HomeMy WebLinkAboutMIS93-0721 Gas, Space Heater - MIS Permit / Conditions - 11/15/1993 MASON COUNTY
Mason County Bldg. 111 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
1- JIN r4 V-" c 1r Up �; 931 t-. tI t In is -I
fff 11 t t I " 'I .`4i i . ., -,10 V)0 fo PI A I
IUfi A F)I . . . . . . . . . . . . . . .
A i'f I h 11 1 C11ONG NA 4 el b 0 9
k"If k (AlONG 14 A 4 09
I f 6 A I H 4 It IN 19 t I ts JOAO It 141
INST Al 1. NATIPRAL (W' . SPACt W All 0
1,1:#)t I! C t I !I t 4 ) I I i f-A
NOR I H ON 1.01 FROM `;HUA I ON 111 AlkPOk I I OCA I f 0 A k I I XAC'O `i I A JON
PH 1 1
91" P 11 ' C 1)M P t I A N C f 14) A I I AgAli- 1) r ONO I I I
Rl-
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date /'�- Z- �'j by � ii Ribbons
date by Gas Piping date b
Foundation Walls date i Z Set Up
date by INSULATI N date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
I�
I
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
y CONCRETE MECHANICAL MOBILE HOME
Footings Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
II FRAMING Walls FIRE DEPT.
` date by date by date by
I! PLUMBING Attic OTHER
Groundwork
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
I
I
I
II
II
I
`I
`I —
I
Permit No.
MASON COUNTY
PLUMBING/MECHANICAL PERMIT APPLICATION
O
426 W. Cedar/P.O. Box 186, Shelton, WA 98584. 427-9670 p13�
PLEASE PRINT Mk-S
#1 Owner 6-- Aa Phone# q;-> (, -2 0 9 2-
Site Address h 17 D 6 Zli, ) 00/2
City Ili f St W/5L zip�� Y�.Sw
Directions to Job Site D !10 —
Owner Mailing Address �i4-m c iP�5 �Bd 0 c
City St Zip
Lien/Title Holder
Address
City St Zip
#2 Contractor Name 7"S TX, AW/J Al Contractor Reg. # w�-sril9ag V tTG-
Address -1"r 0 &OTC Expiration date o 4t -0 7 - 9,3
city St 60 Zip yKfM a7�>Phone 6j?Q
#3 Parcel No. q310 - -
Legal Description
#4 Use of building 77 d 7E A ce> Describe work `�-
z e�
#5 Type of Job: New Add Alt Repair
Plumbing Fixtures ($3 each) EVg Mechanical Fixtures (, h
No._Toilets CIRCLE FUEL TYPE: Electric,Gas
_Bath Basins Heatpump, Other
_Bath Tubs No. jLak Fees
_Showers Furn BTU
_Hot Water Htr Heatpumps
_Laundry Washer Vent Systems
_Sinks Spot Vent Fans
_Floor Drains No.. Boilers/Compressors
_Laundry Basins _ HP
_Dishwasher No. Air Handling Units
_Disposal _ cfm#
_Urinals No. Other
_Other Gas Outlets l�
Wood,avellet Stove
Permit Basic Fee 15.00
TOTAL PLUMBING $
Permit Basic Fee 15.00
TOTAL MECHANICAL $
NOTICE: This permit becomes null and void if work or construction authorized is not commenced
within 180 days or if construction or work is suspended or abandoned for a period of 180 days at any
time after work is commenced. Proof of continuation of work is by means of a progress inspection.
- - - — —J
NOTE: If this permit application includes the placement of a fuel tank, heat pump or other unit to be located
outside of the existing structures, a plot plan MUST be submitted as required below:
Show following on the site plan below: Lot Dimensions, Existing Structures, Structure Setbacks, Water Lines, Septic Systems,
Flood Zones, Wells, Shorelines, Easements, Name of Flanking & Fronting Streets. Indicate directional by N, S, E, W, etc.
OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT
I CERTIFY THAT I AM EXEMPT FROM THE REQUIREMENTS OF I CERTIFY THAT I AM A CURRENTLY REGISTERED CONTRAC-
THE CONTRACTORS REGISTRATION LAW RCW 18.27,AND AM TOR IN THE STATE OF WASHINGTON AND I AM AWARE OF THE
AWARE OFTHE MASON COUNTYORDINANCEREQUIREMENTS ORDINANCE REQUIREMENTS REGULATING THE WORK FOR
FOR WHICH THIS PERMIT IS ISSUED AND THAT ALL WORK WHICH THE PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN
DONE WILL BE IN CONFORMANCE THEREWITH. NO CHANGES CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE
SHALL BE MADE WITHOUT FIRSTOBTAINING APPROVAL FROM WITHOUT FIRST OBTAINING APPROVAL FROM THE BUILDING
THE BUILDING DEPARTMENT. DEPARTMENT.
X OWNER X BY
DATE DATE
Return permit to: Department of General Services
L
426 W. Cedar/P.O. Box 186, Shelton, WA 98584 • 427-9670/1-800-562-5628
jFOR OFFICIAL USE ONLY: Accepted by: Date:
Receipt No. Referred To
DEPARTMENTAL REVIEW Proposal Proposal
FOR OFFICIAL USE ONLY
Approved Denied
Planning:
Building: , 1
W �
Fire Marshal:
1 --