Loading...
HomeMy WebLinkAboutFIR2001-00005 - FIR Permit / Conditions - 5/14/1997 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line (360)427-7262 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670, ext. 352 Shelton, WA 98584 l FIRE PROTECTION PERMIT FIR2001-00005 APPLICANT: AL JOHNSTON CONTRACTOR: RECEIVED: 04/24/2001 SITE ADDRESS: 11900 N U.S. HIGHWAY 101 SHELTON ISSUED: 05/08/2001 PARCEL NUMBER: 420122200090 PERMIT PIRES: 11/08/2001 LEGAL DESCRIPTION: TR 9 OF NW NW EX NULL c&�VOID BY EXPIRATION PROJECT DESCRIPTION: FIXED FIRE SUPPRESSION SYSTEM FOR A CLASS ONE HOOD OATS= IBY GENERAL INFORMATION System Information Type of Use: Commercial Fire District: 11 Sprinkler Heads: Audible Switches: Pull Stations: Hood & Duct?: Y Flow Switches: Visual Devices: Door Releases: Dry Chemical?: Y Pressure Switches:: Smoke Detectors: Duct Detectors: Wet Chemical?: Zones: Heat Detectors: Sprinkler?: Standpipe?: SQUARE FOOTAGE FEES Monitoring Station No. NONE First Floor: Auto Fire Alarm?: N Second Floor: Type Amount Due Amount Paid Third Floor;: Sprinkler System Fee $100.00 $100.00 Total: $100.00 $100.00 This project becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Owner or Agent: — Date: i FIR2001-00005 Please refer to the following pages for conditions of this permit. 1 of 2 CONDITIONS FOR FIR2001 -00005 1.) 1. A 406C RATED FIRE EXITNGUISHER IS REQUIRED ADJACENT TO THE MANUAL PULL STATION FOR THE FIRE SUPPRESSION SYSTEM. 2. A TRIP TEST IS REQUIRED. CONTACT THE FIRE MARSHAL AT 427-7535 TO SCHEDULE. X FIR2001-00005 Please refer to the following pages for conditions of this permit. 2 of 2 I CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by pas Piong date by Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING FIRE DEPT. date by dates by date by PLUMBING OTHER Attic Groundwork date by date b D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by 2 � L