location Information: Street Addresses: Mailing Addresses: Department of Ecology Department of Ecology Attn:Appeals Processing Desk Attn:Appeals Processing Desk 300 Desmond Drive SE PO Box 47608 Lacey, WA 98503 Olympia,WA 98504-7608 Pollution Control Hearings Board(PCHB) Pollution Control Hearings Board 1 111 Israel Road SW, Suite 301 PO Box 40903 Tumwater, WA 98501 Olympia,WA 98504-0903 Electronic Discharge Monitoring Reports(WQWebDMR) This permit requires that Permittees submit monthly discharge monitoring reports (DMRs) electronically using Ecology's secure online system,WQWebDMR. To sign up for WQWebDMR go to: www.ecy.wa.gov/programs/wq/permits/Paris/webdmr.html. If you have questions, contact Tonya Wolfe at(360)407-7097 (locally),or(800) 633-6193/option 3,or email WQWebPortal@ecy.wa.gov. Ecology Field Inspector Assistance If you have questions regarding stormwater management at your construction site,please contact Deborah Cornett of Ecology's Southwest Regional Office in Lacey at(360)407-7269, or deborah.cornett@ecy.wa.gov. Questions or Additional Information Ecology is committed to providing assistance. Please review our web page at: www.ecy.wa.gov/programs/wq/stonnwater/construction/. If you have questions about the construction stormwater general permit,please contact Joyce Smith at(360)407-6858,or joyce.smith@ecy.wa.gov. Sincere, Bill Moore, P.E.,Manager Program Development Services Section Water Quality Program Enclosure oN"SM MASON COUNTY o P� A o N DEPARTMENT OF COMMUNITY DEVELOPMENT > S N Planning Division 7 N y ti P O Box 279, Shelton, WA 98584 of o (360)427-9670 1864 REQUEST FOR ADDITIONAL INFORMATION March 26, 2012 CITY OF SHELTON 525 W COTA STREET SHELTON WA 98584 Parcel No.: 420120060020 Project Description: DAYTON AIRPORT RD WATER EXPANSION PROJECT Dear Applicant: You have submitted a permit application (case no. SEP2012-00016) for proposed construction or development in the county. Upon review of your application, I require additional information to complete the permit review process. Therefore, review of your application will not proceed until the necessary information is provided (see the comment section of this letter for details.) Once the information is submitted and the application is complete, I will continue to process your application accordingly. If the additional information is not provided to the County within 180 days of this request, the application shall expire and no further action on the proposed development shall take place. Please contact me at (360) 427-9670, ext. 360 if you have questions. Sincerely, 4stav A& Grace Miller Land Use Planner Mason County Planning Department 3/26/2012 Page 1 of 3 SEP2012-00016 REQUEST FOR ADDITIONAL INFORMATION 3/26/2012 Case No.: SEP2012-00016 Comments: After reviewing the SEPA checklist for the Dayton Airport Road Water Expansion Project, it appears that we need the following information clarified so that we may further review the proposal. 1) Was a Mason County Permit issued, possibly under a different parcel number, for this project? In order to require SEPA, there must be a permit associated with the project. It appears from the 2007 pre-application notes under these parcel numbers, Case #PAR2007-00018, that Planner, Pam Bennett-Cumming, required a Mason Environmental Permit for the project. The reason given was because the project is located on the Critical Aquifer Recharge area and may be within the buffers of wetlands or other critical areas. If a Mason Environmental Permit was not issued previously for this project, it will be required at this time. The entire project is located on the critical aquifer recharge area. It is unclear what impacts it may or may not have to the aquifer. It is also unclear what the relation of the project is to the wetlands and Turtle Lake which is considered to be a Wetland. Have the wetlands been categorized by a wetland biologist and what are the setbacks of the project in relation to their buffers? If threatened or endangered species are known to be on or near the site and they may be impacted, they will need to be addressed within the Mason Environmental Permit Application also. The MC Resource Ordinance Fish & Wildlife Habitat Conservation Areas Chapter requirements would apply. All resource areas would need to be addressed within a Mason Environmental Permit. 2) The Draft Stormwater Permit Application states that runoff will be directed to Goldsborough Creek and Turtle Lake. The checklist states that the project is not within 200' of a state shoreline. Is the project within 200' of the Goldsborough Creek at any point? Although the creek, at this location, does not appear to be under the jurisdiction of the Shoreline Management Act, it would be regulated by the County Resource Ordinance as a Fish & Wildlife Habitat Conservation Area and would also need to be addressed within the MEP. 3) Is the "Project Description" within the Geotechnical Report accurate for describing the project within SEPA? 4) Site Plan - It appears that the only Site Plan submitted for the project is within Appendix A, Figure 1, of the Geotechnical Report. If you have another Site Plan available, please let me know. 3/26/2012 Page 2 of 3 SEP2012-00016 REQUEST FOR ADDITIONAL INFORMATION 3/26/2012 Case No.: SEP2012-00016 5) An Aquifer Recharge Area Title Notification will need to be recorded with the Auditor's Office and a copy provided to the Planning Department, to be placed within the parcel file, prior to final authorization of the permit. The specific requirements for development on the aquifer can be found within the Aquifer Recharge Chapter of the Mason County Resource Ordinance. Please let me know if you have any questions. Thank you. 3/26/2012 Page 3 of 3 SEP2012-00016 Department of Public Works — Engineering 525 W. Cota St. • Shelton,WA 98584 • PHONE (360)426-9731 • FAX(360)426-7746 ..w dd,.,A Srr W1 eommmr TRANSMITTAL rOGE HLX ■/OM July 31, 2012 RECEWED Grace Miller, Land Use Planner �f, Mason County Planning Department 2�j2 PO Box 279 MMQN c01,-yam Shelton,WA 98584 Subject: Case Number: SEP2012-00016 MEP/SEPA for City of Shelton "Dayton-Airport Water Expansion Project" I offer this response to your Request for Additional Information letter,dated March 26,2012. Attachments include the following: • Narrative responses to five(5)requests for clarification; • City of Shelton Dayton Airport Road Water Expansion Project General SITE MAP and SITE PLANS for Schedule A and C; • Environmental Permit Application(Case Number SEP2012-00016); • New SEPA Checklist,Attachments,and list of changes to previous version; • Copy of Recorded Title Notification ofAquifer Recharge Area requirements;and • Revised and Signed Notice of Intent Application Form for Ecology Construction Stormwater General Permit Please complete review and notify the City of the final SEPA Determination. Contact me via email at dennis(a,ci.shelton.wa.us or by phone 360-432-5167 if you have any further questions. Thank you Sincer ly, De c onald Regional Project Manager cc: Mike Michael JWMA Appropriate Project files 1HARegional Plan\2-Dayton-Airport\Design\Permits\MEP_MasonEnvirPermit.Transmittal20120731.docx e Changes to previous hand-written version of SEPA for Dayton Airport Road: 1. All information is now entered into an editable pdf file 2. Page 1: No changes, other than Date 3. Page 2: a. 2.6:Added wording about Schedule C, deleted wording about Schedule B b. 2.7:deleted wording about Schedule B c. 2.8: no change d. 2.9: no change e. 2.10: no change f. 2.11: Added wording about Schedule C; deleted wording about Schedule B g. 2.12: Changed words "Plan Set"to ""Site Location Map" (Attachment A) and Site Plans" 4. Page 3,Section B: (Earth) a. 1.a.: Added descriptor wording rather than only circling"rolling". b. 1.b.: no change c. 1.c.: added some details about soil mapping d. 1.d.: no change e. 1.e.: no change f. 1.f.: no change g. 1.g.: no change h. 1.h.: no change 5. Page 3-4,Section B: (Air) a. 2.a.: no change b. 2.b.: no change c. 2.c.: no change 6. Page 4-5,Section B: (Water) a. 3.a.1.: revised text to read better and to add Schedule C; deleted wording about Schedule B b. 3.a.2.: revised text to read better c. 3.a.3.: revised text to read better d. 3.a.4.: no change e. 3.a.5.:Added reference to Attachment F(FEMA maps) f. 3.a.6.: no change g. 3.b.1.: no change h. 3.b.2.: no change i. 3.c.1.: revised text to read better j. 3.c.2.: no change 7. Page 5-6,Section B: (Plants) a. 4.a.: no change b. 4.b.: revised text to read better c. 4.c.: revised text to read better d. 4.d.: no change 8. Page 6,Section B: (Animals) a. 5.a.: Added words in addition to circling b. 5.b.: Added some words providing context and Attachment E PHS map reference c. 5.c.: no change d. 5.d.: no change 9. Page 6-7,Section B: (Energy and Natural Resources) a. 6.a.: no change b. 6.b.: no change c. 6.c.: no change 10. Page 7,Section B: (Environmental Health) a. 7.a.1.: no change b. 7.a.2.: no change c. 7.b.1.: no change d. 7.b.2.: minor wordsmithing e. 7.b.3.: no change 11. Page 7-8,Section B: (Land and Shoreline Use) a. 8.a.: no change b. 8.b.: no change c. 8.c.: no change d. 8.d.: no change e. 8.e.: no change f. 8.f.: added Schedule C details; deleted wording about Schedule B g. 8.g.: no change h. 8.h.: mentioned non-functional buffer impacts i. 8.i.: no change j. 8.j.: no change k. 8.k.: no change I. 8.1.: no change 12. Page 8, Section B:(Housing) a. 9.a.: no change b. 9.b.: no change c. 9.c.: no change 13. Page 8,Section B: (Aesthetics) a. 10.a.: no change b. 10.b.: no change c. 10.c.: no change 14. Page 9,Section B: (Light and Glare) a. 11.a.: no change b. 11.b.: no change c. 11.c.: no change d. 11.d.: no change 15. Page 9,Section B: (Recreation) a. 12.a.: no change b. 12.b.: no change c. 12.c.: no change 16. Page 9, Section B: (Historic and Cultural Preservation) a. 13.a.: no change b. 13.b.: no change c. 13.c.: no change 17. Page 10,Section B: (Transportation) a. 14.a.: minor wordsmithing and reference to map Attachment b. 14.b.: no change c. 14..c.: minor wordsmithing d. 14.d.: added details about repaving section of Shelton Springs Rd. e. 14.e.: minor wordsmithing f. 14.f.: no change g. 14.g.: no change 18. Page 10, Section B (Public Services) a. 15.a.: no change b. 15.b.: no change 19. Page 10,Section B (Utilities) a. 16.a.:added some explanatory words b. 16.b.: added Schedule C details; deleted wording about Schedule B 20. Page 11, ESA Listed Salmonids Checklist General Primary questions: 1.Added some details and map Attachment reference 2. no change Project Specifics: 1. no change 2. added Sch C words; deleted wording about Schedule B 3. added Sch C words; deleted wording about Schedule B 4. added Sch C words; deleted wording about Schedule B 5. answered "no"to all,and deleted mention of roadside ditch 6. deleted "not according to PHS maps" comment,added "NA" 7. no change Fish Migration: 1. no change 2. no change 3. deleted mention of temporary construction retention pond, since that is not proposed. 4. no change 5. changed "yes"to "no", as no culverts are proposed 6. no change 7. no change Water Quality: 1. Changed "yes"to "no", and changed explanation slightly. 2. no change 3. no change 4. still answered "No", but deleted "no in-water or near-water work" explanation 5. no change Vegetation: 1. no change 2. minor wordsmithing Map attachments: All are revised and labeled as referenced within the SEPA checklist document. After recording return document to: 1993153 MASON CO WA 08/02/2012 09:48 AM MISC City of Shelton CITY OF SHELTON #56390 Re. Fee: $75.00 Pages: 14 525 W. Cota Street ��������������111111 11111 IIIIiI1111111 IN 111111111111111111111 III 11111111111111111111111 Shelton,WA 98584 TITLE NOTIFICATION OF AQUIFER RECHARGE AREA GRANTEE: Public GRANTOR(S): City of Shelton MAILING ADDRESS: 525 W. Cota Street Shelton, WA 98584 PARCEL NUMBER: 420120060020 by reference, Affected Parcels Attached LEGAL DESCRIPTION: Section 12, Township 20, Range 4W NOTICE: This property lies within a Critical Aquifer Recharge Area as defined by Chapter 8.52.120 of the Mason County Code. The property was the subject of a development proposal for the following: PROPOSAL DESCRIPTION: Dayton-Airport Road Water Expansion Project is by the City of Shelton to extend the municipal water system to the Washington State Patrol Academy. COUNTY APPLICATION NUMBERS: SEP2012-00016 Restriction may exist due to natural conditions of the property and resulting regulation. Review of such application provides information on the location of the critical aquifer recharge area and the restrictions on the site. GRANTOR: � * 7—3D 1 Signature Date Attachment ATTACHMENT Parcel Numbers: The proposed municipal water main will be constructed on Mason County and WSDOT tight-of-way and individual parcels listed below: 420120060020 Mason County Right-of-Way 420120060000 WSDOT Right-of-Way 420021000020 Mason County Easement 420022400010 Dale P. & Rose M. Nye Easement 420022490090 Community Action Council Easement 420022490010 DAPBP, LLC Easement 420027500020 John Titus and Kusumam Titus Easement 420027290012 Jeffery F. & Sally A. Geibel Easement 420027590013 Jeffery F. & Sally A. Geibel Easement 420023260010 Washington State—WSP Academy Legal Description: Shelton Springs Road is along Mason County right-of- way. SR-101 alignment is along WSDOT public right-of-way. For Legal Description of Alignment along SR-102 (Dayton-Airport Road), see table below: Parcel Legal Description Easement Grantor 420021000020 The Southerly 1232.20 feet of the East Half(E 1/2) Mason County of the Northwest Quarter (NW 1/4) and the West Half(W 1/2) of the Northeast Quarter(NE 1/4) of Section 2, Township 20 North, Range 4 West, W.M. , Mason County, Washington 420022400010 The Southeast quarter (SE 1/4) of the Southeast Dale P & Rose M quarter(SE 1/4) of the Northwest quarter (NW 1/4) Nye of Section 2, Township 20 North, Range 4 West, W.M., Mason County, Washington 420022490090 LOT 9 OF Short Subdivision No. 3027, Recorded Community Action under Auditor's file no. 1916060, being a portion of Council the south 24.99 acres of the west half of the east half of the Northwest Quarter of Section 2, Township 20 North, Range 4 West, W.M., in Mason County, Washington 422022490010 Lot 1 of short subdivision no. 3027, recorded DAPBP, LLC under Auditor's file no. 1916060, being a portion of the south 24.99 acres of the west half of the east half of the northwest quarter of section 2, township 20 north, range 4 west. W.M. in Mason County, Washington. 420027500020 That portion of the Southwest one quarter of the John Titus & Northwest one quarter of Section 2, Township 20 Kusumam Titus . Norht, Range 4 W, W.M. described as follows: Beginning at the Southwest coner of said Northwest one quarter; Thence 5870 22' 42: E along the South line of said Northwest one quarter;1001.94 feet to the True Point of Begining; Thence north 10 46' 58" E, 343.42 feet; Thence north 870 22' 42"W, 351.10 feet; Thence north 1° 55' 10" E, 324.77 feet; Thence south 870 22' 42" E, 670.32 feet; Thence south 1° 46' 58" W, 668.21 feet to the Northerly margin of State Highway #102; Thence north 870 22' 42"W along said northerly margin, 320.00 feet to the True Point of Beginning. 420027590012 Lot three (3) of Short Subdivision No. 1851, Jeffery F & Sally recorded March 1, 1989, Auditor's file No. 491036, A Geibel and being a portion of the Southwest quarter (SW1/4) of the Northwest quarter (NW 1/4) of Section two (2), Township twenty (20) North, Range four (4)West, W.M. 420027590013 Lot four (4) of Short Subdivision No. 1851, Jeffery F & Sally recorded March 1, 1989, Auditor's file No. 491036, A Geibel and being a portion of the Southwest quarter (SW1/4) of the Northwest quarter (NW 1/4) of Section two (2), Township twenty (20) North, Range four (4) West, W.M. 17.01.080 CRITICAL AQUIFER RECHARGE AREAS In order to protect the public health and safety, prevent the degradation of ground water aquifers used for potable water, and to provide for regulations that prevent and control risks to the degradation of ground water aquifers, the following standards for Mason County are described in Section 17.01.080. Critical Aquifer Recharge Areas are those areas which are determined to have an important recharging effect on aquifers used as a source for potable water and vulnerable to contamination from recharge. Critical Aquifer Recharge Areas are areas of special concern and are subject to the Mason County Health Codes. Contents: A. Classification of Aquifer Recharge Areas B. Designation C. Pre-existing Uses D. Prohibited Uses and Activities E. Uses Requiring an Environmental Permit F. Subdivision Standards G. On-site Septic System Standards H. Well Head Protection Area- Notice 1. Standards for an Environmental Permit for the Critical Aquifer Recharge Area J. BMP Monitoring and Inspection K. Map Amendments L. Reclassification of Specific Land Use Activity M. Reports N. Public Education/Notice O. Protection of Private Wells P. Secondary Containment and Recycling of Hazardous Materials A. Classification of Aquifer Recharge Areas 1. Classes. Critical Aquifer Recharge Areas are classified as either Class I (Extremely Susceptible), Class 11(Highly Susceptible),Class III(Moderately Susceptible),or Class IV(Low Susceptibility),as described below. 2. Methodology. The aquifer classification system and maps were developed by a qualified geologist in consultation with the Washington Department of Natural Resources and considering data from the following sources; a. Mineral Resources of the Southern Hood Canal Area,Washington; Mackey Smith and R.J.Carson; Department of Geology and Earth Resources-Geologic Map GM-21; 1976. b. Geology and Related Water Occurrence, Southeastern Mason County,Washington; Dee Molenaar and John B. Noble; Water Supply Bulletin No. 29, Department of Water Resources, State of Washington; 1970. c. Geologic Map of the South Half of the Shelton and South Half of the Copalis Beach Quadrangles Washington;Robert L. Logan;Washington Division of Geology an Earth Resources;Open file Report 87-9; 1987. d. Geologic Map of North Central Mason County, R. J. Carson; Department of Geology and Earth Resources; Open File Report 76-2; 1976. e. Soil Conservation Maps for Mason County Washington;various. f. Topographic maps for Mason County;various. g. Water Well records. Interpretation of these data sources was performed by Geologist Gordon Adams. An explanation of that interpretation is included in a letter from Gordon Adams dated March 29, 1999. Mason County Resource Ordinance 37 Revised June 16,2009 2. Standards of Classification. a. Class I(Extremely Susceptible). Areas designated as Class I demonstrate hydrogeologic characteristics that allow for an extremely high susceptibility of an underground source of drinking water.These areas are identified as recessional cutwash of thickness' greater than 25 feet. Recessional outwashes are a geological formation predominantly composed of underground source of drinking water unconsolidated sands and gravels. These formations exhibit horizontal permeabilities greater than 30 feet per day (horizontal permeabilities are generally 10 times less than vertical permeabilities).Potential contaminants entering an underground source of drinking water can be expected to travel one mile in six months or less. b. Class II (Highly Susceptible). Areas designated as Class II demonstrate hydrogeologic characteristics that allow for a high susceptibility of an underground source of drinking water.These areas are identified as recessional outwash and alluvium 25 feet or less in thickness. These geologic formations are composed of unconsolidated sands and gravels interlain with discontinuous layers of hardpan and silty clays. Depth to water is generally 25 to 125 feet below land surface.These formations exhibit horizontal permeabilities in the range of 30 to 15 feet per day. Potential contaminants entering an underground source of drinking water can be expected to travel one mile in a time frame greater than six months and up to one year. c. Class III (Moderately Susceptible). Areas designated as Class III demonstrate hydrogeologic characteristics that allow for a moderate susceptibility of an underground source of drinking water.These areas are identified as advance outwash. The geologic formations consist of discontinuous layers of clayey gravel and sand and layers of silt and clay,which are more continuous and have been compacted into hardpan. Depth to water is greater than 125 feet below land surface. These formations exhibit horizontal permeabilities in the range of 15 to 3 feet per day. Potential contaminants entering an underground source of drinking water can be expect to travel one mile in a time frame greater than one year and up to five years. Class III areas include those well head protection areas, not otherwise designated as a Class I, 11,or III critical recharge area,and recorded with the Mason County Department of Community Development. d. Class IV(Low Susceptibility).Areas designated as Class IV demonstrate hydrogeologic characteristics that allow for a low susceptibility of an underground source of drinking water.These areas are identified as advance outwash found in the southwest part of Mason County along the Satsop drainage. B. Designation The lands and fresh waters of Mason County meeting the Critical Aquifer Recharge Areas Classification,plus 300 feet beyond the mapped boundary of all Class I, II or III areas, are hereby designated under RCW Chapter 36.70A as Critical Area Protection Zones requiring protection for public health. C. Pre-existing Uses Uses legally existing as of the date of adoption of this ordinance and which are listed under Sections D. (Prohibited Uses and Activities)or E.(Uses Requiring an Environmental Permit)are defined to be pre-existing uses. Pre-existing uses may continue operation pursuant to the following provisions and procedures.The purpose of these provisions is to assure that pre-existing uses that represent a threat to the aquifer are brought into compliance with the provisions of this chapter over time and to the highest degree possible.These provisions shall not be construed to mean that a pre- existing business must cease operations even if the type of business operates as a prohibited use per section D. below.The following procedures and requirements are hereby established; Upon identification of a legal pre-existing use,the county shall contact the operator and/or owner in order to develop a compliance plan and time line for bringing the pre-existing use into compliance to the highest degree practicable and which provides an acceptable low level of risk to the aquifer. 1. The County will negotiate with the owner/operator to identify a reasonable time frame and necessary steps to bring the use into compliance with this chapter. Mason County Resource Ordinance 38 Revised June 16,2009 2. Technical assistance will be offered the owner/operator by state and\or local personnel to enable the owner/operator to bring the operation into compliance. 3. The County will require that a written compliance plan be developed and agreed to by the owner/operator setting forth the compliance steps that will be taken and the agreed time frame under which these steps will be completed. 4_ The compliance plan shall be agreed to in a reasonable time as defined by the Director on a case-by-case basis. 5. Such compliance plan will take the form of a contract between the County and the owner/operator. 6. No expansion of any non-conforming aspect of the use or business activity will be permitted. 7. Failure to meet the terms of the contract, including time frames agreed to, shall constitute a breach of contract subject to all applicable law. If legal action on the part of the County becomes necessary to enforce the contract,the owner/operator shall be liable for all legal expenses. D. Prohibited Uses The following uses or activities are considered high impact uses due to the probability and/or potential magnitude of their adverse effects on groundwater and shall be prohibited in Class I, Class II and Class III Critical Aquifer Recharge Areas. 1. Landfill 2. Wood preserving, not fully contained operations 3. Electroplating 4. Dry cleaners excluding drop-off only operations where there is no on-site cleaning using hazardous materials 5. Class V injection wells, but limited to subclasses 5F01, 5D03, 5D04, 5W09, 5W10, 5W11, 5W31, 5X13, 5X14, 5X15, 5W20, 5X28,and 5N24. 6. Surface mining operations within designated urban growth areas, or within Class I, II, or III areas contiguous with the urban growth areas. 7. Radioactive disposal sites S. Outdoor auto wrecking operations 9. Hazardous waste transfer and treatment 10. Land spreading disposal sites where disposal is above agronomic rates(as in WAC 173-304) 11. Feedlots 12. Dumping of chemicals into a on-site septic system of a type or quantity that exceeds the systems designed capacity to treat. 13. Hazardous waste storage facilities unless accessory to an otherwise permitted use and approved P PP under State hazardous waste permit. E. Uses Requiring an Environmental Permit The following activities are allowed in Class I,Class II and Class III Aquifer Recharge Areas after issuance of a Permit per subsection I.below.This requirement is not intended to apply to schools,colleges,hospitals and other public institutions where the activities are incidental or accessory to the principal activity. This requirement is not intended to apply to a home occupation or cottage industry, where the amounts of hazardous materials use are below the thresholds established and regulated in the Uniform Fire Code.Permit review shall be by the Administrative Review process specified in section 17.01.120. 1. Chemical Manufacturing 2. Chemical mixing and remanufacture 3. Above and below ground storage tanks ad pipes used to contain regulated substances (see section 17.01.240) 4. Facilities that conduct biological research 5. Boat repair shops 6. Chemical research facilities 7. Gasoline service stations 8. Pipelines(petroleum and chemical transfer) 9. Printing and publishing operations that use printing liquids Mason County Resource Ordinance 39 Revised June 16,2009 I 10. Below ground transformers and capacitors 11. Sawmills producing over 10,000 board feet per day 12. Solid Waste handling and processing facilities 13. Vehicle repair, recycling, and auto wrecking activities 14. Mortuary 15. Furniture stripping 16. Motor vehicle service garages 17. Chemical processing of photographic film 18. Creosote and asphalt manufacturing and treatment facilities 19. Golf courses or ranges 20. Medium quantity generators (of dangerous, acutely hazardous, an toxic extremely hazardous waste) 21. Large quantity generators(of dangerous, acutely hazardous, and toxic extremely hazardous waste) 22. Activities reclassified as eligible for a Permit after County approval of a request to reclassify per subsection L. 23. Fully contained wood preserving operations. 24. Surface mining operations permitted under general permit by the Washington State Department of Ecology and not otherwise prohibited per Subsection D. F. Subdivision Standards and Evaluation Requirements. 1. Subdivision,short subdivisions and other divisions of land in areas of special concern shall be evaluated for their impact on groundwater quality as follows: a_ In urban growth areas, land divisions may be allowed which create lots less than one acre in size which rely on individual on-site septic systems. Such approvals shall be conditioned so that the total development allowed within the area to be divided shall not exceed an average density of one dwelling unit per acre, or an equivalent waste-water volume, until such development is served by public sewer. b. In urban growth areas, land divisions may be allowed which create lots less than one acre in size which rely on a community on-site septic systems. Such approvals shall be conditioned so that the total development allowed within the area to be divided shall not exceed an average density of one dwelling unit per acre. or an equivalent waste-water volume, until such development is served by public sewer. In addition, said system shall be evaluated to assure that it does not have localized effects that might have a significant adverse impact on wells or surface water bodies.Information for the evaluation shall be provided by the applicant in the form of a Site Evaluation Report as specified in subsection M.2. c. Outside of urban growth areas, subdivisions which provide for clusters of residential development where the density of the cluster of residential lots exceed one lot per acre,or where development will rely on a community on-site septic system, shall be evaluated to assure that they do not have localized effects that might have a significant adverse impact on wells or surface water bodies. Information for the evaluation shall be provided by the applicant in the form of a Site Evaluation Report as specified in subsection M.2. 2. Approval of a permit for 1. b. or c. above shall be based on a review of the report and a determination that there are no probable significant adverse impacts to wells,springs,surface water bodies,or off-site ground water quality- G. On-site Septic System Standards 1. The proper operation and maintenance of community or on-site septic systems is required in the critical aquifer recharge areas. The standards and procedures to be met to assure this are as set forth in the "Mason County On-Site Sewage Operation and Maintenance Program" and any subsequent implementing regulations. Participation in this program is mandatory for existing and new septic systems in the critical aquifer recharge areas. Mason County Resource Ordinance 40 Revised June 16,2009 i 2. New construction a. New construction which relies on on-site septic systems shall not be allowed to exceed a density of one dwelling unit per acre, or an equivalent waste-water volume,except for the development of one dwelling on lots existing or vested by December 5, 1996,where the on-site septic system can comply with all Environmental Health Department standards. For the purposes of this section,the sewage flow of one single family dwelling equals one unit volume of sewage equals 450 gallons per day.An exception to this may be made where a sewage treatment system or plant is used that processes the effluent so that the total of contaminants is equivalent to or less than that which would be produced by one dwelling unit per acre in suitable soils using individual on-site septic systems.The intensity of non-residential development that is allowed in compliance with this standard shall be calculated from Table 1. Alternative calculations for activities not included in Table 1 may be proposed, but the calculation method and conclusions must be approved by the County Environmental Health Department. b. Where such development relies on a new on-site sewage treatment plant or other new on-site community septic system, said plant or system shall not have localized affects that might have a significant adverse impact on wells or surface water bodies. Information for the evaluation shall be provided by the applicant in the form of a Site Evaluation Report as specified in subsection M.2. Approval of a permit shall be based on a review of the report and a determination that there are no probable significant adverse impacts to wells,springs,surface water bodies,or off-site ground water quality. 3. All new development within the designated urban growth areas,except for single-family residences built prior to the opportunity to connect to a public sewer system, shall be required to connect to existing public sewer systems, or to proposed public sewer systems as soon as connection is available. H. Well Head Protection Area -Notice Within well head protection areas,in addition to any other notice requirements,notice shall be provided to the manager of said area for any applications for an Environmental Permit for the Critical Aquifer Recharge Area or for any long subdivisions. I. Standards for an Environmental Permit for the Critical Aquifer Recharge Area To receive an Environmental Permit to operate in the Critical Aquifer Recharge Area an applicant must-, 1. Implement Best Management Practices (BMP), implement the Washington State Department of Ecology's Storm Water,Water Quality,Hazardous Waste,Wetland,and Solid Waste Program BMP and BMP from the Departments of Health,Agriculture,Transportation,and State Conservation District Office, or 2. Demonstrate through a Best Management Practices Report pursuant to subsection M.1.below,howthey will integrate other necessary and appropriate mitigating measures in the design, installation, and management of the proposed facility or use,and 3. Provide a written agreement to the County providing that all employees at the site will be notified that the operation lies above an aquifer recharge area and providing annual training regarding all measures set forth by the BMP established in subsection I. 1 or 2 above. J. 13MP Monitoring and Inspection. To assure that Hest Management Practices are implemented and maintained over time, the following procedures and requirements are hereby established. Mason County Resource Ordinance 41 Revised June 16,2009 1. The countywill maintain a data-base identifying all pre-existing prohibited uses or uses requiring a permit under the provisions of this section. Information for this purpose will be gathered from applicants for development permits and by consultation with appropriate state agencies. During pre-application meetings or on application, the county will require applicants to identify if they are required to have a hazardous waste identification number by the Washington State Department of Ecology and whether they generate any hazardous waste as defined under WAC 173-303. 2. Inspection and monitoring procedures. As a condition of approval, regular inspections for compliance will be required as appropriate to the activity, but not less than once in two years. The first inspection shall be made within 3 months of the issuance of the certificate of occupancy for the project. K. Map Amendments Applicants may seek to have the Aquifer Recharge Map amended as it pertains to the parcel or parcels for which they are applying. The application will be for a conditional environmental permit.This may be granted after the applicant demonstrates to the satisfaction of the county that site conditions meet the standards of classification per subsection C.for the Aquifer Area Class sought. Such demonstration shall be accomplished by providing a Map Amendment Report per subsection M.2.to the county. The County shall evaluate the Report and make a written determination as to whether the map will be amended. Approval of the map amendment requires that,based on the best available science,the site does not qualify as a critical aquifer recharge area, or qualifies as a different class designation from its current designation, as applied by the County pursuant to the Growth Management Act. The report shall be reviewed by the County in conjunction with the underlying permit process, if any exists. The review process shall be a public review as specked in subsection 17.01.120 E. 2. b. The County may consult with the Mason County Health Department, State of Washington Department of Health, independent reviewer, or any other parties it sees fit. The County will review the report with consideration of the level of science that currently exists and was employed to make the map designation being challenged. The applicant will not be required to provide information and/or analysis in excess of that required to convince the County that a map change is warranted. In addition,the County will re-assess all Map Amendment Reports and all other pertinent information received on a periodic basis and consider other appropriate map amendments on the basis of this increased information. L. Reclassification of Specific Land Use Activity Applicants may seek to have the use for which they are applying able to receive a Aquifer Areas Protection Permit per subsection E. This may be granted after the applicant demonstrates to the satisfaction of the County,that the use proposed applies new technologies and/or procedures,not traditional to the industry,that reduce the threat to the aquifer beyond that posed by the traditional technologies and/or procedures to a degree that the County determines will justify the reclassification. Such demonstration shall be accomplished by providing an Activity Reclassification Report per subsection M. 3.to the County. The County shall evaluate the Report and make a written determination as to whether the individual proposed land use will be recategorized. Review of the application shall be a public review as provided in section 17.01.120 2.b. Reclassification of a land use shall apply only to the particular use for which the reclassification is sought and shall not be applied to all or any similar uses. In addition, the County will re-assess all Reports received pursuant to this chapter and all other pertinent information received on a periodic basis and consider the other changes in the categorization of land uses in this chapter on the basis of this increased information. Mason County Resource Ordinance 42 Revised June 16,2009 M. Reports 1. Best Management Practices(BMP)Report-criteria. The following criteria shall apply when preparing a Best Management Practices (BMP) report. a. The report shall be prepared by, or done under the direction of and designed by,a qualified person with demonstrated expertise in the industry or field as demonstrated by a statement of qualifications and at least three references from parties familiar with common business practices in the subject field or known expertise in the field. b. The report will identify appropriate Best Management Practices by specifying all known and available reasonable technologies and how they will be employed to prevent degradation of groundwater.All necessary technical data,drawings,calculations,and other information to describe application of the BMP must be supplied. c. The report will identify how the applicant will satisfy the requirements of the Dangerous Waste Regulations,chapter 173-303 WAC in the event that hazardous material is released into the ground or ground water. d. The report will be reviewed by the Department of Community Development or a consultant hired by the County, at the applicant's expense, for this review.The County may consult with the Mason County Environmental Health Department;State of Washington Departments of Health or Ecology, independent reviewer, or any other parties it sees fit. 2. Map Amendment Report/ Site Evaluation Report - criteria. the following criteria shall apply when preparing a Map Amendment Report/Site Evaluation Report: a. A qualified groundwater professional will make a determination whether the proposed map amendment or project application will have adverse impacts on groundwater based on the requirements of the Safe Drinking Water Act and the Wellhead Protection Program, pursuant to Public Water Supplies, Chapter 246-290 WAC; Water Quality Standards for ground waters of the state of Washington,Chapter 173-200 WAC; and Dangerous Waste regulations, Chapter 173-303 WAC_ Those chapters of Washington Administrative Code are hereby adopted, as written or hereafter amended, as part of this chapter by reference. They are available at County offices. b. Map Amendment Report/Site Evaluation Reports shall include the following: i. Identification of features of the proposed development plan (e.g., on-site septic systems and other on-site activities) that may adversely impact ground water quality underlying or down gradient of the project or project area. ii. Drawing in an appropriate scale showing location of abandoned and active wells,springs,and surface water bodies within 1,000 feet of the project limits. iii. A description of the geologic and hydrologic characteristics of the subject property sufficient to justify the map amendment sought. This information may include any or all of the following.- (a) Lithologic characteristics and stratigraphic relationships; (b) Aquifer characteristics including recharge and discharge areas,depth to ground water, static water flow patterns, and estimated groundwater flow velocity- (c) Contaminant rate and transport including probable migration pathways and travel time of a potential contaminant release from a site through the unsaturated zone to the aquifer(s) and through the aquifers(s), and how contaminant(s) may be attenuated within the unsaturated zone and the aquifer(s); Mason County Resource Ordinance 43 Revised June 16,2009 (d) Appropriate hydro geologic cross sections which depict lithology, stratigraphy, aquifer, units,potential or probable contaminant pathways from a chemical release,and rate of groundwater flow; and (e) Existing groundwater quality, proposal for a groundwater monitoring plan to detect changes and indicate the corrective actions that will be taken if monitoring results indicate contaminants from the site have entered the underlying aquifer(s). (f) Existing soils types and characteristics (g) A discussion of the probable geologic history of the site and its impact on aquifer formation soils conditions; and aquifer susceptibility. 3. Activity Reclassification Report-preparation and review criteria. The following criteria shall apply when preparing an Activity Reclassification Report: a. The report shall be prepared by, or done under the direction of and signed by,a qualified person with demonstrated expertise in the industry or field as demonstrated by a statement of qualifications and at least three references from parties familiarwith common business practices in the subject field or known expertise in the field. b. The report shall contain a complete description of the activity for which reclassification is being sought. This description shall include all necessary technical data for the County to assess potential threat to the aquifer from an unmitigated operation, including chemicals and substances used, byproducts produced, etc. c. The report shall present Best Management Practices and/or mitigation techniques adequate to insure, to the satisfaction of the County, that the activity or land use for which reclassification is sought will present no greater threat to groundwater quality than other uses listed in this ordinance in the category being sought_ The burden is on the applicant to make this showing sufficient in the eyes of the County to reclassify the use. The report will include all technical data necessary,design drawings,specifications for equipment used, performance data on equipment or structures,and any evidence or testimony of successful operation of same or similar facilities and practices in other locations_ d. The report will demonstrate to the satisfaction of the County that reclassification of a land use will have no adverse impacts on groundwater based on the requirements of the Safe Drinking Water Act and the Wellhead Protection Program,pursuant to Public Water Supplies,Chapter 246-290 WAC; Water Quality Standards for Ground Waters of the State of Washington,Chapter 173-200 WAC:and Dangerous Waste Regulations, Chapter 173-303 WAC. Those chapters of Washington Administrative Code are hereby adopted,as written or hereafter amended,as part of this chapter by reference.They are available at Department of Community Development offices. e. The report will be reviewed by the Department of Community Development The County may consult with the Mason County Health Department;State of Washington Departments of Health or Ecology, independent reviewer, or any other parties it sees fit. N. Public Education/Notice 1. The household or commercial use of herbicides, pesticides,and fertilizers not in conformance with the manufacturers instructions/label directions is a violation of state and/or federal regulation. Improper disposal of oil based paints, paint thinners and other hazardous materials is a violation of the Mason County Solid Waste Regulation and of state and/or federal regulation.The county encourages proper use of such materials and shall provide educational information to the public through its sponsorship of the Washington State Cooperative Extension Service, the Mason Conservation District, or through the provision of informational materials in its offices. Mason County Resource Ordinance 44 Revised June 16,2009 2. Notification: a. Title Notification The owner of any site within a designated Critical Aquifer Recharge Area as identified in the Mason County Critical Aquifer Recharge Areas Map, on which a development proposal is submitted,shall record a notice with the Mason County Auditor. The notice shall indicate in the public record the presence of a critical aquifer recharge area, the application of this Chapter to the site, and that limitations on regulated activities may exist. Only one such notice is required to be made on any individual property or lot. The notice shall be as set forth below. "Notice: This site lies within a critical aquifer recharge area as defined by Chapter 8, Mason County Code. The site was the subject of a development proposal for application number filed on (date). Restrictions on use or alteration of the site may exist due to natural conditions of the site and resulting regulation. Review of such application provides information on the location of a critical aquifer recharge area and the restrictions on the site. A copy of the plan showing the aquifer recharge area is attached hereto. b. Plat Notification For all proposed short subdivision and subdivision proposals within Critical Aquifer Recharge Areas, the applicant shall include a note on the face of the plat_ The note shall be as set forth below: "Notice: This site lies within a critical aquifer recharge area as defined by Chapter 8,Mason County Code. The site was the subject of a development proposal for application number _ Filed on (date)_ Restrictions on use or alteration of the site may exist due to natural conditions of the site and resulting regulation. The note shall be recorded as part of final plat approval of any short subdivision or subdivision. c. Evidence of recording of these notices must be provided to the County. O. Protection of Private Wells Generators of hazardous materials are hereby defined as a known or suspected source of contamination per state law. No small, medium, or large quantity generators of hazardous materials shall be permitted to locate within 100 feet of any water well per the provisions of WAC 173-160-171 or its successors.This requirement applies to all portions of the County. P. Secondary Containment of Recycling of Hazardous Materials The following practices and procedures shall be observed throughout the County: 1. Moderate risk waste and petroleum products, including but not limited to oil and grease, shall be disposed of by recycling or use of a hazardous waste management facility operating under interim status or with a permit issued by EPA or an authorized state. No person shall intentionally or negligently dump or deposit or permit the dumping or depositing of any such waste in any other manner,including onto the surface of the ground, into surface water, or into ground water. 2 Moderate risk waste,petroleum products,and hazardous materials shall be kept in containers and shall be stored in such a manner and location that if a container is ruptured, the contents will not discharge, flow, be washed or fall into surface water or ground water. This is not intended to supersede any regulations as stated in the Fire Code. Mason County Resource Ordinance 45 Revised June 16,2009 TABLE 1 TYPE OF FACILITY DESIGN UNITS FLOW(GPD) Airports per employee;add per passenger 10; 4.0 B anquet rooms per seat 5 Barber and beauty shops per chair 100 Bowling alleys(bar and food) per lane 125 Bowling alleys(bar only) per lane 75 Campgrounds with no laundry,no wet sewer per camp site 50 hookups or dump station Campgrounds/RV park,with toilets per camp site 75 i Campgrounds/RV park,showers,toilets, per camp site 100 laundry,sewer hookup Church-food service,4-hour per person 5 Church-no food,4-hour per person 3 Community College per student&faculty,12-hours 15 Country club-includes food,showers,lounge per member;add per non-member 50;25 Day Care Centers, 12-hour per person 20 Dentist office per dentist;add per wet chair 250;200 Doctor office per doctor 250 Doctor office,in medical center per 1000 sq ft, 12-hours 500 Food Service and Bars a. Ordinary restaurant per seat 50 b. 24-hour restaurant per seat 75 c. Bar and cocktail lounge per seat 30 d_ Drive-in restaurant per car space 75 e_ Bar only,no food per seat 10 f. Coffee shop,6 hour operation per seat 6 Hospital per bed 300 Hospital-mental per bed and per employee 172 and 11 Hotels and motels,rooms only per room 130 I Mason County Resource Ordinance 46 Revised June 16,2009 TYPE OF FACILITY DESIGN UNITS FLOW(GPD) Industrial building,excl.cafeteria and process waste per employee/8 hour shift 17 Industrial,add for Cafeteria per employee 13 Laundries,self serve, 16-hour per machine 400 Meeting rooms per seat 3 Mobile home parks per space 300 Nursing homdrest home per bed 200 Office building per worker 20 Parks-toilets per person 10 Parks-toilets&showers per person 20 Prison per resident;add per employee 159; 16 Resort camps,cottages per room 100 Rooming house per resident 50 Schools, no food or showers per student 10 Schools,add for cafeterias per student 5 Schools,add for showers per student 5 Schools,boarding per student 75 Service station-pumps per island;add per employee 500;25 Service stations-repair for first bay;add each additional bay 1000; 500 Shopping centers, 12-hour per 1000 sq.ft floor space 300 Stadiums,race tracks,ball parks per seat 3 Stores,without food service a. Private toilets,for employees only per employee 20 b. Public toilets per toilet room 400 Theaters a. Indoor,auditoriums,12-hour per seat 5 b. Outdoor,drive-ins,4-hour per space 5 Sources:WA DOE,Criteria for Sewage Works Design;State of Florida,Dept_of Environmental Regulation,Technical Information Memorandum 62.1•WA DOE,Large On-Site Sewage Guidelines;US EPA,Design Manual,Onsite Wastewater Treatment and Disposal Systems. Mason County Resource Ordinance 47 Revised June 16,2009 NOTICE OF INTENT(NOI) Check if applicable: APPLICATION FORM r El Change o Update Permit Information DEPARTMENT OF Construction Stormwater General ❑ Modification of Permit Coverage ECOLOGY Permit Permit#WAR State of Washington Please print or type all sections of this appfication. All rrelds are required unless otherwise marked. (.Operator/Permittee(Party with operational control over plans and specifications or day-to-day operational control of activities which ensure compliance with Stormwater Pollution Prevention Plan(SWPPP)and permit conditions. Ecology will send correspondence and permit fee invoices to the permittee on record. Name: City of Shelton Company: Business Phone: Ext. Unified Business Identifier(UBI):none 360 432-5125 (UBI is a nine-digit number used to identify a business entity. Cell Phone(Optional): Fax(Optional): Write"none"if you do not have a UBI number.) E-mail: mmichael@ci.shelton.wa.us 232-000-085 Mailing Address; City: State. Zip+4: 525 W Cota St. Shelton WA 98584-2239 II. Property Owner(The party listed on the County Assessor's records as owner and taxpayer of the parcel[s]for which permit coverage is requested. Ecology will not send correspondence and permit fee invoices to the Property Owner, The Property Owner information will be used for emerge c contact purposes.) Name: City of Shelton Company(if applicable): Business Phone: Ext. Unified Business Identifier(UBI): none 360 432-5125 (UBI is a nine-digit number used to identify a business entity. Cell Phone(Optional): Fax(Optional): Write"none"if you do not have a UBI number.) E-mail:mmichael@ci.shelton.wa.us 232-000-085 Mailing Address: City: State: Zip+4: 525 W Cota St. Shelton WA 98584-2239 Ill. On-site Contact Person(Typically the Certified Erosion&Sediment Control Lead or 0 erator/Permittee Name: Dennis McDonald,Regional Project Manager Company:City of Shelton Business Phone: Ext. Mailing Address: 360 432-5167 525 W Cota St. Cell Phone(Optional) Fax(Optional): City: State: Zip+4: Shelton WA 98584-2239 E-mail:dennis@ci.shelton.wa.us IV. WebDMR Electronic Discharge Monitoring Reporting) You must submit monthly discharge monitoring reports using Ecology's WebDMR system. To sign up for WebDMR,or to register a new site,go to www.ecy.wa.aov/stormwater,and click on the"Construction Stormwater"link. You will find information on WebDMR under the"WebDMR and PARIS"link on the right-hand side. If you are unable to submit your DMRs electronically, you may contact Ecology to request a waiver. Ecology will generally only grant waiver requests to those permittees without internet access. Only a permittee or representative,designated in writing,may request access to or a waiver from WebDMR. To have the ability to use the system immediately,you must submit the Electronic Signature Agreement with your application. If you have questions on this process,contact Ecology's WebDMR staff at WAWebDMR-Stormwater ec .wa. ov or 360-407-7097. ECY 020-86(Rev.03/12) r V. Site Information Site or Project Name Site Acreage Dayton Airport Road Water Expansion Project Total size of your site/project(that You own/control): 38 acres. Street Address or Location Description(if the site lacks a street address,list its specific location. For example, Total area of soil disturbance(grading and/or excavating)for your Intersection of Highway 61 and 34.) site/project over the life of the project: 2.54 acres. (Note: 1 acre= 43,560 W.) Davton Airport Road Shelton Springs Road U5101 Concrete/Engineered Soils Parcel ID#: (Optional) How many yards of concrete will be poured over the life of the project?50 yd3(estimate) Type of Construction Activity(check all that apply): ❑ Residential How many yards of recycled concrete will be used over the life of ❑ Commercial the project?0 yd3(estimate) ❑ Industrial ❑ Highway or Road(city,county,state) Will any engineered soils be used?(For example:cement treated X Utilities(specify):Water base, cement kiln dust,etc.) ❑ Other(specify): ❑Yes X No City(or nearest city): Shelton Zip Code: Estimated project start-up date(mmldd/yy): Sept.2012 County. Mason 98584 Estimated project completion date(mm/dd/yy): June 2013 Record the latitude and longitude of the main entrance to the site or the approximate center of site. Latitude:47.2519 ON Longitude: 123.1456 °W For assistance with latitude and longitude, refer to the following website: hflp://wrvw.,eetlatlon.cont Convert all latitude and longitude coordinates into degrees, minutes, seconds format. For help with this process go to: htta:/Itransition.kc.aov/m b/audio/bicitel/DDDMMSS-(Iecimal.html Vi. Existing Site Conditions 1. Are you aware of contaminated soils present on the site? ❑Yes X No 2. Are you aware of groundwater contamination located within the site boundary? ❑Yes X No. 3. If you answered yes to questions 1 or 2,will any contaminated soils be disturbed or will any contaminated groundwater be discharged due to the proposed construction activity? ❑Yes X No ['Contaminated"and"contamination" here mean containing any hazardous substance(as defined in WAC 173-340-200)that does not occur naturally or occurs at greater than natural background levels.] If you answered yes to Question 3, please explain below or on a separate paper in detail the locations,contaminants, and concentrations,and pollution prevention and/or treatment BMPs proposed to control the discharge of soil/groundwater contaminants. Ecology may request a copy of your SWPPP. N/A VII. Stormwater Pollution Prevention Plan SWPPP You must develop a SWPPP prior to starting construction. Do not submit your SWPPP with your application. The exception is that Ecology may request a copy of your SWPPP if you answered yes to the questions in Part VI. ECY 020-85(Rev.03/12) 2 VIII. Best Management Practices BMPs You must use the BMPs listed in the Stormwater Management Manual for Western Washington or the Stormwater Management Manual for Eastern Washington or other manuals approved by Ecology. Alternatively,you may use demonstrably equivalent BMPs on the basis of permit condition S9.C.4. If you intend to use a BMP at your site that is not included in these manuals, but that you believe meets the definition of a demonstrably equivalent BMP,you must notify the appropriate regional office. (See Definitions in the Construction Stormwater General Permit).* http://www.ecy.wa.gov/pros rams/wq/stormwater/construction/contacts.html *Note that if you receive permit coverage without indicating the preference for a demonstrably equivalent BMP and later decide to use one,you must provide Eco!ogy with notice of the selection of an equivalent BMP no less than 80 days before the intended use of the equivalent BMP. IX. Discharge/Receiving Discharge/Receiving Water Information Indicate whether your site's stormwater and/or dewatering water could enter surface waters,directly and/or indirectly: X Water will discharge directly or indirectly(through a storm drain system or roadside ditch) into one or more surface waterbodies (wetlands,creeks,lakes,and all other surface waters and watercourses). If your discharge is to a storm sewer system,provide the name of the operator of the storm sewer system: (e.g., City of Tacoma): Turtle Lake (NOTE: If your stormwater discharges to a storm sewer system operated by the City of Seattle, King County, Snohomish County,City of Tacoma, Pierce County,or Clark County,you must also submit a copy of this NOI to the appropriate jurisdiction.) ❑ Water will discharge to ground with 100%infiltration,with no potential to reach surface waters under any conditions. If your project includes dewatering, you must include dewatering plans and discharge locations in your site Stormwater Pollution Prevention Plan. Location of Discharge into Surface Waterbody Enter the waterbody name and latitude/longitude of the point(s)where the site has the potential to discharge into a waterbody(enter all locations). • Include the names and locations of both direct and indirect discharges to surface waterbodies,even if the risk of discharge is low or limited to periods of extreme weather. • Some large construction projects(for example,subdivisions, roads, or pipelines) may discharge into several waterbodies. • If the creek or tributary is unnamed,use a format such as"unnamed tributary to Deschutes River." • Attach a separate list if necessary. Surface Waterbody Name Latitude Longitude Decimal Degrees Decimal Degrees W Turtle Lake 47.23610 N 123.1314°W ° N °W ° N °W If your site discharges to a waterbody that is on the impaired waterbodies list(i.e.,303(dj list)for turbidity,fine sediment,high pH, or phosphorus, Ecology will require additional documentation before issuing permit coverage and these sites will be subject to additional sampling and numeric effluent limits(per Permit Condition S8).Ecology will notify you if any additional sampling requirements apply.Information on impaired waterbodies is available online at hHp.11www.ecv.wa.gov/programslwa/303dl2008lindex.html. ECY 020-85(Rev.03/12) 3 illl X. State Environmental Policy Act(SEPA) This Notice of Intent(NOI)is incomplete and cannot be approved until the applicable SEPA requirements under Chapter 197-11 WAC are met. Who is the SEPA lead agency on your site?Mason County Has the SEPA lead agency issued a final decision on your checklist? X No ❑Yes ❑ Exempt* If No: The N01 is incomplete. Ecology will hold the application until a final SEPA decision is made or the Construction Stormwater N01 public comment period ends,whichever is later. You must notify Ecology once the lead agency has issued a determination. If Yes:Type of SEPA decision issued:❑ Determination of Non-Significance(DNS) ❑ Mitigated DNS(MDNS) ❑ Determination of Significance(DS) ❑Final Environmental Impact Statement(EIS) ❑Other:_ • Date of final SEPA decision: • If a supplemental EIS,SEPA addendum,or some other type of additional SEPA review was required, please attach and submit with this form. • Date when all SEPA-related comment&appeal periods are exhausted: *If Exempt:Attach written documentation,check type of exemption below,and proceed to Section VII. ❑Watershed Restoration &Fish Habitat Enhancement Exemption(RCW 43.21 C.0382). ❑ Infill Development Exemption(RCW 43.21C.229). ❑ Planned Action Exemption(RCW 43.21C.031). ❑ Categorical Exemption. Under what section of the SEPA Rule(WAC 197-11-800)is it exempt? (for example,WAC 197-11-800(1)Minor New Construction) More SEPA information is available at.,httP:11www.ecy.wa.pov/programsIsea/sepa/e-review.hfml. XI. Public Notice You must publish a public notice at least once a week for two consecutive weeks with seven days between publications, in at least a single newspaper of general circulation in the county in which the construction is to take place. Ecology cannot grant permit coverage sooner than the end of the 30-day public comment period,which begins on the date of the second public notice. Mail or fax(360-407-6426)the NOI to Ecology on or before the first public notice date. If you fax the public notice to Ecology,you must also mail a hard copy. Failure to do so may delay the issuance of your permit, Provide the exact dates(mm/dd/yy)that the first and second public notices will appear in the newspaper(s): First notice: 08/02/2012 Second notice: 08/09/2012 (Begins 30-day public comment period.) For example: First notice: 01/01/10 Second notice: 01/08/10 Name of the newspaper(s)publishing the notices: Shelton-Mason County Journal ECY 020-85(Rev.03/11) 4 PUBLIC NOTICE TEMPLATE Complete this template using project-specific information and submit to a local newspaper with general circulation within the county where the project is located. The bold language is required by WAC 173-226-130 and must be included in its entirety. (Either use the till-in template below or attach on a separate sheet of paper, if necessary.) (Note: This section is unprotected so you can delete text in parentheses) City of Shelton, 525 W Cota Street, Shelton, WA 98584, is seeking coverage under the Washington State Department of Ecology's Construction Stormwater NPDES and State Waste Discharge General Permit. The proposed project, Dayton Airport Road Water Expansion Project is located at Shelton Springs Road, US 101,and Dayton Airport Road near Shelton, in Mason County. This project involves 2 54 acres of soil disturbance for watermain construction activities. (List all construction activities, for example, residential, commercial, industrial, highway, utility). Stormwater will be discharged to Turtle Lake. Any persons desiring to present their views to the Washington State Department of Ecology regarding this application, or interested in Ecology's action on this application, may notify Ecology in writing no later than 30 days of the last date of publication of this notice. Ecology reviews public comments and considers whether discharges from this project would cause a measurable change in receiving water quality,and, if so,whether the project is necessary and in the overriding public interest according to Tier II antidegradation requirements under WAC 173.201A•320. Comments can be submitted to: Department of Ecology Attn:Water Quality Program, Construction Stormwater P.O. Box 47696,Olympia,WA 98504.7696 XII. Certification of Permittees "1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Gary H. Cronce / City of Shelton Mayor Printed Name i Company(operator/permittee only) Title Signature of Operator/Permittee* Date * Federal regulations require this application is signed by one of the following: A. For a corporation: By a principal executive officer of at least the level of vice president. B. For a partnership or sole proprietorship: By a general partner or the proprietor, respectively. C. For a municipality, state,federal,or other public facility: By either a principal executive officer or ranking elected official. Please sign and return this document to the following address: Washington Department of Ecology- Stormwater P.O. Box 47696 Olympia,WA 98504-7696 ECY 020-85(Rev.03111) 5 Public Notice City of Shelton, 525 W Cota Street, Shelton, WA 98584, is seeking coverage under the Washington State Department of Ecology's Construction Stormwater NPDES and State Waste Discharge General Permit. The proposed project, Dayton Airport Road Water Expansion Project is located at Shelton Springs Road, US 101, and Dayton Airport Road near Shelton, in Mason County. This project involves 2.54 acres of soil disturbance for watermain construction activities. Stormwater will be discharged to Turtle Lake. Any persons desiring to present their views to the Washington State Department of Ecology regarding this application, or interested in Ecology's action on this application, may notify Ecology in writing no later than 30 days of the last date of publication of this notice. Ecology reviews public comments and considers whether discharges from this project would cause a measurable change in receiving water quality, and, if so, whether the project is necessary and in the overriding public interest according to Tier II anti-degradation requirements under WAC 173.201A-320. Comments can be submitted to: Department of Ecology Attn: Water Quality Program, Construction Stormwater P.O. Box 47696,Olympia,WA 98504.7696 �o a 1?o Z L06� �PO N 010 Z � 2 � City of Shelton Ake u� Johns cake 1� Project Site Map W t /IAVTnM AIDDnDT D!1 ` Dayton-Airport ' I WBUSINESS PARKRD—' , � Road Water Turtlo Lko CM Expansion __l_ E FAIRFIELD CT o Project � O Washington w�"DERsoN h'AY State Patrol J + Academy , L622 Shelton Water Pipelines �� 5 PROJECT LOCATION � Schedule A W " MCCIMV oM," r 11 Sc h e d u l e Cpadk „ ,. 0— Shelton Cityvrlway I _ A� P�f Limits A� � 0 13784ft Materials Testing & Consulting, Inc. MTC Geotechnical Engineering&Consulting•Special Inspection•Materials Testing•Environmental Consulting February 23,2012 JWM&A c/o Mr. Steve Willie, P.E. 1700 Cooper Point Road SW, Suite B-2 Olympia, WA 98502 (Sent via email: steve@jwmorrissette.com Subject: Final Geotechnical Engineering Report(MTC Project#11SO64-03) Dayton Airport Road Watermain Project Shelton, Washington Dear Mr. Willie: This letter transmits our Final Geotechnical Engineering Report for the above-referenced project. Materials Testing & Consulting, Inc. (MTC) performed this geotechnical study in accordance with our November 22,2011 proposal. The attached report has been issued upon receiving your comments. The site soils have been classified within the attached report and are generally described as silty sand with gravel to a gravel with sand. As requested, dimensions of maximum particle sizes encountered during our exploration were recorded and included in the test pit logs in Appendix B. A free groundwater surface was observed at a depth of 6.5 feet in test pit 8 (TP-8). Groundwater was not observed to depths explored in any other test pit. We appreciate the opportunity to provide geotechnical engineering services to you for this project. We would be pleased to continue our role as your geotechnical engineering consultants during the project planning and construction. We will be pleased to meet with you at your convenience to discuss these services. If you have questions regarding this report, or if we can provide assistance with other aspects of the project,please contact either Lance at(360) 534-9777 or Scott at(360)755-1990. Respectfully Submitted, Materials Testing& Consulting,Inc. r� �ance G. Levine, P.E. Scott A.Palmer,P.E. Professional Geotechnical Engineer Geotechnical Division Manager Attachment: Final Geotechnical Engineering Report Corporate • 777 Chrysler Drive • Burlington,WA 98233 • Phone(360)755-1990 • Fax(360)755-1980 SW Region • 2118 Black Lake Boulevard SW • Olympia,WA 98512 • Phone(360)534-9777 • Fax(360)534-9779 NW Region • 2126 E Bakerview Road,Suite 101 • Bellingham,WA 98226 • Phone(360)647-6061 • Fax(360)647-8111 Visit our website:www.mtc-inc.net Final Geotechnical Engineering Report Dayton Airport Road Watermain Project Shelton, Washington Prepared for: JWM&A c/o Mr. Steve Willie, P.E. 1700 Cooper Point Road SW, Suite B-2 Olympia, WA 98502 Prepared by: �GARY�F �G Of wasy� Li cooz cc �LI �✓ �.t� ,9 45853 O �� FGIST 1e C?�O N A 4 `� ;,&mod 02-23_2012 n ' l Lance G.Levine,P.E. S ott A. Palmer,P.E. Professional Engineer Geotechnical Division Manager MATERIALS TESTING& CONSULTING,INC. (MTC) MTC 2118 Black Lake Boulevard SW Olympia,Washington 98512 Phone:(360) 534-9777 Fax: (360) 534-9779 c o • aterials Testing&Consult ' February 23,2012 MTC Project Number: 1 I S064-03 Materials Testing&Consulting, Inc. All Rights Reserved Dayton Airport Rd. Watermain— Final Geotechnical Report Materials Testing & Consulting, Inc. Project No. 1 l S064-03 February 23, 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...........................................................................................................................I 1.1. GENERAL...................................................................................................................................1 1.2. PROJECT DESCRIPTION .........................................................................................................1 1.3. PURPOSE AND SCOPE OF SERVICES...................................................................................1 2.0 SITE EXPLORATION AND LABORATORY TESTING ............................................................2 2.1. SITE EXPLORATION................................................................................................................2 2.2. LABORATORY TESTING ........................................................................................................2 3.0 EXISTING SITE CONDITIONS....................................................................................................3 3.1. SURFACE DESCRIPTION ........................................................................................................3 3.2. AREA GEOLOGY......................................................................................................................4 3.3. SOIL CONDITIONS...................................................................................................................5 3.4. GROUNDWATER CONDITIONS.............................................................................................5 4.0 CONSTRUCTION RECOMMENDATIONS.......................:.........................................................6 4.1. EARTHWORK............................................................................................................................6 4.1.1. Excavation ...........................................................................................................................6 4.1.2. Wet Weather Construction ..................................................................................................6 4.2. STRUCTURAL FILL MATERIALS AND COMPACTION.....................................................7 4.2.1. Materials..............................................................................................................................7 4.2.2. Placement and Compaction.................................................................................................7 4.3. TEMPORARY EXCAVATIONS AND SLOPES......................................................................8 4.4. UTILITY TRENCHES AND EXCAVATIONS.........................................................................8 5.0 LIMITATIONS................................................................................................................................9 APPENDIX A. SITE PLANS APPENDIX B. EXPLORATION LOGS APPENDIX C. LABORATORY RESULTS Dayton Airport Rd. Watermain— Final Geotechnical Report Materials Testing& Consulting,Inc. Project No. 11 S064-03 February 23,2011 1.0 INTRODUCTION 1.1. GENERAL This report presents the findings and recommendations of Materials Testing& Consulting, Inc.'s(MTC's) geotechnical engineering study conducted in order to construct approximately 11,500 feet of watermain. The project site is composed of Washington State Department of Transportation (WSDOT) and Mason County right-of-ways or parcels near Shelton, Washington. The location of the project site is shown in Figure 1 of Appendix A. These services were requested by Steve Willie of Jerome W. Morrissette & Associates, Inc.,via email on October 12, 2011. 1.2. PROJECT DESCRIPTION We understand the development includes constructing approximately 11,500 feet of 12-inch diameter watermain. Horizontal borings and typical trenching methods will be used to construct the alignment. Up to five locations may require horizontal borings to cross existing roadways. The proposed alignment follows the rights-of-way for SR 102 (Dayton Airport Road), US 101, and Shelton Springs Road. The proposed alignment is generally flat with no significant slopes that would limit access. Vegetation along the proposed alignment varies between grass and scotch broom to areas with no vegetation. View Looking South along US 101 at TP-4 1.3. PURPOSE AND SCOPE OF SERVICES The purpose of our study was to explore subsurface conditions at various locations along the proposed watermain and provide geotechnical engineering recommendations for design and construction of the proposed development. Our scope of services was consistent with our proposal dated November 22, 2011. 1 Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing& Consulting,Inc. Project No. 11 S064-03 February 23, 2011 2.0 SITE EXPLORATION AND LABORATORY TESTING ZL SITE EXPLORATION We investigated the site on January 6, 2012, by excavating eight test pits. Approximate test pit locations were selected by Jerome W. Morrissette & Associates Inc. All approximate test pit location measurements provided in this report were determined by pacing and taping the distance off existing site features and roadways. Test pits were excavated to a depth of 10 feet below the existing ground surface unless prevented by existing conditions (TP-1 and TP-8). During the excavation of test pits, the soils encountered were logged in accordance with the Unified Soil Classification System. Soil samples were collected at depths of 3, 6, and 9 feet, sealed in plastic bags to preserve their moisture, and transported to our laboratory for re-examination and testing. View Looking North at TP-4 View Looking South at TP-6 Additional information on the site exploration program is provided with our exploration logs for the test pits in Appendix B of this report. 2.2. LABORATORY TESTING Laboratory tests were performed on selected soil samples in accordance with ASTM standards to determine index and engineering properties of the site soils. Testing included natural moisture content and grain-size distribution. Laboratory test results are presented on test reports included in Appendix C. 2 Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 11 S064-03 February 23,2011 3.0 EXISTING SITE CONDITIONS 3.1. SURFACE DESCRIPTION The project site is relatively flat with mild slopes and primarily vegetated with field grass and scotch broom. During excavation, all existing soils appeared to be in a moderately compacted state (loose to dense). In general, excavation of the site soils was relatively easy using a large backhoe due to the un- cemented matrix of site soils. The upper 3 feet was generally the hardest material to excavate as it contained the largest percent of silty sand acting as a binding material. Due to the extent of the alignment,the project site is bordered by varying public,private, and commercial properties in all directions. Site access is from SR 102, US 101, and Shelton Springs Road of which the watermain will parallel. View Looking North at TP-2 View Looking Southeast at TP-7 3 Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing& Consulting,Inc. Project No. 115064-03 February 23,2011 3.2. AREA GEOLOGY The site is generally located within the southern portion of the Puget Sound lowland. Multiple glacial advances have deposited glacial material throughout the area with the last advance nearly 14,000 years ago. The site soils are mapped as Grove Gravelly Sandy Loam, 0 to 15 percent slopes and Carstairs Gravelly Loam, 0 to 5 percent slopes by the Soil Survey of Mason County.' Carstairs soils are generally a mixture of sandy and gravelly material that occupies glacial outwash plains. The unit is generally dark at surface is described as excessively drained. Grove soils are also a mixture of sandy and gravelly material occupying glacial outwash plains. The unit is generally reddish brown at the surface and is described as somewhat excessively drained. According to the Geologic Map of Washington — Southwest Quadrant, the geology of the project sites consists of undifferentiated outwash deposits (Qgo) deposited during the Vashon Advance. The recessional and proglacial material is stratified sand and gravel locally containing silt and clay? The Geologic Map of the Shelton 1:100,000 Quadrangle, Washington describes the site geology as proglacial and recessional outwash (Qgo) at test pits 1 to 7 and as Alluvium (Qa) at test pit 8. The recessional outwash material is typically poorly to moderately sorted and locally contains fine and coarse deposits including rounded gravel. The alluvium material is sorted combinations of silt, sand, and rounded gravel deposited in streambeds and alluvial fans.3 The results of our field and laboratory investigations indicate that site conditions are consistent with the published geology. A free groundwater surface was observed at a depth of 6.5 feet in test pit 8 (TP-8). Groundwater was not observed to depths explored in any other test pit. ' Web Soil Survey(hnp. itebsoilsurvey.nres.usda.Qoviapp.,ii"ebSoilSurvev.aspx);United States Department of Agriculture—Natural Resources Conservation Service 2 Geologic Map of Washington—Southwest Quadrant; WA State Department of Natural Resources; Timothy Walsh and others; 1987 3 Geologic Map of the Shelton 1:100,000 Quadrangle, Washington; WA State Department of Natural Resources; Logan et al;2003 4 Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 11 S064-03 February 23,2011 3.3. SOIL CONDITIONS A general characterization of the onsite soil units encountered during our exploration is presented in this section. The exploration logs in Appendix B present details of the soils encountered at each exploration location. As encountered in our test pits,the onsite soils are generally characterized as follows: Silty Sand with Gravel—SP-SM: Dark brown silty sand with gravel to 1 to 3 feet below the ground surface. Moist and loose to dense with roots. Gravel with Sand — GW or GP (Glacial Outwash): Gray, brown, and orange/brown gravel with sand generally from 1 to 3 feet below the ground surface extending to 10 feet below the ground surface (depth of exploration). Excessively drained, moist, loose to medium dense, containing cobbles and boulders. TP-2 TP-4 3.4. GROUNDWATER CONDITIONS A free groundwater surface was observed at a depth of 6.5 feet in test pit 8 (TP-8) due to the adjacent wetland. Groundwater was not observed to depths explored in any other test pit. A review of well logs on file at the Washington State Department of Ecology listed several wells in the near vicinity of the project. Most well logs indicate a depth to water table of approximately 40 to 50 feet on the northern portions of the project (higher in elevation) and 25 to 35 feet on the southern portions of the project(lower in elevation)4 4 Washington State Well Log Viewer(htto:;/amecv.u,a.eov,ivellloQ'MavSearchl Washington State Department of Ecology, Well Logs for wells BBE769 5 Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing& Consulting,Inc. Project No. 11 S064-03 February 23,2011 4.0 CONSTRUCTION RECOMMENDATIONS 4.1. EARTHWORK 4.1.1. Excavation Excavation of the onsite soils can generally be performed with conventional equipment such as backhoes and excavators. However, difficult excavations should not be completed in excessively wet soil or near the water table without proper dewatering. Excavations below the water table will be unstable and will result in an unstable subgrade which may not provide proper support to utilities or structural fill. A free groundwater surface was only encountered in TP-8 at 6.5 feet. However, the groundwater surface can vary due to seasonal and other effects. The Contractor should anticipate the removal of boulders and cobbles greater than 6 inches from native (existing) soil to be reused as structural fill. The Contractor should anticipate that the soils may require moisture conditioning when they are removed from the ground at non-optimum moisture contents. Soils stockpiled onsite to be used as structural fill shall be covered to limit exposure to inclement weather. Where possible, excavations should be made within about one foot of finished subgrade level. We recommend using smooth edged buckets to minimize subgrade disturbance. 4.1.2. Wet Weather Construction The finer grained native soil may be moisture sensitive and could become soft and difficult to compact or traverse with construction equipment when wet. During wet weather,the contractor should take measures to protect the exposed trenches and backfill material. During wet weather, earthen berms or other methods should be used to prevent runoff from draining into excavations. All runoff should be collected and disposed of properly. Measures may also be required to remediate onsite soils in the event of wet weather. These measures can include: • Drying and recompaction. Selective drying may be accomplished by scarifying or windrowing material during periods of dry or warm weather. • Removal of affected soils to expose a suitable subgrade and replacement with compacted structural fill. • Mechanical stabilization with a coarse crushed aggregate compacted into the subgrade,possibly in conjunction with a geotextile. • Soil-cement admixture stabilization. The fine-grained portion of the onsite soils may be difficult to work with during periods of wet weather. Since frozen soil is not suitable for use as structural fill,we recommend that earthwork activities generally take place in late spring, summer, or early fall. 6 Dayton Airport Rd. Watermain— Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 11 S064-03 February 23, 2011 4.2. STRUCTURAL FILL MATERIALSAND COMPACTION 4.2.1. Materials All trench backfill material should be placed and compacted as structural fill. Structural fill material should be free of deleterious material, have a maximum particle size of 6 inches, and be compactable to the required compaction level. Native glacial material (below topsoil) may be reused as structural fill, provided it is properly moisture conditioned and cobbles greater than 6 inches in diameter are removed. Portions of the native glacial material have a higher silt content and may be more moisture sensitive. Moisture sensitive soils may be very difficult to use as structural fill if allowed to become too wet. These soils will be difficult to dry out if allowed to become too wet. Therefore, they are not recommended for use during periods of wet weather. On the other hand, during warm dry weather, it may be necessary to add water to achieve optimum moisture conditions. Imported structural fill material should conform to the most recent edition (at the time of construction) of WSDOT Section 9-03 in Standard Specifications for Road, Bridge, and Municipal Construction (WSDOT Standard Specifications).5 Controlled-density fill or lean mix concrete can be used as an alternative to structural fill materials, except in areas where free-draining materials are required or specified. Frozen soil is not suitable for use as structural fill. The contractor shall submit samples of each of the required earthwork materials to the geotechnical engineer for evaluation and approval prior to use. The samples should be submitted at least four(4) days prior to their use and sufficiently in advance of the work to allow the contractor to identify alternative sources if the material proves unsatisfactory. 4.2.2. Placement and Compaction Prior to placement and compaction, structural fill should be moisture conditioned to within 3 percent of its optimum moisture content. Loose lifts of structural fill should not exceed 12 inches in thickness; thinner lifts will be required for walk-behind or hand operated compaction equipment. All structural fill should be compacted to a dense and unyielding condition and to a minimum percent compaction based on its modified Proctor maximum dry density as determined per ASTM D1557. Structural fill shall be compacted to the indicated percent compaction: Utility Trenches(upper 4 feet): 95 Percent of Modified Proctor Utility Trenches(below 4 feet): 90 Percent of Modified Proctor We recommend structural fill placement and compaction be observed on a full-time basis by a MTC representative. A sufficient number of tests should be performed to verify compaction of each lift. The number of tests required will vary depending on the fill material, its moisture condition and the equipment being used. Initially more frequent tests will be required while the contractor establishes the means and methods required to achieve proper compaction. 5 Standard Specifications for Road, Bridge, and Municipal Construction(WSDOT Standard Specifications); Washington State Department of Transportation; 2010 7 Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing& Consulting,Inc. Project No. 115064-03 February 23,2011 4.3. TEMPORARY EXCA VA TIONS AND SLOPES All excavations and slopes must comply with applicable local, state, and federal safety regulations. Construction site safety is the sole responsibility of the Contractor, who shall also be solely responsible for the means, methods, and sequencing of construction operations. We are providing soil type information solely as a service to our client for planning purposes. Under no circumstances should the information be interpreted to mean that MTC is assuming responsibility for construction site safety or the Contractor's activities; such responsibility is not being implied and should not be inferred. Temporary excavations in the existing native soils should be inclined no steeper than 1 H:1 V. Heavy construction equipment, excavated soil, and vehicular traffic should not be allowed near the top of any excavation. Temporary excavations and slopes should be protected from the elements by covering with plastic sheeting or some other similar impermeable material. Sheeting sections should overlap by at least 12 inches and be tightly secured with sandbags,tires, staking, or other means to prevent wind from exposing the soils under the sheeting. 4.4. UTILITY TRENCHES AND EXCA VA TIONS The contractor should be responsible for the safety of personnel working in utility trenches. We recommend all utility trenches, but particularly those greater than 4 feet in depth, be supported in accordance with state and federal safety regulations. Pipe bedding material should conform to the manufacturer's recommendations and be worked around the pipe to provide uniform support. Cobbles exposed in the bottom of utility excavations should be covered with pipe bedding or removed to avoid inducing concentrated stresses on the pipe. Trench backfill should be placed and compacted as structural fill as recommended herein. Particular care should be taken to make sure bedding or fill material is properly compacted in-place to provide adequate support to the pipe. Jetting or flooding is not a substitute for mechanical compaction and should not be allowed. 8 Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. I 1 S064-03 February 23, 2011 5.0 LIMITATIONS Recommendations contained in this report are based on our understanding of the proposed development and construction activities, our field observations and exploration, and our laboratory test results. It is possible that soil and groundwater conditions could vary and differ between or beyond the points explored. If soil or groundwater conditions are encountered during construction that vary or differ from those described herein, we should be notified immediately in order that a review may be made and supplemental recommendations provided. If the scope of the proposed construction changes from that described in this report, our recommendations should also be reviewed. We have prepared this report in substantial accordance with the generally accepted geotechnical engineering practice as it exists in the site area at the time of our study. No warranty, express or implied, is made. The recommendations provided in this report are based on the assumption that an adequate program of tests and observations will be conducted by MTC during the construction phase in order to evaluate compliance with our recommendations. Other standards or documents referenced in any given standard cited in this report, or otherwise relied upon by the author of this report, are only mentioned in the given standard; they are not incorporated into it or"included by reference", as that latter term is used relative to contracts or other matters of law. This report may only be used by Jerome W. Morrissette & Associates, Inc., and those parties involved with the project for the purposes stated within the report for a period no later than 36 months from the date of the report. If the report is to be used beyond 36 months from the date of the report, we must complete a review of our findings and recommendations to issue an amended report. Land or facility use, on- and off-site conditions, regulations, or other factors may change over time and additional work may be required with the passage of time. Based on the intended use of the report, MTC may recommend that an additional inspection be performed and that an updated report be issued. We recommend that MTC be given the opportunity to review the final project plans and specifications to evaluate if our recommendations have been properly interpreted. We assume no responsibility for misinterpretation of our recommendations. The scope of work for this subsurface exploration and geotechnical report did not include environmental assessments or evaluations regarding the presence or absence of wetlands or hazardous substances in the soil, surface water, or groundwater at this site. 9 Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing & Consulting, Inc. Project No. 115064-03 February 23, 2011 APPENDIX A. SITE PLANS Site Vicinity H-!; 'w 11iI z? � * e . V Sanderson Sys k qy r chwrnm Viiloge a - a r 4 W sip,, ,p Rk+ Ip a+ , '� �118hGi1 � 42, Ca Ekg OF * ° ae 4'�Rd e E ... :.. SEMI Google 2012 (Dayton Airport Rd) Map 1 , �- I Site Location T� IMF US 101 h` r Shelton Springs Rd 4 x Y.� Google 2012 Materials Testing & Consulting,Inc. Regional and Local Site Vicinity FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 1 Olympia, WA 98512 Shelton,WA Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. I I S064-03 February 23, 2011 na tL' ff � a 3 3 "^^--- -....._.W DAYTON AIRPORT RE) X-_-._,-.-..,. o; eueftfts P ARKt,4� a FP-1 E FAItFIEID CT W TP_5 Q wS4Nl1EkS 3 Gir o' � ; 1P-6 w m W g w TP-7 Q Fr < (n w x w a z P TP-8 4P S'°c 1 Approximate Test Pit(TP)Location Not to scale Materials Testing & Consulting, Inc. Site Plan with Test Pit Locations FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 2 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain— Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 11 S064-03 February 23,2011 APPENDIX B. EXPLORATION LOGS Representative soil samples were collected from below the existing ground surface. Soil samples were collected by grab sampling methods from the sidewalls of the excavations. During the field exploration the soils were classified in accordance with ASTM D2487. All samples were placed in plastic bags to limit moisture loss, labeled, and returned to our laboratory for further examination and testing. The excavations were monitored by our field geologist who examined and classified the materials encountered, obtained representative soil samples, and recorded pertinent information including soil sample depths, stratigraphy, soil engineering characteristics, and groundwater occurrence. Upon completion of fieldwork,the test pits were backfilled with the native excavated soil. The stratification lines shown on the individual logs represent the approximate boundaries between soil types; actual transitions may be either more gradual or more severe. The conditions depicted are for the date and location indicated only,and it should not necessarily be expected that they are representative of conditions at other locations and times. Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 11 S064-03 February 23, 2011 Unified Soil Classification System Chart Major Divisions Graph USCS T Sampler Symbol Description .io Typical Description Coarse C; - GW Well-graded Gravels,Gravel-Sand Mix- Standard Pencuattan Test(SPT) Grained Sods Gravel tires Clean Gravels ® Shclbc Tube More Than i- GP Poorly-Graded Gravels,Gravel-Sand 50%of ;� Mixtures ® Grab or Bug: Coarse Frac- tion Retained ! GM Silty Gravels,Gravel-Sand-Silt Mixtures More Than 50% On No.4 8 California(3.0"O.D.) Retained On Sieve Gravels With Fines No.200 Sieve GC Clayey Gravels,Gravel-Sand-Clay Mix- tures . Modified California(2.5"O.D.) $W Well-graded Sands,Gravelly Sands San Stratieraohic Contact Clean Sands Distinct Stratigraphic Contact More Than Sp Poorly-Graded Sands,Gravelly Sands Between Sod Strata 50%of Coarse Frac- \ Gradual Change Between Sod tion Passing $M Silty Sands,Sand-Silt Mixtures Strata No.4 Sieve ______ Approximate location of Sands With Fines stratagraphic change SC Clayey Sands,CleyMvdues Fine Grained ML Inorganic Sibs,rock Flow,Clayey Silts = Groundwater observed at time of Soils With Low Plasticity exploration Silts&Clays Liquid Limit Less C L Irorganic C lays of Low To Medium sz Measured groundwater level it y 4 Y Than 50 Plasticity exploration,well m or piezoeter More Than 50% Perched water observed at time Passing The OL Organic S dts and Organic S ihy C lays of . of exploration N.200 Sieve Low Plasticity NIH Inorganic Silts of Moderate Plasticity Modifiers Silts&Clays Liquid Limit CH Inorganic Clays of High Plasticity Description % Greater Than 50 Trace >5 OH Organic Clays And Sibs ofMedium to Some 5-12 High Plasticity PT Peat,Humus,Soils with Predominantly With >12 Highh Organic Soils Organic Content Soil Consistency Grain Size Granular Soils Fine-grained Soils DESCRIPTION SIEVE GRAIN SIZE APPROXIMATE SIZE SIZE Denser SPT Consisseaey SPT Blowcoanr Blowcorrat Boulders >12" >12" Larger than a basketball Very Loose 04 Very Soft 0-2 Cobbles 3-12- 3-12" Fist to basketball Loose 4-10 Soft 2A Coarse 3/4-3" 3/4-3" Thumb to fist Gravel Medium 10-30 Firm 4-8 Fire #4-3/4" 0.19-0.75" Pea to thumb Dense Dense 30-50 Stiff 8-15 Coarse #10-#4 0.079-0.19" Rock salt to pea Very Dense >50 Very Stiff 15-30 Sand Medium #40-#10 0.017-0.079" Surgsr to rock salt Had >30 Fire #200-#40 0.0029-0.017" Flour to Sugar mines 00 <0.0029" Flour and smaller Materials Testing& Consulting,Inc. Key FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 3 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing & Consulting, Inc. Project No. 11 S064-03 February 23, 2011 Materials Testing& Consulting. Inc. Test Pit 1 (TP-1) Geotechnical Engineering and Consulting Olympia,WA (Page 1 of 1) Dayton Airport Road Watermain Pro)ec.. Date Started January 6.2011 Geotechnical Site Investigation Date Completed January 6.2011 Sampling Method Backhoe Shelton.WA Location Nest of WSP Entrance 1-N47.252'.W123.159') Project#11 S064-03 Logged By .B Hicks,L Levine `m m E d m m m c Surf U Elev a DESCRIPTION o Q J m 300 C m m T W 0 300 Grass and root zone,3 inch depth � Brown well graded GRAVEL with SAND,coarse grained,medium dense,moist,rounded gravel and cobbles up to 3.5 inch diameter t 295 GW 2 298 1 3 297 Total depth=3 feet Test pit terminated due to discovery of three cables not marked by locate No Groundwater encountered 4 296 5 295 6 29 7 293 8 292 9 291 10 290 tt Materials Testing & Consulting,Inc. Exploration Log FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 4 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 11 S064-03 February 23, 2011 Materials Testing&Consulting Inc. Test Pit 2 (TP-2) Geolechnical Engineering and Consulting Olympia,WA (Page 1 of 1) Dayton Airport Road Watermain Project Date Started January 6,2011 Geotechnical Site Investigation Date Cpnppo :January 6,2011 Sampling Mettwd Backhoe Shelton,WA Location :37N,WTE CCDayton Airport Rd/PW Drive Intersection Project#11 S064-03 Logged By B.Hicks.L.Lavine ro E $ o � E surf, i ro $, -J Elev. 0 0- DESCRIPTION E 300 c� mg 0 300 Brown SILTY SAND with GRAVEL,coarse grained,dense,moist.rounded cobbles up to 8.0 inch � diameter SM f 299 Orange/brown SILTY SAND with GRAVEL,coarse grained,medium dense,moist,rounded cobbles up to 9.0 inch diameter SM 2 296 Broom/gray poorly graded GRAVEL with SAND,coarse grained,loose to medium dense,moist to wet,rounded cobbles up to 6.0 inch diameter,soft to medium digging at 3.0 feet,caving at 4.5 feet 3 297 1 6 GP 4 296 ro 5 295 Brown/gray well graded GRAVEL with SAND,coarse grained,loose to medium dense,wet, rounded cobbles up to 8.0 hall diameter,soft to medium digging,caving 6 294 2 7 293 GW a 292 v 9 291 3 ip 10 290 Total depth=10 feet No Groundwater encountered 11 Materials Testing & Consulting,Inc. Exploration Log FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 5 Olympia, WA 98512 Shelton, WA Dayton Airport Rd. Watermain— Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 11 S064-03 February 23,2011 Materials Testing&Consulting Inc. Test Pit 3 TP-3 Geotechnical Engineering and Consulting Olympia.WA (Page 1 of 1) Dayton Airport Road Watermain Project Date Sated January 6,2011 Geotechnical Site Investigation Date Completed January 6.2011 Sampling Method :Badchoe Shelton,WA Location :130"N,36W of Dayton Airport Rd t 101 Intersection Project#11 S064-03 Logged By B.Kicks,L.Levine i6 m E m o c surf. a Slev. C05v 0. DESCRIPTION £ X 00 7 tmn 0 300 Duff and root zone,3 inch depth Red I brown SILTY SAND with GRAVEL.coarse grained,dense,moist,rounded cobbles up to 4.0 inch diameter,roots 1 299 SP-SM 2 1 298 Gray well graded GRAVEL with SILTY CLAY and SAND,coarse grained,medium dense to loose,moist,rounded cobbles and boulders to 13 inch diameter,roots to 3 feet 3 297 1 10 W-G 4 296 6 5 295 Gray well graded GRAVEL with SAND,coarse grained,medium dense to loose,moist,rounded cobbles and boulders to 16 inch diameter,caving and easier digging at 7.5 feet 6 294 2 fv 7 293 GW 8 292 ro x g 291 3 m 10 290 Total depth=10 feet No Groundwater encountered 11 Materials Testing& Consulting,Inc. Exploration Log FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 6 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 11 S064-03 February 23, 2011 Materials Testing&Consulting, Inc. Test Pit 4 (TP-4) Geotechnical Engineering and Consulting Olympia,WA (Page 1 of 1) Dayton Airport Road Watermain Project Date Started January 6,2011 Geotachnicai Site Investigation Date Completed January 6.2011 Sampling Method Sackhoe Shelton,WA LOCO t on 11 W of road surface.$50'S of Dayeon Airport Rd Project 0 11 S064-03 Logged By B.Nicks,L.Levine E C Surf. S H J t Ekv. a DESCRIPTION a io 280 Cn 07 280 Grass,moss,and root zone,3 inch depth FILL;Brown SILTY SAND with GRAVEL,coarse grained,medium dense,dry,rounded gravel up to 2.0 inch diameter SP-SM `r 1 279 Asphalt,old road surface Brown poorly graded GRAVEL with SAND,coarse grained,medium dense to loose,moist, 2 278 rounded cobbles up to 5,0 inch diameter(one cobble to 9.0 inch) 3 277 1 4 276 in 5 275 GP s 274 a x 7 273 8 272 in 9 271 3 10 270 Total depth=10 feet No Groundwater encountered 11 Materials Testing & Consulting, Inc. Exploration Log FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 7 Olympia,WA 98512 Shelton, WA Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing & Consulting, Inc. Project No. 11 S064-03 February 23, 2011 Materials Testing&Consulting Inc. Test Pit 5 (TP-5) Geotechnical Engineering and Consulting Olympia,WA (Page 1 of 1) Dayton Airport Road Watermain Project Date Started i January 6.2011 Geotechnicall Site Investigation pate Completed January 6,2011 Sampling Method :Backhoe Shelton,WA Location 70'S of Airport Entry.25'W of 101 Centerline Project Y 11 S064-03 Logged By B.Flicks,L Levine 0 c Surf. t Elev. rn n DESCRIPTION a m a280 rt6n 3 0 280 Moss and root zone,2 inch depth Light brown SILTY SAND with GRAVEL,coarse grained,dense,dry,rounded cobbles up to TO x inch diameter to 1 279 SP-SM 2 276 Dark brown SILTY SAND with GRAVEL intedayed with orange!brown SILTY SAND with GRAVEL,coarse grained,medium dense,moist,roots,rounded cobbles up to 4.0 inch diameter, SP-SM caving at 3.5' a 3 277 Gray/brown well graded GRAVEL with SAND,coarse grained,medium dense to loose,moist. 1 rounded cobbles up to 10.0 inch diameter 4 276 5 275 b x 6 274 2 e GW 7 273 8 272 io x in 9 271 3 b 10 270 tO Total depth=10 feet No Groundwater encountered 11 Materials Testing & Consulting, Inc. Exploration Log FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 8 Olympia, WA 98512 Shelton,WA Dayton Airport Rd. Watermain— Final Geotechnical Report Materials Testing & Consulting, Inc. Project No. 1 l S064-03 February 23, 2011 Materials Testing & Consulting, Inc. Test Pit 6 (TP-6) Geotechnical Engineering and Consulting Olympia.WA (Page 1 of 1 l Dayton Airport Road Watermain Project Date Started January 6 2011 Geotechnical Site Investigation Date Completed January 6 2011 Sampling Method Backhoe Shelton,WA Location 50'N.30'E of 101 i Shelton Springs intersection Project#11 SD64-03 Logged By B Hicks,L Levine d E m - 0 m c Surf fl E1ev v ° DESCRIPTION E 280 = n D 280 Grass and root zone,3 inch depth Dark brown SILTY SAND with GRAVEL,coarse grained,medium dense,moist,rounded cobbles SP-SM up to 8.0 inch diameter 1 279 Orange i brown SILTY SAND with GRAVEL,coarse grained,medium dense,moist,rounded cobbles up to 6.0 inch diameter SP-SM 2 278 Gray 1 brown GRAVELLY SAND.coarse grained,loose,moist.rounded cobbles up to 6.0 inch SP diameter 3 Orange I brown well graded GRAVEL with SAND,coarse grained,medium dense to loose,moist. 1 rounded cobbles up to 9 0 inch diameter 4 275 54 275 GVJ � 6 274 2 7 273 8 272 Orange/brown poorly graded GRAVEL with SAND,coarse grained,medium dense to loose. x moist,rounded cobbles up to 9 0 inch diameter 9 27. GP 3 10 270 Total depth=10 feet No Groundwater encountered 1t Materials Testing & Consulting, Inc. Exploration Log FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 9 Olympia,WA 98512 Shelton, WA Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 11 S064-03 February 23, 2011 Materials Testing&Consulting, Inc. Test Pit 7 (TP-7) Geotechnical Engineering and Consulting Olympia,WA (Page 1 of 1) Dayton Airport Road Watermain Protect Date Started January 6,2011 Geotechnical Site Investigation Date Completed ,*,,,,,,y 6,2011 Sampling Wttwd Backhoe Shelton.WA Location 25N.ME of Shelton Songs/Blevins Intersection Project#11S064-03 Logged By B.Hicks.L.Levine m RE U. U Elev rn a. DESCRIPTION a m n V E O 280 0 280 Grass and root Zone.3 inch depth Dark brown SILTY SAND with GRAVEL,coarse grained,medium dense,moist,rounded gravel up to 2.0 inch diameter 1 279 SP-SM N Broom well graded GRAVEL with SAND,coarse grained,medium dense to loose,moist,rounded 2 278 cobbles up to 4.0 inch diameter ih GW 3 277 1 4 276 Brown well graded SAND with GRAVEL,coarse grained,medium dense to loose,moist,rounded cobbles up to&0 Inch diameter 5 275 SW 6 274 2 to 7 273 Gray!brown wall graded GRAVEL with SAND,coarse grained,boss,moist,rounded rabbles up to 9.0 inch diameter 8 272 GW b 9 271 Gray well graded GRAVEL with SAND,coarse grained,loose to medium dense,moist,rounded 3 GW cobbles up to 6.0 inch diameter m 10 270 Total depth=10 feet No Groundwater encountered 11 Materials Testing& Consulting,Inc. Exploration Log FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 10 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing& Consulting,Inc. Project No. 11 S064-03 February 23, 2011 Materials Testing &Consulting, Inc. Test Pit 8 (TP-8) Geotechnical Engineering and Consulting Olympia.WA (Page 1 of 1) Dayton Airport Road Watermain Project Date Started January 6,2011 Geotechnical Site Investigation Date Completed :January 6,2011 Sampling Method :Backhoe Shelton,NIA Location :100'N from Tarragon.WE from Shelton Springs Rd Project it 11 S064-03 Logged By :B Hicks,L Levine ;v m E Cl tl U c Surf. _ rn ME Elev, in a DESCRIPTION a 0 240 o 240 Grass,scotch broom,and root zone 6 inch depth Orange/brown SILTY SAND with GRAVEL,coarse grained,medium dense,moist,rounded gravel up to 2 0 inch diameter,charcoal at 1 0 foot depth 1 239 v SP-SM 2 233 Brown!orange well graded GRAVEL with SAND coarse grained,loose to medium dense,moist, rounded cobbles up to 6 0 inch diameter,2 5 inch diameter tree root at 2 5 foot depth s 237 cw - 4 236 5 235 Brown well graded GRAVEL with SAND and trace SILT,coarse grained.loose to medium dense moist to wet,rounded cobbles up to 6 0 inch diameter,water table at 6 5 foot depth at time of exploration 6 234 2 7 233 GW 6 232 3 is 9 1 231 Total depth=9 feet Terminated at 9.0 feet due to caving on west side trench near fiber optic cable No Groundwater encountered 10 23C 11 Materials Testing & Consulting,Inc. Exploration Log FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 11 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain—Final Geotechnical Report Materials Testing& Consulting,Inc. Project No. I 1 S064-03 February 23, 2011 APPENDIX C. LABORATORY RESULTS Laboratory tests were conducted on representative soil samples to better identify the soil classification of the units encountered and to evaluate the material's general physical properties and engineering characteristics. A brief description of the tests performed for this study is provided below. The results of laboratory tests performed on specific samples are provided at the appropriate sample depths on the individual test pit logs. However, it is important to note that these test results may not accurately represent in situ soil conditions. MTC cannot be responsible for the interpretation of these data by others. The soil samples for this project will be retained a period of 3 months following completion of this report,unless we are otherwise directed in writing. SOIL CLASSIFICATION Soil samples were visually examined in the field by our representative at the time they were obtained. They were subsequently packaged and returned to our laboratory where they were reexamined and the original description checked and verified or modified. With the help of information obtained from the other classification tests, described below, the samples were described in general accordance with ASTM Standard D2487. The resulting descriptions are provided at the appropriate locations on the individual exploration logs, located in Appendix B, and are qualitative only. MOISTURE CONTENT Moisture content tests were performed in general accordance with ASTM Standard D2216 on representative soil samples to approximately ascertain the in-place moisture content of soil samples at the times they were collected. The information obtained assists us by providing qualitative information regarding soil compatibility. The results are presented at the appropriate sample depths on the exploration logs. GRAIN-SIZE DISTRIBUTION Grain-size distribution analyses were conducted in general accordance with ASTM Standard D422 and C 136 on representative soil samples to determine the grain-size distribution of the onsite soil. The information gained from these analyses allows us to provide a description and classification of the in- place materials. In turn, this information helps us to understand how the in-place materials will react to conditions such as excavation, loading, potential liquefaction, infiltration, and so forth. The results are presented in this Appendix. Dayton Airport Rd. Watermain-Final Geotechnical Report Materials Testing & Consuting,Inc. Project No. 115064-03 February 23, 2011 Sieve Report Project: Dayton Airport Rd Watermain Geotech Date Received:6-Jan-12 ASTM D-2487 I nified Soils('lassification Sy stem Project#: I1SO64-03 Sampled By:BH GW,Well-graded Gravel with Sand -- Client:JWM&A Date Tested:12-Jan-12 Sample Color: -- - - Source:TP1@3' Tested By:CL Brown Sam le#: 12-010A D,., 0 297 mm %Gravel=70.7% Coeff.of Curvature,C,;=1.43 Specifications ll,,,,=0.561 nun °tb Sand=29.4% Coeff,of Uniformity,Cr=55.07 No Specs D,.,=4.981 mm %Silt&Clay=1.0% Fineness ModuluIs=6.53 Sample Meets Specs? D„RI=14.587 mm Fracture°b=n/a Min Liquid Limit=n/a D16,;=30.876 nun Moisture%=9.0% Plastic Limit=Wires DI,,,,=90.934 mm Sand Equivalent=airs Min Plasticity Index=n/a Actual Interpolated Cumulative Cumulative Grain Size Distribution Sieve Sae Percent Percent Specs Spec tr s @g pgg US Metric Passin Passing Mu Mis 'x`.x - x �4"a+411�?� aL 100% m n!-•. T I C r r- 100.0% 12.00" 300.00 100% 100.0'/• 0.01/6 n 1 1 1 u u 1 1 l I I I I I I I I I I I I I I 10.00" 250.00 100% 100.0°/R 0.0% I I I I I I u u 1 1 n u t n n 1 1 8.00" 200.00 100% 100.0% 0.0% gm9 Ili l_1 l 1 _I--__lm!' I_I__l,i t L'_I__Lit Ili L 1 _ 900o/. IIIIII 1I IIIIIII /1111111 IIIIIII 6.00" I50.00 1008/6 100.01/6 0.0% n 1 1 1 1 I 1 n 1 1 1 I I n n 1 1 1 I n 1 1 1 1 1 1 4.00" 100.00 100% 100% 100.0% 0.0% n 1 1 1 InIIII u n I n I 3.00" 75.00 73% 73% 100.0% 0.0% 80% IH Iy++ `1�-1--1M1+r1-1--:rlH rrr-Hl+t+rr- 80.0% IIIIIII II IIIIIII 'IIIIIII IIIIIII 2.50" 63.00 69% 100.0% 0.0% II111 IIIII :IIIII I IIII I 2.00" 50.00 668/6 100.01/6 0.0% 70% I It 1 1 1 ; IIIII 11 d 11 1 1 i IIII 1 1 1 70 0% IIIIII IIIII IIIIIII IIIIII 1 1 1.75" 45.00 64% 100.0% 0.0% IIIII I I ` Hill I I IIII I11 I I IIIII I I 1.50" 37.50 62% 62% 100.0% 0.0% III11 I I I Hill I I I IIIII I I 1 IIIIII 1 1 1.25" 31.50 60% 100.01/6 0.0% 60% 1uu 11_J1_. •" __1u 1111_'..wuL 1_1--L11111i 60.0% IIIII 111 IIIIII IIIIIII II11111 1 1.00" 25.00 58% 58% 100.0% 0.0% C IIII 1 n 1 `% 111 1 1 1 '.IIIIII I IIIIII C 3/4" 19.00 54% 54"/6 100.0% 0.0% jp IIIII IIIII I IIIII '.II, I111 '- 5/8" 16.00 52% 52% 100.0% 0.0% ^ 50% 1nnTT--1Ir1 n-1-I\-mIT n-1--'..mn rl-r-rITITrT 50.0% 6 IIIII I I IIIIII I I IIIIII 11 11111111 1 11111I I I d 1/2" 12.50 47"/o 47% 100.0% 0.0% IIII I III I111 1 IIIII 1 LI11I IIIIII , " 3/8" 9.50 41% 41% 100.0% 0.0% 40% I1111_I __IIIII I_I_I__IIII 1_I_I__41111 1 1_I__ Hill1- 400% \ 1/4" 6.30 34°/ 34% 100.0% 0.0% IIIII 1 IIIII II II 1u1111 1 IIIII I I 1 IIIII I I IIII 1 1 I I I I 11 1 1 I '.I I I I I I I � g I I I I I I I #4 4.75 291/6 29% 100.01/6 0.0% Hill I I II II I I I I Ili`I I I I 111 1 1 I I I I II I I I I I #8 2.36 21% 100.0% 0.0% 30% IH N t Y-yl+I 1lI I Tell H-I--,It H r 1-r-MI+H r r- 30.0% I1111 I I II I111 I I IIIII I I IIIIIII I I IIIII I I I 410 2.00 20% 20% 100.0% 0.0% 1 1 IIIII I I I IIIII I I :IIIII I I I IIIII 11 1 #16 1.19 161/6 100.0% 0.0% I dill 1 1 IIIII I I I 1111 1 I IIIII l I #20 0.850 14% 14% 100.0"/6 0.0% 20� I T i--It-I_I I ii i;i il- -uTl i11 l i I I 'III I i T- 20.0°/ IIII IIIIIII IIIIIII III I I I I I IIIIIII #30 0.600 11% 100.0°/ 0.Oo/ IIIII IIIII i IIIII I ! 11 I I 1 IIIII I #40 0.425 88/6 8% 100.0% 0.0% 10% ILI IJII_JIlI LIJ J_-ILIIl LI_I_ LLI•J.LL_LIil1L 1_ 100% IIII IIIII I IIIII II'.'` #SU 0.300 5% 1 00.0% 0.0"/ IIIII I I 91111 1 I I IIII l l l I `•. I I I #60 0.250 4% 41/6 100.0°/ 0.0°/" #80 0.180 3% 3% 100.0% 0.0% 0% 0.0°r6 #100 0.150 21/6 21/o 100.0% 0.01/6 1000.00 100.00 10.00 1.00 0.10 0.01 #140 0.106 1% 100.0% 0.0% Particle Size(men) #170 0.090 1% 100.0% 0.0% #200 0.075 1.0% 1% 100.0% 0.0'/0 + s�ra�.R -. .I. "a -•-w"".. -•-s,...a.I,m �"vsesl sue,.�e�e a T.�I.�t sw�.es.Ivss•e our vr6mn,PFrnv,l. Comments: Reviewed by: Mesh Ca,doq W'AB(,Suprvvnr laboruory Mwgu.S W Repion Materials Testing & Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 12 Olympia,WA 98512 Shelton, WA Dayton Airport Rd. Watermain- Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 11 S064-03 February 23, 2011 Sieve Report Project:Dayton Air port Rd Warerm ain Geotech Date Received:BJan-12 AS GP,Po Dygrad d Gravel c'<I Soils Classification System Project#: I1S064-03 Sampled By:BH GP,Poorly graded Gravel with Sand Client:JAIM&A Date Tested: 12-Jan-12 Sample Color, Source:TP2 3' Tested By:CL Brown/Gray A6CREDITED Sam le#• 12-0lOB ''""+°�„"'°' D,.,=0.748 mm %Gravel=57.5% Coeff.of Curvature,Cr.=0.91 Specification., Du°,= 1.131 mm 4'•Sand=42.1% Coeff ofliniformity,C,=8.06 No Specs Ias.t=3.067 mm %Silt&Clay=0.4% Fineness Modulus=5.82 Sample Meets Specs° Df51,,=6.425 mm Fracture%=da Min liquid Limit=da Q.,=9.115 mm Mcistore%=3.7% Plastic Limit=Wa PPP,=31.010 mm Sand Equivalent=n/A Min Plasticity Index=da Actual Interpolated -- Cumulathe Cumulative Grain Size Distribution Sieve Sae Percent Percent Spas Specs rr g k US Metric Yassm Paaain Mar Min cIZ gQg�$8�-G a 12.00" 300.00 100% 100.0% 0.0p/ 100p/. I1 n p_•- art I'l l I>•II tilMFile >+a,i l-ir I I 100.0% IIII I I I I 111 I I 1 IIII I I I I IIII I I I I I 10.00" 250.00 100% 100.0% 0.()*/. IIII I I I I 1111"•,'�I I 111111 1 I 111111 1 I I!1111 1 I 8.00, 200.00 100% 100.0% 0.0°/ 90°/P in11_il _ilil IN _I__nili I_I_1__liu_I I_IIf nil I 900./. IIII I IIII I I I I IIII I I �I I111 6.00" 150.00 100% 100.0% 0.0°/ 'III I (IIII III n11III I Iu1II1 I nnIIII I 4.00" 100.00 100% 100.0% 0.0/0 n n \ n 11 IIn 1 I I 3.00" 75.00 100% 100.0% 0.0% 8M. 11',�'-a11{J 41J J -1 u111-I-1--1}I F-I 41- -w1�1;u.- 80.0'/ I I I I '.IIII I I I tin I I I I IIn I I I I Inl I I I I 2.50" 63.00 100% 100% 10D.0% 0.01/6 IIn .IIu IIn I IIn I I ;I I I I 1 1 100" 50.00 95P/ 95% 100.0% 0.0% I I I-i111 I II1111 1-1 _IIII I I I II11111 I I 1.75" 45.00 94% 100.0% 0.0% 7�/ -i IT1 I l-i -1 i n I I I I IIII i-Iin i 1 i 7 70.0P/o I illl V11 I I I 1 IIII 11 11111 I I 11 1.50" 37.50 92°/ 92% 100.0% O.tP/ �I i I 1 IIII I I I I IIII 1 1 I IIII I I 11 i1111 1 1 1 I 1.25" 31.50 90% 90% 100.0% 0.0°/6 60p/6 ILL IJ L 1_JIU L11 J_ UI1 LI.I__ILU I L-L_UIL11 L L_ 60,0- IIII I I I IIII I I I I I I I IIII I I I I 'IIII I I I I 1.00" 25.00 851. 85% 100.0% 0.01/0 C IIII V L I111 1 1 •IIn 11 1 3/4" 19.00 79% 79% 100.0% 0 101/ IIII I I I I d l I I 1 1 I I i i I 1111 1 1 I I -.I I I I I I I I 'N 509/6 I n 17 r-r-+IIn r l-r-1--� -1-'Irl ry r l'r-"I r l T SIR" 16.00 74°/. 74% 100.0% 0.0% 1 V 12.50 68% 68% 100.0% 0.0% Ills IIII .IIII I 1 3B" 9.50 61% 61% 100.0% 0.0% 40'1'O -i1�ll -ilia -i--i _1__171i1i 1_i_�inilii 7- 40.0% 1/4" 6.30 W/o 50% 100.0% 0.V/. .nllI I 1 1 #4 4.75 431/o 43% 100.0% 0.0°/ 1iii 11 1 I 1n11 i 1 i IIII n 1 I un111 1 1 #8 2.36 25% 100.0% 0.0"/ 30% i4I� 4 _1111L1_I__:WI41+H1- 30.0% IIII 1I I IIII IIII 111 1 -rill 111 1 #10 2.00 22% 22% 100.0% 0.0% 1IIi 11 1 d111 1 I�� nI1111 1 .nu 1 I 1 #16 1.18 11% 100.0% 0.0D/. IIII nn IIII l i IIII 'IIII 00 1 1 #20 0.850 6°/. ON. 100.0% % 20% lnnrn- mnmnn-r-Inm7rr- 20.096 IIIIII nn 111 II IIIII 1 II11111 !1111111 #30 0.600 3°/ 100.0% 0.0'/o nu I 1 1 1 nl1 11 1 11u I nn I 1 Ilnl 11 I 1 #40 0.425 2% 2% 100.0% 0.01/ 10% n1i 1_ii i_ I11111i_1ui1i 1_i_1 ili l_I__auilii L- 100P/o #50 0.300 1% 100.0% 0.0% III 11 1 IIII IIu ` ... l I IIII 11 1 III I I I I ]III I I I I IIII I I I � I I illll l l l I #60 0.250 1% 1% 100.0% 02/0 •. 1 #80 0.180 1% 1% 100.0% 00/ #100 0.150 1% 1% 100.0% 0.0% 1000.00 100.D0 10.D0 1.00 0.10 0.01 #140 0.106 lP/o 100.0% 0.01/ Particle Size(mm) #170 0.090 0°/. 100.0% 0.0"/. #200 0.075 0.4% 01/6 100.0% 0.0"/b ' '�a='=, -•�sp,,, ---• -�tn.,paa ems".aar1. Co PJri6hl Span Fi�gi�n�°a 1'sMcal Servce P5.19969. N rmlu yply"nA to acwl loatim.and mdcriA tc.dui. 4 a mutual Pm c.,un to cimta the puFli and oun d,w,all re Pon.aarc xubmit.tl ax tM1e m Mdmtal Property a(d�nn ab auth:rvainn for Pubiul nn�i(petunmt"mnc Lr unn nr«Ind,Irom or rgrdinP our npmte is rowed pmd,M am wttcn approa°. Comments: Reviewed by: M14hGPrdm WABOStgerJuP°Llwat"ry M•ugm.SW'aegu" Materials Testing & Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 13 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain-Final Geotechnical Report Materials Testing& Consulting,Inc. Project No. 115064-03 February 23,2011 Sieve Report Project:Dayton Aapon Rd Watetmain Geotech Date Received:6-Jan-12 %SIN] D-24871 nifted Soils Classification System Project#: 11SO64-03 Sampled By:BH GW,Well-graded Gravel vvith Sand Client:JWM&A Date Tested: 12-Jan-12 Sample Color. Source:TP2@6' Tested By:CL Dk Brown Gray ACCREDtTE61 Sam le#• 12-010C o.ouc+p+Seam.1pt°o::ra°> Df51=0.795 mm %Gravel=69.5% Coal ofCurvanre,C,•=1.03 Specifications Due,=IA64 min %Sand=29.7% Coll of Uniformity,q,=9.88 1Vo Specs Am,=4.672 nnm °b Silt&Cal=0.7% Fineness Modulus=6.42 Sample fleets Specs? D,a,=10.106 nun Fracture%=da Min liquid Limit=da 1.)° 14.473 min Mcisure°'=4.2% Plastic Limit=na Div,,,=83.168 mm Sand Equivalent-n/a Min Plasticity Index=da ASTM Actual Interpolated ---- Cumulative Cumulative Grain Size Distribution Sieve Size Percent Percent Specs Specs t, us Metric Passing Passing Man Min 4 100% Irn -. f nT r r- 100.0% 12.00" 300.00 100% 100.0% 0.0% ill 11 I I 10.00" 250.00 100% 100.0% 0.0% IIII IIII 1 1 1 1 'Hill I I IIII I I I I 8.00" 200.00 100% 100.0% 0.01/° 90% Ini 1_il -_I--IT. l_I_I--Iin_ii I-I__inilii i_ 900% 1111 I ''H I l l I IIII I I I I -IIII 1 1 1 6.00" 150.00 100% 100.0% 0.011/ II11 Hill I I I IHi l l 11 111111 1 1 4.00" 100.00 1001/6 100% 100.0% 0.0% IIII 1 1 1 u u 1 1 1 1 n u 1 1 1 I 111 1 1 1 3.00" 75.00 85% 85% 100.0% 0.0/ aty/p II '••` IIII I IIII I I IIII 250" 63.00 84% 100.0% 0.0 200" 50.00 821/0 82% 100.0% 0.0% 70% IIII I I I I 111. ` '.III 11 I I II11 I I I I IIII l 1 1 I IIII 'Ili ',.11 1 1 IIII 11 I I 1 -.rllr I I - �.�/ 1.75" 45.00 82% 100.0% 0.0% nu I I I I I I I 1.50" 37.50 81% 100.0% 0.01/0 Hir I I 1 .1n1 1 1 1 1 nn I I :1u111 1 1 1.25" 31.50 81% 81% 100.0% 0.0/ 50/p Iuui1_aIwuJ \ -:IiI_I_I__liluL_L_Iu1L11LL_ 60.0% IIII (III IIII l I :IIII I I 1.00" 25.00 75°/ 75% 100.0% 0.01/0 cn 3/4" 19.00 67% 67% 100.0% 0.0/ 'V1 IIII 1 1 11111 , '.III 1 I11111 1 I II111 I I I 'y ,n 50'/0 1tt I7r7-7m r1Y ,IT 1-1---mein ri- -l"Iril 1-t 50tr/. m 5/11" 16.00 63% 63% 1110.0% 0.0/ m Q. 12" 12.50 571/ 57% 100.0% 0.0/ III I11 I II11 I I 1 IIIII I I III111 IIII 111 III IIII III I innlll 3B" 9.50 48°/ 48% 100.0% 0.0/ 40% -- - --- - ---- - - - - 40.0/ \ 1/4" 6.30 38% 38% 100.0% 0.0/ nn r T ll -i1T1,11 a T1I Iiu lil i �i1l lii IIII I I I I 4111 I I I I III I I I I IIII I I I I (IIII I I I I #4 4.75 30% 30% 100.0% 0.01/6 IIII 'IIII IIII I I111 I '.IIII I #8 2.36 16% 100.0% 0.0% 30% IUI-I�-�-a1u I-IaJ-_I4; �I-I--1,I-141-L--HI1.IlL 1- 30.0% II vn11 IIII I 1 IHI 11 1 1 '.1111 I I 1 #10 2.00 14°/ 14% 10).0% 0.0/ IIII 1 1 1 l l 1 I I Hill 11 1 1 '.Hill I I 1 1 #16 1.18 8% 100.0% 0.0/ 1111II I I dll11I I I IInI I I IIIII I I I 'IIIIII I I #20 O.tL50 5% 5% 100.0% 0.0/ 2�° Innr�-�mn1-I--Imr1 -r-lrrnrrr-.nlrcirr - 20.Oi III IIn 1111 1 I IIII I .IIII I #30 0600 39/6 100.0% 0.0/ Hill,I I '.Iu1 l l I I 1ul l I I IIII I I '.nn l l I I #40 0.425 2% 2% 100.0% 0.0% 1096 IIL I_ii ii1i 1 _1I l it Il_I_1 _I111111_1i11i1ii i- 100% #50 0.300 1% 1000% 00'h III 'IIII 11 1 IIII I 11111 I I IIII 111 I I I I -IIII 11 1 I I I I I I I I I III I I i l l l l 1 1 I #60 0.250 1% 1% 100.0% 0.0/ III I11 1 Hill,I IIIIII •L. 1111I 0.0/1 .:� 1�0 0.180 1% I% 100.0% 0.0% 11100 0.150 1% 1% 100.0% 0.0/a 1000.00 100.00 10A0 1.00 0.10 0.01 #140 0.106 1% 100.0% 0.01/6 Pat Size(man) #170 0.090 1% 100.0% 0.0% #200 0.075 0.7% 1 1% 100.0% 0.01/6 + siaasr<. Copyighspar.raRiv%A T-c.1S.rvca P3.19965° Alraultr yply pnM In.cwl laatnn.and macrva I.�"d..4a a mutual pm eceon to cimu ree pubic and"un da«.all rcp"n.art ruM1mticJ a•IFc m Tdmlwl prop M1,of Jcnl"aM aulb rvri��n(or puM1i�alun'!"elan ml..a�n.�.yin.��r«,ra.a.li"m or rtg rdine our rtpaM1a i.r«mcd pmdih ow wr.ten approval. Comments: Reviewed by: Muk Gladm,WAaO3y-nie.{Lbonlary Maapr.SN'R.Suu Materials Testing & Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 14 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain- Final Geotechnical Report Materials Testing& Consulting,Inc. Project No. 115064-03 February 23,2011 Sieve Report Project:Dayton Airport Rd Watermain Geotech Date Received:6-Jan-12 ASTN1 D-2487I ni6etl Soils Classification System Project#: 115064-03 Sampled By:BH GW,Well-graded Gravel with Sand Client:JWM&A Date Tested: 12-Jan-12 Sample Coln r: Source:TP2@9' Tested By:CL DkBrown/Gray Sam a#• 12-010D a D..=Q730 nun %Gravel=682% Coeff.of Curvature,C,.=1.17 Specifications Idol=1.371 tom %Sarl 30.6% Coeff ofUnifonnity,Ci,=9.00 No Specs Dtdo,=4.459 mm %Silt&Clay=1.20/9 Fineness Modulus=6.14 Sample Meets Specs! D,,,,1=9.102 Onto Fracttre%=rJa Min Liquid Limit=n1a 12.336 Onto Moistum%=3.8% Plastic Limit=da 35.333 min Sand Equivalent=-n/a Min Plasticity Index=Wall Actual Interpolated Cumulative Cuinubtive Grain Size Distribution Sieve Ske Percent Percent Specs Spec gog�g BS� c� us Metric Passing Passin Max Min 1000h Inn!•-A#i3t,•.�ayi+�ii141�li�atr+>F i171R41 011A r17 r T- 100o% 12.00" 300.00 10D% 100.01% 0.00/e III 1 1111.I 11 n 1 1 1 n I I 1 1 u n 1 I I 10.00" 250.00 100% 100.0% 0.0% 1 uu 1 u11 t 1 1 I u 11 1 1 III I I I I I 8.00" 200.00 100°h 100.0% 0.0% 90% l 1_ilil _I__n1111_1_1__n1n_111_L_Lu111 L 1- 90.0% II JIIIIII IIIIIII I IIIII III 1111III 6.00" 150.00 100% 100.0% 0.0% III IIIII lull I I IIIII I IIII I 4.00" 100.00 100% 100.0% 0.01"/ °. I I l u I I I I I l u l I I 11 u l l I I 1 I 3.00" 75.00 100% 10D.0% 0.0% 80% 141, -a1H lla`:--INI4 Fl-1--IKIHi I-F-.H If Ii F+- 8D.0% 1 I11 1 1 1 IIIII IIII I I I illll l I l I IIII 1 1 I 2.50" 63.00 100% 1OD% 100.0% O.a/o nl I I I uu un I I !Inl 11 1 I IIn 1 200" 50.00 96% 96% 10D.0% 0.0% 70% I1I1I1I II 1I II I IIlIlI!III I IIIII I 1 IIIII I IIII 1 1 70 0/ 1.75" 45.00 95% 1OD.0% 0.0/ II11 I I I I 'IIII I I IIII I I •IIII I I111 I 1.50" 37.50 93% 93% 100.0% 0.0% IIIII 1 1 1 dill 1 111111 1 1 '.HIM I I IIII I I 1.25" 31.50 84% 84% 100.0% 00/0 600/p ILLIJ L I_JIL LIJ_I_-IH111--1- LLILI LI_L_JI-L1 600% I111111 1 II II III 1111ItI 1 11111111 1 IIII III I 1.00" 25.00 79'/9 79% 100.0% 0.0% ( IIII I I I I i 111 11 1 1 till I I I I hill I I I I IIII I I I I 3/4" 19.00 74°/P 74% 100.0% 0.0M1/o I u 111 1 ,In l l 1 1 nlu 11 1 I In1 t 1 1 1 'y 500/ 7 r Y--IIn r 1 -1- n T n-I--I m n r 1-r-n Ir 17 r T 50.0% 518" 16.00 68°/ 68% 100.0% 0.0°"/ d -IIu I IIII I 1 .IIII I I IIII I a 12" 12.50 60% 60% 100.0% 0.09/ a IIII I I I I lull I I J e 3i8" 9.50 52% 52% 100.0% O.IP/ 409% IIu I 1 -IIII I -I II I I I_ !IIII-I1 I- -IIH I I 1 400% IIII 1 1 i111 1 1 --11 -1 -=IIII I I IIII I • 1/4" 6.30 39% 39% 100.0% 0.01% II11 11 1 1 I11111 1 1 III 11 1 1 t111111 1 1 111111 1 1 #4 4.75 32% 32% 1WOO` 0.01% I'll I I I I I I Iol 11 1 IIIII I I I I IIII 11 1 1 #8 236 17% 100.0% 0.0% 000/6 II+H+i--IIH HIi-1--IHI HI-I--II+IH 41-F--HI+Ii L+- 30.00/6 IIII I I I I IIII I l t I IIIII I 1 ;IIII I I I I IIII I I I I #10 2.00 150/1 15% 100.0% 00% IIII In111 1 1 n 1 11n 11 1 1 uu 11 1 1 #16 1.18 9% 100.0% 0.00/o 11u l nn 11 1 l 11 1n 1 1 1 1u1 l l 1 #20 0.850 6% 6% 100.0% 0.0% 20°h IITnr7-7mrn-1--11� -'�Irin-r-nlrlTrr- ZO.o°i 1111111 1 ill! 'II Iu111 1 1 #30 0.600 4% 10D.0% 0.0% III I I ]IIIII IIII I IIII IIIII 11 I 1 #40 0.425 3% A. 100.0% OAo/p 10°/ Iu11ii1_JlL1II1-1_-Ito II •� -1. 1- -��Ir1iL1_ 10.0% #50 0.300 2% 100.0% 0.0% III I I o l n I I I I I I 1 •� I I III I I I I In1111 1 Im 11111 #60 0.250 2% 2% 100.0% 0.0g/ IIn 1 1 1 1 u 1 1 1 #90 0.180 2% 2°/l 100.0% 0.0% 0,� 111 - •� 0.0°i. #100 0.150 1% 1% 100.0% 0.Op/° 1000.00 100.00 10.00 1.00 0.10 0.01 #140 0.106 1% 100.0% 0.01% Particle Size(mm) #170 0.090 1% 1OD.0% 0.01i #20D 0.075 1.2% 1% 100.0% 0.0g/ Co pvight Span ragi-%At T,-SO,-PS 19" :U rmulu yPl,onA lo.c.al lomlun.anJ macro!�cnd lcamulualpmtcl"n1"ciml.IM1c puM1lc and ound,m.Jl npon,.n,ubmilcda,tM1cm�dmlol pr"pcn M1af dem,,and aulbrvJi"n for pubfmew d41su1".mecMono or ear"°e(mmm Amding our np"d,ic ra m-cd pmdiq our nrt�c appm.J. Comments: Reviewed by: MukGsb4 t1.4 PI1 Supern,ing I.banlon\!auger.SN'Re8_ Materials Testing& Consulting,Inc. Laboratory Test Results g FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 15 Olympia,WA 98512 Shelton WA > Dayton Airport Rd. Watermain- Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 115064-03 February 23,2011 Sieve Report Project:Dayton Airport Rd Watermain Geoteeb Date Received:6-Jan-12 ASTM D-2487 Unified Soils Classification System Project#: 115064-03 Sampled By:BH GW-GC,Well-graded Gravel with Silty Clay and Sand laig Client:JWM&A Date Tested: 12-Jan-12 Sample Color. Source:TP3@3' Testy By:CL Gray ACCREDITED Sam eih 12-010E e.oeael.a laaen.+armsawa D,r 1=0.068 min %Gavel=64.0% Coefl'of Curvature,C1.=1.91 Splri6cations D;1el=0.299 tram %Sand=30.5% CoetT.ofUnifonnity,Co=56.35 No Specs I]• =3,100 mm %Silt&Clay=5.51/6 Fineness Modulus=5.92 Sample Meets Specs? D,,,=10.87E mm Fracture%=eta Min liquid Limit=n/a D.)=16.821 nun Moisture%= 1.2°/ Plastic Limit=eta Drip,=55A88 tam Sand Equivalent=el Mtn Plasticilylndex=eta Actual Interpolate Cumulative Cumulative Grain Size Distribution Sine Site Percent Percent Specs Specs ;, g us Metric Passing Passing Met Min k pR 8Y 100 12.W 300.00 100% 100.0% 0.0% "h Irtnt_� 3tt. >tIF '^rl�rT 700.0% nil I I IIIr1l 10.00" 250.00 100% 10D.0% 0.0%00" 200.00 100% 100.0% 0.0% 900/ n111 l 1 AI IlilllI 1 _.Ills 1LI I "It 11 L 1 900p/6.00" 150.OD 100% 100.D% O.tl%4.00" 100.00 100% 100.0% 0.0'/ 111111 1 111 .� II1111 1 -IIII I I IIII 3.00" 75.00 700% 100.D% O.tp/ 80% IKH4 4--11H FyI I--1.1 1-1-1--141Hf1-F-..1f1414 800% I111111 1 '1111111 1 IIIIII1 1 •1111111 1 4III 111 1 2 50" 63.00 100% 100% 100.0% 0.0% IIII 1 1 '.1111 1 1 I III I 1 I I I i m I I I I I n l I I 1 1 200" 5D.00 83% 83% 100.0% 0.0% 11 I I 9In I I 1111 1 1 I I Intl I I I I I, I I l 7�0 itIIII 'IIIII -I IIII 1-I--n111 9111 IT 70.0% 1.75" 45.00 82% 100.0% 0.0% IIII I "I I1111 1 IIII 1 1 :'IIII ]11111 l 1.50" 37.50 Sap/ 90% 100.0% 0.01/6 I I11 I IIII I I 91I 1 1 1 d i l l I 1.25" 31.50 74% 74% 10D.0% 0.0% 80°h ILL IJ 11_JIL LIIJ _ILLII LI-I__:Ill LJ L1_L_.LILI�L1 ��� 11 ti I I I IIIII I IIII I 1111 II11 t l 1.00" 25.00 671% 67% 100.0% 0.0% C I I I I I I I I II I I I III I I I I I 1"I'l l I I I III I I I I C 3/4" 19.00 63% 63% 100.0% 0.01/° nu I I I I IIn I 1 1 �1u1 1 I mn 11 1 nli I 'm °/p 50.0 Irc lnr-r-am rlY-1' In17 r1-r-.rcm rrr-:n lrl�rr % 0 S 8" 16.OD $9°� $9% . 100.0% 0.0% d 50 It I I R 12" 12.50 54/ 54% 100.0% 0.0% nn I 1 11u 1 1 11 1 1 I ,IIn 1 1 :1ni 1 I 1 e 3/8" 9.50 47°/ 47% 100.0% 0.0% 400/6 IIII 1 1 1 1- Illl I I 1 I -1 1 1 1[_I__1111_I I I-I -1111 I I _ 40�% \ I 1 IIII 11 lil 11 I I 'J11111 I 'IIII I I 1/4" 6.30 40% 40% 100A% 0.01/0 1 IIII I IIII.yy1 1 1 ':IIII 11 1 1 9III I I #4 4.75 36% 36% 10D.0% 0.01/6 �'i'11 1 I IIII I Ind I\I I II11111 1 1 II1111 I #8 236 271/6 100.0°� 0.0°� 309/6 IK IJ f i--I IH FI S H--IKIK I--IKIH F I-F-H-4 t- 3D.0% 1111111 I IIII III 1 I111111 I 1till III I II11111 I #10 2.00 26% 26% 10D.0% 0.0% nu 11 1 nn 11 1 1 u11 I I nut I 1 I I :nn 11 1 1 #16 1.18 20% 100.0% 0.01/ 20p/ 1111 1 1 1 1 9111 11 1 1 till I I 11 1nn 11 1 1 111111 1 1 #20 0.850 18% 18% 100.0% 0.0% t17-1T-1 -1 Tl rrt---1IIIT n-I- In rr 1- 11: T F T- �. II II 1 IIIII IIII I I 11 I I .Ind I #30 0.600 15% 100.0% 0.0°/ IIII I I I I IIII I I I I IIII 11 1 I lull I I I 4111 I I I I #40 0.425 13% 13% 100.0% 0.0% 200h ill 1J 11_ 91 L1 LIB_I__1 I111III_I__rIll LI 1_L11111 L 1_ 10.0% I11 1 IIII I IIn I I I !I I11 1 1 1 'IIII I #SD 0.300 10% 100.0% 0.01/0 I11 11 I I I I I I I .1 n 1 1 1 1 1 o�o:Xl 11 #60 0.250 9% 91/6 IWO% 00% I11 II11 I IIII I 1 1 not 1 'IIII l 1 1 #80 0.180 7% 7% 100.0% 0.0"/6 0.0% #100 0.150 7% A/o 100.0% 0.0% t 000.00 t W.00 10.0D 1.00 0.10 0.01 #140 0.106 6% 1010% 0.ar Particle Sin(nwn) #170 0.090 6% 100.0% 0.01/0 #200 0.075 5.5% 5% 100.0% 0,01/0 . hiwcs;.. -+ -nl..yn" -.-nf:,spw. SiccRmle Co FJ^Shl Sp-a,pi...M r iwhncal Servie PS,1996-98 V raull.yplvonh to veal lo.�lonv vnd m.er�h re"d .0 ammud pn�tcaun tn.imlx the publ�vnd"und.a.Jl rcpcn.v«•ubmited vv them�dmlel prnanfof lima vb amb reiionfnr p�M1futnn ofparunmly.mne L.i.na or mrv"n liom nr np rdinp oin reponviv revved pmdilp our wr"Ic.ppN..1 Comments: Reviewed by: sa.hc"la".waeos.p.rr...s I.t"r.l«rla."str.sw R.em Materials Testing & Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 16 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain- Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 11 S064-03 February 23,2011 Sieve Report Project: Dayton Airport Rd W"atermain Geotech Date Received:6-Jan-12 ASINI D-2387 1 nified Soils Classification System _ - Project#: 11SO64-03 Sampled By:BH GW,Well-graded Gravel with Sand Client:JWM&A Date Tested: l2-Jan-12 Sample Color: Source:TP3@& Tested By:CL Gray _- -' Sam le#: 12-OIOF D,,,--0.537 mm %Gravel=74.2% Cceff.of Curvature,CT=1.50 Specifications D(oo_1.233 mm 1,6 Sand=24.3% Coeff.of Uniformity,Co=17.62 No Specs Dpo,1 6.332 mm %Silt&Clay=1.5% Fineness Modulus=6.55 Sample Meets Specs! D,,,,)=16.797 mm Fracture%=n/a Min Liquid Limit=n/a D16„,=21.713 man Moisture 9'o=4.46/6 Plastic Limit=n/a D„p,=50.059 mm Sand Fquivalent=n/a Min Plasticity Index=n/a Actual Interpolated Cumulative Cumulative Grain Size Distribution Sieve Size Percent Percent Spcea Spec u z us Metric PassingPassingMu Min x �g e�� 100% hh.Y.. '. 1 100.0% 12.00" 300.00 100"/ 100.0% 0.0% Inn-•' + IIIIIII 1 n r r IIIIII I 111 III I IIIIIII I .IIIIIII 1 10.00" 250.00 1001/6 100.0% 0.0% 11 1 1 1 1 n n n 1 1 1 1 u 1 1 1 1 1 n n 1 1 1 IIIII IIIIII IIIIII I I IIIII 1 1 II1111 i t 8.00" 200.00 100% 100.0% 0.0°/, fp% _ __ ___ ____ _ _ - 90.0°/p IIII I I I IIII. I I IIIII I I I IIIIII I I - !IIIIII i t 6.00" 150.00 100% 100.0% 0.0% HHH, 1 1 4.00" 100.00 100% 100.01/ 0.0% III11 I 75.00 . 1r11 + -1II1+II1 -t--IInIIIl+I Ir Il-I--IIr11lrI +r1 I1 '.IIII11 ++ 80.0/ 3.00" / / f0I " " 1111 1 11 111 1 1 :IIIIII 1 1 2.50" 63.00 100% 100% 100.0% 0.0°/ IIII 1 1 IIIIII' 1 -HILL I I I Iu11I I I :un1l 1 1 2.00" 50.00 90% 90°/ 100.0% 0.0% 70% IIII IIII 1 1 _111 1 1 1 1 1 111 1 1 1 I I 111 1 1 1 1 1 70.0 1.75" 45.00 88% 100 0°/ 0 0% 11 1 1 1 -IIII 1 1 -I- 1 1 1 1 1 IIIII l l l l l l 1 IIII IIIIII I illll l IIIIIIIIII II 1.50" 37.50 85% 85% 100.0% 0.0°/ IIIII IIII 1 1 1 IIIII IIII 1 1 1 I 1.25" 31.50 75% 75% I00.0°� 0.0°� 60% Iu IJ 11_J111 LIJ _IV Il LI_I__tyl tJLLL 1.00" 25.00 65% 65% 100.0% 0 0% Q IIII IIIII I I 111 I I I I 1 I I 1 1 I I I n n I I I C IIIII I I I IIIIII I IIIII I I I IIIII I I Inn11 1 1 � 3/4" 19.00 56% 56% 100.06/6 0.0% j, IIIII 1 IIIII d 1 1 1 I III n n 1 1 5/8" 16.00 48% 48% ]00.0% 0.0% a 50% 1nnT-r-rinnll -:1nu -mnII rrr-n1T1Tr1 - 50.0% m dIIII IIIII I IIIII IIIII 1uII11 R 1/2" 12.50 43% 43% 100.0% 0.0% X IIII III I1 1 1 1` IIIII IIIII IIIII n I111_I 1 1 II111 I_I_I IIIII I_I_I_ IIII I I 'IIIII I 1/4" 9.50 37% 37% 100.0% 0.0% 40% -- -�- - - -!- ao.o% \ 1/4" 6.30 30% 30% 100.0% 00% 11I I I I IIIII I 1 IIII IIIII IIIII 1 1 IIIII I I IIIIII I I - IIII I I IIIIII I I II11111 I #4 4.75 26% 26'/6 100.0% 0.0% IIII I I I n 1 1 1 1 I 1 n 1 1 I n 1 1 1 I I "I I I #8 2.36 170/6 100.0% 0.0 30% Ir11-1+J-­1 It"rl+r r-:r 1+11 r+ 30.0% #10 200 15% 15% 100.0% 00% IIIIII 1 1 IIIIII1 1 11 Ilk I I I IIIIII I I In I11 I I IIIII 1 1 IIIIII I I IIIII I I I11111 I I 'IIIIII 1 1 #16 1.18 l0% 100.0% 0.0% III I I I n 11_1_I__I U I I I n11111 I n1111I I 20% 11111 ,--IIIIIII I IIIIII IIIII I - 111111 -i 20.0% #20 0.850 7"/6 7% 100.0"/o 0.0% 1 1 n t 1 1 1 1 1 IIn 1 1 1• 1 n 1 I 1 1 1 n 1 1 I 1 #30 0.600 5% 100.0% 0.0"/ IIIII 1 1 n I I I IIIII 1 III I11 1 1 ,.IIII11 1 1 #40 0.425 4% 4% 100.0% 0.00/ 10% Iuu 11-JILI LIJ J--1uu� •\,1.1ui1-�_uu11�-;_ 10.0% #50 0.300 3% 100.0% 0.0% #60 0.250 3% 3% 100.00/ 00% 1 1 1 nl 1 -un 1 1 1 #80 0.190 21/6 2% 100.0% 0.0"/ 0% 0.0% #100 0.150, 2"/• 2% 100.0% 00% 1000,00 100.00 10.00 1.00 0.10 0.01 #140 0.106 2% 100.0% 0.01/6 Particle Size(mm) #170 0.090 2% 100.0"/o O.Oo/p 9200 0.075 1,5% 1% 100.0% 0.0% + g".e- -^+• r -� -.+ r - �•"="e• Copyr®M11 tipun rngbmnp @ r-I Sw K.199b9g Allrnnh.appA onh to.wual bcnbm and malwub laced.A..mutwlpmle<iionw egenl..the puM1lw and our•eha.all rayon•.rc.vAmhled wlM1e cnMidrnlulpmpenr of ctiew...rd authorvnbn rm puFlul6n"f.t.lanenu.canchubw or e.lncl.fmm or reg.rdbg ow rnpaN.ramed pmdbg ow mmn.ppmv.l. Comments: Reviewed by: t r.,t cwm>W, spp m,t,.mm-efm.rw.sw Regnn Materials Testing& Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 17 Olympia,WA 98512 Shelton,WA I i I Dayton Airport Rd. Watermain-Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 115064-03 February 23, 2011 Sieve Report Project:Dayton Airport Rd VJatermain Geotech Date Received:6-Jan-12 ASTM D-2487 I_:nilied Soils Classification System _ - Project#: 11 SO64-03 Sampled By:BH GW,Well-graded Gravel with Sand Client:JWM&A Date Tested: 12-Jan-12 Sample Color: Source:TP3W Tested By:CL Gray Sam le#: 12-OIOG ASTM*2216'" D,s,=0.592 mm %Gravel=68.26/o Coeff of Curvature,Cc=1.05 Specifications Dtlm=1.121 nun %Sand=30.01% Coeff.of Uniformity,Cc=14.77 No Spas Dt30,=4.407 min %Silt&Clay=1.7% Fineness Modulus=6.17 Sample Meet Specs! D,s,,,=11.619 mm Fracture%=n/a Min Liquid Limit=n/a D,,,r,=16.552 mm Moisture%-5.8% Plastic Limit=Na D,po,=36.354 mm Sand Fquivalent=n/a Min Plasticity Index=Na Actual laterpolated Cumulative Cumulative Grain Size Distribution Sieve size Percent Percent Specs Specs >. B q2 US Metric Passing Pawing Macs Min 100% h.1f.Y,•,�s •.s�#a �i, }� 700.0% Inn-4• + nrr- 12.00" 300.00 IOIP/o 100.0% 0.01/6 n n u: n IIIIIII u 10.00" 250.00 100% 100.0% O.tr/p n 1 1 u ll li I u I I I I a I I I 8. 11111_I 1 1 11,1, 1�1 1 1111111 IIIIII I I_ 'IIIIII 1 - 90.0 00" 200.00 100r/o 100.0% O.Or/r 90% -- ---- - - °/p IIIIII IIIIIII IIIIIII IIIIIII (IIIIIII I 6.00" 150.00 ]00% ]00.0'/0 O.Or/• 1I I I I I I I 111 1 1 1 1 I I I I I I I I I I I I I I I I I 'I I I I I I I I 4.00" 100.00 100% 100.0% 0.01% 1 1 III 1 1 1' III 1 1 1 1 I 1I I 3.00" 75.00 10 100.0% 0.0% 80% I+t-�I+I r1�-I--ln It rl-l--ffl rlrrr-.+11t1�r+- 80.0°/ 0r/o II IIIIII IIIIIII IIIIIII .Inll1l 2.50" 63.00 100% 100.01/6 0.01/6 l l I111 1 1 1• I I I11 11 1 2.00" 50.00 100% 100r/• 100.0% 0.01% 70% 1 1 1 11 n 1 1 1 I 111 1 1 1 1 1 n I I I I I 1 1111 1 1 1 1 70 0% 1.75" 45.00 97% 100.0% 0.0% nT1 il_i�--n11i11 1 171i1T1 T,ILii i I I I IIIIII I IIIIII I I IIIIII I I IIIIII I I 1.50" 37.50 91% 91% 100.0% 01 0. 1 1 1 1 I11 1 I I I I1 1 1 u 1 1 1 1 1 1 1 11 n 1.25" 31,50 84% 84% 100.0% 0.0% 60% JIi1 w��-IWl LI-I_ g0.0% IIIIII IIIIIII IIIIIII IIIIIII IIIIIII 1.00" 25.00 74% 74% 1000% 0.01/6 0III 1 1 1 1 u n 1 1 1 1, u u 1 1 1 1 1 u 1 1 1 d n 1 1 1 5/8" 16.00 59r/o 59% 100.0% 0.01/6 n III I I I I I I I I 1 1 1 1 1 (I I I 'IIIII 50.0%3/4" 19.00 65% 65% 100.0% 0.0% -4 50% - r I - '^N A d 'Ill l l I Inn I1111 (III II I111 tL 1/2" 12.50 51% 51% 100.0% O.tP/• x IIIIII I I IIIIII I I 111 1 I I I11I I I 1 1 IIIIII I I x 3/8" 9.50 47r/o 47% 100.0% 0.0% 40% 111i1_ii1__u11i 1_i_I__1111_1_1__1j1i1i l_i_.illilii l- 400% 1/4" 6.30 37°/ 37% 100.0% 0.0'/ III 1 1 II III I111 IIIIIII I IIIIIII I IIIIII I I11III11 11uIII I #4 4.75 32% 32% 100.0% 0.0r/• 1 I I I 1 1 1 I nil I11 1 l l l #8 2.36 19r/o 100.0r/o 0.0% 30% 1lt rltt--slrl rly-l--Inl 1-1--nl rlrrr-'.n ltly r+- 30,0% #10 2.00 18% 18% 100.0% 00% IIIII I 1 IIIIII I dnn I IIIII i 1 'lllll l I IIIIII I I IIIIIII I IIIIIII I IIIIII I I ,WWII #16 1.18 11% 100.0% 0.0'A IIIIII l I 111 11 1 1 111111 1 1111111 I mu111 20% III -I I 11111 1 I-I--11117 1 1 III I -'II111 1 7- 20.0% #20 0.850 8% 8% 700.0% 0.0% Illl I l IIIIII I I IIIII I IIIIII 111111 #30 0.600 5% 100.0% 0.0% IIIIII 1 I IIIIII I I IIIIII 1 1 IIIIII I I :.IIIIII 1 I #40 0.425 3% 3% 100.0r/ 0.Or/o 10 IU IJ 11_JI111-IJ-1--i1u 11 L1-I- 111U J-LL-�ilulJxi_ 10.0% #50 0,300 3% 100.0% 0.0r/o llll l I (III I I .IIIIII 1 1 III 1 1 dlII11 I1111 IIIIII I l III11 I II I IIIIII #60 0.2$0 2°/ 2% 100.0% O.Or/ I I I I I I I 1 1 11111 1 1 I III 1 !•SHgJ"I #80 0.190 2% 2% 100.0r/o O.01/o 0.0% #100 0.150 2% 2% 100.0% 0.0% 1000.00 100.00 10.00 too 0.10 0.01 #140 0.106 21/6 100.0r/ 0.0r/o Partfde Size(mm) #170 0.090 2/ 100.0"/• 0.0'/s #200 0,075 1.79/6 2r/o 100.0% 0.01% ♦ ft- -wnov® �+-rJu,sp=, �•�s.MRmJI. C"pyr9nt Spw.Fn9nnvn8 @ raMral Swiry PS.1-98 All re,ub"ph onlyl nclunl bcnlonn and ma,m"6,n,d.M.mu,wlpm ce,nn to creNr.IM1e publc.nd"urrehw,all rgrorl.me rubm",uJa",M1ec"nfdentulpmpnly r(etnd".nM amhoranlwn Lr puhlinun of nL,emvm..c"rclurnna or a"neL(mm"repuJwB" rep"n.nrewed prnJnp our- approval. Comments: Reviewed by: ALA OorJon.N'ABO Supervsmg Lnbrrpory Alnupr.SW Rnpnn Materials Testing& Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project ig Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain-Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 115064-03 February 23,2011 Sieve Report Project:Dayton Airport Rd Waternrain Geotech Date Received:6-Ian-12 AS I%I D-2487 1 nified Soils Classification System _ Project#: I1S064-03 Sampled By:BH GP,Poorly graded Gravel with Sand Client:JWM&A Date Tested: 12-Ian-12 Sample Color: - Source:TP4@3' Tested By:CL Brown --- - Sam le#: 12-OIOH D1s1=0.233 mm %Gravel=59.5% Coeff.of Curvature,C,=0.81 Specifications D,tpl=0.384 mm "I Sand=38.5% Coeff of Unifomdty,Ch=35.54 No Specs D„°I=2.055 min °gyp Silt&Clay 1.9% Fineness Modulus=5.56 Sample Meets Specs? DIw1-8.263 nun Fracture°b=n/a Mtn Liquid Limit=n/a D,prli=13.634 mm Moisture% 7.2% Plastic Limit=n/a D1,rll=38.848 mm Sand Fqulvalent=a/a Min Plasticity Index=n/a Actual loterpolated Cumulative Cumulative Grain Size Distribution Sieve Sae Percent Percent Sptxa Specs rr k % us Metric Pamin Passin Maa Min �{t g $$_g ssc� 100% Inn.•-•.�.liLYt,S� ++ai ArM+r �IFi7I7 r T- 100.0% 12.00" 30000 100D/D 100.01/6 0.0°/D nlI Inl Intl :III. Inll 10.00" 250.00 1001/6 100.00/0 0.0P/° n n n u l l u n 8.00" 200.00 1001/6 100.0% 0.0W/D milli nilL _lill�l_I_I .IiILILI_L_ LII�IiL 90°/p - -- -- 90.0 i IIIII I I IIIII lI I IIIIII I I ..IIIIII I I IIIIII I 6.00" 150.00 100% 100.0°/ 0.0°/ Inn I•` I u u I u I n n I 4 00" 100.00 l000/ 100 tP/° O 01/ 1 1 'IIIII 1 I�I IIIII I I I I l n l l I I n 11 1 1 I I 3.00" 75.00 100% 100.00/0 0.0°/d 10% r1y -IM1+r1-1--rr1 l-Irrr-n1+1+r+ SO.Or:-6 null I I IIIII I I I IIIII I I I .IIIIII I I IIIIII I I 2.50" 63.00 I000/° 100.0% 0.0% I I IIIII IIIII 1 -.IIIIII 11 u n I i 2.00" 50.00 100p� 100% 100.0% 0.0% lull I I_ IIIII -11 1 1 1 I I J I 1 1 1 1 1 111 1 1 1 1 1.75" 45.00 96% 100.0% O(P/o 70% lulII i 11T1i I-i rini1I 1 um i1 1 -I T1 7 70.0% IIIII I IIIII I I � IIIIII I I IIIIII I I IIIIII I I 1.50" 37.50 891/6 89°/p 100.0*/ 0.0% till I I I n 1 1 I I 1 1° W i l I I I n 1 1 I I I I n 1 1 I 1 1 1.25" 31.50 86% 86% 100.0% 0.0% 60% IUIJ11_JILI LIJJA-IU II LI_I_-.at LI L I_L_L1111 L 1- 60.00/, IIIII ( I (III I I I I °\11 1.00" 25.00 81% 81% 100.0% 0.0% c3/4" 19.00 70% 70% 100.00/ 0.0% rlSB" 16.00 63% 63% 100.0% 00% a 50% mnT77Irl rn-I- 17 r1-I--mnrl-r-mTI1 rr- 50trAd II I (IIIIII 1111 1 Jn111 1 IIIIII Ia 1/2" 12.50 58°/ 580/6 IWO% 0.0% A I I I Ill I I I I I11 I I 1 1 111 1 1 1 1 I Hit 1 I I I n 318" 9.50 53% 53% 100.0% 0.0% 40% I 1 1 i__ui1 L1_i_1__1i11 t_1_1_-,.III I I I I_1-- till I I 1 40.0% \ 1/4" 6.30 45% 45% 100.0°/p 0.00/0 l l l l IIIII I I IIIII 1 1 IIIIII i l l IIIII I I IIIII I I I III I11 I ''-IIIII I I I IIIII I I I #4 4.75 40% 40% 100.0% 0.0% IIIII I I III 1 1 1 I I [till I I n 1 1 1 1 I I Hill 1 I I 98 2.36 31% 100.0% 0.00/0 30% 1H:y++-y1+l hly y--Il l+1-1 S bl rl r l-I--M1+I*r+- 30.0% #10 2.00 30% 30% 1000°/ 00°� IIIII I I dIII I IIIIII '.11I 1 IIIII 1 1 1 IIIII I I IIIIII I I IIIIII I 411111 I I IIIIII I I #16 1.18 23% 100.0% 0.0% 20% III I I I _II11 1 1 1_1_ 11111 1 1_I_ �'11 1 1 I111 1 1 1 1 20 0% #20 0.850 21% 21% 100.0% 0.0% Ili1lT IIIITI-I I -milli 1 1 _.l 11 1 1 Hill I I T IIIII I I In111 I IIIIII I II I IIIII #30 0.600 15% 100.0% 0.0% M l I I I IIIII I I 1 IIIIII 1 1 'Ill I I I IIIII 11 1 #40 0.425 11% 11% 100.00/6 0.01/6 10% IUU 11_JILI LI-IJ__W 11 LI_I__:WU`I_L-LI111L1_ #50 0.300 70/6 100 0°/ 0 0°/ IIIII 1 I11 1 1 1 1 1111 1 1 1 u 1 n I. IIIIII 1 IIIIII I I (IIIIII 1 1111111 • 1 1 #60 0.250 5% 5% 100.00/0 O.OD/D ( I I r1III I 1 n11 1 1 -IIIII I #80 0.190 4°/p 4% 100.00/0 0.0D/D 0% II 0.0 #100 0.150 3% 3% 100.0% 0,0°/ 1000.00 1M00 10.00 1.00 0.10 0.01 #140 0.106 2% 100.00/0 0.0°/a Particle Size(mrn) #170 0.0% 2% 100.0% 0.0% #200 0.075 1 1.90/6 1 2% 100.0% 0.0% Cop!T9M Spun Enpisuvi8 A T.M.1 Sw M.IS46-9t .\0 rou6 apph airy to.anal baton and malwlr leled.A.amumd prvicMnlo clrnU.N<P"M1lc uW owchm.a0 rrq"n.are rubmitnd ae lR mnldemulpmpvt�"f climU.aM audnvarwn for Dublialwn of rla�emmla.ewwMo�uunxtranrfimm repard�"ur rnpon.nrem rd pmdup our rMlcn approval. Comments: Reviewed by: slut Gordw w.sao snpa"..D 1.eomwy nt.n,par,sw a.sbn Materials Testing &Consulting,Inc. Laboratory Test Results I g g� rY FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 19 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain - Final Geotechnical Report Materials Testing& Consulting,Inc. Project No. I I S064-03 February 23, 2011 Sieve Report Project: Dayton Airport Rd Watermain Geotech Date Received:6-Jan-12 :%S"I-%I D-2487 1 niticd Soils(lassification System ---- Project#: 115064-03 Sampled By:BH GP,Poorly graded Gravel with Sand Client:JWM&A Date Tested:12-Jan-12 Sample Source:TP4@6' Tested By:CL Brmsn Sam lek 12-0101 -- SEEMM D•2419'[ D-4318 D,.,, 0.205 - %Gavel=53.0% Coeff.of Curvature,Q..=0.50 Specifications DI,°1=0.326 mm °o Sand=44.4% Coeff.of Unifomuty,Cr.=30.57 No Specs D,.W,=1.268 mm °;Silt&Clay=2.5% Fineness Modulus=5.32 Sample Meets Spec? D.w)=5.822 mm Fracture 95=n/a Min Liquid Limit=n/a Dj6,,;=9.968 mm Mai sture%=6.2% Plastic Limit=n/a D,�,=53,008 mm Sand Equivalent--all Min Plasticity Index=n/a Actual Interpolated Cumulative Cumulative Grain Silt Distribution Sieve Size Percent Percent Specs Spec ti US Metric Passing Passing Max Min 100% I n n.•.•. YftlR�I M .ArIMIF T r r 100.0 12.00" 300.00 100% 100.0% 0.0% 1 1 1 1 n 1 1 1 1 I I I I I I I 1 n 1 1 1 1 10.00" 250.00 100% 100.0% 0.00/0 u 1 1 1 1 1 1 n III 1 u 1 1 1 1 1 1 111 1 1 1 I 111 n 1 1 8.00" 200.00 100% 100.0% 0.00/1 90% 1111 11 __oil _i_1__1 u 1 t 1_1_I__..Ill l L I_I__111 1 1 1 1 90 0 IIIII I111 I Iltlll l IIII111 1 IIIIIII 6.00" 150.00 1000/0 100.0% 0.00/0 I n 1 1 1 I u 1 ri%� 4.00" 100.00 100% 100.01/ 0.fto III III 1 1 1 ly 1 I n 1 1 1 1 11 11 1 1 1 3.00" 75.00 1000/0 100.0% 0.01/° 80% .rI-r-:n lily r+ 80.0% IIIIII IIIIII IIIIII IIIII111 1 IIIIIII 2.50" 63.00 100% 1001/6 100.0% O.Q% III I I I I IIII I I I 1, IIII I I I I :1III I I I I IIIIII I I 2.00" 50.00 87% 87% 100.0% 0.0% • g l I I l 1 I 1111 1 1 70% niil7i--uTli1_i nn111 1 +nn11 -i11T1i7T - 70.11/6 1.75" 45.00 86% 100.0% 0.01/0 1.50" 37.50 85% 100.0% 0.0% 1 Iu 111 1 1 �un11 1 1 :nn111 Iu 111 1 1.25" 31.50 84% 100.0% QO% 60% - J 1_J111LU J- lu 11 u_1__lulu LL L_uu11 r_i 60.0p/ 1.00" 25.00 83% 83% 100.0% 0.00/0 :I I 1111 1 1 I I I I I 1 111 I I I I I I I I I I I I I I C 3/4" 19.00 77°/ 7T/o 100.0°/ 0.0% 'I° n 1 1 n I I I I 11 n 1 1 1 1 1 1 'S 5/8, 16.00 71% 71% 1000°/p 000/0 n 50% 1nnT T--11T1 r1 -1--1n I I rrin rrr-nlT17 rT 500% . s a �.I IIIIII IIII. I IIIIIII I .IIIIII 1 1 d 1/2" 12.50 65% 65% 100.0°/ 0.0% a , I I IIII I I I I 11111 I I ❑I I I I I I I IIII I I I I o 3/8" 9.50 59% 591/ 100.0% 0.0% 40% _1111 I I_I_1__Ii11i I_ 1_n ilili l_I__i11i1ii 40.0% \ 1/4" 6.30 51% 51% 100.0% 0.0"/0 111 1 1 II111 1 1 IIIIII •LI -I1111 1 IIIIIII .IIIIII I IIIIIII I IIIIIII ❑IIIIII I (IIIIIII #4 4.75 47°/ 47% 100.0% 0,00/0 Joll I I I Hill I 11 I 1\ I n 1 1 n 1 1 1 1 #8 2.36 38% 100.00/0 00% 30°/p tlH Iy++-yl+l rlti-i--ln It rl-l- iYl rlrrr-+11+I�r+- 30.0% #10 2.00 36% 36% 1QQ.0°/ 00% IIII11 Hill I I I IIIIII I I %I I I I I 1 IIIIII 1 1 1111111 HIM II I IIIIIII 1 t III : IIIIIII , #16 1.18 29% 100.0% 00/6 11111 1 1 (III I I I (III I I i 'll (III I I I I 20% __ _-__ ____ _ _ _ 20.0% #20 0.850 26% 26% ]00.0°/p 0.0% 1111i T l 1IT1i 1 1i11i 1 I ITI• i1 iuT1i i T 11111 I II111 I IIIII I ill ( I I IIIII 11 1 #30 0,600 20% 100.0% 0.0% 1 I n 1 I I I HIM I I 1 I I I I I I 11 r 111 1 1 I I n u 1 1 1 1 #40 0,425 15% 15% 100.0% 0.01/0 10% 'I1 IJ 1 1_Jlll LIJ J__Ill 11 LI_I__!LLI lJ L`1_L_L 1 L 1_ 10 0n/p #50 0.300 9% 100.0% Q 01/0 11 1 1 I I I I :.11 1 1 1 11 1 JIII 111I 31111 l t �� #60 0.250 69/6 6% 100.00/0 0.0°/d � 1 #80 0.180 4% 4% 100.0% 0,01/0 0% 1 1 1 0.0% #100 0.150 4% 4% 100.0% 001/0 1000.00 100.00 10.00 1.00 0.10 0.01 #140 0.106 3% 100.0% 0.0% Particle Size(mm) #170 0.090 3% 100.0% 0.0% #200 0.075 2.5% 3% 100.0% 0.0% • s�.,e s�... -...,. --" �•-gaaVaa�b. C"pyrgAl Spun Engvnrx:,g a Tcbnc,l Swcn PS,1-9. 10 rauW apph Doty to,dwl bcationa aM m,lairY lolad.A.am"w,lprvaclon to clo,ar,Ne pubic and ounelvm.,ll aagod,arc ndntad uthe confMndulpmpvfY ofc4rnla.and amMwaina("r publea,ion of alalemrnl..cnn<Iwnna"r cxvac,afi"m or repardwg our rcpoNerecrvd Prndmg "a.ad n.vwnart Comments: Reviewed by: m.a onus..wneo snp�::ro r.e.mwy xtws,r.sw xqe. Materials Testing& Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 20 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain-Final Geotechnical Report Materials Testing& Consulting,Inc. Project No. I 1 S064-03 February 23, 2011 Sieve Report Project:Dayton Airport Rd Watennain Geotech Date Received:6-Jan-12 AS I%I D 2487 1 nified Soils('lassification Scstem - --- Project#: 11SO64-03 Sampled By:BH GP,Poorly graded Gravel with Sand Client:JWM&A Date Tested: 12-Jan-12 Sample Color: Source:TP4@9' Tested By:CL Brown Sam le#: 12-010J -- -- D,s,=0.173 men %Gravel=56.4% Coen of Curvature,C,_=0,96 Specifications Dtlo,=0.357 men %Sand=40.1% Coeff.of Uniformity,C,=29.05 No Specs Dew,=1.881 men °'o Silt&Clay=3.4°A Fineness Modulus=5.49 Sample Meets Specs? D.,,„-6.777 men Fracture%=n/a Mtn Liquid Limit=n/a D,o,,,=10.369 men Moisture I=7.1% Plastic Limit=n/a D,y,,,=50.737 men Sand Fquivalenr-n/a Min Plasticity Index=n/a Actual Interpolated Cumulative Cumulative Grain Size Distribution Sieve Sae Percent Percent Spees Speer t+ 's x US Metric Paxsin Passim Ma: Min �g 100% Inn�.•. !`YH, x 4 'M'aa.# TI7 r T- 100.0% 12.00" 3W00 100% 100.0% 0.0°A III IIIII I1111 IIIII 1 10.00" 250.00 100% 1000% 0.OYo I I I I I I 1 u 1 u u 1 1 1 n u 1 1 1 u 1 1 1 1 1 800" 20000 100% 10000/0 001/ g0% nli l_i __Ilil-1_1_1__It11j I_1_1__11�111 l l_I__Llli l L i 90.0% IIII I I I IIII'I I I IIIII I I I III I l i I I IIII I I I I 6.00" 150.00 100% 100.00/0 0.0°/d n 1 1 1 11 n 1 1 I n 11 1 1 1 :II I I I I I 1 n n 1 1 1 1 4.00" 100.00 100% 100.0°A 0.0°A IIII IIIII `I IIIII I I -I I I I I I I I :I I II I I I I 80% 80, 3.00" 75.00 100% 100.0% 00°A II+I�+ -y1+1 rly•1--1h11+r1-1--:M1 M r 1-r-�I+I+r+- 10 IIIIII 1 IIIII Ir IIIIII 1 'IIIIII IIIIII 2.50" 63.00 100% 101P/o 100.00/0 0.0% 2.00" 50.00 89% 890/. 100.00/. 0.0% 70% IIIII u n 1 1 1 1° 1 n 1 1 1 1 u n 1 1 1 1 .I I I I I I I 1 70 0% 1.75" 45.00 88% 100.0% 0.01% 11 1 1 IIIII -� IIIII '.I11 1 1 1 d I111I I I IIIIII I I IIIII I I I IIIIII I I IIIIII I I 1.501, 37.50 86% 100.0% 0.01/. IIIII IIIII IIIIII u n 1 l IIII I 1.25" 31.50 84% 84% 100.0% 0.0°A 60% luull_uuar-u_I_ Iuuu1_I__.ulu�l_u_uull�.i- 60.0°/ IIIIII IntIII IIIIII IIIIIII IIIIIII 1.001, 25.00 80% 80% 100.0% 0.00/0 IIIIIII 1 111 1 1 1 1 1 IIIII -.IIIIIII u n , 3/4" 19.00 75% 75% 100.0"A 0.00/0 Hit I I IIIII IIIII 1 1 IIIII ',° 5/8" 16.00 71% 71% 1000% 00°A m 50% InnT I--lmrn n--1 ••�T'n_I__,.Irinrr r-nITIT r T- 50.09/0 IT, Iilll l Illll IIII 4I1111 IIIIII a 1/2" 12.50 65% 65% 100.0% 0.0°A IIIII d1I111 I IIII I I '.Intl IIIII 3/8" 9.50 58% 58% 100.0% 0.0% 40% IU11_i1 i_i1i1111_I__lini i�1__'Ii1i111_I__.Luil�Li _ 400"/ 1/4" 6.30 49% 49% 100.0°A 0.0°/ II111 1 IIIII IIIIII 'IIIII IIIII I II111 I I HIII I I I IIIIII i IIIIIII I n111I 11 #4 4.75 44% 441/6 100.0% 0.0°A IIII IIIII IIIIII IIIII #8 2.36 33% 100.0% 0.00/1 30% rr H++-yl+l 1-- 1M I+rl-' -I rl r l-r-n l+I+r+- 30.00/ IIIIII I I III,I I I HIM 1 `. 111 1 1 11 1 1 1 1 #10 2.00 31% 31% 100.0% 0.00/0 n111 1 1 Hull 1 1 u111I 1 1 1n 111 1 1 #16 1.18 24% 100.0% 0.0% ;IIII I I IIIIII 1 1 Hill I I `. 1 1 n1111 20% 1 1i 1 - 1 _TnL - 20.0% #20 0.850 21% 21% 100.0% 0.01A n111 1 I u1111 11 n1u 1 I 1 uln 1 I I #30 0.6W 160/a 100.0% 0.0% IIIII IIIII IIIII •\u H i l l l l 1 #40 0.425 12% 12% 100.00A 0.0% 10% 1 Hui l_uu1 i-u_I__Iu a - 10.0% #50 0.300 81 100.0% 0 0"/0 1 n 1 1 1 1 u n 1 1 1 a 11 1 1 1 1 111 1 1 I'll I I I Hill I I I IIIII I '.IIIII '• #60 0.250 7% 7% 100.00/0 0.0"/o u l 1 1 1 1 I11 n 1 1 1 1 1 #80 0.180 5% 5% 100.0% 0.0"/6 0% 0.0`4 #100 0.150 5% 5% 100.0% 0.01/ 1000.00 100.00 10.00 1.00 0.10 0.01 #140 0.106 4% 100.01/6 0.0"A Particle Size(men) #170 0.090 4% 100.01/6 00% #200 0.075 3.49/6 3% 100,01/0 0.01/0 rnpyem Spwn bgvy a rzb�s.l smvr;<v cs.1ogd.os Allraulh apply only to wYwlloculionr and nuraiY rsM.Numwual pm,ervnlo ctim,..Nc pu-uul aunclam.all reponu are rubm�,edwrFewnlda"ielpmpnvofcYmlr,uN rwborw,onlor pubicniov otrinrnml..canclwonamcxtracH 4om ar�egerd�am rcporo•reined pmdmg ow vraten uppmrul Comments: Reviewed by: Mah Gorden.N'A&1 Supm�ng IiMelory Mwger.SN'Region Materials Testing& Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 21 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain-Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 115064-03 February 23,2011 Sieve Report Project: Dayton Airport Rd Watermain Geotech Date Received:6-Ian-12 kSI NI D-2487 I'nilied Soils Classiliration Svctem Project#: 11SO64-03 Sampled By:BH GW,Well-graded Gravel with Sand Client:JWM&A Date Tested:12-Jan-12 Sample Color: Source:TP5Q3' Tested By:CL Brown/Orange Sam le#: 12-OIOK -- D-2216 ASTM D-24 D,d,=0.331 train fro Gravel=63.6% Coeff orCunature,Cc=1.42 Specifications D„0,=0.621 mm 95 Sand=34.6% COeff.ofUnilbinil y,CI.=20.58 No Specs Dp_,,,,=3.354 mm %Silt&Clay=1.9% Fineness Modulus=5.88 Sample Meets Specs? Dp51,=9.014 mm Fracture%=n/a Min Liquid Limit=n/a D„,0,=12.777 mm Moisture%=4.3% Plastic Limit=n/a D,pg,=40.717 mm Sand Equivalent=nh Min Plasticity Index=n/a Actual Interpolated Cumulative Cumulative Grain Size Distribution Sieve Sae Percent Percent S S 11111 I I 11.1x X�US Metric PassingPasn Mau Mo 100% � g R $"- r 100 0 12.00" 300.00 100% 100.0% 0.0/ II111 I I I I I I 10.00" 250.00 1001% 100.0% 0.01/0 111 1 1 1 1 n c i n n 1 1 l 1 u l u l 111 1 1 1 8 00" 200.00 1001/e 100 01% 0.0% 90%-11H 11 1 1 90.0% ulll III. IIIIIII IIIIII I I .IIIIII I 1 6.00" 150.00 100% 100.00/0 0.9"/ I I I I I I I 111 , I I I I I I l I IIIII 1 1 1 IIIIIII I I 4.00" 100.00 100% 100.00/0 0.0"/o I I I I I n 1 n 1 1 a 11 n I 3.00" 75.00 100% 100.0% 0.0% 80% IH I�+-r-�It� ` --Irl li rl---rtlrrrr-Ir l+lyrr- 80.0% hill 1 1 I III. Mu l l 111111 1 1 -IIIIII 1 1 2.50" 63.00 100% 1000/0 100.00/0 0.00/0 11111 n ` I 11 1 111111 1 1 :11 I 2.00" 50.00 95% 95% 100.01/ 0.01/a IIIII 1n1 _ u_nl I_1_1_-null 1-I m1111 I 1 _ 70% Ii 1 I I I I I I I I I I I I I 1 1 1 1 II 11 j 70.0% 1.75" 45.00 92% 100.0% 0.0e/ IIIII 1 • IIIII 1 1 IIIII 1 1 1 UII I 1.50" 37.50 88% 88% 100.01� 0.01/ 111 1 1 1 1 IIIII `411 I I I I 1 1 1 I 1111 1 1 1 1 1 1.25" 31.50 83% 83% 100,0% 00/ 60% ILI IJ 11I_JILI LIJ J_•_Ill 11 UI-I--Ul U LL L- I11J 11- 60,0% IIIII IIIIII IIIIIII IIIIII I I IIIIII I.Do" 25.00 77% 77°/ 100.0°/ 0.ill/ C IIIII IIIII IIIIII 1 IIIIII I IIIIIII 3/4" 19.00 71% 71% 100.01% 0.00/ b IIIII 1 IIIII 'IIIII I IIIIII I IIIIIII 'y e 50% + III I III 500% ❑I111 I m5/8" 16.00 66% 66/ 100,(ft 0.0% � I IIIIII I I VIII 11 1 d 1/2" 12.50 59% 590/ 100.0% 0.00/ � 111111 I 11111 1 1 t 3/8" 9.30 52% 52/0 100.0% 0.0/ 40% _ e 40.0% 1/4" 6.30 42% 4r/o 100.00/0 0.00/ IIIII I 1 IIIII I 1 1 III •I I I IIIIII 1 :IIIIII 1 (II I I I I I (IIIII I I IIIII I I (IIIII I I (III I I I I #4 4.75 361/0 36% 100.01/0 0.0% IIIII 1 lull .IIIII IIIIII I 1 #8 2.36 25% 100.01/0 0.01/0 30% IHHr+--11r1 rlti-l--1r11y -r-mnrrr--t,, r- 30.0°/ #10 2.00 24% 24% 100.0•/ 0.61/0 1111 1 1 lull l I 1 IIIIII IIIII I I I 'IIII11 I I IIIIII I IIIIIII I (IIIIII IIIIIII 1 #16 1.18 171/ 100.0% 0.01/ III 1 IIIII IIIIII 1111 1 1 1111 1 1 1 o 20% 1 1 i I 11 IIIIII 1 1 III II 1 1 1 IIIII 1 I I 1�IIIII 1 I .IIIIII - 20.0% • #zo 0.850 la"r lai 1oo.olr o.ai #30 0.6W 10% 100.0% 0.01/o IIIIIII I IIIIIII I IIIIIII I I I (IIIIIII I #40 0.425 7e/ 71/ ]O1t1.01/o O.dl/ 10% ILJ IJI I-JILT LIJ-I--IU Il LI-I_-..`" -.1- L- L111J L1- 10.0% #50 0.300 41/6 100.00/0 0.01/ I1111 1 IIIII I 1 II111 1 1 1 �" IIIIII I I IIIIII I I 4IIII I I I �. i t l I #60 0.250 3% 3% 100.0`% 0.01% 0e 1 1'1 1 0.0% #80 0.180 3% 3% 100.0% 0.01/0 #100 0.150 21/ 2% 100.01/ 0.0% 100010011 1100.0011 10.00 1.00 0.10 0.01 #140 0.106 2% 100.0% 0.01/ Particle Size(mm) #170 0.090 2% 100.01/ 0.01/0 #200 0.075 1.9% 2% 100.0% 0.OYo r +��1- -I- -.I� r -•�gN.aR.ne" Copyr•M tipun Eng.wvwBa TuclniulSm�m PS.19161g � ,,�• All�uea apply onF to auual bcNona and maleruh lord.Aaa mutualpmlxlbn to clmla.IM1e puMr.and oureeFm.all reporu are aubmelcd as lM1e co�JNcxul propcn,o(ckmr+.act aNhorcation br publcalbn of Nabnrnlr.mrcMi"na or nsbaGa tivm or rtgudag ou repoN•rvuened prndmp our xrple PP r'al. Comments: Reviewed by: ..,,,a,.h%p'r:H.,-•'..:j-.✓' Mary(:ordoa W'ABf1 Supmiaag I�borNory A4lugar.S W Rugbn Materials Testing& Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 22 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain-Final Geotechnical Report Materials Testing& Consulting,Inc. Project No. 115064-03 February 23, 2011 Sieve Report Project: Dayton Airport Rd Watermain Geotech Date Received:6-Jan-12 \S"fNl D-2487 I nified Soils Classification System Project#: 115064-03 Sampled By:BH GNA,Well-graded Gravel with Sand Client:JWM&A Date Tested: 12-Jan-12 Sample(olor. Source:TP5@6 Tested By:CL Grav%Brown Sam le#: 12-0IOL 318 ASTM D13,=0.445 mm %Gravel=70.5% Coefl'of Curvature,Cc=2.18 Specifications D„o,=0.779 mm "/o Sand=28.6% CoeT of Uniformity,C,=18.07 No Specs D(3o,=4.896 mm %Silt&Clay=0.9o/p Fineness Modulus=6.14 Sample Mesta Specs? D„o,=10.592 mm Fracture%=n/a Min Liquid Limit=n/a D..)=14.084 nun Moisture%_3.8% Plastic Limit=n/a D„o,=39.374 nun Sand Equivalent=a/a Min Plasticity Index=n/a Actual Interpolated Cumulative Cumulative Grain Size Distribution Sieve She Percent Percent Specs Spep M k 1,US Metric Passing Passing Max Min100% gy� s 12.00" 300.00 100Ye 100.0% 0.0% 100% Inn.•••-1th.Y+, x x •M"`a/111R'F�r I I r T- 100.0 roll 11 (IIII (IIII IIIIII I 10.00" 250.00 IDYK 100.0% 0.0% IIII n; 1 1 I I I I I I I I_I __II 1_I__II 1 1 I II I Iu 11 1 1 8.001. 200.00 100°/p 100.0% 0.0% 90% - ------------------ Intl IIII( IIIIII IIIIII '.IIIIII 6.00" 150.00 1000/0 100.0°/ 0.0% IIII I I I I I I I I I I I IIIIII I I IIIIII I I -.IIIIII I 4.00" 100.00 100% 100.0% 0.01/o n u l I n 1 1 I 1 u 1 1 1 I u n l 1 1 I I u 1 I 1 3.00" 75.00 100% 100.0% 00% 80% Ir11�++-y1+I r1�-r--In Fi r1-1--r+1 rlrrr-ii11?1i++- 80.0% (IIII 1 11111 I (IIII I I11111 2.50" 63.00 100% 100p/ 100.01/o 0.00/ a 11 1 HIM I I n 1 1 2.00" 50.00 94p/o 941/6 100.01/6 0.00/0 70% I I I u l l 1 1 1 l u l l 1_I I__HIM 1 1 1 I - n n 1 I 11 70 0p/ 1.75" 45.00 92% 100 0% 0 0% 1 1 7 nTl i 1_i 1. 1 1 1 1 1 1 T11 1 T 7 I I II111 I I I I I 11111 I I I 1uI I I I 1.50" 37.50 890/o 89% 100.0% 0.0% 1 1 u n 1 1 1 l 1 1 1 1 n 1 1 1 1 1 11 n l 1 1.25" 31.50 83% 83% 100.0% 0.00/0 60% -W4 1 l_ 60.09% 1.00" 25.00 771/6 77% 100.0% 0.0% 11 u n 1 1 1 I I I I 1 n 1 1 1 1 1 .11 n l 1 1 1 � n i i I I I I I I I I I I i 1 1 1 1 I IIIIII I I I I I I I I I I S 3/4" 19.00 71% 71% 100.0% 0.0% 'Vi IIII IIII 1 1 1 l Ill l l l l III }S h 50% m n T n-n lrl r n_ _.IT n-1-'m n r r r-n 1711 7 T- 50.0% 519" 16.00 65% 651/6 101 0.00/6 a I I 1 1 1 1 1 u u 1 1 1 I I I n 1 1 1 1 1 l I 1 u 1 1 1 a 1/2" 12.50 56% 56% 101 0.00/6 u 1 1 1 1 1 u u l 1 1 1 1 1 n 1 1 1 1 1 n u 1 1 1 1 3/8" 9.50 47o/p 47% I00.0o 0.0% 40% ui1_i i__ni1i 1_i_ _ i1_I_1__lilili 1_i_illili 1_ 400% 1/4" 6.30 35% 35% 100.00/0 0.00/ IIII II un1l IIIIII I (IIIIII I II III I IIIIII ( I (IIIII I i #4 4.75 29% 29% 100.0% 0.0% IIII IIIIII IIII. IIII I11I #8 2.36 20% 100.0% 0.00/ 30% 1rr l-l++-y1+1 r1�ti--In1+r1-l--Ml rltrr-wl+I-rr+- 30.0% #10 2.00 18% 18% 100.0% 0.0"/ IIII IIIIII 1 111II IIII 911I1 1 IIIIII I (IIIIII I IIIIII I (IIIIII I -(IIIII I I #16 1.18 13% 100.0% 0.0% IIII 1 1 1 InII1 1 II1u 1 1 (IIII I 1 Iu111 1 20% � --------------- -- _ -__ - 20.0% #20 0.850 11% 11% 101 0.0"/o I Inll11 I n1111I I u1u11 � 1ni1i1 i Iu 11i i 1_ '(IIII IIIIII IIIIII I` IIIIII 411III #30 0.600 7•/ 100.0% 0.0°/ #40 0.425 5% 5% 100.00/0 0.01/0 10% luula-�lil LIJ-1-_luuul-I_ .I,.r.r_ lei_ 10.0% #50 0.300 3% 100.0% 0.tP/o l 1 1 1 �• ; 1 1 #60 0.250 210 2% 100.0% 0.0"/ 1 1 �•. #80 0.180 1% 1% 100.00/10.tP/o 0% 0.0 #100 0.150 1% 1% 101 00"1 1000.00 100.00 1000 1.00 0.10 0.01 #140 0.106 1% 100.00/0 0.01/o Particle Size(mm) #170 0.090 1% 100.0% 00/ #200 0.075 0 9p/o 1% 100.0% 0 o°o + 1-- -.,. p . -•- ,., ,�_�. l'opvrBM tip=n rngnarnP i TcMiul Smw 15.IY96-Yg I Tll mops.appF only to awual bcato�u and matnu6lotd.Namulualprvt¢lan to cti"nn.an Publw and ouneAm.all reponx arc eubiniltednlAc cnntidcmul property oreEsMr.mW aulAorrsalnn br publcntion of.n�emrnt...on.lu.un.or..alrau.INm or eegardng our repunew�ameJ prndmg opr nnun wpro..l. � Comments: Reviewed byl- M.rt Gordon.M'Anl)Supcnsng laboratory Mmugsr.S W Rrynn I I III Materials Testing & Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project Olympia,WA 98512 Shelton,WA 23 Dayton Airport Rd. Watermain-Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 115064-03 February 23,2011 Sieve Report Project: Dayton Airport Rd Watermain Geotech Date Received:6-Jan-12 AS'I M D-2487 1.nificd Soils Classification System _ -- Project#: 11SO64-03 Sampled By:BH GW,Well-graded Gravel with Sand = Client:JWM&A Date Tested:12-1an-12 Sample Color: Source:TP5@9' Tested By:CL Gray/Brown Sam le#: 12-OIOM - -- -- D,t,=0.301 mm %Gravel=59.1% Coeff.of Curvature,Cc=1.42 Specification, Dpo,=0.575 mm 0.o Sand=38.9% Coeff.of Uniformity C,;=18.35 No Specs 13,3m=2.930 mm %Silt&Clay=2.00/6 Fineness Modulus=5.66 Sample Meets Specs? D,,.j=7.190 mm Fracture%=n/a Min Liquid Limit=n/a D,,;p,._10.544 mm Moisture 9b=4.7% Plastic Limit=n/a D,•„1-29.551 mm Sand Equivalem=n/a Min 111o,!icitv Index=n/a Aetna) Interpolated --. - Cumulative Cumulative Grain Size Distribution Sieve Side Percent Percent Specs Specs rr 4 US Metric PassingPasai Max Min x >z _g 12.00" 300.00 100% I00.0% 0.fP/o 100% Inn?•-jt1!�Y7: 1} y�tla $ r T- 100.0% IIIII IIII�I IIIIII IIIIIIIIIIII I 10.00" 250.00 100/ 100.01/ 0.01/6 IIII I III 1 1�y IIIII I i l l l l -.IIIIII I III 11_I IIIIII _II�11�1-I 1 I�IL � I�u�1� B.00" 200.00 100°/p ]00.0% 0.0% 90% __ ___ _ _ _ 90.0% IIIII IIIIII IIIIII I IIIIII I 11111II I 6.00" 150.00 100•/ 100.0% 0.0"/ IIIII I I I II111 1 1 1 IIIII I I I IIIIII I I :IIIIII 1 I 4.00" 100,00 100•/p 100.00/ 0.00/ III11 IIIII • IIIII I IIIIII I I111 1 3.00" 75.00 1000/0 100.0% 0.00/0 80% IH Iy+Y-ti1+I rin�- nH r1-I--mrlrrr-;MI+IHr+- 80.0% IIIIII I I IIIIII I 'III I I IIIIII I I �III1111 I 2,50" 63.00 100% 1000/ 100.0% 0.0% 2.00" 50.00 96% 96% 100.0% 0.0% 70% n 1 1 1 1 I_ IIII 1 _ ((( 1-I I _u n I l 1 I u n 1 1 1 1 _ 70.0 iill T I IIII 1 11 I I11111 I I II 1.75" 45.00 95% 100.00/o 0.01/6 l l l t I IIII 1 1 I I I i l l l l I III 1 1 1.50" 37.50 949/6 100.01/6 0.090 1 1 n I 1 I 1 1 III I IIII 1 1 1 I u n 1 1 1 1 1.25" 31.50 93% 93% 100.0% 0.01/6 60% :ulu_ulaluu `L.0 L1_I__u1ulLL_;lluull- 60.0% 1 IIIIII IIIIII I I �11111I I 1.00" 25.00 83% 83% 100.01/6 0.01/6 0 11u 1 I I Iun 1 1 I IUII I I I unn 11 1 � ' 3/4" 19.00 78% 78% 100.0% 0.01/ n u 1 1 I u I I , 111 1 1 1 1 I u n 1 i I 'y 50% 5/8" 16.00 72% 72% 100.0% OOYo InnT-I-nlnrn I--n-inrrr-:T11TI-ITT- �.0% A m 1 11111I 1 I II11111 1111111 1 IIIIII I I d 1/2" 12.50 65% 65% 100.O0/6 0.0 a 11 1 1 1 11 IIII 1 I I ` 3/8" 9.50 58% 580/0 100.0% 0.00/0 40% n IJ 1 i-1, -1__I i 1 i 1_i I__ 1 _1 i 1 1 1 I 1 _- 11 L 40 0% 1/4" 6.30 47% 470/ 100.0% 0.0% IIII1 I i l l I1111 1 1 1 111 1 1 IIIII I I IIIIII I I 1� I IIIIII I I -IIIIII I #4 4.75 41% 41% 100.0% 0.01/6 IIIII 1 I IIIIII 1 I I III I I I HIM I I I #S 2.36 270/o 100.00/ 0.00/6 30% IHH++- nrrr--:nlrinrr- 30.0% #10 2.00 241/6 24% 100.0% 0 0'/p 111 1 1 1 1 1 11 1 1 1 l l l l l l 1 1I I IIIII I I IIIIII I I 11�, IIIIII I I :IIIII I I #16 1.18 171/ 100.0% 0.0% 20% IIIII 1 _I 1111 1 111111 •\ 111 I - I1111 1 _ 2000/ #20 0.850 14% 140/p 100.0% 0.0% Ili11T-IIITI T u1 I-i 1 1i1 Ii11 1 1 111 1 11111 IIIII I Illll InII 11 1 1 III1111 I' #30 0.600 100/0 100.0°"/ 0.01/6 IIIIII I I IIIIII 1 I IIIIII •` I I I111111 1 1 #40 0.425 8% 8% 100.00/ 0.0o/p 100h Iuu44-a1il,_Iu�-_Iuu�l- .`. _c_wulaai- 10.0% 111111 1 IIIHII 1 1111111 1 IIIIII #50 0.300 5% 100.0% O.Op/ III 1 1 I I n n I I I I 111 1 1 1 1 •` n 1 1 1 1 I 1 #60 0.250 4% 4% 100.01/0 0.0% 11 IIII 11 1 1 1 111 u 1 1 #80 0.180 3% 3% 100.00/0 0.0% - 0.0% #100 0.150 3% 3% 100.0% 0.0% 1000,00 100,00 10.00 1.00 0.10 0.01 #140 0.106 2% 100.00/0 0.01/6 Particle Size(mm) #170 0.090 2% 100.0% 0.0% #200 0.075 2.00/ 2% 100.0% 0.0'/0 + 1-1- -"+in spm �•�s:.•aeo,M1. Copyrpht Spun Engvmv,e A'1«M'ul Sr�'cu P5.199699 M,uu4 apply mly to nvvwlbutnu u,d m.Ien6luled.n.amuuulpul«Ibv l"ekeua,tM1e public"nd"ur"eha.a0 rpp"rn nrt rbnPled r,M1c epNdcmulpmpeny of ctieme.and arhurvnnn ii�r publea,n�n nl.I.IcmenY.«rchuou«e"traG"6"m nr roprdep"r•ap"ro�mrvd puEng "r.ur"app"vnr Comments: Reviewed by: Materials Testing & Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 24 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain-Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 11 S064-03 February 23,2011 Sieve Report Project: Dayton Airport Rd Watermain Geotech Date Received:6-Jan-12 .AS I NI D-2487 unified Soils Classification System Project#: 11SO64-03 Sampled By:BH GW,Well-graded Gravel with Sand Client:JWM&A Date Tested: 12-Jan-12 Sample Color: Source:TP6@3' Tested By:CL Brown/Orange Sam le#: 12-0ION ASTM' D_ 0.366 mm %Gravel=63.1% Coeff.of Curvature,Cc=1.27�- Specifications D,,o,=0.740 mm °'Sand=34.5% Coeff,of Uniformity,C,=17.63 No Specs D„m=3.497 mm %Silt&Clay=2.4% Fineness Modulus=5.86 Sample Meets Specs? D,,,,=8.951 mm Fracture%=n/a Min Liquid Limit=n/a D,.,=13.048 our Moisture% 2.9% Plastic Limit=n/a D„o,=33.464 nun Sand Equivalent=a/a Min Plasticity Index=n/a Actual Interpolated Cumulative Cumulative Grain Size Distribution Sieve Sae Percent Percent Speea Specs & x k US Metric passing PassingMu Min 100% 1 n n•!A-Aw 'm^' x ABM'*A•ii�VkF �r T_ 100.0 12.00" 300.00 100% 100.0% 0.07e 11 n 1 1 1 11 i 1 1�777 I10.00" 250.00 100% 100.0% 0.0%8.00" 200.00 100% 100.0% 0.0"/0 90% I U,U i_i I i n i l I I I i l i l i I _ ._u_I i i 90.0% IIIII III111 I I III I111 I 6.00" 150.00 100°/ 100.01% 0.01/6 II111 1 1 n I. IIII11 I I 111111 I I .IIIII I I 4.00" 100.00 1000/1 100.0% 0.00/0 3.00" 75.00 1000/o 100.00/0 0.0% 80% 1r1H++-ylr� , --m1+r1-1--11I+I-I-I--s11+H++ 80.0% IIIII I I I III IIIII I I I I11111 I I '.un11 I I 2.50" 63.00 1000/ 100.00/ 0.0% IIIII I III ` l ll l l l IIIII I 200" 5000 1 01(ft 1000*/ 00% 70% _ n1i_ _ _In_11 I_I_I_ n1111 1 w111 1 700% 1.75" 45.00 100% 100.0% 0.0P/ i 1 1 -II1111 IIIII -IIII11 I I Iilll l I I I IIIIII 11• Iu 111I I fllill I f IIIIIf 1 I 1.50" 37.50 100% 1001/6 100.0"/6 0.01/6 I IIII 1 1 1 1 III 1 1 1 ❑1 1 1 I J 11 1 1 1 1.25" 31.50 85% 85% 100.0% 0.Q% 60% IUIJII_JIII LIJ J__IU Il LII LJLLL_-U 111.1L1_ BQ Qo� IIIII I IIIII I IIIII I I Hill I I -Hill I I 1.00" 25.00 78% 78% 100.0% 0.0% rn ` O1 C 11111I I I II I1111 I II1111 Illil 3/4" 19.00 721/6 720/6 100.0% 0.0°/ 'n 11 1 1 1 I IIIII j I 1 I 1 1 1 1 4I 1 1 1 'S 5/8" 16.00 66% 66% 1000% 00% w 50% ,InnT�-�1r1rn-1 1Tn-r-rnnrrr-nrtl�rT- 50.0°h m 1/2" 12.50 59P/e 59% 100.0% 0.0% 1 11I d e I I I IIIII I l i II II I I I IIIII 1 1 1 '.0 IIII I I " 3/8" 9.50 52% 52% 100.0% 0.01/6 40% -'-Ii i__nilLli_1-_1�111_1_I__111�111_1__'.ilfili l_ 40.0% \ 1/4" 6.30 42% 42% 100.0"/6 0.0°/ IIII 1 1 I I ""I I IIII 1 1 IIIII '.11111 1 I IIIIII I I IIIIIII I I1111 I I illlll I I IIIIII I I #4 4.75 37% 37% 100.0% 00/0 111111 1 1 IIIII 1 1 IIIII 1 1 111111 '.IIII I #8 2.36 24% 100.0% 0.0% 30% 1M Iy++-r:r1ti-1--1t11+ 1--nl rlrrr--Ml+i+r+- 30.0°/ #10 2.00 22/ 22% 10000/ 00% IIIII III11 I11 IIIII 1n i l IIIII I I IIIII I I 1 IIIII l I.. in 111 1 1 1u 111 1 1 #16 1.18 14% 100.00/0 0.0% IIII I I I IIn1I In 111 i11111 1 1 -.1n 111 1 #20 0.950 11% 11% 100.0"/6 0.0% IIIII I I IIII11 1 I IIIII I �II1 1 F n 1 I I 11 1 lilt I I III11I I I -I11111 I I I I '.11111I 1 #30 0.600 8% 100.00/ 0.0% Hill1 1 I III 1 1 1 1 I 111 1 1 1 1 l l l 1 1 #40 0.425 61/6 6% 100.0% 0.01/o 10% _ 10.0% #50 0.300 4% 100.00/0 Q 0°/ 1 1 1 1 1 111 1 1 1 1 J 11 1 1 1 •�•` IIIII I I I IIIII I I I -IIIII I I I i i l l #60 0.250 3% 3% 100.0% 0.0% 080 0.180 3% 3% 100.0P/e 0.00/0 0100 0.150 3% 3% 100.0% 0.01/6 1000.00 100.00 10.00 1.00 0.10 0.01 #140 0.106 3% 100.06/0 0.0% Particle Size(mm) #170 0.090 2% 100.01/0 0.U% #200 0.075 2.4% 2% 100.0% 0.00/. ' C"PyngN Spw ay�"vvPa TxM�nlSmen g.1996-98 i All rsuM"apply wly t""a"albuluro WmateruY twd.A.a mulvl prolalun to ckml..IR public"nd ow.cha..11 rcyun."rc rvbmNcdu�hc:nnfWcmul props nf.hml..aM aulAmaal"m6,pvblulon of.lalvncnt..w�clu.vn:nr c�Ua.l.fmmo«p"rdnP M•wrnmcd prn y "r<.ralrn rowa.,r Comments: Reviewed b y, Muk G."WARM SWcniviP lab 1n AL"aper.SY'Rnpon Materials Testing & Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 25 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain-Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 11 S064-03 February 23, 2011 Sieve Report Project: Dayton Airport Rd Watermain Geotech Date Received:6-Jan-12 ASTM D-2487 Cnified Soils Classification System - Project#: 11SO64-03 Sampled By:BH GW,Well-graded Gravel with Sand Client:JWM&A Date Tested: 12-Jan-12 Sample Color: Source:TP6@6' Tested By:CL Brown/Orange _ --- Sam 1d1: 12-0100 2419 ASTM D43MMM D-S82 D, 0,478 turn %Gravel=72.T/o Coeff.of Curvature,Cc=1.80 Specifications 13j1°,=0.974 tarn %Sand=26.9% Coeff.of Uniformity,C,.:=18.44 No Specs D(3a,=5.607 tutu %Silt&Clay=0.4% Fineness Modulus=6.29 Sample Meets Specs" D,s°,=12.943 tam Fracture%=n/a Min liquid Limit=n/a D_,=17.950 tutu Moisture&o=2.0% Plastic Limit=n/a D,.=31.617 min Sand Equivalent=n/a Min Plasticity Index=n/a Actual Interpolated Cumulative Cumulative Grain Size Distribution Sieve Sae Percent Percent Specs Specs & US Metric PassingpassingMu Min 100% ltJft.Y,.,<:,. y�a�a� e� 100.0 tun-••A. 17r7 12.00" 300.00 100% I WO% 0.0% u 1 1 10.00" 250.00 100% 100.0% 0.0% IIIII II III .I-1 -111 1 III 1 1 1 L I I 1 1 1 1 I_I 111 1 1 I I I_I 11_1__I I I LI I_I_ IIII 1 8.00" 200.00 101 100.0% 0.0% 90/° l u 1 1 1 1 n u 1 1 1 1 n 1 1 1 1 1 u u 1 1 1 1 n 11 1 1 1 90.0°/ 6.00" 150.00 100% 100.0% 0.0% u 1 1 1 1 n n 1 1�1 1 u n 1 1 1 n u 1 1 1 1 n 11 1 1 1 1 4.00" 100.00 100% 100.0% O.Oo/ IIIII IIIII 1 4IIII 1 I11111 I ':IIII 3.00" 75.00 ]00% 1000% 00% 80% In1�++-�1+1 r1 -1--1r11+r1-I--wl rlrrr-rl+lyr+- 80.0% IIIIIII IIIIIII IIIIIII IIIIIII '.un11I I 2.50" 63.00 100% 100.0% O.tP/ IIII IIIII IIIII I11111 I III1111 1 2.00" 50.00 100% 100.0% 01 IIII 111 1 1 1 1 IIIII IIIII I ':'I111 1 1 1 1 70% -- ---- --- - - - 70.0% 1.75" 45.00 100% 100 0% 0 0% IIII 111 1 1 1-� IIIII IIIII I L I I 1 1 IIIII I I I IIIII I I IIIII I I I IIIII I I I :IIIII I I I 1.50" 37.50 100% 100% 100.01% 0.01/o n n 1 1 1 1 u l 1 1 1 1 1 1 1 1 1 1 n 1 1 1 1 1 1 u u l 1 1 1.25" 31.50 90% 90% 100.0% 0.0°" 60% 1uu11_u1i1L! ' uL1_ _ulutuu_: IILI- 60.0% 1.00" 25.00 73% 73% 100.0% 00% IIII IIIII 11 1 1 1 H I 1 1 I I I IIII I I I I I C Illltl I I IIIIII I III I I I11III I I _IIIIIII 1 � 3/4" 19.00 62% 62% IWO% 0.0% .N I111 1 1 I IIIII I I ` I I I I I Ill l l i I I III111 1 I I '� 5/8" 16.00 56% 56% 100.0% 00% 50% InnT 7- 27 -.IT rr I--rrl n r r r-m1TI�rT- 50.0% m II1111I IIII IIIIIIII 'lllllll d 1/2" 12.50 49"/6 49% 100.0% 0.01/6 " 1: 1 1 318" 9.50 42% 420/6 I WO% 0.0% 40%- i 1 i I L 1_I �. _I_1__111 L1 1 1_L_!1n11�L 1_ 40.0% 1/4" 6.30 32% 32°/ 100.0% 0.0% 1 1 111 1 1 1 1 I u 11 1 1 1 1 I I IIIII I I IIIII I I I :.II11I I I I #4 4.75 27% 271/o 100.0% 0.0'/0 1 1 1 1 u 1 1 1 1 1 HIM I I I #8 2.36 18% 100.0% 0.0% 30% 30.0% #10 2.00 170/c 17% 100.0% 0.0% II1111 II I111 IIIII I 'IIII I I IIIIII I I lulu I I \ IIIII l l I :IIIIII I I #16 1.19 11% 100.01/6 0.0% 20% IIIII I I I 111111 1 1 ♦I- .1111 1 1 1111111 1 1 200% #20 0.850 9% 9% 100.0% 0.01 111 Ii T i 11TIi1-i 1 If 1 lint T 1 i nnT1 T #30 0.600 6% 100.0% 0.0% IIII I I IIIII I 1 1 1 III 11 1 IIII 1 1 I i !IIIII I I IIIIIII I IIIIII I I�IIIIII I I ':IIIIII 11 #40 0.425 41/6 4% 100.0% 0.01/6 10% -w 1 111 L IJ uuauu_u,ulaia- 10.0% #50 0.300 2% 101 0 0% I I I IIIII I I I 1I I I I I I I I I I I I IIII 1 1 1 I I IIIII I I 111111 I111 I '111111 1 1 #60 0.250 2% 2% 100.0% 0.01/o �I�•. #90 0.180 1% 1% 100.0% 0.01/o 0% •�I'I 0.0% #100 0.150 1% 1% 101 0.011 1000,00 100,00 10.00 1.00 0.10 0.01 #140 0.106 1% 100.08/a 0.0% Particle Size(tam) #170 0.090 0% 100.0% 0.0% #200 0.075 0.4% 09/6 100.0% 0.0% + ,,., �M,"sow, -M r -•�sww a..m cwnaM sp",w a"na�ae s rwlwr,l sw..:w as.Ivva-se nu.o"n..°rn o"7 m,c1u,1�ww".."a www:1,,w,d..o..wm„1 vw,eoao"w,rw",..ow.�uM."a"w.,1.�e..n.ry"n.,n:wew°wa w,n,wmal.mul v."rm.�r.ti,w,.,m,tun"."„w"er r�er.1m"orw,mw.,...Po,Mnwo".o.F.v,.r.rww o.esaa:e ow.w"•:�ew.�ed ow�e:s Comments: Reviewed by: ALh Gordoa P'Aat)Sup,rv:ng L,nvruory nlw,gu.SN'x•nloe Materials Testing& Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 26 Olympia,WA 98512 Shelton, WA Dayton Airport Rd. Watermain-Final Geotechnical Report Materials Testing& Consulting,Inc. Project No. 115064-03 February 23,2011 Sieve Report Project: Da}aon Airport Rd Watermain Geotech Date Received:6-Jan-12 AS TM D-2487 l nified Soils Classification System Project#: 11SO64-03 Sampled By:BH GP,Poorly graded Gravel with Sand Client:JWM&A Date Tested: 12-Jan-12 Sample Color: Source:TP6Q9' Tested By:CL Brown/Orange Sam 12-OIOP URV' ASPM D-5821 U,., 0.225 tom %Gravel=51.46/6 Coeff.of Curvature,Cc=0.05 Specifications D/Iw=-0.322 nun orb Sand=46.1% Coeff.of Uniformity,C,: 93.40 No Specs Dm3o,=0.720 Into 46 Silt&Clay=2.5% Fineness Modulus=5.48 Sample Meets Specs P D,so,=7.326 mm Fracture%=n/a Min Liquid Limit=n/a D„01=30.096 mm Moisture%=3.0% Plastic Limit=n/a D.%)=57.582 mm Sand Equivalent=n/a Min Plasticity Index=n/a Actual Interpolated Cumulative Cumulative Grain Size Distribution Sieve Sae Percent Percent Spec Spec 6 ;• % US Metric Passin Pass Max Min �g g$ 8 Qe 100% Inn.:••-h, 1rti # 'M�+AS+IR I,r T- 100.0% 12.00" 300.00 1 W/o 100.01% 0.0% J I n I I I I III I I I I I u I I I I I I I I I I I 10.00" 250.00 1000/0 100.0% 0.00/0 11 1 1 1 1 1 n 1 1 1 1 I n' 1 1 1 u n I I 1 n n I I I 8 00" 200 00 100°/ 100.0% 0 0°/ i 1_i_I__Ifni 90.0 i, IIIIII IIIIII (IIIIII I 11111II ��IIII I 6.00" 150.00 100% 100.0% 0.0% IIII III IIIIII IIII '.IIII 4.00" 100.00 100% 100.00/ 0.00/ 11 1 1 1 IIII I .Ills 1 1 III 1 1 1 3.00" 75.00 100% 100.0% 00% 80% 80.0% IHIy++- 1r1 1y --Irl+r1-l--nl rrr-nl+lir+- (IIII II11 1 lull l (IIII 1111111 2.50" 63.00 1000/0 1000/ 100.01/0 0.ft 41111 2.00" 50.00 76% 761/0 100.01/o O.Op/o 70% IIIIII nII+•I1 1 nItI1 I_I__nnI11 1 nIn11I 700" 1.75" 45.00 71% 100 00/ 0 01/ -111 1 1 1 1 1 1 1 1 1 1 1 (IIII I I IIII I�I I IIIIII I I (IIIIII I 1111111 1 1.50" 37.50 63% 63% 100.0% 0.0% • IIIIII I 1.25" 31.50 61% 100.0% 0.0% 60% 1uu1�_�1ilr-it�__wu u_1__wui�l__.uuuil- 60.0% IIIIII (IIIIII 1 (IIIIII (IIIIII I111111 1.00" 25.00 58% 58% 100.0% 0.0% c 11 n 1 1 1 1 n 1 1 1 1, Will 1 1 1 1 n l 1 1 1 1 3/4" 19.00 55% 55% 100.0% 0.01/o Ta 11 1 1 1 I n 1 1 1 1 •••.•� 1 1 1 1 n n 1 1 u 1 1 1 5/8" 16.00 54% 54% 100.01/0 0 0oA h 50% Inn 7 r-r m r n-1--1!•..r 1-I--m n r r r-n 17 n r T- 50.0% m w 1. R u11111 1 nu111 1 11n11 Inn11 I In IIII 1 a 1/2" 12.50 52% 52% 100.0% 0.0% 11 1 1 1 1 1 u u l 1 1 n n 1 1 1•�u 1 1 1 1 1 1 l u 1 1 1 1 t e 3/8" 9.50 51% 51% 100.0a/o 0.01/0 40% nlil_ii i__uili l_i_I__Iini 1_I-1 IIIIII l-I__inili�l_ 40.0% 1/4" 6.30 49% 49% 100.0% 0.01/ IIII IIII 1 1 11111 1 VIII I IIII (IIIIII I (IIIII I I (IIIIII I (IIII I -IIIIII ( I #4 4.75 49% 49% 100.01/0 0.01/0 11 1 1 1 u 1 1 1 1 1 1 n 1 1 1 1 1 I 1 u I 1 1 #8 2.36 46% 100.01/ 0.00/0 30% mly+Y-rlrl rlr---rnl+rl-I-- ri+rr-.tt l+l7rr- 30.0% #10 2.00 46% 46% 100 00/0 0 01/0 11 1 1 1 1 IIIIII 1 n 1 1 1 1 11 1 1 1 I n 1 1 I I I IIII1 1 1 I IIII I I I 111•I I I I 'IIII I I I I 916 List 39% 100.0% 0.01/0 1 IIII I 11I I 1 1 1 I 1 u u I I I I I #20 0.850 36% 36% 100.0% 0.01/1 20% 20.0% 7 -i1T1 1_1___1i11i 1____1�i1 i i-:Tn11 i T- #30 0.600 24% 100 00/0 0.0% (IIIIII I (IIIIII I (IIIIII I I 1.IIIIII ( I #40 0.425 16% 16% 100.0% 0.01/0 10% 1 10.0% #50 0.300 9% 100.01/0 0.01/o 1 1 1 1 1 1 11 1 1 #60 0.250 6% 6% 100.00/0 Will00 .11111 1 0.0% #80 0.180 4% 4% 100.0% 0.01/0 #100 0.150 3% 3% 100.0% 0.0% 1000.00 100.00 10.00 1.00 0.10 0.01 #140 0.106 3% 100.0% 0.01/e Particle Size(mm) #170 0.090 3% 100.0% 0.01/0 #200 0,075 2.5% 2% 1000"/0 0.0% CopyrOt S,-rnea�e 1 I-I swims Ps.199fi-9B .411r-u4,pph wly t",tlmlbwom act m,tm,h tetd.N,muru,lpmtzton 11 c11cN,.the W�a vM"mreAo.,ll rnpona,m.ubmatcduthc mvrdeeul prmpen�ofcticnla.,M.ulM1orvatunf"r puhi"vvn ofvnrncnl...onlu.un.c�caPact.(tom cr rcpvdal8"m repon,armmod pmdmp om wratrn,pprov,l. Comments: Reviewed by: -- - nf.h cmm..u�nao snp"�emp L,hn..In�wn,em.sx Rcgon Materials Testing & Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 27 Olympia,WA 98512 Shelton, WA Dayton Airport Rd. Watermain-Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 11 S064-03 February 23, 2011 Sieve Report Project: Dayton Airport Rd Watermain Geotech Date Received:6-Jan-I2 AS]%I D-2487 I nified Soils Classification Ss stem - Project#: 11SO64-03 Sampled By:BH GW,Well-graded Gravel with Sand Client:JWM&A Date Tested: 12-Jan-12 Sample Color: - - - Source:TP7@3' Tested By:CL Brown Sam le#: 12-010 - ASTM D-221 'ASI N D-24 '. D15,=0.299 mm %Gravel=63.3% Coll of Curvature,C,=1.03 Specifications D,,,,,=0.548 mm %.Sand=33.1% Coeff.of Uniformity.C,=28.99 No Specs D„o,=2.987 mm °'p Silt&Clay=3.7% Fineness Modulus=6.07 Sample Meets Specs? DL,,;=10.171 mm Fracture%=n/a Min Liquid Limit=n/a D,1,,,=15.883 mm Moisture%=4.5% Plastic Limit=n/a D,op,=57.873 mm Sand Equivalent- n/a Min Plasticity Index=n/a _y Actual Interpolated -- - Cumulative Cumulative Grain Size Distribution Sieve Sae Percent Percent Specs Specs ,, k US Metric PassingPassingMu Min x -Ak Q_g 8 B� 12.00" 300.00 10(No 100.0% 0.0% 100% 1 n n�.••h. Yp, X IIIIII A'N 7 r, 100.0 IIIIII I IIIIII I I I IIII II I 10.00" 250.00 100% 100.0% 0.0% l u l 1 1 1 u 1 1 1 1 1 u 1 u 1 1 l u 1 1 1 1 n n 1 1 1 8.00" 200.00 100% 100.0°/a 0.0% 90% Ill i l_i i i__Ili 1 l_i_I__l- l-t_I--ail- l_1__- l�L 1 90.0% IIIIII IIII I IIIIIII I -IIIIIII I IIIIIII 6.00" 150.00 100% 100.0% 0.0% 4.00" 100.00 100% 100.0% 0.9"/ IIIII 1 i IIIII I11 1 1 IIII 1 1 1 1 3.00" 75.00 100% 100.0% 0.0% 80% rrl- ++-�Irl 1�---Inl+rl-1- rrl rirrr-Witty r> 80.0% IIIIII IIII 1 IIIIII I.Itllll I IIIII 2.50" 63.00 100% 100% 100.01% 0.0'/ IIII I IIII.I IIIII I 1 .IIII IIIII I 1 2.00" 50.00 75% 75% 100.0% 0.0% 70% III 1 1 1 1 1 u 1 1 k` 1 u 1 1 1 1 1 u u 1 1 1 1 u u t l l 1 1 700 1.75" 45.00 74% 1000% 00% 11111 1 1 IIIII 1 n �I1 1111 1 1 .nut l 1 - 11 11 1 IIIII I I IIIII I I I yy, IIIIII I I 'IIIIII I I IIIIII I I 00.0 1.50" 37.50 72% 1 % 0.01/o n I 1 I I I I I I I 1 1 1 ' 1 u 1 I I I I 11 I I I I11 I I I I I 1.25" 31.50 71% 100.0% 0.0% 60% 141J11_JIlI LIJ_I♦_IV 111_I_I_ LLI LI LI_L_.L 1111LL- 60.0% 1.00" 25.00 69% 69% 100.0% 001/ 011, U IIIII ` IIIII "IIIII I IIII I C IIIIII I IIIIIII I IIIIIII I '.1111111 I IIIIIII I C 3/4" 19.00 666/6 66% 100.0% 0.0% H `IIII 1 1 1 b 5/8" 16.00 60% 60% 100.0% 0.0% i 50% Innrn--Ilrtrn-l-{{n1�r1-1--.rrinrrr-nlrlTrr- 50.0% � 1 IIIII I I IIIIII I I IIII I I :'IIIIIII 1 IIIIII I I tl 112" 12.50 55% 55% 100.0% 0.0% aft 111,1 1 1 ;IIII 1 1 I i l l Lill l I I1111 1 e 3/8" 9.50 49% 49% 100.0% 0.0% 40% n 1 l 1_i __I 1 1_i_1__i 1.1 1_1_ 1 I i I_1__ 1 1 L 1_ 40.0% 1/4" 6.30 41% 41% 100.01/6 0.0'/0 IIIII uu11 1 m�l 1 1 uIII I 1 1 In111 1 IIIII IIIIII IIIII IIIIIIIIIIIII 44 4.75 371/e 371/e I00.01% 0.01/o n 1 1 1 u n 1 1 n n l�I 1 -IIIIII 1 u I 1 1 1 #8 2.36 28% 100.0% 0.0% 30% IM 1ti 7 i-"1 rly-1-- 111 1- Irl H r l-r-:rl lrl+r I,- 30.0% 410 2.00 261/6 261/6 100.0% 0 01/e n n 1 1 u n 1 1 1 n u 1 1 I•.� n 1 1 1 1 n 1 1 1 1 IIIII IIIIIII IIIIII -1� :.IIu 11I 1 IniI1 1 #16 1.18 20°/1 100.0% 0.0% IIII I I I IIIII I I I IIIIII I I 'IIIII I I I nn1l I I 20% - -- --- - -- - --- 20.0% #20 0.850 17°"/ 171/ 100.01/ 0.01/ 11 1 1 1 I I 1 I 1 1 1-I I ❑1 1 1 1 i 1�I 11 1 1 1 1 111 1 1 1 I1111 I I IIIII I I 1 111111 1 1 I 911111 #30 0.600 11% 100.0% 0.0% IIIIII I I IIIIII 1 I IIIIII 1 1 ` 1 1 IIIIII 1 I #40 0.42$ 71� 71� 100.0% 0.0% 10% 11�IJ 11_J111 LIJ_I__IV 111_I_I_ 11 L _ II II II LL_ '10.0% II IIIIIII IIIIIII `. ill #50 0.300 5% 100.0% 0.01/6 I I I IIIIII I I IIIIII I I I I I "0 0.250 4% 4% 100.0% 0.0% t .. #80 0.180 4% 4% 100.01/o 0.01% 0% 0.0% #100 0.150 4% a% 100.0% 0.0% 1000.00 100.00 10.00 1.00 0.10 0.01 #140 0.106 4% 100.0% 0.01/o Particle Size(rnm) #170 0.090 4% 100.0% 0.01/6 #21Coppjht Spun 0.075 3.71/0 4% 100.0% 0.01/0 + s1rr,:,� -n1. pe. -- ,_.I n -•-,1.,�as.1.. En1YenYIg d Tccbniul Swco f5.1996-96 All rout apph�onh Io aaul bcn�aur and materuY Imted..N a mu"al pmtsli"n 1"clmrr.the pubic and"wehe.all rep"nu are wbmotd u th uvfdMul propat�'of ekuu.rM aulMriuton for publcalon of etutcmuta,con.luronr m eelnctr bum m r.gardip our rcponu i ruwd pmdry "ur wrdten upprovul. Comments: Reviewed by: Mnh GoNon W Aa0 auprnel libonlory Mnnalur.5 W nelion Materials Testing & Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 28 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain- Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. I I S064-03 February 23, 2011 Sieve Report Project:Dayton Airport Rd Watermain Geotech Date Received:6-Jan-12 %ST)1 D-2487 I nified Soils Classification Svstem - Project#: 115064-03 Sampled By:BH S'A,Well-graded Sand with Gravel - Client:]WM&A Date Tested: 12-Jan-12 Sample(-olor: - - _- ' Source:TP7Cn6 Tested By:CL Brown = -- ----- 18 D131=0.238 mm %Gravel=46.9% Coeff.of Curvature,Cl,=1.10 Specifications D,1°,=0.630 mm "I Sand=48.7% CoetT of Uniformity,CI,_10.63 No Specs D,;°,=2.158 mm 4'°Silt&Clay=4.4% Fineness Modulus=5.45 Sample Meets Specs? D,�,=4.400 mm Fracture%=n/a Min Liquid Limit=n/a D,•rl)=6.697 mm Moisture%=4.6% Plastic Limit=n/a DI°,,,=50.368 mm Said Equivalent--n/a Min Plasticity Index=n/a Actual Interpolated Cumulative Cumulative Grain Size Distribution Sieve Size Percent Percent Specs Spets ti ; US Metric passing Passing INa: Min lull x I I $ - 100.0% 12.00" 300.00 100% 100.0% 0.0°/ 100% Inn..• r I I III I I-I I I?I I':I le i II I I I IIIIII I I 10.00" 250.00 1001% 100.(Pt 0.00/ II I11 III IIIII III III I1 t 800" 20000 100% 10000/0 000/0 90% 11L 11 i i__liit III-I--ILIi I_I_I__Ilili l_1_ mill i!- 900% IIIIII I Imi1I II I I I I I I IIIIIII I It I I I I 1 1 6.00" 150.00 100°/ 100.00/ 0.0°/ IIIII 1 1 1n1IY 1 u111 1 1 1u1111 1 1 In 111 4.00" 100.00 100% ]00.0% 0.0% In 1 1 1 1 I III II t 1 I IIIII I I I H M I 11 111 1 1 1 1 1 3.00" 75.00 100% 100.0% I+ 0.0% 80% H 1y+y-y1+1rr4-1--IHr1-r-.I+1H t I- H1+1+++- 80.0% I I I IIIIII 1111111 I unIII I I IIIIII I I 2.50" 63.00 100% 1000/0 100.01/ 0.0% l l IIIII I IIIIII I I 1111 2.00" 50.00 90% 900/0 100.01% 0.0% 70% 1 1 11 n 1 1 1 1 u u 1 1 1 1 n u 1 1 1 1 1 1 n n 1 1 1 70 0% 1.75" 45.00 87% 100.0% 0.0% 7 1 nil il_i-I Iini 1 1 1 -.171 1 1 i11i1i i i I I I IIIII I I I II111 I I 'IIIII I I I IIIII I I I 1.50" 37.50 82% 82% 100.00/0 0.0% 1 1 1 1 1.25" 31.50 80% 100.0% 0.0% 60% 1u 1111_Ju1Lu_I__i. _L_.u1u L1_L_Lu11 L1_ 1.00" 25.00 79% 79% 100 0% 0 0% u 1 1 1 111 1 1 1 1 1 111 1 1 1 1 1 n n 1 1 1 1 � IIIIIII I IIIIIII I I :1111111 I IIIIIII I � 3/4" 19.00 76% 76% 100.0% 0.00/ 1 1 1 I 4 1 n 1 1 1 1 1 •u l u 1 1 1 u 5/8" 16.00 74% 74% 100.0% 00/6 '^ 50% III III -nlrl rn-1--r. r-.m n r r r-nlnr r r- 50.0% R IIIII 1 IIIII -.1 n 1 111 1 1 1 1 R 1/2" 12.50 71% 71% 100.00/6 0.0% a IIIII I I IIIII I I I � I II11111 1 1 IIIII I I I " 3/8" 9.50 67% 671/6 100.00/0 0.0°0 40% n 1 1_i n 1 -i-I__ - 1 1 1 1 1_ a 1---_ 40.0% \ 1/4" 6.30 590% 59% 100.0% 0.0% u11I1 1 011ii1 I i., 1u 1111 1 n1111I 1111 I I I I I IIII I I I IIIIII 1 1 #4 4.75 53% 53% 100.01/6 0.0°/ n 1 1 1 1 u 1 1 1 1 1 1 1 n 1 1 1 1 1111 1 1 1 #8 2.36 32% 100.0% 0.0% 30% 1 H 1-+++-y 1+1+I y-1--w i+ \ i+1 n r 1-r-H 1+1 i 11+- 30.0% #10 2.00 29% 29% 100.0°/a 0.0% IIIIII 1 1 u11111 1 IIIIII -111I 1 1 u1111 1 IIII I I I II I111 I I ill!l I I IIIIII I I #16 1.18 17"/6 100.0"/0 0.00/6 1n 111 1 uii111 1 ilnlil 1 nn111 20% 1 Fi ii T-I--nil i l l-__ i i i t i i-_---I I__ 20.0% #20 0.850 13% 13% 100.0% 0.0 111 #30 0.600 10% 100.0% 0.00/0 n 1 1 I I I II IJ I I I I IIIII I I ILn 1 1 1 1 n n 1 1 1 #40 0.425 7% 70/ 100.01/6 0.00/ 10% 10.0% #50 0.300 61% 100.01% 0.0% n 1 1 1 1 1 u n 1 1 1 1 u n 1 1 1 1 n�• 1 1 1 IIIIII I (IIIIII I (IIIIII I 'IIIIII. ... II I #60 0.250 5% 5% 100.0% 0.0% 1 1 1 1 1 11 n 1 1 1 n n 11 1 . #80 0.180 5% 5% 100.00/6 0.0% 0% 0.0% 9100 0.150 5% 5% 100.0% 0,0°/ 1000,00 100.00 10.00 1.00 0.10 0.01 #140 0.106 4% 100.01/6 0.01/0 Particle Size(mm) #170 0.090 4% 100.00/0 00/ #200 0.071 4.4% 4% 100.0% 0.01/0 + scam - pvrphl Spun lnpmcnmg B TaMul Swan Pg.1996-9P :\II rnuln apply on1Yto•nwl bcalianr•nd matmuh Iured.N•mulu•Ipvrnlwn In chrnn.U�puM1la•nd uuneh.s,all repun.an.ubn�g�W uthe cunfdmrulpmpenyofekrnn.•M•ulhorv�Ionforpublr•Iion of rtalcmrnn..oncluevnr or cr4•en fi-or regarding our repann rnrnMprndmp our"rn1 ppro.•I. Comments: Reviewed by: �.4rk-i-WAao S W III Materials Testing& Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 29 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain- Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 115064-03 February 23, 2011 Sieve Report Project: Dayton Airport Rd Watermain Geotech Date Received:6-Jan-12 ASTM D-2487 1.nified Soils Classification System -_ - Project#: 11SO64-03 Sampled By:BH GW,Well-graded Gravel with Sand = Client:JWM&A Date Tested: 12-Jan-12 Sample Color: Source:TP7@9' Tested By:CL Gray/Brown ---- ---= ASTM D- 19 1 D..,--0.399 mm %Gravel=63.54/6 Coeff of Curvature,Cr=1.14 Specifications D„a=0.743 mm %Sand=35.3% Coeff.of Uniformity,C,=20.25 No Specs D,;d,=3.564 torn %Silt&Clay=1.2% Fineness Modulus=6.16 Sample Meets Specs 7 D,wl=9.536 nun Fracture%=n/a Min Liquid Limit=n/a D,.,=15.050non Moisture%-4.3% Plastic Limit=n/a D,op,=56.104 mm Sand Equivalent-n/a Min Plasticity Index=n/a Actual Interpolated Cumulative Cumulative Grain Size Distribution Sieve size Percent Percent Specs Spec s, US Metric Passing Passing Mu Min �� �xp•�i�x'i 100% 1 n n•4� Y7RaMtIt�ArI�'1wa 41t/}# a n r - 100.0% 12.00" 300.00 100% 100.0'/g 0.00/ n 1 1 l 1 n 1 1 1 1 n n 1 1 1 n 1 1 1 u u 1 1 1 10.00" 250.00 100"/g 100.0p/e 0.IP/a n 1 1 1 n m 1 1 1 u 1 u n 1 1 800" 20000 100% 1000% 00'/6 90% Ilil_ii iIli lillil l_1lilili l_1 ;inilii 90.0% IIIII II. 11111I I IIIIII I (lullll : 6.00" 150.00 1001/. 100.01/6 0.0% IIII I I I II!� Itlll I I I IIIII I I I 'IIIII 11 1 4.00" 100.00 10M/a 100.00/0 0.01/6 n I I 1 n n 1 1 1 1 n 1 1 1 1 n 1 3.00" 75.00 100% 100.00/0 0.0% 80% IHHi t-HI+% --m1i rl-l--rlHrrr-:n ltlt r+ 80.0% I1111 111 III111 1 1 IIIII I IIIII I 2.50" 63.00 1001/6 100% 100.0% 0.0% 2 00" 50.00 81% 81% 100 01/ 0.0% .11 1 1 I 1 111 !11 1 1 1 1 1 IIIHI I I III 1 l I 1 70.0% 7D% IIII I I nil ` - -ill du l I I IIIII l I I '. 11 I I 1.75" 45.00 79o/g 100.00/0 0.0% n 1 1 1 1 1 n l I I I n n 11 I IIIII I I 1.501, 37.50 76% 100.01/0 0.0% ...111 1 1 Ill 11 1 1 IIII11 1 1 11u1I I 1 1 1.25" 31.50 74% 74% 100.01/6 0.01/6 60% 11W 1-I 11 1-_;yuJ 60.0% 1.00" 25.00 73% 73% 100.00/0 0 0% M n 1 1 1 1 1 11 u 1 1 1 1 1 1 1 n u 1 1 1 n u 1 1 1 1 IIII I I lull l III I (IIII '111111 3/4" 19.00 661/6 66% 100.0% 0.0°/ N IIII 1 1 IIII 1 1 ` IIII I IIII '.111111 "y 5/8" 16.00 62% 62% 100.0% OOYo m 50% TIMnT 7--lIn n1- , I mnrrr-mllnr T- 50•0 m 0. HIM I I 1111I I I ulll l I I IIIn1I 1 1 (1. 1/2" 12.50 561/6 56/ 100.00/0 0.0% u IIII I I 1 IIIII I 1 \ null 1111111 a 3/8" 9.50 501/0 501% 1 Wo% 0.01/6 40% u.[Ii J1!__''it L IJ-- ; --111 i 1 1 1-L_i I I i I i I 1_ 40.0% 1/4" 6.30 42% 42% 100.0°� 001/6 IIII I IIII I IIII I11111 II11I I I IIIII I I 11111I a IIII #4 4.75 36% 36% 100.0% 0.0% III I I I II111 I 1 ♦1 III VII #8 2.36 23% ]00.0% 0.0% 30% IHHtt-y1rlrly --n ---rrlHrrr-;+t Hlt ri- 30.0% #10 2.00 21% 21% 100.00/ 0.0% 111II I 1 I 111II 1 1 L. I11111 1 411111 1 1 IIII I 111111 I IN. nlll l I '.II I111 #16 1.18 14% 100.0% &ON. 11111 1 1 n1111 I I III111 I� 11111 1 '1I1111 I I 20% _ _ ____ __ ____ __ 20.0% #20 0.850 12% 12% ]00.1P/o 0.0g/ 11 1 1 1 I I -I #30 0.600 8% 100 0"/ 0 0% 111 1 1 I I I I I J I :I IIIII I I 1 II I111 I I 111II I I I IIII I I I 'II I111 I #40 0.425 5% 5% 100.00/0 0.0% 10% Iuu.Ll-aul 4lu--_Iuu -1_1__ uiuu--uulaal - 10.0% #50 0.300 3% 100.0% 0.0% III 1 1 III I11 1 1 11111 1 1 1 1 •.IIII IIII 1 1 IIIII I I II1111 .IIII I wall #60 0.250 20/a 2% 100.0% 0.0% 11 1 n n 1 1 1 1 u 1 I n I I •��•.�i'tI I I #90 0.180 2% 2% 100.0% 0.0% 0% 0.0 #100 0.150 2% 2% 100.0% 0.01/ 1000,00 100.00 10.00 1.00 0.10 0.01 #140 0.106 1% 100.00K 0.00/0 Particle Size(mm) #170 0.090 1% 100.00/0 0.01/6 #200 0.075 1.2% 1% 100.0p/o 0.0% t ,-1- ^ -�1. games-nh. enp>*em spe.r.engnee.e m rw.,t.1 sw:�rs.Ivse-sg AO rtuuh++pph only 1"+ctwl butom+nd m+lmah twld.Aa a modal polalon 10 egew.lhe public and"urwhw.ag rgroN are aub"aad a the c".Jde"Iul pmpeny"f cgeN++M a"tlwm+lov dr puhl�alon"("Ialanen4.coru.luvi"nv"r e�trvvu form"r reg+rdeg our rtp"r1v h rwmW pmdmg ow.rgdn wr+•"+t Comments: Reviewed by: ''` `""i� M.h Gordon,wABO guperv�og L+b"nl"ry N+n+ger.Sw'Rego" Materials Testing& Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 30 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain-Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 115064-03 February 23, 2011 Sieve Report Project: Dayton Airport Rd Watermain Geotech Date Received:6-Jan-12 AS]M D-2487 Unified Soils Classification SN'atem Project#: 1 IS064-03 Sampled By:BH GW,Well-graded Gravel with Sand _- Client:JWM&A Date Tested: 12-Jan-12 Sample Color: =_ Source:TP9@3' Tested By:CL Brawn/Orange -- ---- - ------- Sam le#: 12-OIOT - D,s,=0.565 mm %Gravel=75.3% Coeff.of Curvature,C,=2.60 Sptrifications Do°,=1.178 mm %Sand-23.5% Coeff.of Uniformity,C, =9.92 No Specs D,dg,=5.980 mm %Silt&Clay=1.1% Fineness Modulus=6.08 Sample Meets Specs P D,s,1,=9.758 mm Fracture%=n/a Min Liquid Limit=n/a D,,=11.690 mm Moisture%=4.4% Plastic Limit=n/a D„�g,=28.089 mm Sand Equivalent-a/a Min Plasticity Index=n/a Actual Interpolated _ Cumulative Cumulative Grain Size Distribution Sieve Size Percent Percent Specs Specs ti k k B aR US MetricPwsin PassingMu Min 100% Inn-�.t#6Yj,°,�� Im4'�OWA=I�r T- 100.0 12.00" 300.00 100% 100.0% 0,0% 11 u 1 1 I 1 n 1 °• u 1 u 1 1 11 u 1 1 1 1 n n 1 1 10.00" 250.00 100% 100.01/. 0.00/o 1I I I I I 1 u u u n 1 I u III I_I I __III II_I I I I11 1 -II I11 1 1 8.00" 200.00 1000/ 100.0% 01 90% _I-I__CI� --- -L- - 90.0 IIII I III IIIII 111111 I illlll l 6.00" 150.00 100% 100.0% 01 IIII I I I III \ .III I I I IIII11 I I "-111111 I I 4.00" 100.00 1001/. 100.0% 0.0p/ 1 1 1 1 1 III 1 1 1 u I 1 1 I 3.00" 75.00 lOG°/ 100.0% 0.0% 80% 1r11ti T t-y1r11 ' IT r1-1--1r1 r1 r r r- 1HIi r t- 80.0% I I IIIII 1 1 I I n l l i 2.50" 63.00 1001/. I00.01/6 0.00/ I I I I IIII 1 1 l i III I1111 1 III I I I I 2.00" 50.00 100p/o 100% 100.0% 0.00/ 70% 'IIIII u 1 u l I I I I n 1 1 1 I_I l I n I 1 I _ 70 W. 1.75" 45.00 99% 100.0% 0.0% IIIIIII I T i -uT1 1 I I I I I i I i I -1 1111111 1 7u71 1 II I IIIIIII IIII I I' 1.50" 37.50 91 97% 100.0% 0.0/ 1 I IIIII 11 IIII11 I I IIIIIII 1 1 1.25" 31.50 92% 92% 100.00/0 0.01/o 60% ula 111411>,i_ 60.0% 1.00" 25.00 88% Il 100 00/ 0 IJ% 11 1 1 I IIIII l l 111 1 1 1 I !I I C III11I I I IIIII I I III I I IIIIII I I IIIIIII I I � 3/4" 19.00 83% 83% 100.00/ 0.0p/ 'N I1111 I I IIIII �I IIIII 50% In 111111 1 'y 5/8" 16.00 76% 76% 100.0% 0.0% m n T T-11r1 n7 7 m n r- -� n-r- rr-:n IT T I rT- 50.0p/o A tl IIIII I I IIIIII I I d 1/2" 12.50 64% 64% 100.0% 0.0% n IIII II u I I I I I I I n n 1 1 1 1 II u I I I I e 3/8" 9.50 49% 49% 100.0% 0.0°/ 40% n 1_i i i__u 1 L1_i -1__111 L1-1-L '.-i 1 i i i_ 40.0p/ 6.30 31% 31% 100.0°/s 0.0% IIII 1 1 IIII 1 1 1 1 II 111 1 I I II n 1 1 1 1 IIIII I I IIIIIII I IIIIIII 1 '.1111II I I #4 4.75 25% 25% 100.IP/o 0.01/ IIII I IIII11 IIIII 1 1 I (IIIII #8 2.36 16°/a 100.0% 0.0°/ 30% IHHT♦--11tl H-I-I--'.`` --ITI rlrr r-Y1HH rT- 30.0% IIIII IIIII IIIII III I111 I I 010 2.00 141/6 14% 100.00/0 O.Op/° 1IIIII 1 1 IIII I I I I L IIIII I I I :.IIIII I I I #16 1.Is 100/0 100.0% 0.01/. IIII I _ IIII I.. III111 'IIII 1 1 20% `II- -- - -- 20.0p/ #20 0.850 8% 8% 100.0% 0.0p/ 11 1 i i nil I_i 1i11 I ITn! l IIIII III 1 1 1 I .IIII �,I4 IIIII !111 1 1 #30 0.600 5% 100.00/0 0.0% 111 1 1 1 1 I IIIII I I I 1 u n 1 1 „ IIIII I I-I IIIIIII I I 040 0.425 3% 3% 100.0% Will 10%4.1 W IJ 1 1__Iw L-I J__ILl 11 L1_ .` 1 _IN µl1 a_1- 10,0% #50 0.300 2% 100 0°/ 0 0°/ IIIII I IIII 1 1 I I IIIII % n 1 I IIIIIII 1 IIIIIIIIIIIIII #60 0.250 2% 2% 100.0% 0.0% IIIIIII IIIIIII IIIII 1 � �•- �,1 1 #80 0.180 2% 2% 100.0% 0.0% 0% 0.0 i #100 0.150 2% 21/6 100.0°/ O0*/ 1000.00 100.00 10,00 1,00 0.10 0.01 #140 0.106 1% 100.00/0 0.01/0 Particle Size(mm) #170 0.090 1% 100.00/0 0.00/0 #200 0,075 1.1% 1% 100.0% 0.0% + +^•+.•a -,I. ,.R -�I: , •�sam.Rmm Copyright Spun Engnarng R TVM1neal gavcv P5.1996-98 i All muW appal only to amwl bul6m and malmblvaed.Aaamu°ulpmrxtinn to c4n"a,Ihn public and ourwhv,ag rcp"na an aubmi°adulM1e coN'dcnulpropcny of cgema.eM adM1arvalbn br pubM1ulion of.Wvncnl..corcbunns or vtracla hum or ngudvg ou vpoN�ro-mwlpudmg ow Nrmu approval. Comments: Reviewed by: !M1Lr1 Gordon.N:Vi11 Supenvbg I.aMralan lWagv,tiN'R<gnn Materials Testing&Consulting,Inc. Laboratory Test Results I g g rY FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 31 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain-Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 115064-03 February 23,2011 Sieve Report Project:Dayton Airport Rd Watermain Geotech Date Received:6-Jan-I2 "IIS I NI D-2487 Unified Soils('lassificati(on System Project#: I1SO64-03 Sampled By:BH GW,Well-graded Gravel with Sand Client:JWM&A Date Tested: 12-Jan-12 Sample Color: Source:TP8@6' Tested By:(T Brown Sam INE: 12-010U _---_---- TM D-2216 ASTM D 18 ASTM D- D_- 0.582 mm %Gravel=72.9Yo Coeff.of Curvature,Ce=1.56 Specifications D,ro,=1.411 min 0',Sand=24.90/9 Coeff.of Uniformity,Cr=9.72 No Specs D„o,=5.487 min Silt&Clay=2.1% Fineness Modulus=6.20 Sample Meets Specs? aso)=10.766 min Fracture%=n/a Min Liquid Limit=n/a Didg)=13.710 min Moisture%=4 9% Plastic Limit=n/a D„A,=30.071 min Sand Equivalent=n/a Min Plasticity Index=n/a AS Actual Interpolated - - - Cumulative Cumulative Grain Size Distribution Sieve Sze Percent Percent Specs Specs Lg{r Us Metric PassingPassingMax Min 100% in n!.•{Lr<.'�`<fi•�,�'• 'aaa�..�l�"�aT 1 T r r 100.0 12.00" 300A0 1001/6 100.0% 0.01/6 n 1 1 1 n l 1 i 11 u 1 1 1 u l l l 1 1 1 n n 1 1 10.00" 250.00 100% 100.0p/e 0.0% 8.00" 200.00 100% 100.00/ 0.0% 90% 1 1 I_1 __u _I__i i n i____i 1_I__ i L 1 90.0 IIIII IIIIII IIIIII I Hill II I 11111111 6.00" 150.00 100% 100.0% 0.0% 11 1 1 1 1 1 11 n 1 1 11 1 n l i l 1 •.I null 1 1 4.00" 100.00 1000/0 100.0% 0.00/0 11 1 1 1 1 u n 1 1 1.1 i u 1 1 i 1 1 n 1 u l t i u n 1 1 1 3.00" 75.00 100% 100.0°/b 0.0% 80% Iri 1y+y-y1+l rly -InI+r1-1- r+1 r1 rr r-M1+Iy r+ 80.0% IIIIII 1111111 IIII111 'IIIIIII IIIIII 2.50" 63.00 100% 100,0% 0.IW/a 1 1 II II11 1 1 'III 11 III 2.00" 50.00 1WK 100.0% 0.01/6 n 1 1 1 1 4 n 1 1 1 I 1 1 1 1 n i I I I n 1 I I 1 1.75" 45.00 100% 100 0% 0 0% ul 1 1 T 1 1 n 1 1 1 1 1 1 1 l 1T1 ii l TnT 1 1 1 - 1I I I I I I I I I I I I I 1 1 1 I I I I I I I I I I I I I I I I I I 1.50" 37.50 1000/ 100% I DO.0% 0.0% Hill I 1 w 1 1 1' III n 1.25" 31.50 92% 92% 100.0% 0.0% 60% 1uu 11_�Iiluu_ ._uu1_i__.uluil_u_u1111ii_ 60.0% 11111 I I III111 � II I I I lull l I I IIIIII I I 1.00" 25.00 83% 83% 100.0% 0.0"/o c 3/4" 19.00 73% 73% 100.0% 0.0% qIIIII 1 1 11 1 I 'H 5/8" 16.00 67/0 67"1 100.00/0 0.0% 'a 50% 1n n T -nln rn -IT rrI--I IT': nII"!T T r- 60.0% IL I I'll I I I Hill 11 1111 IIIIII 4IIII I IL 12" 12.50 56% 56% 100.00/ 0.01/6 I •IIIIII J l l t o 3/8" 9.50 45% 45% 100.00/0 0.09g 40% 1111111 i__ui1i 1_I_ _I_1_I_-Iliiili�_t _.i IIII1 40.0"/p \ 1/4" 6.30 33% 33% 100.0% 0.06/ IIII 11 1 Hill� 1 :Hill 1 1 1 IIIIII 1 1 III11 1 I IIIII I I ,� II11111 1 I IIIIII 1 I #4 4.75 27/0 27/6 100.0% 00/ #8 2.36 15% 100.0% 0.0% 30% IHN++-yl+l riy-l--.�_` - Irrltirl-r-wl+I-r++- 30.0% #10 2.00 13% 13% 100.00/ 0.00l IIIIII 'IIII 1 1 1 111 1.1111I 4III IIIII I I 1111111 I I '.1111�11 I 1111111 #16 1.18 9"/0 100,00/ 0.01% 11111 I 11111 11 nn11 _ 20% _ __ ____ _ __ _ _ #20 0.850 7% 7/0 100,0% 00% nl 1 1 T n T i _I i v. 1 i71 71 1 l_ TiIT 1_I i T 20.0% 11111 1 I 1111111 � 1111. �I -1111111 I I11uII I I #30 0.600 5% 100.0% 0.01/ II111 .IIIIII 1 IIIIII 1 IIIIII 1 I #40 0.425 4% 4% 100.0% O.OYg 10% 1u a 11_J 111Lu_1__1uuu• LL!u L1_L_-II I L 11u 11- 10.0% #50 0.300 3% 1000/0 0.0"/e 1 1 1 l t 11 #60 0.250 3% 3% 100.00/0 0.01/6 n l I I I I I I I I 1111 I I I i #80 0.180 3% 3% 100.00/. 0.0% 0% 0.0% #100 0.150 3% 3% 100.0% 0.0% 1000,00 100.00 10.00 1.00 0,10 0.01 #140 0.106 2% 100.0% 0.0"/o Particle Size(mm) #170 0.090 2% 100,0% 0.01/6 #200 0.075 2.1% 2% 100.0% 0"op/o ♦ s�wa�m -n� pQ. -+-ra,n sprc, -• ,.,�xe�n. CopY^gb�sPon EngK�g n TcMi.a1-P5.1991�-98 AO rmu4 apph"M to actml bcaiionr and maivuY.orcd.Tuamu�ualprotwmnt"clmas-�bc publi aM ouncha.all rcpnnearceubm�rW aaikmnfka"ialpwputYofcYmra.aM auaMwWnfor publ�tlnn o(.,atmwib,cmcbuova or e�vaue from rcgardmg" cp surnmcd prndmg ow xrllcn appraaal. Comments: Reviewed by: ALrY Cnadm,WARD SupmYy l�bonlory h4nagar,SN'Region Materials Testing& Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 32 Olympia,WA 98512 Shelton,WA Dayton Airport Rd. Watermain-Final Geotechnical Report Materials Testing & Consulting,Inc. Project No. 115064-03 February 23, 2011 Sieve Report Project: DaNlo11SO6 Airport Rd w'aternlain Geotech Date Received: B1Jan-12 GW, ll--?rad 111i5ve Suits Sand flcatiun S,acln Project#: 115064-03 Sampled F3p: BH GW,Well-graded Gravel with Sand Client:JWM&A Date Tested: 12-.Ian-12 Sample Color: Source:TP8Q9' Tested By:CL Brown ACCREDITEU� Sam lek• 12-OIOV c.,s.=• -. D 2216 ASTM D-2419 ASTM D-431 1) 0636 mm 4b Gravel=76.0% Coeff of Curvature,Cc,=1.89 Specifications Dtlp�= 1.533 mm %Sand=22.3% Coeff of Uniformity,CI,=8.92 No Specs D,., 6.288 nun %Silt&Clay=1.6% Fineness Modulus=6.22 Sample Meets Specs? 11.075 nun Fracture ono=n/a Min Liquid Limit=n/a Dtopl=13.681 mm Moisture%=11.64/6 Plastic Limit=n/a D„pl=23.994 mm Sand Equivalent=n/a Mtn Plasticity Index=n/a 1, Actual Interpolated cumulative cumulative Grain Size Distribution Sieve Sole Percent Percent Span Specs ti 8 Q$ egg US Metric Pawing Passing MAX Mn 100% ,R-.,.k$Y..$<:. �tM4 r„r r- 100.0 12.00" 300.00 1WK 100.0% 0.0% 1 10.00" 250.00 100% 100.0% 0.01/6 a n u n n 1HII I I I _II II I_II 1 11111I 8.00" 200.00 100% 100.0% 0.0% 90.0°/ III I I � � IIII IIII I I I I -111111 I i I1111l 1 6.00" 150.00 100% 100.0% 0.0% n l I u u n i -u i i i I i n u i l 4.00" 100.00 100% 100.0% 00/6 jm i l I n a n u I I a I I I I I 1 1 3.00" 75.00 100o/p 1000% 00% 80% ini�++-yiri, - --ini+i----_rn r-irrr-nl+itr+- 80.0% 2.50" 63.00 100% 100.0% 0.0% u 1 u n l n n 1 u 1 2.00" 50.00 100% 100.0% 0.0P/e n 1 I n u I 70% nl ii T --uii ii 'i l iTi ii -ii i7i T- 70.0% 1.75" 45.00 100"/e 100.0P/o 0.0% n u n n e❑ n u 1.50" 37.50 100% 100% 100.0% 0.0% 1a n u t u n n u l 1.25" 31.50 99% 99% 100.01/6 0.0% 60% iw�i u_�1ii>_u_.' i_i_i__uw,-i_u_uuil i.- 60.0% unit i unlit Ili i iuiiii I niuli i 1.00" 25.00 92% 921/6 100.0% 0.0% n n l a u u 1 u n c 3/4" 19.00 79% 79% 100.0% 0.0% 'w _ n ni m r j 1 n u u •h e 50% r n-4 rn r 1 n n-r rn r r-n it I r 500%r- . w SB" 16.00 69°/P 69% 100.0% 0.0% m 1/2" 12.50 56% 560/6 100.0% 0.0% � � i n i i i i n n l i i i •u i i i i 1 n i i i i 1 i i n i i i 1 i iE 3/8" 9.50 44% 44% 100.0% 0.0% 40% n i_i 1 _n 1 111 1 1 I I 'J I i_i I I H i111 1 1 40 0% 1/4" 6.30 300/. 30% 100.0% 0.0% n n nn 1st #4 4.75 24% 24% 100.0% 0.0% #8 2.36 14% 100.0% 0.0% 30% - +i-yw riy-'. - - - ',1+I ri ri-r-ei+I+r+- 30.0% #10 2.00 12% 12% 1000% P/o O0 iiiiii iniii #16 ].is 8% ]00.0% 0 0% still nii' _ #20 0.850 7% 7°/p 100.0% 0.0% 20% -- -. 1 - I - 20.0% l l \ ❑III I #30 0.600 5% 100.01/6 0.08/6 1 n n n 1 n n #40 0.425 4% 4/ 100.0% 0.0% 10% iuull_�w�u_i •'� �,.�u,-I_�_uuil>_i_ 10.0% #50 0.300 3% 100.0% 0.0% •y' 1 n u #60 0.250 3% 3% I00.0% 0.0% R 1'I-!•�.4 .o •I i i i i #80 0.190 2% 2% 100.00/ 0.0P/o 0% 0.0% #100 0.150 2% 2% 100.0% p0o/ t000.00 100.00 10.00 L00 0.10 0.01 #140 0.106 2% 100.0% 0.0% Particle Size(mrn) #170 0.090 2% 100.0% 0.01/6 lc.r.. 1 -M, .-.. -\, p� -• #21 0.075 1.6% 2% 1000"/o 0.0% + c"pyripN Spc+n Enpvsam6 R rcclmiul5avicw PS.l--98 Allrwuhn appty��tybnnuJ ben,on,and mn,tteh t-,eJ Nnmutunlpm m,on,o clmlr.the publw.M ouneNe.nll npoNnrt rvbmHduthe mn(dm,ul Pr"pen�otchM•..nd mlbrv�tvn far publu,nno(,�tmnWv.vonclwunx ar exVac,n Eom re8nrdiy" rtponrnrexm uJ pmJmu "m wrltm approval jComments: I j I I Reviewed by: =_ " �,.a c,�raon u nuo snar,.�r i.lwrnnr.tun+em,sw tkeon ill Materials Testing& Consulting,Inc. Laboratory Test Results FIGURE 2118 Black Lake Boulevard SW Dayton Airport Rd Watermain Project 33 I Olympia,WA 98512 Shelton,WA Il l I � I I i S � a �o �a G City of Shelton W Johns Lake AV Project Site Map W Dayton-Airport wBUSN PARKt0' Road Water o ' I 1 Turtle La he "'al Mr Expansion FRD , G r__ __E FAIRFIELD CT o Project Washington w$1NOERS0 N WAY — O _ Y State Patrol s �Nu ° K Academy .. - s — �° ----- ., o L W O sa Shelton Water Pipelines �4 s �RaEO LOCATION l Schedule A """ r � Schedule C � .. Pdk Shelton CityVICANIT„ MAP a° F►�a ov °g a° UM, its v+ 0 37848 DAYTON-AIRPORT ROAD WATER EXPANSION PROJECT City of Shelton for WSP DOC Parcels adjacent to route 420020060000 County road Case Number SEP2012-00016 Shelton Spring Road ROW Tarragon Avenue 420121300010 420125300004 420125100027 E. Woodland Drive 420125100001 420121260040 E. Island Lake Road 420125200024 420125200025 E. Park Place 402125200031 420122100020 420122190124 420122100010 420125500029 420125500001 E. Springwood Drive 420125500028 420122190001 420122190002 420122200040 420122200180 420128888888 420122200110 420122200100 420122200120 420122200122 E. Blevins Road North 420122200140 420122200000 420013300060 Trailer Park SR 101 ROW 420024400010 Arsen/101 420020062000 Port/101 SR 102 Parcels with Easements 420021000020 Mason County/102 W. Public Works Drive 420022400010 Nye 420022490090 Com mCoun 420022490010 Bloom 420027500020 Titus 420027590012 Geibel 420027590013 Geibel Cross SR 102 4200232600101 WSP Academy 4/27/2012 H:\Regional Plan\2-Dayton-Airport\Design\Permits\ParcelsAlongRoute.xlsx