2019-00033 MECH/PLUMB - COMMERCIAL
CT DESCRIPTION: REPLACEMENT BOILER&AIR HANDLER ISSUED: 05/29/2019
DDRESS: 631 W DAYTON AIRPORT RD SHELTON
EXPIRES: 11/25/2019
PARCEL: 420112200010
APPLICANT: WASHINGTON STATE PATROL OWNER: STATE OF WASHINGTON
631 W DAYONT AIRPORT RD 631 W DAYTON AIRPORT RD
SHELTON,WA 98584 SHELTON,WA 98584
000-000-0000
CONTRACTOR: NORTHWEST THERMAL HYDRONICS
2915 MARVIN RD NE
OLYMPIA,WA 98516
253.863.1202
GENERAL CONTRACTOR'S LICENSE: NORTHWEST THERMAL HYDRONICS License: NORTHTH877PP
2915 MARVIN RD NE Expires: 10/23/2019
OLYMPIA,WA 98516
253.863.1202
FEES: Paid Due
Mechanical Base Fee $30.00 $0.00
State Fee-Commercial $25.00 $0.00
Final Inspection $80.00 $0.00
Mechanical Fees $75.00 $0.00
Totals : $210.00 $0.00
FIXTURES
(sty Mechanical Fixtures
1.0000 For each air-handling unit to and including 10,000
cubic feet per minute(cfm) (4719Us), including
attached ducts.
1.0000 For each appliance or piece of equipment
regulated by the Mechanical Code but not
classed in other Appliance categories, or for
which no other fee is listed in the table
Printed by:Nicole Norris on:05/29/2019 09:19 AM
Pagel of 3
Mason County
Mason County - Division of Community Development
z
615 W. Alder St. Bldg. 8
`°�• jdjt Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
MECH/PLUMB - COMMERCIAL COM2019-00033
I
(sty Mechanical Fixtures
1.0000 For the installation or relocation of each boiler or
compressor to and including 3 horsepower(10.6
kW), Or each absorption system to and including
100,000 Btu/h(29.3kW)
2.0000 For each ventilation system which is not a portion
of any other permitted heating or air-conditioning
system
REQUIRED INSPECTIONS
Rough- Plumbing Inspection BLD-Final Inspection
Mechanical Inspection
CONDITIONS
All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency
(ORCAA).
It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos
containing materials have been identified and removed from the area to be demolished. Work shall not commence on an
asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B
Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
P P rY 9
unregistered contractor. Further information can be obtained at 1-800-647-0982.The person signing this condition is either
9 P 9 9
the homeowner, t owner r according A state law.
, agent for he o e or a registered contractor acco d g to W
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
Printed by:Nicole Norris on:05/29/2019 09:19 AM Page 2 of 3
Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg. 8
` Shelton,WA 98584
\ 360-427-9670 ext 352
www.co.mason.wa.us
MECH/PLUMB - COMMERCIAL COM2019-00033
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site,
Approval WILL NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will
be charged and collected by the Mason County Building Department prior to any further inspections being performed or
approvals granted.
* Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to
the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of
the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In
addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
* All new or revised fuel piping shall be inspected after the installation of fuel piping is complete, and before the attachment
of fixtures, appliances, or shut-off valves. At the time of inspection the test pressure shall be no less than 10 psi held for no
Ierss than 15 minutes. Appliances to be attached to the fuel piping system shall not be used until the final inspection has
been performed and approved by a Mason County building inspector.
_* All HVAC installations shall meet the minimum efficiencies set forth in the current edition of the Washington state energy
code(WSEC). any portion of the mechanical system that is altered or replaced shall meet the minimum standards set forth
in the WSEC and international mechanical code.
* In accordance with the International Fire Code and International Building Code duct detection must be installed and tested
for system serving 2,000 CFM or more. If duct detection is not present a permit must be submitted, reviewed and approved
by Mason County Fire Marshal's Office. Whether new or existing the system must be tested and approved by the Mason
County Fire Marshal prior to final inspection by the Mason County Building Department. You can reach Jeromy Hicks with
the Fire Marshal's office on Mondays at 360.427.9670 ext 282 8:00AM-3:330PM.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of aqy other state/local law regulating construction or the performance of construction.
Issued By: \
Contractor or Authorized Agent: Date:_ "
Printed by:Nicole Norris on:05/29/2019 09:19 AM Page 3 of 3
INSPECTION CARD
Mason County
615 W. Alder St. Bldg. 8, Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
PERMIT# COM2019-00033 PROJECT ADDRESS 631 W Dayton Airport Rd Shelton, WA 98584
PARCEL# 420112200010 PROJECT DESCRIPTION REPLACEMENT BOILER &AIR HANDLER
OWNER STATE OF WASHINGTON ADDRESS 631 W DAYTON AIRPORT RD PHONE
CONTRACTOR NORTHWEST THERMAL HYDRONICS ADDRESS 2915 MARVIN RD NE PHONE 253.863.1202
CONTRACTOR LICENSE NORTHTH877PP LENDER
INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments
Rough-Plumbing Inspection BLD-Final Inspection I Pal< /$ Pwc-'
Mechanical Inspection ( sS