Loading...
HomeMy WebLinkAboutSEP - SEP Determinations - 3/20/2018 SEPA ENVIRONMENTAL CHECKLIST A. Background 1. Name of proposed project, if applicable:. WSP EVOC Skid Pan Rebuild; State Project No. 1001174 2. Name of applicant: The Washington State Patrol 3. Address and phone number of applicant and contact person: Richard Duke Mechanical Engineer Property Management Division Washington State Patrol PO Box 42626 8623 Armstrong Road SW Olympia, WA 98504-2626 Ph: 360-704-5424 Email: richard.duke@wsp.wa.gov 4. Date checklist prepared: February 14, 2018 5. Agency requesting checklist: The Washington State Patrol 6. Proposed timing or schedule (including phasing, if applicable): Construction activity estimated to begin mid June 2018 and end September 2018 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. No future projects are planned at this time. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 1 of 11 None. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. There are no application pending from this proponent for the subject property. 10. List any government approvals or permits that will be needed for your proposal, if known. Mason County Land Modification Permit. 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) This project proposes to rebuild the skid pan training area located within the interior of the north course track to improve functionality. The project proposes to remove the existing asphalt pavement and replace it with a combination of cement concrete pavement and asphalt concrete pavement. The orientation and layout of the proposed skid pan improvements will be very similar to the existing layout but slightly narrower. The total amount of paved area in the proposed condition will be slightly less than currently exists. Along with the pavement improvements the project also proposes associated stormwater improvements and modifications to the reclaimed water main service fittings and connections adjacent to the skid pan for a pavement irrigation system. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic ma if reasonably available. While you should submit an plans required b p� Y Y any q Y the agency, you are not required to duplicate maps or detailed plans submitted with any 9 Y� Y q P P permit applications related to this checklist. See attached vicinity map. B. Environmental Elements 1. Earth a. General description of the site: (circle one): Flat, rolling, hilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)? 15% SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 2 of 11 c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. Sandy gravels consistent with Grove gravely sandy loam. Previously commercial forest. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. No. e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. Fill will consist of recovered roadway construction materials and import materials for pavement improvements. Approximately 6.1 acres will be affected by construction activity. The project proposes approximately 5,300 cubic yards of net fill. The selected contractor will supply fill material from approved sources. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. Yes, Minor risk of ersosion. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? Project reduces impervious surface coverage, approximately 20,000 square feet. Percentage change is negligible for parcel. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Erosion will be controlled through construction BMPs and through final site stabilization. 2. Air a. What types of emissions to the air would result from the proposal during construction., operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. Fugitive dust during construction. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. No. c. Proposed measures to reduce or control emissions or other impacts to air, if any: Fugitive dust will be controlled by application of water according to generally accepted construction methods under state contract requirements. SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 3 of 11 3. Water a. Surface Water: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. No. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. No. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. None. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. No. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No. b. Ground Water: 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. No. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. None. c. Water runoff(including stormwater): 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Stormwater runoff and irrigation/pavement wetting runoff from the proposed pavement area will be collected in a proposed grass ditch and routed to the existing infiltration pond area which will be improved as part of this project. Water will be infiltrated into the ground after passing through stormwater treatment improvements. 2) Could waste materials enter ground or surface waters? If so, generally describe. No. SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 4 of 11 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. No. d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: Grading in affected areas. 4. Plants a. Check the types of vegetation found on the site: _x_deciduous tree: alder, maple, aspen, other _x_evergreen tree: fir, cedar, pine, other _x_shrubs _x_g rass pasture crop or grain Orchards, vineyards or other permanent crops. wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? Approximately 2.6 acres will be cleared and grubbed. The majority of the area is grass and shrub bush. A small number of trees will be removed and disposed of. c. List threatened and endangered species known to be on or near the site. None. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: None. e. List all noxious weeds and invasive species known to be on or near the site. None. 5. Animals a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: birds: hawk, songbirds mammals: deer fish: None b. List any threatened and endangered species known to be on or near the site. None. SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 5 of 11 c. Is the site part of a migration route? If so, explain. No. d. Proposed measures to preserve or enhance wildlife, if any: None required. e. List any invasive animal species known to be on or near the site. None. 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. Construction equipment will consume diesel fuel. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: Energy efficiency will be as high as the use of modern construction equipment will allow. 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. No. 1) Describe any known or possible contamination at the site from present or past uses. None. 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. None. 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. None. 4) Describe special emergency services that might be required. None. 5) Proposed measures to reduce or control environmental health hazards, if any: None. b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? Limited traffic noise from West Dayton-Airport Road. Occasional noise from a permitted automobile raceway located to the northeast of the property. SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 6 of 11 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. Heavy construction equipment noise for the duration of the construction project will be created at a level of around 100 dB in immediate vicinity of the equipment itself. Expected noise levels at the property line are expected to be well within Mason County standards for unincorporated areas. Noise associated with the project will occur only over an expected construction period of 54 days or less. Working hours will be restricted according to applicable Mason County noise ordinances. 3) Proposed measures to reduce or control noise impacts, if any: Observance of applicable Mason County noise ordnances. 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties?Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. Commercial, agricultural and forestry. b. Has the project site been used as working farmlands or working forest lands? If so, describe. The project site may have been working forest land prior to development of the property by the Washington State Patrol(WSP) in 1968. The Emergency Vehicle Operations Course (EVOC) was constructed in two phases starting with the North Course (where the proposed project is located) in 1968, and the South Course in 1989. The WSP leased the land from the Port of Shelton from 1969 until 1993 before finalizing purchase of the entire 163 acres in 1997. The site has not been used as working farmland or forest lands since WSP first started developing the course in 1968. How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? None. If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? None. 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: No. c. Describe any structures on the site. None. d. Will any structures be demolished? If so, what? No. e. What is the current zoning classification la ification of the site? Rural Residential 20 Acres. f. What is the current comprehensive plan designation of the site? Rural Area SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 7 of 11 g. If applicable, what is the current shoreline master program designation of the site? None. h. Has any part of the site been classified as a critical area by the city or county? If so, specify. Mason County does consider this property part of their aquifer recharge area. i. Approximately how many people would reside or work in the completed project? None. j. Approximately how many people would the completed project displace? None. k. Proposed measures to avoid or reduce displacement impacts, if any: None. I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: None. m. Proposed measures to reduce or control impacts to agricultural and forest lands of long-term commercial significance, if any: None. 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, mid- dle, or low-income housing. No housing provided. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. No housing eliminated. c. Proposed measures to reduce or control housing impacts, if any: None. 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? No structures are proposed. b. What views in the immediate vicinity would be altered or obstructed? None. c. Proposed measures to reduce or control aesthetic impacts, if any: None. 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None. b. Could light or glare from the finished project be a safety hazard or interfere with views? No. c. What existing off-site sources of light or glare may affect your proposal? None. d. Proposed measures to reduce or control light and glare impacts, if any: None. SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 8 of 11 it �I 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? None. b. Would the proposed project displace any existing recreational uses? If so, describe. No. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: None. 13. Historic and cultural preservation a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers ? If so, specifically describe. No. b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. No record of previous studies. c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. Consultation with State of Washington Department of Archeology and Historic Preservation. d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. In the event that archeological or historic materials are discovered during project activities, work in the immediate vicinity must stop, the area secured, and the concerned tribes and the State notified. 14. Transportation a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. State Highway 102 (W. Dayton-Airport Road) b. Is the site or affected geographic area currently served by public transit? No. If so, generally describe. If not, what is the approximate distance to the nearest transit stop? SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 9 of 11 2.6 miles. c. How many additional parking spaces would the completed project or non-project proposal have? None. How many would the project or proposal eliminate? None. d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). No. e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. The proposed project is within 1 mile of Sanderson Airfield. f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and nonpassenger vehicles). What data or transportation models were used to make these estimates? None. g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. No. h. Proposed measures to reduce or control transportation impacts, if any: None. 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. No. b. Proposed measures to reduce or control direct impacts on public services, if any. None. 16. Utilities a. Circle utilities currently available at the site: tncity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, othe Reclaimed water b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Modification to the reclaimed water service is proposed as part of this project. Reclaimed water is provided by the City of Shelton. SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 10 of 11 C. Signature The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: L F-a Name of signee ( e7 Position and Agency/Organization C'AATf�N DTiT. �oMm — � Date Submitted: 3 9 zC ro SEPA Environmental checklist(WAC 197.11-960) July 2016 Page 11 of 11 W Dallon Airport Rd 10227, WSP ACADEMY 101 STATE PATPOL ACADEMY y;* ,I PROJECT FS SITE 4, SANDERSON 101 a o� y FIELD 2 E Wallace 1� Kneeland Blvd VICINITY MAP ~ NT5 ,• SSE STATE O.n C b y JAY INSLEE d — s JOHN R. BATISTE Governor Chief H1 ]889 h STATE OF WASHINGTON WASHINGTON STATE PATROL 8623 Armstrong Road SW • PO Box 42626 • Olympia,WA 98504-2626 • (360) 704-5409 • www.wsp.wa.gov March 20,2018 Attention: Ms. Genie McFarland RECEIVED Mason County Community Services 615 W Alder ST MAR 2 6 2018 Building 8 Shelton WA 98584 615 W. AJder Street Subject: SEPA Threshold Determination DNS &EC WSP EVOC Skid Pan Rebuild: State Project No. 1001174 Dear Ms. McFarland: In accordance with State Environmental Policy Act(SEPA) WAC 197-11-340, enclosed for your review and comments are the SEPA Determination of Non-significance (DNS)and Environmental Checklist(EC)that was prepared by the Washington State Patrol (WSP) for the Skid Pan Replacement Project. SEPA regulations require the DNS and EC be circulated to agencies with jurisdiction. This project proposes to rebuild the skid pan training area located at the WSP Academy in Shelton, Washington within the interior of the north course track to improve functionality. The project proposes to remove the existing asphalt pavement and replace it with a combination of cement concrete, and asphalt pavement. The orientation and P P P p layout of the proposed skid pan improvements will be very similar to the existing layout, but slightly narrower. The total amount of paved area in the proposed condition will be slightly less than what currently exists. Along with the pavement improvements,the project also proposes associated storm water improvements,modifications to the reclaimed water main service fittings,and connections adjacent to the skid pan for a pavement irrigation system. Please submit written comments on the proposed project no later than April 12,2018. After the review period has lapsed,all comments received will be evaluated and the DNS will be retained,modified, or withdrawn as required by SEPA regulations. If you have any comments concerning the proposed project,please contact Richard Duke,at(360) 704-5424. Si cerely, t✓� Ca ain James C. iley Pr erty Management Division JCR:kcr Enclosures cc: Richard Duke, Property Management Division • ' ���STATE o� 0 6 4 9 JAY INSLEE m JOHN R. BATISTE Governor ,�� Chief STATE OF WASHINGTON WASHINGTON STATE PATROL General Administration Building • PO Box 42642 • Olympia,WA 98504-2642 • (360) 596-3900 • www.wsp.wa.gov STATE ENVIRONMENTAL POLICY ACT Determination of NonSignificance March 20, 2018 Lead Agency: Washington State Patrol Agency Contact: Richard Duke, richard.duke@wsp.wa.gov(360)704-5424 Agency File Number: NA Description of proposal: This project proposes to rebuild the skid pan training area(WSP Academy, Shelton Washington)located within the interior of the north course track to improve functionality.The project proposes to remove the existing asphalt pavement and replace it with a combination of cement concrete pavement and asphalt pavement.The orientation and layout of the proposed skid pan improvements will be very similar to the existing layout but slightly narrower.The total amount of paved area in the proposed condition will be slightly less than currently exists.Along with the pavement improvements the project also proposes associated storm water improvements and modifications to the reclaimed water main service fittings and connections adjacent to the skid pan for a pavement irrigation system. Location of proposal: 631 Dayton Airport Rd Shelton WA Parcel#420112200010 Proponent: Washington State Patrol The Washington State Patrol has determined that this proposal will not have aprobable significant adverse impact on the environment. An environmental impact statement(EIS) is not required under RCW 43.21C.030(2)(c). This determination is based on the Environmental Checklist and other information on file with the Washington State Patrol. The Environmental Checklist is attached. This DNS is issued under WAC 197-11-340(2)and the comment period will end on April 12,2018. Responsible Official: John R. Batiste, Chief Contact Person: Richard Duke 8623 Armstrong Rd SW PO Box 42626 Olympia WA 98504 (360) 704-5424 Richard.duke ws .wa. ov Signature G Date 3 l9 2!e Cap n James C. Ril ,Property Management Divi n Commander