Loading...
HomeMy WebLinkAboutSEP2019-00051 - SEP Determinations - 6/28/2019 MASON COUNTY Planning Division of Community Development 615 W.Alder St.Bldg.8, Shelton,WA 98584 360427-9670 ext 352 DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-340) SEP2019-00051 Description of Proposal: CLASS IV GENERAL FPA TO LOG SLIGHTLY LESS THAN FOUR(4) ACRES OF MERCHANTABLE TIMBER LOCATED ALONG US HIGHWAY 101 AND THE PORT OF SHELTON'S PRIMARY RUNWAY FOR THE PURPOSE OF OBSTRUCTION REMOVAL. Proponent: PORT OF SHELTON Location of Proposal: 81 W AlRVIEW WY Parcel Number: 420120060000 Legal Description: NW W OF HY,NW1/2 SW W OF HY,W1/2 SEC EX Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement(EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. Please contact Kell Rowen at 360-427-9670 x352 with any questions. This DNS is issued under WAC 197-11- 340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to the Dept.of Community Development, 615 W Alder St, Shelton WA 98584 by 07/12/2019. Appeal of this determination must be filed with a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. Authorized Local Government Official Date Printed by:Kell Rowen on:06/27/2019 05:17 PM Page 1 of 2 SEPA Environmental Checklist Mason County Permit Center Use: i SEP ❑ Single Family DNS: $600.00 ! Other DNS: 0 to 9.99 acres: $730 i Parcel M O 20 acres: $ 0 Date RREC E I V E D Overer 20 acres: $111100 u ❑ DS/EIS:$5000 + $90 per hour JUN 2 4 2019 615 W. Alder Street Purpose of checklist: Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant.This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an-environmental Impact statement will be prepared to further analyze the proposal. Instructions for applicants:t1jeM This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully,to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use"not applicable"or "does not apply"only when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision- making process. The checklist questions apply to all parts of your proposal,even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Instructions for Lead Agencies: Please adjust the format of this template as needed. Additional information may be necessary to evaluate the existing environment,all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made,the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. A. BACKGROUND n( el 1. Name of proposed project, if applicable: net,l 2. Name of applicant: Irw.pl 3. Address and phone number of applicant and contact person: tell 21 cv. Sla,a��2sav,f Wray Sl,/�Grav� WA. HgTfi y lv 2i0.vr04nr rppUw,t 34 6 YZG t t�y �G�' S�7roG�'�1 t�1lc �Lclr ror9, 3!o Sl9D b 3 SEPA Environmental checkllst(WAG 197-11-960)(Mc version-non project portion omitted):2016 Page 1 of 11 4. Date checklist prepared:Il,eipl 5. Agency requesting checklist:IneM /4AS1v C)ou v7Y - 6. Proposed timing or schedule(including phasing,if applicable):pieipj 7~o C- o�Ji=fi�8 i/vN TG CrT�1.,-7' Z-3 wKs 1Qpr4;/2 I®,RIV trio G. 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes,explain.LkE lipl 8. List any environmental information you know about that has been prepared,or will be prepared, directly related to this proposal.(held 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes,explain.Iheip] Nei 10. List any government approvals or permits that will be needed for your proposal,if known.[qt!PJ MAzd&'J 604.Nry r a"o% rCJ,�,o�ri� fir ,- �� 11.Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) [help] ivat�u a G. G 6= 13 j7 rkw4M,i0 41-% Lc s �'i'r' S��uc c, a n�tcrrt�.u„�Tipf�L JV w Y Jgnz 4r-119 Tr.�� ��z� v�,o��• p4.vWA 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address,if any, and section,township,and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency,you are not required to duplicate maps or detailed plans submitted with any permit applications related,to this checklist. tteil'i Parcel#(s): 4/2o/Z Address: N/A Legal Description: S4"L" �`�"� 1 ZJ ZZ4'VJ 2 ✓, Twp/Range/Section and/or GPS location: -54-v—Y,,e>rV /Zj TZaNj?lyVuJ., W.JA,'• itSEPA Environmental cbeeklist(WAG 197-11.060)(MC version-non project portion omitted):2016 Page 2 of 1 i i I B. ENVIRONMENTAL ELEMENTS Lhel i 1. Earth a. General description of the site jheipj (circle one): Flat, o Ing, hilly, steep slopes, mountainous, other: b. What is the steepest slope on the site(approximate percent slope)?)qglipj I 7m _ c. What general types of soils are found on the site(for example, clay,sand,gravel, peat,muck)? If you know the classification of agricultural soils,specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils.jheld dgdv a/1ZQVCGLY 45/0,VIOI Z13004 '61�N1_7-gN ?AAV&4,y 5AN10Y L44•4 . d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe, hel_I MO e. Describe the purpose,type,total area, and approximate quantities and total affected area of any filling,excavation, and grading proposed. Indicate source of fill.Llelpl JV6 NL- f. Could erosion occur as a result of clearing,construction,or use? If so,generally describe. hel I NO g. About what percent of the site will be covered with impervious surfaces after project construction(for example,asphalt or buildings)?,,elyl i h. Proposed measures to reduce or control erosion, or other impacts to the earth,if any:Lie�i�, 2. Air a. What types of emissions to the air would result from the proposal during construction, operation, e is completed?if an generally describe and give and maintenance when the project p y,9 Y approximate quantities if known. li,rii,, au81 AN12 G'�pwr�f c4.v7` 4' 1�f4trs; - /fitO"Atfr' 14N&A1e4QV b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. *ii ipl i N� c. Proposed measures to reduce or control emissions or other impacts to air, if any: 11�rxnl� fdG ur2r+4 - 414.012JY 7-L-Am. L ;'&e?a2/"i6• hIA113e li SEPA Environmental checklist(WAG 197-11-960)(Mc version-non project portion omitteBJ:2016 Page 3 of ii 3. Water a. Surface Water: nei)l 1) Is there any surface water body on or in the immediate vicinity of the site(including year- round and seasonal streams,saltwater,lakes, ponds,wetlands)? If yes,describe type and - provide names. If appropriate,state what stream or river it flows into.fhe!pI M 2 Will the require uire any work over, in,or adjacent to (within 200 feet)the described P q waters? If yes, please describe and attach available plans. ihelpi No 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material.fhei;j Narv� Give general description, 4) Will the proposal require surface water withdrawals or diversions? g p , purpose,and approximate quantities if known.1r eipj Ato 5) Does the proposal lie within a 100-year floodplain? If so,note location on the site plan. t+,QIPJ �d 6) Does the proposal involve any discharges of waste materials to surface waters? If so, I describe the type of waste and anticipated volume of discharge.g (_rloi�- �U I jb. Ground Water; 1) Will groundwater be withdrawn from a well for drinking water or-other purposes?If so,give a general description of the well, proposed uses and approximate quahtities withdrawn from the well.Will water be discharged to groundwater?Give general description, purpose,and approximate quantities if known. hejf�i . No 2) Describe waste material that will be discharged into the ground from septic tanks or other sources if any(for example: Domestic sewage; industrial,containing the following chemi stem ail chemicals. . . ;agricultural; etc.). Describe the general size of the system,,the number of such systems,the number of houses to be served (if applicable), or the number of animals or humans the system(s)are expected to serve. fh�1pj Mee i c. Water runoff(including stormwater): 1) Describe the source of runoff(including storm water)and method of collection and disposal, � if any(include quantities, if known). Where will this water flow? Will this water flow into other waters? If so,describe. fneipi av�Re�Ar�" ecw dF- wi,c.°- �� 9")Pc�20aO �3Y cle.tu.1s 1 4^0 il"V /iln"c) C-IW:FJ d4 u4;1-4�10 �dR- s lyli4vVTi4�Na� Page d of 11 SEPA Environmental checklist(WAC 197.11-96 (MC version-non project porlion omitted):2016 I li 2) Could waste materials enter ground or surface waters? If so generally describe. nem 9 Y (__�J 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site?If so, describe. Nca d. Proposed measures to reduce or control surface, ground,and runoff water,and drainage pattern impacts, if any: 'K1t1vVC' 4. Plants nei a. Check the types of vegetation found on the site: hei deciduous tree: alder, maple,aspen, other X evergreen tree: it ear in other shrubs I'I grass pasture I crop or grain I orchards,vineyards or other permanent crops wet soil plants: cattail, buttercup, bullrush,skunk cabbage,other I water plants: water lily,eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered?nei 2 <<wvA� a Ar !. s w,u. R�-•gta v�so Hi2�r ��trJ StT�.' G. List threatened and endangered species known to be on or near the site.+heel .S74,-LTvrq (>caek7"Copj4ez. SfRp41',YJ /Jd7aNeo 4A&X. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any:'Lru Norv� e. List all noxious weeds and invasive species known to be on or near the site. $'Gu'j�tij 'L2,RQDM 5. Animals I a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: !tu_:ul jbirds: hawk, heron, eagle,Ejn birds other: mammals: deer bear,elk,beaver,other. it fish: bass,salmon,trout, herring,shellfish,other. I SEPA Environmental checklist(wAc i9mi-96o)(!Mc version-non project portion omilteog:2016 Page 6 0 t 1 I I I I b. List any threatened and endangered species known to be on or near the site.Itiem �• �cicll.�' G�-�aTJNt'� • Srru�v era /aar4v�ra LAraor,. c. Is the site part of a migration route? If so, explain.LeiFI Proposed measures to preserve d s/c�c7 o ParJZ--,r Ot:y7lVaA rs enhance sraT�ildlife, if any:L'hLLM -rrr.+t�,o�-GN r� �- 11/'Z, A 7NAT/gitc vela C� T/ 's /J/� 5+�tlt*sf3f/Wm- G-fZA;saCC'a Itw+O /% �„ $7/�a19 `� /!q/1JN l�e� f 73.197 C�/�'G.DG✓iR G. 7A1A&9T-W I0N0/VC077 ✓.,T- ?O cv7'T✓a✓CaT'c►1c �lycf,/c�c7 SITC�Ov�I t�T-pu s/IVA&"'f AS e. List any invasive animal species known to be on or near the site. A'cw4-, 6. Energy and natural resources a. What kinds of energy(electric,natural gas,oil, wood stove,solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating,manufacturing, etc.tLieipl Nam b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe.Iqff-tLi Nv c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any:tnefpj j /1l we 18C'4 UiA -4 I 7. Environmental health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion,spill, or hazardous waste,that could occur as a result of this proposal? If so, describe.Lhtivi Nc_We" -1) Describe any known or possible contamination at the site from present or past uses. I /�loac I I 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. II NoNN j 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. JVo.Q4' II I 4) Describe special emergency services that might be required. Novv� SEPA Environmental checklist(WAC 197.11-960)(MC version-non projectponion omi(teco:2016 Page 6 of 11 II 5 measures Proposed es to reduce or control P �>z1n environmental health hazards, if any: /YQwt>~ Rc'�u b. Noise 1) What types of noise exist in the area which may affect your project(for example: traffic,equipment, operation, other)?p,eipj NelWe 2) What types and levels of noise would be created b or associated with the project on a P Y P1 short-term or a long-term basis(for example: traffic,construction,operation,other)?Indi- cate what hours noise would come from the site.(hei t:?cAu�1��1t N� ►Vcat3 ,C7�aw►� Lu4GivG itt,DUdit1['S� �iMO a i ?A•H- 5'p� Ats.�,v,oAys� �Rt/,�,OY-��asnrrvvaw�' u1rG'>�u7�Mc�T� SAZc./2�Iro 3) Proposed measures to reduce or control noise impacts, if any:l_hei � I Ncwr RtjcE.iutrZe•O i 8. Land and shoreline use a. What is the current use of the site and adjacent properties?Will the proposal affect current land uses on e n arby or adjacent properties?If so,describe, [help[ �anrf or Sl•/Gdt_�-oti-+ p�r��w_; I b. Has the project site been used as working farmlands or working forest lands?If so,describe. Nv How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? If resource lands have not been designated,how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? help! j 14 AC_ 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations,such as oversize equipment access,the application of pesticides, tilling, and harvesting? If so, how: Nc� c. Describe any structures on the site.Lipj III Naw�' I d. Will any structures be demolished? If so,what?lhei Np I e. What is the current zoning classification of the site?ywip f. What Is the current comprehensive plan designation of the site? liwipi SEPA Environmental checklist AC 197-11-960 MC version-non I M1 1( protect Portion omitted: 2016 Page 7 of 11 I g. If applicable,what is the current shoreline master program designation of the site?ft!pj N/A h. Has any part of the site been classified as a critical area by the city or county? If so,specify. help NO i. Approximately how many people would reside or work in the completed project? i,eij; Naafi J. Approximately how many people would the completed project displace?gLeiu1 /1/onre k. Proposed measures to avoid or reduce displacement impacts, if any:theipi IV40ve Jqeqp ml eD. L. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans,if any:�h, &I m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest lands of long-term commercial significance, if any: 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle,or low- income housing. ihopi Mw4- b. Approximately how many units, if any,would be eliminated?Indicate whether high, middle, or low-income housing. it,eUl NC,N&-" G. Proposed measures to reduce or control housing impacts,if any: hei i MoMe 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas;what is the principal exterior building material(s)proposed?I b. What views in the immediate vicinity would be altered or obstructed?ilrav Al ewr` c. Proposed measures to reduce or control aesthetic impacts,if any: itjeinwcwe 11. Light and glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? +n1G 1✓u 3 t4,m".t'—PAy`J 4-1er kXVz � b. Could light or glare from the finished project be a safety hazard or interfere with views?!tte..)V; Na II SEPA Environmental checklist(WAC 197-11-960)(MC verston-non project portion omttted):2016 Page 8 of 11 I' c. What existing off-site sources of light or glare may affect your proposal?Itigm. /Lr0eve d. Proposed measures to reduce or control light and glare impacts, if any:IheV Mcwe R u�✓�c%O 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity?tqtipl Mrwv ''- Acer1J C. 7eW b. Would the proposed project displace any existing recreational uses? If so,describe. inelol c. Proposed measures to reduce or control impacts on recreation,including recreation opportunities to be provided by the project or applicant,if any:Lhetpl A&VV/,f !�'c�v/4c4. 13. Historic and cultural preservation a. Are there any buildings, structures,or sites,located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers located on or near the site?If so,specifically describe. het NO b. Are there any landmarks,features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries.Are there any material evidence, artifacts, or areas of cultural importance on or near the site?Please list any professional studies conducted at the site to identify such resources.cLie1pI IV C. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. t�I�z'a2toI4L t��Ti�. d. Proposed measures to avoid, minimize,or compensate for loss, changes to,and disturbance to resources. Please include plans for the above and any permits that may be required. Name. 1z&(p4J.' 'Q 14. Transportation a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. lj-li [4 Y [a l ' SEPA Environmental checklist(VIIAC 197.11-960)(MC version-non projectpor[ion omitted):2016 Page 9 of l l b. Is the site or affected geographic area currently served by public transit? If so,generally describe. If not,what is the approximate distance to the nearest transit stop?Itlelpi �d c. How many additional parking spaces would the completed project or non-project proposal have? How many would the project or proposal eliminate?Lt,et /IlcYvr d. Will the proposal require any new or improvements to existing roads, streets,pedestrian, bicycle or state transportation facilities, not including driveways?If so,generally describe(indicate whether public or private).Lhee Nc� e. Will the project or proposal use(or occur in the immediate vicinity of)water, rail, or air transportation? If so,generally describe.Lqi jpj /%(n f. How many vehicular trips per day would be generated by the completed project or proposal?If known,indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and nonpassenger vehicles).What data or transportation models were used to make these estimates?iiieipj lVajgL - Ve/J/c-"r,4/Z -r/2IP 3NcYLr -IL-4,44J CWI-jr wN'�.a finoJ&C.•r-ls AC-T7 vt`' g. Will the proposal interfere with,affect or be affected by the movement of agricultural and forest products on roads or streets in the area?If so,generally describe. /Vo h. Proposed measures to reduce or control transportation impacts,if any: IbLei.L. jiJo v� l� ttt/�-L r� -YAJOXT- '7 /4L1 , LJnrrt' wr!/ vlAt 15. Public services a. Would the project result in an increased need for public services(for example:fire protection, police protection,public transit, health care, schools, other)? If so,generally describe. 1� b. Proposed measures to reduce or control direct impacts on public services, if any. ;t1ejpj NorvGs' 'C�r cJ 2a:Q 16. Utilities a. Circle utilities currently available ----attt�the site: I�ectricity, natural gas, <wt�L�t! fuse servic telephon , sanitary sewer, septic system, other SEPA Environmental checklist( lAC 197-11.960)(MC version-non projectpoitionomitted:206 Pafle 10 of 11 I b. Describe the utilities that are proposed for the project,the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed.Li10ipl Maovd C. SIGNATURE LtLeM The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on th to make its decision. Signature: Date Signed: Z� t J Print Name f Signee: JGrw �L��f If applicable,Position and Agency/Organization: 6110VSt4Z.r,-d rir Date Submitted: I SEPA Environmental checklist(WAC 197.11.960)(NC version-non project portion omilled):2016 Page 11 Of 111