Loading...
HomeMy WebLinkAboutBLD2007-00116 SFR - BLD Permit / Conditions - 3/23/2007 Inspection Line (360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, WA 98584 i , i RESIDENTIAL BUILDING PERMIT BLD2007-00116 OWNER: CAPSTONE HOMES LLC RECEIVED: 1/24/2007 CONTRACTOR: LICENSE: EXP: SITE ADDRESS: 51 EST ALBANS LN ALLYN ISSUED: 3/23/2007EXPIRES: 2/15/2013 PARCEL NUMBEWr 122185000061 LEGAL DESCRIPTION: LAKELAND VILLAGE#12 PHASE II LOT: 61 PROJECT DESCRIPTION: DIRECTIONS TO SITE: New SFR Lakeland Villiage Stock Plan#2003-0150 51 E. St. Albans Ln. General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: 3 Type of Constr.: VB Type of Use: SF Insp. Area: No. of Bathrooms: 3 Occ. Group: R-31_1 Lot Size: Deck: Type of Work: NEW Fire Dist.: 5 No. of Stories: 2 Occ. Load: Building:3,500 Garage-Attached 780 Valuation: $ 251,879.50 Building Height: 29 Occ. Status: Primary Basement: COVPORCH 59 Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: S 20.0 Ft. Shoreline: Ft. Water Body: Rear: N 27.0 Ft. Slope: Ft. SEPA?: Model: Width: Ft. Side 1: E 5.0 Ft. Shoreline Desig.: Year: Serial No.: Side 2: W 5.0 Ft. Comp. Plan Desig.: Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Water Closets (Toilets) 3 Furnace<100K 1 Plan Check Fee KKK 1/24/2007 $367.87 S2200700000001 Lavatories 5 Ventilation Fan 5 Planning Review Fee KKK 1/24/2007 $ 155.00 S2200700000001 Bath Tubs 2 Propane Tank 1 Address Fee BLJ 1/26/2007 $ 140.00 S2200700000001 Showers 1 Gas Outlets 6 Building State Fee ARC 1/30/2007 $4.50 S2200700000001 Water Heaters 1 Propane Stove 3 Building Permit Fee ARC 1/30/2007 $ 1,844.95 S2200700000001 Clothes Washer 1 Exhaust Hood 1 Mechanical Fee ARC 1/30/2007 $248.15 S2200700000001 Kitchen Sink 1 Dryer Vent 1 Mechanical Base Fee ARC 1/30/2007 $23.50 S2200700000001 Dishwasher 1 Plumbing Fee ARC 1/30/2007 $ 117.00 S2200700000001 Hosebibs 3 Plumbing Base Fee ARC 1/30/2007 $20.00 S2200700000001 Laundry Tray 1 EH Plan Review TW 2/2/2007 $75.00 S2200700000001 Building Permit Fee TW 8/15/2012 $ 1,105.05 S2201200000001 Total $4,101.02 BLD2007-00116 Please refer to the following pages for conditions of this permit. Page 1 of 5 CASE NOTES FOR BLD2007-00116 CONDITIONS FOR BLD2007-00116 1) Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. X 2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 3) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. X 4) In accordance with international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads," all new structures that require an address shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting inspections. X 5) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. X 6) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X 7) The "approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. X BLD2007-00116 Please refer to the following pages for conditions of this permit. Page 2 of 5 8) Washington State Energy Code Compliance has been approved using the following: Heat Type: Electric or other fuels, Compliance Method: IV, Window(Max U-Factor):0.40, Skylight(Max U-Factor):0.58, Doors (Type/Max U-Factor):0.40 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-30, Slab Insulation R-10. X 9) Per 2003 IRC - SECTION 1609 -WIND LOADS - 1609.1 Applications. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads prescribed herein. Decreases in wind load shall not be made for the effect of shielding by other structures. Per FIGURE 1609 BASIC WIND SPEED (3-SECOND GUST)the wind speed for Mason County is 85 MPH. X 10) Per 2003 IRC - SECTION R905 - REQUIREMENTS FOR ROOF COVERINGS - R905.1 Roof covering application. Roof coverings shall be applied in accordance with the applicable provisions of this section and the manufacturer's installation instructions. X 11) Stock Plan Identification number: 2003-0150 This project is approved subject to the provisions identified the Mason County Stock Plan Policy. The site plan approved by the Planning Department, original building plans, and all attachments approved by the Mason County Building Department shall be available for the Mason County Building Inspector at each required inspection. X 12) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). X 13) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150' from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X 14) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. X 15) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X BLD2007-00116 Please refer to the following pages for conditions of this permit. Page 3 of 5 , 16) • Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X 17) All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. X 18) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. X 19) All property lines shall be clearly identified at the time of foundation inspection. X 20) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X 21) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. X 22) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. X 23) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan" to ensure these structures meet the setback conditions listed. X 24) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Approved Site Plan" to ensure these structures are shown and meet the setback conditions listed. X BLD2007-00116 Please refer to the following pages for conditions of this permit. Page 4 of 5 25) ,This parcel is located in a smoke management zone. Please contact a fire warden at(360) 427-9670 ext. 459 for further information. X This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection. The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. OWNER OR AGENT: DATE: BLD2007-00116 Please refer to the following pages for conditions of this permit. Page 5 of 5 ov - o CONCRETE MECHANICAL MANUFACTURED HOME D o w C) Footings ttae Sstks Data By Ribbons Cl) Gas Piping --I o Intenor Date By Interior-Date(�-/9'/�/ BYIj � Date By Exterior Date By Exterior-Date V7 14 BY ��� Sat-up m Paint Load I Isolated Footings INSULATION Date By 2 BG 1 SLAB INSULATION Q Date By Data By FIRE DEPARTMENT E Foundation Waits Floors Date By Cl) Date By Data q l ey DECKS r FRAMING Waits Date By n Dot,- �� rog1wData ey PROPANE TANKS - PLUMBING Vain DAL � Date By OTHER Groundwork Attic Date By Typo: Date BY Data By o wv DRYWALL Type_ Int Brace Wall Date By W B Date By r FINAL INSPECTION v y Water Lin Vf Fire Sepe ration N CD m �:;k- By Data By Date y� IY !t( By C CD v o Pass or Request Inspect. c Type of Insp. Fail Date Date Done By Comments o CD o II Cr) •� ,�� -2�' �Zi-�` �� -, cap^ �ei� ��� m t— cn / � m v, c cJ f c� -- 5-� Z. 0 0 ? s Cn r e, Cn + • CD S ASS 1 i1 ,7/'t 1,4 ro 0 ti 9/5/2012 Case Activity Listing 10:22:58AM Case #: BLD2007-00116 i Assigned Done Activity Description Date I Date 20 at Hold Disp To By 1.?plated rpumpdat,d By BLDA010 Application Received 1/24/2007 None 1/24/2007 IUK K BLDB110 Building Plan Review 1/24/2007 1/30/2007 None DONE ARC 1/30/2007 ARC SETTING UP STOCK PLAN WAITING FOR ENG.CALCS REVISED STAMP DATE AND FOR LOT 63&61 ARC I-26-07 sent to case manager 1-30-07 arc BLDB120 WSEC Compliance Review 1/30/2007 None DONE AItC 1/30/2007 ARC BLDB200 Environmental Health Review 1/24/2007 1/30/2007 None DONE TW 1/30/2007 TW NORTH BAY SEWER BLDA900 Telephone Call 1/30/2007 None DONE TW 1/30/2007 TW Called water system office,spoke with Lori and explained that the water adequacy form must be signed by the manager of record with a current date.The form must be completed entirely including connections. BLDB210 Water Adequacy 1/24/2007 2/2/2007 None DONE TW 2/2/2007 TW 01.30.07 pending compliance check from DOH.see telphone call activity tw 02.02.07 water system compliant at this time(connection#800). BLDB130 Planning Review 1/24/2007 3/8/2007 None DONE RDH 3/8/2007 RDH Visited site on 3-8-07. No issues. BLDA100 Approved for Issuance 3/13/2007 None DONE CMH 3/13/2007 CMH Notified Paul. BLDA500 Issue Building Permit 3/23/2007 None DONE KKK 3/23/2007 KKK BLDA540 Print Inspection Card 3/23/2007 None DONE KKK 3/23/2007 KKK Page 1 of 2 CaseActivity..rpt Case Activity Listing 9/5/2012 10:22:58AM Case #: BLD2007-00116 lip, Assigned Done Activity Description IN& "777W Date 2 Date 3 Mold Dis To B Updated U d �. P Y ' u P P ated By`T BLDC110 Footing Inspection 4/24/2007 4/26/2007 None FAIL LAW 5/1/2007 MRB 1.CLEARLY MARK OUT ALL PROPERTY LINES EITHER STRING LINE OR FLAG 15'TO 20'OC 2.PER ENGINEER FOOT PLAN THE INT GARAGE FOOTINGS ARE CONNECTED TO THE PERIMETER FOOTINGS STUB OUT BAR FOR FUTURE POUR BLDC110 Footing Inspection 4/27/2007 4/30/2007 None PASS MAU 5/9/2007 MRB FOOTINGS/SETBACKS BLDC 115 Foundation Wall Inspection 5/4/2007 5/7/2007 None PASS LAW 5/9/2007 MRB BLDC110 Footing Inspection 5/4/2007 5/7/2007 None FAIL LAW 5/9/2007 MRB INT FOOTINGS GARAGE FOOTINGS NOT PER ENGINEERING BLDC110 Footing Inspection 5/14/2007 5/17/2007 None PASS BTA 5/16/2007 MRB INT FOOTINGS APPROVED ON REVISED ENGINEER PLANS BLDC250 Permit Extension 11/16/2007 11/16/2007 None EXTD PIB 12/10/2007 PIB Extended per customer's request -6 months to 05-17-2008 BLDC105 Progress Inspection 5/12/2008 5/16/2008 None PASS MAU 5/19/2008 KDM MUD SILL INSTALLED. BLDA900 Telephone Call 8/6/2012 None DONE DLC 8/6/2012 DLC Gary called from Capstone Homes to inquire about reinstating this permit(and another BLD2007-00401). The permit can be reinstated up until the next code change which is July 1,2013 at the rate of 50% of the permit,plumbing,and mechanical fees= $1105.05($1844.95+$117+$248.15=$2210.10*501/o). Capstone Homes plans to come in no later than 9.1.2012 and resume framing of the structures. D Coker BLDA975 Reinstated Permit 8/15/2012 None DONE TW 8/15/2012 TW Page 2 of 2 CaseActivity..rpt Permit# - MASON COUNTY BUILDING III 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been found: Items listed below must be c ected to gain compliance 1441 You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK ❑ Call for re-inspection when corrections are made before continuing ❑ please contact our office Make corrections, ms will be checked on next inspection regarding possible structural JZJ i OK tom //!, damage incurred by recent "natural/man made" ❑This is not a complete inspection disasters.This is NOTa Date �> /2 -/ Department CORRECT/ON NOTICE. Inspector,? DU NUT i MUV ' TH/ 0 TArqff