Loading...
HomeMy WebLinkAboutPAR2014-00048 - PAR Application - 7/16/2014 ��- PAR Zbr4 -61Q046 DATE -J- I U- a)i=-4 PRE-APPLICATION CONFERENCE REQUEST FORM The purpose of the pre-submission conference is to identify and/or eliminate as many potential problems as possible in order for the project to be processed without delay. Representatives for the Fire Marshal's Office,Building Department, Environmental Health,Planning, and Public Works Departments may attend the meeting to discuss rules and regulations applicable to the proposed project Topics covered during the meeting will include the comprehensive Ian, shoreline program, zoning, availability of sewer and table water, development concepts, P P 9�m� g, � Po p n ts, building construction, P g n, fire protection and life safety concerns of the proposed project The pre-submission conference will be most informative when you provide accurate and detailed information on the Pre-Application Conference Application Form and the site plan.Applications wi:lI be accepted when all information is received and deemed complete. Pre-Application Conferences are held every Wednesday and last up to one hour. To schedule a meeting complete the applications and return with 10 copies of the detailed site plan,by 3:00 PM on the Wednesday two weeks prior to the proposed meeting. 1.Pre-Application/Dept of Community Dev. 2.Environmental Health 426 W Cedar Street Shelton, WA 98584 Shelton,WA 98584 360.427.9670 ext 352 360.427.9670 exf.400 Check amount: S255.00 Check amount: S1 fDG,00 BOTH CHECKS MADE PAYABLE:MASON COUNTY TREASURER Applicant: Site Plan Name: / ZA5 nib/ l,A iv, / t y �A 1`J'.•�,S Z-L� Submit 6 copies Mailing Address: j 11L ,L S"r G`fXI{a/4Include the following information Daytime Telephone: Fax: rV 0/_J ❑ Indicate Scale and North Arrow Email address: `u � r�l jA/L, �+,�5 , C®1 ❑ Property line dimensions,easements, and right-of-ways. Representative: Name: ��//�(��� C� �� l ZZ�I��I� ❑ The location of all existing and _ proposed structures.Include square Mailing Address:/12-5 -66 H -- , Al, (j V"f t A _ footage of existing and proposed IA-1 41� Zj� structures. Daytime Telephone:`�/q S i��J C'1� Fax: •— ❑ Setback distance,in feet from all Email address: �u. �t'R111(L FA141S , C_6 properly lines and structures. Parcel Number: (12 digits)4.Q 002- `Zq -9� �"� p ❑ Existing and proposed road access to and from the site. Description of Project: Include: 1) Square footage of structure,2)Use of building and rooms(i.e., ❑ Parking sites office,warehouse,restaurant,storage,etc),3)Occupancy classification per ❑ Location of on-site sewage tanks and drainfields. IBC, Section 302.1,and construction type.4)Provide two sets of plans,if ❑ Location of drinking water supply. available.Use separate sheet if necessary`35 0 Sq, =r Include location on the proposed site S t ►emu ttG }l � _Q - L,1 L,�E 6q and surrounding parcels. Je,4i}r,l T-L�47J.� C L) LTI 1��Z:gJ, @20 C,��i Ai 6 ❑ Steep bluffs,wetlands;streams,and bodies of waxer 4_ ) 6F-E! Cp- 0 Location of fire hydrants and emergency vehicke access roads, including grade. Surface and storm water,run-off routes. i Has the project been discussed during a previous Pre-Application Conference: If yes,please indicate date. A/U Will the building have employees?If yes,how many? © j What is the water availability of the proposed project?If there is an existing well, what is the name of the system? 6/ZP521 4 22/2 Ct l'l010 y ��/�i< �i "✓l i J•- What is planned for the on-site sewage system?If you are proposing a new on-site system provide tail on the required site plan.S1 f--Prl C, f� P go V& (pCWy/T # S t EJ �j Z�i�f C��-7 1 ADDITIONAL INFORM4TION. APPLICABLE BUILDING CODES 2012 International Building Code/2009 International Residential Code 2012 International Fire Code-ANSI Al 17 2012 International Mechanical Code—WAC 51 A2 2012 Uniform Plumbing Code—WAC 51-56/51-47 2012 International Energy Cons.Code/Washington State Energy Code—WAC 51-11C&51-I1R Mason County Ordinance Title 14 Code changes are on a 3 year cycle;effective in July of that particular year. Date of Conference: 1_3v —Zv'14 Time of Conference: c; Location of Conference: 426 West Cedar Street,Shelton Planner: 3 i -0 ext. N 1 LEGEND: A ALARM � + MOTHER ROOM . CLONE LAB 10x10 Ft. DOOR 7x10 Ft. 100 Sq.Ft. �J l 70 Sq.Ft. CAMERAS D ' X X SECURITY '� FLOWER ROOM#1 D SYSTEM 52x22 Ft. STORAGE 1144 Sq.Ft. i VEG ROOM 17.5x10 Ft. f—�C 175 Sq.Ft. D FIRE DOOR A D D 52x5HALLFtAY D O O OTE D D C V (No ACCESS) 260 Sq.Ft. PROCESSING. TRIMMING/DRYING (, Ye O D F D WEIGHING/PACKAGING 168.25 Sq.Ft. G Q . 3u� D K W Pr . 3 LL �U) FLOWER ROOM#2 0 vi D OFFICE D ���' 52x22 Ft. cWi 8.5x10 Ft.' C 1144 Sq.Ft. o¢ 85 Sq.Ft. U CLEAN p D ROOM ` t. X X D Sq. t D BATH SERVICE D RO M ROOM ACCESS 5 Ft. Sx4 Ft. 1. C C C 0 Sq.Ft. 20 Sq.Ft Sq. I. D 7 FLOOR PLAN � s't yl C�') - 3 Mason Famil Farms LLC y 3 �� cf � SEC 2, TWP 20N, RGE 4W, W.M. CONSTRUCTION NOTES r 1 1 I O PRONDE SITE OR WIDE LLG PIVE BUFFER FILTER FA IHO ARWM `t V A KCas W V WM1 4tl1aH PROJECT THE VE INSTALL UFFE RCAOTBFAORIG FENCVRO(BIEP C2]])IF THE VEGETATIVE BUFFER CANNOT F BE M THE GIX TANNED FENCE XTA TO HL ON MEETT SEDIMENT I.2 FAIT RUNOFF FROM THE SITE SEE TILT ■i N IA IY MVAR YTAn ZAgGf O INSTALL STORM GRAN INLET PROTECTION(UP C220)W TIE TOO ! �'— EfOSTINO CATCH BASINS LOCATED AT ME MAIN ENTRANCE.FILTERS 6 E MT MAINTAIN N U AND CLEANED OR 00-P M AFTER EVERY SidiY 7 E+ EVENT. ERMO UN AM CONSTRUCTION REPLACED ANp EVERY } STABILIZATION. 1 1 W ._ ._ _._ ,__ ya��.-- s -- ---•—O CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE(SUP C105)PER DETAIL ON SHEET C1.2 k� PgER OSEOGRUB, YPROYEYOIT'a PREPARAX RTE ASATION OW T O CON ION OF LOT AREML MEET IN REGRUDGING. END GRADING. DING. A1E WIN OWNER ON LIMITS O CIEARVNO. GRUBBING,AND gRADWG I 7 (IMP,) y O CONSTRUCT WFILIRARON POND PER PLAN AND DETAIL ON SHEET C1.L 3 1 I •( \ c INFILTRATION POND BOTTOM AREA-000 SFN INSTALL 12-0 ADS St GRAIN BASINS(OR W/SOLD •/ _� 1. 7 :t O COVERS PER MANUFACTURERS INSTALLATION EQUAL)ALLATION GUIDELINES PROM ME IN. Y �11 •) o I2•DEEP SVYP DEPTH IN ALL DRAW BASINS 1 I 3AM f ( to B O INSTALL ROOF OAAN PIPES AND RGHTLINE 10 INFILTRATION POND AS 0' A.W1201,I P J %ICWIL YIN.-0.01 FT/FT.INSTAL CIEANOUTS YWERE SHOWN ON I JI PLAN(IMP.OF 7).INSTALL WYES AT ALL CHANGES IN PIPE gRELRON Z I 1 JJ I AHD AT ALL PIPE CONAMPON/RE-IN PgN1S SEE BIAYNNO('WIS 0 I _1 •BLOC. FOR ROW'DRAW DOWNSPOUT OCATION LOONDMATE INSTALL P. Z IGX�E� .ly Plc AND LO-TION OM BUILDING CONTRACTOR.PROME HIM.12^C01ER. V O SAOo Y COORM AM WIN WATER I 1 r 1 s I•• y/ AN:]OI.W O AND INSTALLATION OF MASTER hWATER ME—ON DOM RECOMMENDED SIZE IT. 1 I ••I rF InC I•'• R'/ �, N Y MEETER BOKPREVFRDgI DEVICE SHALL BE INSTALLFn W.8'O s 1 L ,, •, I '•'p I! STORAGE E O CONSTRUCT tlfAW.ENTRANCE.DRIVEWAY.AND PARKING AREA PER _ I I I F• 'r ::,: y SHED PLAB AN TYPICAL SECTION xm' CONTROL PLAN FOR REFERENCE. ON SHEET cL2.SLF NIn20NTAl (• />M :.;�.: •1 A-l50L7 I 10 GRADE MIN.IC ODE VEGETATIVE WSPEASICHIM HLIEA STRIP O 2 DOWN-CJLIDIFNT OF 1NE GRAVEL oRIVE1YAY,YARNWO STALLS ANO Q Q 1 1 DRIVE AISLES((BLIPS TS.12 R T0.50).GROSS SLOPE GRAVEL AREAS TO 1 I C I 1•••1.•'- ALLOW STORM'A'ATER RUNOFF TO SNEETIT. OFF ONTO ME DSPER1.1 d •F•1 0 1 I STRIP.PLACE COMPOST AMENDED SOILS IN VEGETATIVE DSPERSIOH i I •� (M) 7 I,'. `: �� (� B A STRIP(BLIP T61]).SEE DETAIL M SLAT C1.2 FOR flEFE11FN[E JO(7 1 N I I he a x— I i. .',.I'., •i I a(m.) ��/' ,`1 BLD2.DG.� x. v�, LANDSCAPING NOTE 0 c Fr-y3fflA M1M1 SEE LINOSCAPWO REQUIREMENTS HOIC ON SIIFET C1.2. _ I ! .'_` I I...:.;•�`>t �e:.>,'F. ..,�.... . 7 (TYL) 19 Mbo° a� I 1 1• . ,) to r o r F.E SPOT ELEVATION NOTEOPOR b 1 1 A •`'•( •1 p I :::: , G � I SPOT ELEVATIONS SHOWN ARE FINAL GRADE AT TOP OF GRAVEL 0: I I k P I A 1•.' '! (;).„,.`, �. UNLESS OMEROSE NOTED. YI tl I i :,�i I•.• ' "� _____ ___,_�i�� -�//''''�1�� I GENERAL EROSION CONTROL NOTE IN ADDITION 10 ME BEST YANACEYFNi PRACRCE5(D.P'S)SPECIFIED • I BLDG•Jp`• I• ' .y;;�.::, OF ON THIS PLAN,THE CONTRACTOR SHALL WNMRZE CLEARING AND a ] i Q I.�• -I.I 40DO 1F ""' / a•1�• O INCORP O I LPAgNC.MAINTAIN BYP'S UNTIL FINAL S11E SIABIUTARON.AND OI OI I 'I +I 1 11 I Ad]DIA I ' OR My ADDITIONAL BW'S A SAL i0 YWIYI$E A EROSION ANO SEgNENFARM WRING CONSTRUCTION.SEE VOLUME N TIE AND STALE DEPARTMENT OF ECOLOGY STORYWAIEP aI 0 q 1•'• I MANAGEMENT MANUAL FOR WESTERN WASHINGTON.2005 EDROL FOR t t 1 Q ,'^J,' ,I I•,• ANTI-RONAL UP'S THAT MAY APPLY 10 MIS PROFCT(I.E.OIEEL m y WASH,MMCMG.DUST CONTROLCONCRETE HANDLING,ETC)SEE (M^) 0 k I `�'•• ] N I SIORMWAnR POLLUTION PREVENTION PLAN(SWPPP)FOR REFERENCE. h L{ f FN :I Q I l y 1 1 (TY1.) Io I 1 Z Y'A'',' � BLDG. G AI'rdN RN, 3"SF n A.*Mkl ( I 2 A IT I I I 1. >• I 1 O !• a IF. ra lac r la< I & 1 1 .i '•Il W ,a,r.sE ..'IE�sa �anai�l o-iini -'' - RMMIRYI SCAIL:I•.20 AEI € a--� —.I— YETIIIL.LL DA HIM Y F A—:NLVD I9 .,1 Y I 1 I 1 (IMP.) 10 _ 1 I u L� MERIDIAN:MASON 'RECORD Ili SII2 2 I i VOLUME 27,PAGE O$4.N.AF N0.17A301 Ap WAR[IL NGS BENCH MARX DESIGNARON r 255 Ia000 _ 1 I I NOW'20 ELEVATION.2112.SIT 1RAWro xAVH� T I I AILS DFNOH YARN DESICNAITON R Ib At YN: NOW'29 ELEVATWN.28 2.95 "CALL UNDERGROUND LOCATE AT 811 BEFORE YOU DIG" C1.1 0g '14 Cop MASON COUNTY. S. DEPARTMENT OF COMMUNITY DEVELOPMENT Mason County Bldg. III, 426 West Cedar Street PO Box 279, Shelton, WA 98584 1854 www.co.masonma.us (360)427-9670 Belfair(360)275-4467 Elma (360)482-5269 MASON COUNTY PERMITTING FOR RECREATIONAL MARIJUANA • BUILDING DEPARTMENT REPRESENTATIVE: Debbera Coker(360) 427-9670 EXT 510 E-Mail: DLC@co.mason.wa.us • DATE: July 30, 2014 • PRE-APPLICATION CASE NUMBER: PAR2014-00048 • PROJECT REPRESENTATIVE(S) : Mason Family Farms, Maurice Bretzfield (MB@masonfamilyfarms.com) • PROJECT ADDRESS: 50 W Westfield Ct, Bldg B • PARCEL NUMBER: 42002-24-90070 • DESCRIPTION & SIZE OF PROJECT: Finish shell bldg permitted under Mason County building permit number COM2014-00084 • GENERAL NOTES: The structure will be used to grow and package marjuana. Walls will be constructed to separate the 3500 sq. ft structure into rooms and hallways. Based upon the floor plan submitted one exit is required. The path of egress travel to the required exit(s) shall be marked by readily visible exit signs that clearly indicate the direction of exit travel. Egress through intervening rooms may be allowed provided the egress path is clearly identified with external or internal illuminated exit signage. As presented an addressable fire alarm installed in accordance with NFPA72 shall be required unless the building is separated into fire areas(with firewalls) not exceeding 2000 sq. ft. Provide information and details showing how partition walls will be constructed including connection to the floor/foundation and roof framing. I I Oil extraction information is not provided. If oil extraction activities will take place in the structure not information will need to be provided with permit documents. Identify where the work will take place and �b(-identify equipment that will be installed. If cooking will be done as part of the business identify location and provide cooking information. I Identify storage locations and material that will be stored. See STORAGE information in this document Include MSDS sheets for fertilizers, identify packaging information, etc. • OCCUPANCY CLASSIFICATION & USE: "U"Occupancy=Agricultural building or area used for production and crop production shelter. Use may include planting, cultivating, growing, and harvesting. The provisions of Washington State Chapter 19.27 RCW may apply to some projects.- Provisions of the construction code do not apply to temporary growing structures used solely for the commercial production of horticultural plants including ornamental plants, flowers, vegetables, and fruits. "Temporary growing structure"means a structure that has the sides and roof covered with polyethylene, polyvinyl, or similar flexible synthetic material,and is used to provide plants with either frost protection or increased heat retention. A temporary growing structure is not considered a building for purposes of the building and fire code. Building department and fire-life-safety review shall not be required for a temporary growing structure. "F1"Occupancy= Structure or area used to process material into a useable product. Includes packaging, labeling useable product for wholesale in retailers. "M"Occupancy=A structure or area used for retail sales to the public. "S"Occupancy=A structure or area used for storage. • SETBACKS TO PROPERTY LINES: Provide a site plan, drawn to scale, shall clearly identify setback dimensions on site plan. Overhangs shall be limited in accordance with IBC 705 Structures shall be located not less than 10-ft from the adjacent property line (ref IBC 603) • DISTANCES TO OTHER STRUCTURES: Site plan, drawn to scale shall clearly identify distances, where required include fire-resistive details, including continuity, &tested assembly details. To be considered a separate structure each structure shall be located 20-ft from each other. Referencing IBC 705.3, buildings located on the same lot shall be assumed to have an imaginary line between the buildings, therefore to be considered a separate building a distance of 20-ft or more shall be provided. Overhangs shall be limited to in accordance with Table 705.2. • FIRE RESISTANCE FOR EXTERIOR WALLS: When required include fire-resistive details, including continuity, &tested assembly details. When firewalls are required to create a "separate"building the firewalls shall be constructed equal to 3- hours or better assembly constructed in accordance with IBC Section 706. • IDENTIFY TYPE OF CONSTRUCTION & PROVIDE ALLOWABLE AREA CALCULATIONS WHERE NEEDED. See Chapter 5, IBC.... when fire flow is available and provided: Referencing IBC Table 503, assuming Type VB construction: "U" occupancy single-story 5500 sq. ft, "F1" occupancy single-story 8500 sq. ft, and "M" occupancy single-story 9000 sq. ft. • FIRE-RESISTIVE RATED CONSTRUCTION &TYPE OF CONSTRUCTION : Where required demonstrate compliance. Identify the location of the assembly, compliance to continuity requirements and construction details: EXTERIOR WALL (IBC704), FIRE WALL (IBC705), FIRE BARRIER (IBC706), SHAFT ENCLOSURES (IBC 707), FIRE PARTITIONS (IBC 708), SMOKE BARRIERS (IBC 709), SMOKE PARTITIONS (IBC 710), HORIZONTAL ASSEMBLIES (IBC 711), PENETRATIONS (IBC 712), FIRE- RESISTANT JOINT SYSTEMS (IBC 713), FIRE-RESISTANCE RATING OF STRUCTUURAL MEMBERS (IBC 714), OPENING PROTECTION (IBC 715), DUCT&AIR TRANSFER OPENINGS (IBC 716), CONCEALED SPACES (IBC 717), ETC, Buildings with mixed used such as a "U"and an "F1"the uses may be non-separated in accordance with IBC Section 508.3. The allowable area and height shall be the most restrictive requirement. Unless specified otherwise, referencing Table 508.4, the following will apply: When non-separated uses will not apply, a 2-hour fire barrier shall be required to separate F1 and U occupancies. Separation between an F1 and M is not required. i • NUMBER OF EXITS REQUIRED/OCCUPANT LOAD:(IBC 1004): Include design calculations on building plans. Clearly identify the exit path and exit signage on construction plans. Referencing Table 1004.1.2 the following occupant factor applies: U-Occupancies: 1:500 sf of the gross area F-1 Occupancies: 1:100 sf of the gross area M Occupancies: 1:30 sf of the gross area The occupant load is needed to verify that adequate exits are provided and to verify that adequate restrooms and other plumbing are fixtures are provided in accordance with Chapter 29. • ENGINEERING REQUIRED: NO... New structures will need to comply with current code and designed to support lateral and vertical loads. This was covered when the structure was permitted. Structures 4000 sq. ft or more shall have all plan pages reviewed and stamped by a Washington State licensed design professional. The review shall include a code evaluation addressing life-safety, plumbing & mechanical evaluation, and structural analysis. (ref. RCW 18.08.410) ALL PLAN PAGES SHALL BE STAMPED AND SIGNED BY THE DESIGN PROFESSIONAL, including plumbing and mechanical pages. • ACCESSIBILITY REQUIRED: YES, include compliance information including design calculations demonstrating compliance to Chapter 11 and details demonstrating compliance to ANSI 117.1 in effect at the time of submittal. Include information demonstrating compliance for restrooms, employee work areas, parking spaces, accessibility to structure, drinking fountain, signage, etc. When required verify that building plans contain compliance information. Existing buildings shall comply with IBC/WAC amendment Chapter34. "U"occupancy structures need not be accessible except that agricultural buildings shall require access to paved work areas open to the general public. (IBC 1103.2.5) • PLUMBING SYSTEMS (Chapter 29 Washington Amendment to IBC): Permitted building shall comply. On plans, include design calculations for the following: water closets (M/F), Lavatories, Drinking Fountains, etc. Plumbing fixtures need not be provided for unoccupied buildings or facilities(2902.1). Agricultural buildings would be considered a building that is not normally occupied. Other occupancies shall be provided with restrooms in accordance with WAC Table 2902.1. When the total occupant load is 15 or less separate facilities for male and female need not be provided but the fixtures and space must be accessible for persons with disabilities. • WASHINGTON STATE ENERGY CODE: The following refer to Energy Code compliance. Referencing the 2012 International Energy Conservation Code (IECC)/Washington State Energy Code (WSEC). New elements shall apply. When an existing structure is unheated and heat is added the building shall be made to comply with the energy code and compliance forms submitted with the permit application ► NON-RESIDENTIAL ENERGY CODE: Heated spaces require NREC Compliance forms (envelope & mechanical). WSEC forms and information can be accessed at: hftp://www.neec.net/resources/resources.html ► LIGHTING: All non-residential structures shall comply with WSEC lighting requirements. Complete NREC Compliance Forms and lighting plan including switching locations. WSEC forms and information can be accessed at: http://www.neec.net/resources/resources.html. Task lighting for plant growth and maintenance is exempt(ref 405.5.1 #6). In addition your local utility may have an incentive program, designed to help you lower energy consumption. To discuss incentive opportunities contact the Energy Services Department at PUD3 by calling (360) 426-0777 or PUD1 at (360) 877-5249. • COMMERCIAL KITCHEN: Show compliance to Chapter 5 of the International Mechanical Code when a kitchen is included. When the structure will be provided with a kitchen the kitchen must comply with specifications of the Mechanical Code. When cooking produces grease or smoke a type I hood with fire suppression system. To properly evaluate provide information that clearly identifies what will be cooked and the type of cooking that will take place in the kitchen. • GEOTECH REPORT REQUIRED?4,--Planning regulations and IBC chapter 18. PROVIDE A SPACE FOR STORAGE OF RECYCLED MATERIAL & SOLID WASTE (WAC51-50-009): Identify the location. • X CTION: Referencing IBC Chapter 17, Section 1704.1.1. This will typically apply to new me construction types and methods will require special inspection. When required nt of special inspections prepared by registered design professional in responsible te a pecial Inspection authorization form. • INTERIOR FINISHES: Include information demonstrating compliance to Interior finishes required in IBC Chapter 8. Gypsum board will comply with requirements for interior finish. If you wish to use another finish material, including plastic please provide information about the material and submit with permit documents. Clearly identify finish material in cross section of construction plans. • STORAGE SPACES: Clearly identify the space. Include a list of material that will be stored, anticipated quantities, height, and if hazardous such as solvents, fertilizer gases, etc, include MSDS sheets for each product. Identify the anticipated storage height. QSTORAGE RACKS greater than 5'9" shall be permitted either with the proposed project or separate building permit. Where required documents shall include design information demonstrating stability for seismic conditions. Special inspection may be necessary, reference IBC Section 1707.6 and 1705.3 (4.5), storage racks, provide compliance information. • MECHANICAL EQUIPMENT: Identify the location and type of mechanical equipment located within, and outside the structure. Address foundation and support systems for equipment. Where new equipment will be placed on site provide UL listing information and/or construction details stamped by a Washington State licensed design professional. Where applicable include duct information and duct support compliance information. • SUSPENDED CEILING SYSTEMS: Provide details and specifications relating to suspended ceilings wherb applicable. Details shall be designed and approved for seismic loading in accordance to IBC Chapter 16. Where required designate special inspection plan. FIRE MARSHAL REQUIREMENTS: The following address specific Fire Marshal comments. On construction plans identify compliance information on the proposed building plans. NOTE THAT SEPARATE FIRE PROTECTION PERMITS ARE REQUIRED FOR: \ NFPA72 ADDRESSABLE FIRE ALARM SYSTEM OR NFPA 13 AUTOMATIC FIRE SPRINKLER SYSTEM • Identify the location of fire extinguishers and type of fire extinguisher. Typically in non-cooking areas, permanently install a type 2A10BC fire extinguisher such that it is located within 75-ft travel distance. • WATER SUPPLY& FIRE HYDRANT- Referencing IFC, Section 508; clearly identify fire hydrant location if one is located within 400-ft of the project. • FIRE FLOW: A copy of the approved method for determining fire flow is enclosed. Complete the Commercial fire-flow work sheet to identify fire flow and fire protection that may be necessary. Note that when fire flow is not available step 3 shall apply. See also requirements for IBC Table 503, allowable areas: 0-500 sq. ft.: no protection (mitigation) needed. 501-5999 sq. ft: Install an NFPA 72 addressable fire alarm system OR construct firewalls in p Y accordance with IBC Section 706 to create maximum 2000 sq. ft. fire areas 6000— 12,000 sq. ft: Install NFPA 13 automatic fire sprinkler system OR install NFPA 72 addressable fire alarm system maximum 6000 sq. ft fire area with fire walls constructed in accordance with IBC Section 706, OR construct firewalls in accordance with IBC Section 706 to create maximum 2000 sq. ft. fire areas 12, 000 sq. ft or more: Install NFPA 13 automatic fire sprinkler system • EMERGENCY VEHICLE ACCESS:A copy of the "Standards for Fire Apparatus Access Roads" adopted through Mason County Building Code, Section 14.17 is attached. Verify that documents clearly identify code compliance. • ADDRESSING: Referencing IFC, Section 505 and Mason County Code Chapter 14.28, all new buildings shall have an approved address. Applications for an approved address can be obtained on the Mason County website at: www.co.mason.wa.us, Forms and Brochures, Community Development, the address to the referenced web page is: http.//www.co.mason.wa.us/forms/Community—Dev/index.php. Each building within the facility shall be distinguished with a separate identification so that emergency personnel can find the building in the event of an emergency. • AUTOMATIC FIRE ALARM: Referencing IFC, Section 907 and NFPA 72, when proposed provide information on plans that identifies your intent to install the alarm system. Automatic fire alarm systems require a separate "Mason County Fire Protection System Permit Application". The application can be obtained by going to same website and page referenced above. • SPRINKLER SYSTEM: Referencing IFC, Section 903 and NFPA 13, when proposed provide information on plans that identifies your intent to install the NFPA 13 fire sprinkler system. Automatic fire sprinkler systems require a separate "Mason County Fire Protection System Permit Application". The application can be obtained by going to same website and page referenced above. • KNOX BOX: Referencing IFC, Section 506, access shall be required, typically through use of a Knox box. Provide compliance information with construction documents. Contact the local fire district to make arrangements for an approved key box, location, etc. The local fire district for your project is Fire District Number: 11 and can be reached as follows: (360)426-1822 • GAS METERS/TANKS: Referencing The International Fuel Gas Code (IFGC) and NFPA 58 provide compliance information as required within the referenced codes. • STORAGE (TYPE, HEIGHT, ETC.) Referencing IFC, Chapter 19 (Lumber yards and wood working facilities), Chapter 23 (High-piled combustible storage), Chapter 27 (Hazardous Materials), etc. o Identify all materials to be stored, including commodity classification (see IFC2303 and Table 2306.2), and type of plastics when applicable. Include anticipated quantities, loose or baled, anticipated height, o Identify hazardous materials classified as a physical or health hazard, include MSDS sheets as specified in IFC Section 2703.4. Referencing Table 2703.1.1(1), identify proposed control areas and method of protection. Referencing IFC Section 2704, identify spill control and proposed secondary containment, see also IFC Table 2704.2.2 o Identify method of storage (i.e. racks, shelves, pallets and what storage method is constructed of such as plastic, wood, metal, etc.) If pallets will be used , identify location of unused pallets and anticipated quantity o Identify flammable and combustible liquids, flammable gases, and flammable solids regulated under IFC Chapters 34, 35 and 36. Include information demonstrating compliance, including proposed storage, classification of flammable material and/or combustible liquid • OTHER: P RMITS REQUIRED FOR PROJECT BUILDING PLUMBING/ MECHANICAL ❑ GRADING PERMIT (When greater than 200 cubic yards) ❑ CHANGE OF USE FIRE SUPPRESSION, where required. See Fire Marshal comments ® SIGN ❑ FENCE (Greater than 7'0" above grade) Ll ADDITIONAL NOTES: WHEN YOU ARE READY, SUBMIT FOUR (4 SITE PLANS, DRAWN TO SCALE ALONG WITH THREE (3) COMPLETE SETS OF BUILDING PLANS INCLUDING THE FOLLOWING. (NOTE, ALL PLAN PAGES SHALL BE STAMPED BY THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHEN THE STRUCTURE EXCEEDS 4000 SQ. FT.): • CONSTRUCTION PLANS, drawn to scale. Include floor plan, elevations, cross section, cross section, construction details, etc. • MECHANICAL PLAN, • PLUMBING PLAN AND • NON-RESIDENTIAL ENERGY CODE/VENTILATION & INDOOR AIR QUALITY CODE INFORMATION. • DEFERRED SUBMITTAL WILL NOT BE ACCEPTED. • A PLAN REVIEW FEE WILL BE COLLECTED WHEN THE BUILDING PERMIT IS SUBMITTED. VALUATIONS ARE BASED UPON THE MOST RECENT BUILDING STANDARDS VALUATION DATA RECOMMENDATIONS AND THE PERMIT FEE WILL BE DETERMINED BASED UPON TABLE 1-A OF THE 1997 UBC. DESIGN CRITERIA: SEISMIC ZONE: D2 WIND LOAD: 85 MPH, Depending upon location see IBC 1609.4.1 SNOW LOAD: See Mason County website: http://www.co.mason.wa.us/forms/Community_Dev/snow—load—map.pdf 25 PSF, Except: Lake Cushman 55psf Along Hood Canal, Potlatch North to County line 40 psf Matlock, Lake Nahwatzel up to Skokomish Valley 35 psf REFERENCE CODE EDITIONS: Effective July 1, 2013 2012 INTERNATIONAL BUILDING CODE (IBC), INCLUDING APPENDIX CHAPTERS C, E AND H, EXCLUDING H106; SECTIONS 101 THROUGH 107, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, AND EXCLUDING APPENDIX CHAPTERS A, B, D, F, G, I, J AND K AND; ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51- 50, AND THE 2009 INTERNATIONAL EXISTING BUILDING CODE. 2012 UNIFORM PLUMBING CODE (UPC), PUBLISHED BY THE INTERNATIONAL ASSN. OF PLUMBING AND MECHANICAL OFFICIALS(IAPMO)AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51-56 AND WAC 51-57, EXCLUDING SECTIONS 102.4 AND CHAPTERS 12, 15, AND 16, PART I. 2012 INTERNATIONAL MECHANICAL CODE (IMC), PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, AND THE 2009 INTERNATIONAL FUEL GAS CODE AS ADOPTED THROUGH THE WASHINGTON STATE BUILDING CODE WAC 51-52. 2012 INTERNATIONAL FIRE CODE, PUBLISHED BY THE INTERNATIONAL CODE COUNCIL, EXCLUDING APPENDIX A, D, AND K AND ADOPTING APPENDICES B,C,E,F, G AND ADOPTING THE WASHINGTON STATE BUILDING CODE WAC 51- 54. 2012 INTERNATIONAL ENERGY CONSERVATION CODE(IECC), AS AMENDED BY WASHINGTON STATE BUILDING CODE WAC 51-11 To view the Mason County Building and Construction Code and adopted amendments go to the Mason County website at: www.co.mason.wa.us. Case Activity Listing 9/30/2014 2:23:35PM Case #: PAR2014-00048 qg Activity Description Date 1 Date I Date 3 Hold PARB50 Public Works Review 7/16/2014 None DONE FJP FJP 7/30/2014 DLC Access is to a State Route so all access issues and approvals need to be addressed by Washington State Department of Transportation FJP provided information to bldg representative prior to meeting. PARA10 Application Received 7/16/2014 None GMM 7/16/2014 GMM PARB10 Planning Review 7/16/2014 7/23/2014 None DONE GBM GBM 7/23/2014 GBM The Planning Department was unable to attend the meeting on 7/30/14 but has comments for the applicant tenant on behalf of the Planning Department.There had been a previous Pre-Application Meeting regarding this site with Mr.Kirby of Canopy Park,Case#PAR2014-00007,on 3/5/14.The same type of development,including this building,was reviewed with that application.The Planning Dept.has the following comments regarding this proposal for use by this tenant,MASON FAMILY FARMS LLC: 1)ZONING-The zoning of the parcel is"Industrial",located within the Shelton Urban Growth Area.The proposed I-502 use is for Marijuana Cultivation,Processing and Office in accordance with WAC 314-55. 2)RESOURCE AREAS-The property is located on a critical Aquifer Recharge Area,as a Class tI-Highly Susceptible Critical Aquifer Recharge Area.The Mason County Resource Ordinance regulates critical aquifer recharge areas.A"Title Notification"acknowledging the proposed use on the aquifer must be recorded within the Mason County Auditor's Office and then a copy of the recorded document should be submitted to the Planning Department.The owner,Mr.Kirby,may have already submitted this document. 3)PARKING-The parking area has been indicated on the original submitted site plan and should be shown on your building permit application. 4)STORMWATER- A Stromwater Plan was submitted by Mr.Kirby to include this building. 5)The City of Shelton water will be available in approximately one year.Mr.Kirby has been working with Cindy Waite in Public Health and the State regarding the current water system. Please let me know if you have any questions.Thank you. sl h�- �i �"`1✓► u �C't t o1 F�(1�(. PARB20 Building Plan Review 7/16/2014 7/30/2014 None DONE DLC U 7/30/2014 DLC Met with Randy and Maurice to discuss the project. They specified that will only be producing the material. No cooking,oil extraction,or packaging will be done inside the building.The document distributed during the meeting is attached to this case. In addition to the document DLC provided the representatives with code information including Section 1011 (Exit signs), 1006(Means of Egress illumination),Section 1007(Accessible means of Egress), and 1014.2(Egress through intervening spaces). PARB40 Environ.Health Review 7/16/2014 7/30/2014 None DONE CEW 7/30/2014 CEW WILL NEED WATER ADEQUACY.THERE IS AN EXISTING APPROVED DESIGN.WILL NEED TO ADDRESS FLOWS. Page 1 of 2 CaseActivity..rpt Case Activity Listing 9/30/2Q14 2:23:35PM Case #: PAR2014-00048 Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By PARB60 Fire Marshal Review 7/16/2014 7/30/2014 None DONE DLC 7/30/2014 DLC Representatives plan to install a NFPA72 compliant addressable fire alarm system. Page 2 of 2 CaseActivity..rpt