Loading...
HomeMy WebLinkAboutFPA2019-00011 - FPA Reports - 1/16/2020 FINDINGS OF FACT FPA Case#2019-00011 APPLICANT: Port of Shelton APPLICATION DATE: June 24, 2019 Mason County has reviewed the above referenced application for Class IV General Forest Practices and finds it in conformance with all applicable County land use regulations in effect at the time of application. j FINDINGS I The proposed FPA is compliant with the following conditions: The proponent has paid the prescribed fees. The proponent has filed a complete, signed application. A map has been received that complies with the requirements of 11.05.120: (I) Harvest boundaries and tree retention areas. (II) The approximate location of any structures. (III) The location of all existing and proposed streets, right-of-ways, easements, skid roads,haul roads, and landings within the proposal. (IV) The location of future land development including stormwater management facilities and vegetation to be retained for site landscaping, open space, wildlife habitat, screening, and/or buffers. (V) Site topography at contour intervals of 40 feet. (VI) Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance. (VII) Drainage ways and culverts. (VIII) Site area targeted for further harvest including proposed timing. (IX) North arrow and scale shall be shown on all site plans. The scale shall be no smaller than one inch to 200 feet. That this FPA is in conformance with the following Mason County ordinances: 11.05 That the proposed FPA involves 4 acres on two parcels. That the notifications required by 11.05.060 have been made if applicable. Note: Harvest unit is greater than 500 ft from State Parr Mason County Resource Ordinance 1 1 y _X_That at the issuance of this permit will not result in a violation of the Mason County Resource Lands and Critical Areas Ordinance. The site was inspected by Kell Rowen of the Mason County Planning Department who determined that any critical area buffer and/or steep slope issues have been resolved. Geo-Technical Report/Assessment Review A Geo-Technical__ _Report(check one) was written by and a submittal checklist was approved by Michael MacSems of Mason County DCD on_ N/A Washington State Department of Transportation _X_A DOT Access Permit is not required for this proposal. A DOT Access Permit is required for this proposal. Date Approved by DOT: N/A Mason County Road Access Permit Road Access Permits were issued by Mason County Public Works on N/A —,Existing Access to SR 101. lin Shore a Master Program That, if applicable, all activity under this application are in conformance with the Mason CountyShoreline Master Program and has a shore line designation of g g N/A. State Environmental Policy Act i i This application for FPA#2019-00011: _X_Has been reviewed for SEPA compliance under case#: SEP 2019-00055. Is SEPA exempt. X DNS _MDNS Stormwater Management 2 f A Stormwater and Erosion Control plan written to the specifications of the 2012 WSDOE Stormwater Manual by Port of Shelton, as well as a submittal checklist was reviewed Fred Perryman of MCPW and he approved a submittal checklist on 1/16/2020. Permission from Underlying Property Owners: Rose Nye did not sign the FPA but she did sign an agreement with the Port of Shelton (dated 1211012020) as to the amount of compensation she will receive for the tree cut on her parcel. Permit Signed by Operator: Waived becauset is is an ATF permit. DOR Tax ID#888-888-888 CONCLUSION In conclusion,this application for Class IV General Forest Practices is consistent with the above criteria and that the public uses and Mason County has fulfilled its statutory obligations. RECOMMENDATIONS I,being the Director of the Mason County Community Services,hereby attest to and certify that appropriate provisions have been made for this Class IV General Forest Practices Application and hereby recommend approval. In addition to these facts evidenced by the contents of the file for this Forest Practice Application. Signed, V-cq 'rlS �'21z2 Kell Rowen, Aaministrator Community Services Dept. Date flA JYIW� S / /-Z Z ichael ac em , FM Reviewer Date 3 MASON COUNTY t COMMUNITY SERVICES Building,Planning.Environmental Health,Community Health 615 W.Alder St.-Bldg.8,Shelton,Wa 98584 Phone:(360)427-9670 ext.352 ♦Fax:(360)427-7798 FPA FOREST PRACTICES APPLI ATION/NOTIFICATION Type IV General This application should be accompanied with an Environmental Checklist(SEPA)as well as an activity map/site plan which addresses items listed below. TYPE OR PRINT IN INK: 1. Landowner Timber Owner and O erator information. Legal Name Of LANDOWNER ANDOWNER Legal Name of TIMBER OWNER dal Name of OPERATOR Mailing Address: Mailino Address: Mailing Address: City,State,Zip City,State,Zip City,State,Zip 5 L Phone C3Ld t{Z`_ Phone( ) Phone( ) Email: Email: Email: 2. Contact person information. Contact Person�>QJ6+�101ctN 'WA44 �_ 04" 417 phone(�(� zL 6ttS'/ Joy► Vr,44 -y Nac.,�vc�,rrn+r j3L0 Y9b a�33 Email: a G 3. If you are harvesting timber,enter the Forest Tax Reporting Account Number of the Timber Owner: _8' $8�' •$8 g- For tax reporting information or to receive a tax number,call the Department of Revenue at(800)548-8829. 4. Legal description where the forest ractices will occur. Parcel Number Sub Division(Y.V. Section TownshipRan a Gam, N ttJ 5. Answer each question as it applies to your proposed forest practice. a. []No. Yes. Is the activity within an urban growth area? b. 6Q No. [] Yes. Is the activity within a public park? C. pe)No. [1 Yes. Is the activity within 500 feet of a public park? Park name: d. No. [) Yes. Is the activity located on lands platted after January 1, 1960? C. bf No. [] Yes. Is the activity within 200 feet ofsaltwater lake river/creek/stream wetland seasonal runoff , Pond f. What is the expected duration of FPA? slopes which exceed 15/o? / y Ag S Proposed start date:_ 7-/• _ Za 19 Proposed end date: 6. Are you cutting or removing timber? —LQ'L S- 2 0 l 4 []No. DQ Yes. Complete the table below and identify all timber harvest and salvage activity boundaries on the activity map. Rev.August 2017 ,f Acres Volume to be Steepest Slope in Unit# Harvest Type Yarding Method net Harvested mbt Harvest Unit % 1 — *tfi t p 7. Are you constructing or abandoning roads? Dj No. [] Yes. Complete the table below. Show locations and identify all road activities on the activity map. Total Length Steepest Side Slope Abandonment Date Type of Activity feet % (Mo/Yr) Road Construction Does Not Apply Temporary Road Construction Road Abandonment 1i - Work in or over typed water may require a Hydraulic Project Approval(HPA)from the Washington Department of Fish and Wildlife (WDFW). If you have questions concerning the HPA,visit the WDFW website at www.wdtiv.wa.gov/Itabitat.htm. 8. Are you installing or replacing water-crossings? No. [J Yes. Complete the table below. Show locations and identify all proposed water-crossings on the activity map. Crossing Crossing Dimensions Crossing Crossing Dimensions Identifier Type width x length Identifier Type width x length) 9. Mark the followring activities that will be done in or over typed water. Activity in or over: Type l Stream Type II Stream Type III Stream Type IV Stream Type V Stream Removing culverts of bridges Equipment crossing Ground skidding Suspendine cables Cable yarding Failing and bucking Other 10. Is any activity in a wetland or wetland buffer? H No. [] Yes. Complete the table below. Show locations and identify all wetlands and buffers on the activity map. Wetland Wetland Type Activity Type in Activity Type in Total Wetland Total Area i Total Area Identifier (I,11,II1,IV, Wetland Buffer Area(acres) Drained(acres) Filled(acres) other l 1. Describe how the following are identified on the ground. • Harvest boundaries/unit comers: 09 A�j1,,e F4fGlNnI&, NIGNGJy 141, A/1RAGfZ.T' 4w= AA--A 5 • Right-of-way limits and centerlines for road work,culverts and ridges: • Critical areas and critical area buffer boundaries: _— Page 2 of 4 r 12. Have you reviewed this forest practices activity area to determine whether it may involve historic sites and/or Native American cultural resources? []No. QQ Yes. 13. We affirm that the information contained herein is true,and understand that this proposed forest practice is subject to the Forest Practices Act and Rules and Mason County Forest Practices Conversion Ordinance as well as all other federal,state or local regulations. Compliance with the Forest Practices Act and Rules and the Mason County Forest Practices Conversion Ordinance does not ensure compliance with the Endangered Species Act or other federal state or local laws. Signature of L NDO Signature of TIMBER OWNER Signature of OPERATOR /y (if different than landowner) (if different that landowner) Print name: Print name: LjtDnilkkO Print name: U be Date: 01 L`t Date: Date: Additional information: (Optional) Per Mason County Ordinance l 1.05, Section 11.05.120,a site map shall accompany this application which includes the following information. I Harvest boundaries and tree retention areas. Il The approximate location of any structures. III The location of all existing and proposed streets,right-of-ways,easements,skid roads,haul roads,and landings within the proposal. IV The location of future land development including stotmwater management facilities and vegetation to be retained for site landscaping,open space,wildlife habitat,screening,and/or buffers. V Site topography at contour intervals of 40 feet. VI Critical areas and Critical area buffers regulated pursuant to the Critical Areas Ordinance. V11 Drainage ways and culverts. VIII Site area targeted for further harvest including proposed timing. IX North arrow and scale shall be shown on all site plans.The scale shall be no smaller than one inch to 200 feet. Staff asks that,at a minimurn,the corners of the harvest trnit(s)be flagged for clear identification. Page 3 of 4 I i NOTE: Copies of all FPA Applications will be forwarded to Mason County Public Works for stormwater and erosion control review.Projects which disturb more than one acre(regardless of total lot size)will require an engineered sormwater plan consistent with the Mason County Stormwater Ordinance(Chapter 14.48.)and the 2012 WSDOE Stormwater Manual.Applicants will be charged for Public Works staff time to review these plans and applications. Property owners should also be aware that the Washington State Department of Ecology(WSDOE)might ask for a NPDES(National Pollution Discharge Elimination System)Permit.The threshold for such a permit is equivalent to Mason County's threshold.WSDOE will notify applicants through SEPA review if a NPDES is required.An NPDES is not a perquisite for FPA approval.It is the responsibility of the applicant to obtain this permit when required. FPA FEE: $300 SEPA FEE: 0-9.99 Acres$730 10 to 20 Acres$880 Over 20 Acres$1,100 EIS(DS)$5,000+90/1u Departmental Review (For Office Use Only) Site visit: I i Nteroved. J J Z Ni ason County t6mmunity Services _ I . .._.... _. II I i Page 4 of 4 t PORTOF SHELTON i P R O M O T ING P O S S 1 8 1 l IT 1 E S December 2, 2020 Rose Nye Property owner of parcel number 420122300000 PO Box 2283 Shelton, WA 98584 Dear Mrs. Nye, This letter is intended to confine the final compensation and property cleanup associated with the obstruction removal (trees) that the Port of Shelton (Port)had performed for temporary runway 5/23, along US 101. The Port recently harvested timber in this vicinity to clear obstructions from our temporary runway and inadvertently removed trees from the property of Mrs. Nye. As previously agreed, the Port of Shelton hired Jim Frost of Lusignan Forestry, Inc. to perforun a stumpage cruise along the southwest of parcel number 420122300000, owned by Mrs. Rose Nye. The Port and Mrs. Nye agreed that the Port will pay the value of the harvested trees, based the stumpage cruise, which established a lump surn value of$1,924.00, in order for the Port to provide just compensation to Mrs. Nye. In addition to the financial compensation,the Port and Mrs. Nye agreed that the Port will remove the stumps, grade smooth the area where tree harvesting occurred, move the stacked log pile up next to the house, and spread grass seed to revegetate the disturbed area. Please note that stumping and grading will not occur in the WSDOT right-of-way due to concerns over steep slopes and potential erosion that could result. Upon completion of the above described scope of work to the satisfaction of bothparties, it is � p p P � 21 W Sanderson Way, Shelton, WA 98584 (360)426-1151 (360)427-0231 fax www.portofshelton.com agreed that this matter has reached it's acceptable conclusion and no further actions will be taken by either party, with regard to the tree removal. Regards, L I Wendy Smith date Rose Nye date Executive Director Property Owner,parcel 420122300000 21 W Sanderson Way, Shelton, WA 98584 (360)426-1151 (360)427-0231 fax www.portofshelton.com MASON COUNTY (360)427-9670 Shelton ext. 352 COMMUNITY SERVICES DEPARTMENT (360)275-4467 Belfair ext. 352 Mason County Bldg. 8, 615 W.Alder Street (360)482-5269 Elma ext. 352 Shelton, WA 98584 www.co.mason.wa.us ease Brandon Palmer 21 W Sanderson Way Shelton,WA 98584 August 26,2019 Letter of Incompleteness RE:42012-00-60000 and 42012-23-00000 Dear Mr.Palmer, Back on June 24,2019 your office submitted what turns out to be an incomplete Class IV G FPA application.Because of the emergency circumstance of keeping the airport open during a- repaving project,the Planning Dept.decided to let the harvest happen prior to FPA approval, once a SEPA review had been carried out(which was conducted by Planning Manger Kell Rowen). I have now reached your submittal in my permit backlog and am starting off by reviewing for completeness.Here is a list of items that I need before FPA 19-11 can be approved: A complete FPA application(no application was found in the submittal).A fresh copy is being provided with this letter.Please be aware that the landowner needs to sign as well,which in this case includes Rose Nye for the small amount of her property that this application covers. As for the stormwater and erosion control narrative, limiting the narrative to just Minimum Requirement#2 is acceptable,if there is no more than 7,000 sq.ft of ground disturbance and no more than 2,000 sq.ft of new impervious surfaces,provided that the narrative,address all 12 criteria,not just the four provided:This is so even when the other eight criteria are not applicable. In recent weeks,forester Joe Staley has been in touch with me and it sounds like an engineered stormwater and erosion control plan is being prepared for the 3-acre site.My suggestion is that approval of the FPA follow approval of the engineered stormwater plan(which will be reviewed by Fred Perryman in MCPW). In order to keep this case alive,please respond within 180-days.If you have any.questions,please contact me at extension 571 or by e-mail at: mms@co:mason.wa.us. Thank you. Sincerely, r •7/ ichael MacSems, FPA Reviewer cc: Joe Staley,Fred Perryman(MCPW) 7 7-- - Port of Shelton Sanderson Field Teruporary Runway 5123 1p, y 0 struttian Rernaval Areas �9 c *. :7 h W' ul;,, . Fort of Shelton Airport Runway Hazard Trees f l�c.nrU�kiy HARVEST BOUNDIES EXISTING ROADS H WY 101 ---�,a Scale 1"=200' , 1REES PENETRATING-TSS ALL BE REMOVED PRIOR ` '0 TEMPORARY-RUNWAY;' ` OPENINGTRE ` n ABOVE ll TSS + TREE @ IS' E 26' ABOVE TSS --` TREE @ 2T BO E SS t`n-5 ABOVE TSS .1i: TREE @ 14' --� ABOVE TSS PZ RDZ� i TREE @ 17' �. TREE @ 28' A801&E•TSS ni "r. LTR�@ ? AB01fE T S ABOVE TSS 1•, j a , 'FREE 23' E2EE,@ 27•' ABOVE TSS 4: TREE TSS 32-T TREE @ 32` FABOVt TSS ABOVE TSS t a r t PORT OF SHELTON AVIATION I INDUSTRIAL I MARINE June 19,2019 Grace Miller Mason County Dear Ms. Miller: The Port of Shelton has completed preliminary design and environmental review and is nearly finished with a Federal Aviation Administration(FAA)/United States Fish and Wildlife Service(USFWS) consultation and final design for the 2019 Runway Pavement Overlay Project,which is scheduled to go to bid on June 27`h,2019. The project involves runway pavement milling,asphalt pavement overlay, replacement of runway edge lighting and runway signage,and paint striping. Since the project will require closing the active runway for approximately forty five days,beginning around August 5`h,the Port intends to activate the parallel taxiway("Taxiway A")as a temporary runway("Temporary Runway 5/23")to minimize impact to airport users/tenants. The Port's engineering consultant, Century West Engineering,and the FAA have determined that approximately three acres of trees located along US101 are currently obstructions to the approach end of Temporary Runway 23 and have been declared an "airport hazard". The obstructions in question are trees located along US Highway 101 and south of Airview Road,as shown on the attached Exhibit A Temporary Runway Obstructions(aerial sketch). RCW 14.12.010 defines"Airport Hazards"as any". . .tree . . .which obstructs the airspace required for flight of aircraft in landing or taking-off at an airport or is otherwise hazardous to such landing or taking- off of aircraft". RCW 14.12.020 further defines Airport Hazards contrary to public interest, ". . . if of the obstruction type in effect reduces the size of the area available for the landing,taking-off and maneuvering of aircraft thus tending to destroy or impair the utility of the airport and the public investment therein." Mason County code allows for the removal of trees that create a hazard when there is an imminent danger to public health and safety without requiring an Environmental Permit,or a Forest Practice Permit.These hazard trees have been determined to be obstructions to the Airport Flight Pattern.The trees will be cut down at the base using a mechanized timber harvester(aka "shovel")by the successful bidder for this emergency timber sale. There are no wetlands or significant steep slopes located in this area and the timber harvest will be quick and of minimal impact. The fact that these trees present an eminent hazard to the flight operations at the Airport warrants immediate action.Your timely attention to this request would be much appreciated. Sincerely, ^A . Brandon Palmer, Engineering Manager 21 W Sanderson Way, Shelton,WA 98584 (360)426-1151 (360)427-0231 fax www.portofsheiton.com M. fin vie y� cn 1L<L. , OfILL to LL- Q I r _ D Ll Q _ CK, v sic 1 _Q 14 dft i LL �--_ f o j _ r; u o l� M r D o cn 0 T o L O rp SANDERSON FIELD-PORT OF SHELTON RUNWAY 5-23 MAINTENANCE OVERLAYgw%/ CENTURY �1 /WEST m TEMPORARY RUNWAY OVERVIEW E N G I N E E R I N G PORT OF SHELTON c xr...K.+n..+rwew s..xnee•u.,ow ra,rrcs.r mro..sr+o�rlonwr�xv.w.awcYn.mnr.mmvcraw.,u,.�..•i.•,..�..,