Loading...
HomeMy WebLinkAboutCOM2014-00125 Growing and Processing - COM Permit / Conditions - 12/3/2014 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(315U)41/-12192 ` Pepsi COD�,TA Phone: (360)427-9670, ext. 352 Mason County Bldg. III 426 W. Cedar Shelton, WA 98584 COMMERCIAL BUILDING PERMIT COM2014-00125 OWNER: PRANA RECEIVED: 8/27/2014 CONTRACTOR: LICENSE: EXP: ISSUED: 12/3/2014 SITE ADDRESS: 50 W WESTFIELD CT BLDG E SHELTON 4S Ot- 00w EXPIRES: 6/3/2015 PARCEL NUMBER: 420022490070 LEGAL DESCRIPTION: LOT 7 OF SP#3027 PROJECT DESCRIPTION: DIRECTIONS TO SITE: CHANGE IN TENANT FOR BLDG E, GROWING AND US HIGHWAY 101 NORTH, L ON DAYTON AIRPORT RD, R ON WESTFIELD PROCESSING CT FOLLOW TO BLDG E to SAW General Information Construction &Occupancy Information Type of Use: CANNABIS Insp.Area: No. of Units: Type of Constr.: Type of Work: ALT Fire Dist.: 16 No. of Bathrooms: a Occ. Group: Valuation: $ 540,448.00 No.of Stories: I Exit Design. Load: Building Height: Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: : Model: Width: Building: Year: Serial No.: Basement: Parking Spaces: Setback Information Shoreline& Planning Information Front: Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.: Not Applicable Side 1: Ft. SEPA?:No Comp. Plan Desig.: Urban Growth Area Side 2: Ft. Fire Protection System Information Auto Fire Alarm System?:\es Emergency Key Box?: 165 Standpipe?: Auto Fire Sprinkler System?:No Access Road?:*6 Fire Extinguishers?:_�es Fixed Fire Suppression System?:N10 Fire Hydrants?:)\b Fire Lanes?: COM2014-00125 Please refer to the following pages for conditions of this permit. Page 1 of 11 Plumbing Fixtures Mechanical Fixtures retb Type Qty. Type Qty. Type By Date Amount Receipt Floor Sink 4 Heat Pump 6 Plan Check Fee rnnnn R/77/gn1a -0.9 77R R I C17n1ann Hosebibs 1 Ventilation Fan 2 Planning Review Fee rnnnn R/77/7n1d a�in nn gign1Ann Water Closets (Toilets) 2 IFC Plan Check Fee rnnnn R/77/?n1d I.t1 11d Rt, g17n1dnn Water Heaters 1 Building Permit Fee rRARA R17719n1d Ql d9R tin C17n1dnn Building Permit Fee (-,nAnA RY77/7n1a Tl d7R/;n R17n1ann EH Minor Plan Review rnnnn a/7,t/7n1d alnn nn C1?n1Ann Mechanical Permit Fee rnnnn 1/R/7n1ri #.1n4 7n S77n1Fnn Mechanical Base Fee rnnnn 1/R/qn1/; �07R t;n Cggn1 Rnn Mechanical Permit Fee rnnnn 7/.r,/7n1.ri 01R nn C17nirnn Plumbing Permit Fee rnnnn 7/F/7r ix; -#.R7 1n R19n15nn Plumbing Base Fee rnnnn 9/5/9n15 a?a 7n R19n1Fnn Total $10,877.68 CASE NOTES FOR COM2014-00125 CONDITIONS FOR COM2014-00125 COM2014-00125 Page 2 of 11 1) 2012 IECC/WSEC COMPLIANCE: This project is approved for compliance to the 2012 International Energy Conservation Code/Washington State Energy Code (IECC/WSEC); components shall be installed as follows: ENVELOPE: Prescriptive Using Table C402.2, applies to heated spaces not used for plant growth Roof: R-49 in attic Wall insulation minimum R-21 Slab insulation R-10 or better installed in around the entire perimeter from the top of the slab edge to the bottom of the footing. Fenestration including doors and windows, including store door(s) shall have a U-Factor as follows-fixed/non operable windows .38 and operable windows U-0.40or less, entrance doors U0.60 or less and skylights U-0.50 or less. Solar heat gain coefficient(SHGC) 0.40 or better except skylights SHGC 0.35 or better. OTHER DOORS: Other than entry doors U-0.37 or less and roll-up or sliding doors min. R-4.75. LIGHTING: Total interior lighting shall not exceed 1783 watts, and is approved in as presented on plan sheet 5. All daylight zones shall be provided separate control in accordance with IECCWSEC. Automatic daylight sensing controls shall be capable of reducing light out put, that control luminaires only within the day lighted area, shall be clearly identified. Switches shall be equipped with separate automatic controls to shut off the lighting in all spaces during unoccupied hours. Occupancy sensors shall be capable of automatically turning off all lights in an area in accordance with IECC/WSEC. Exterior lighting shall not exceed 4000 watts and is approved as presented on plan sheet 5. MECHANICAL SYSTEM: Mechanical systems used for cooling purposes shall have a SEER Rating of 13.0 or better. Provide compliance information for inspection. X COM2014-00125 Page 3 of 11 i 2) The three hour fire wall required to mitigate due to lack of fire flow shall be constructed in accordance with the 2012 International Building code Chapter 7 and in accordance with engineer design specifications using 1/2" plywood or OSB, 3-layers of 5/8" GWB and 1/2" GWB. Request an inspection of each layer. The fire wall assembly shall extend from the foundation to the roof sheathing provided the system is constructed as follows: 1) No openings shall be located in the roof within 4-feet of the required fire wall 2) The roof is covered with a class "B"or better roofing material 3) The roof is protected with not less than 5/8-inch gysom wall board directly beneath the roof sheathing or deck, supported by a minimum of 2-inch nominal ledgers attached to the sides of the roof framing members for aminimum distance of 4-ft on both sides of the firewall In addition all openings and th i ntire assembly shall have a 3-hour or more rating. Provide testing in accordance with NFPA 252 or UL 10C for inspection.. X 3) ACCESS TOKuildings DINGS The site an shall be accessible to persons with physical disabilities in accordance with ICC A117.1. Accessible routes within the site shall be provided in accordance with IBC Section 1104 and not less than 60% of all entrances shall be accessible. PARKING: Accessible parking spaces shall be located on the shortest accessible route of travel form adjacent parking to an accessible entrance in accordance the 2012 International Building Code Section 1106. Spaces shall be constructed in accordance with Section 1101.2/ICC A117.1. Accessible parking spaces shall be provided in accordance with Table 1106.1 as follows: 1 to 25 total parking spaces requires not less than one accessible parking space 26 to 50 total parking spaces requires not less than two accessible parking spaces Construction and design shall be completed in accordance with ICC A117.1, Section 502. Accessible parking spaces shall be located on the shortest accessible route of travel from adjacent parking to an accessible building entrance. Car parking shall be not less than 96-inches wide and access aisles not less than 60-inches wide shall be properly marked. Parking surfaces shall be firm, stable, and slip resistant material and shall not be steeper than 1:48. Accessible parking spaces shall be clearly identified by signs containing the International Symbol of Accessibility placed not less than 60-inches at ground surface, measured from the bottom of the sign. X COM2014-00125 Page 4 of 11 4) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. Commercial structure mile point number or unit designation posting requirements: 50 feet or less setback shall post a 6 inch minimum with a'/< inch stroke. 50 feet or more setback shall post a 12 inch minimum with a 1 '/ inch stroke. Designating unit on a building will be no less than 6 inches in height with minimum '/ inch stroke. Designating unit on a door will be no less than 4 inches in height with minimum % inch stroke 100 foot setback or less shall post 18 inch minimum with 2 inch stroke. 100 foot setback or greater shall post 24 inch minimum with 3 inch stroke. X Q � 5) ADD SSABLE FIRE ALARM REQUIRED: The parcel is not provided with an approved water supply capable of supplying the required fire flow. As a result mitigation shall be required including installation of an NFPA 72 addressable fire alarm system or NFPA 13 fire sprinkler system. The tenant has elected to install an addressable fire alarm system and fire walls with a fire-resistive assembly of not less than 3-hours. Fire areas shall not exceed 6000 sq. ft. A separate fire-protectio it application must be submitted to Mason County Dept. of Community Development, approved, and issued prior to the installation of protection system(s). The addressable fire alarm system shall be maintained and inspected annually. X 6) ALL CO STRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHAN�kE OF U R OCCUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVFRRRIOR TO CHANGE. x 7) Property is located on a Class II Critical Aquifer Re ge Area. All development to comply with the Critical Aquifer Recharge Area criteria of the Mason County Resource Or i nce. X 8) Changes to appro uilding plans that affect compliance to the current Washington State Energy Code (WSEC), ventilationrequirements), Building/Plu ' g/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction. X 9) ThJ demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA). It is unlawful for any person to cause or a demolition (or major renovation) of any structure unless all asbestos containing materials have been identified and removed from a to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtain en approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org X COM2014-00125 Page 5 of 11 10) EXITS & EXIT ACCESS DOORS All doors shall be side hinged and swing in the direction of exit travel. All exit doors shall be illuminated at all times that the building is occupied and be equipped with approved accessible hardware that does not require tight grasping, tight pinching or twisting of the wrist to operate. ALL exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. All exit signs shall be internally or exte y illuminated at all times and equipped with to ensure continued illumination for a duration of at least 90-minutes. X 11) DEFERR(D SUBMITTAL- EXTRACTION PROCESS The proposed extraction process using hydrocarbons is not approved as shown on sheets 3 and 5. Provide construction plans and details sealed by a Washington State licensed fire protection engineer that clearly addresses ALL compliance items listed in the marijuan extraction operation checklist. The framing inspection of this project will not be approved until the deferred submittal documents are s itted and approved . X 12) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance Xw* lthe international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason Counlding Inspector shall be made prior to requesting additional inspections. X 13) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to reque final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-com pli with Mason County ordinances and building regulations. X COM2014-00125 Page 6 of 11 14) The structure is subject to inspection by the Mason County Fire Marshal. All corrections deemed necessary by the Fire Marshal, to assure the minimum fire d life safety requirements as adopted by Mason County and Washington State may be required. X 7 PORTABLE FIRE EXTINGUISHERS: Install 2A10BC fire extinguishers with a maximum travel distance of 75 feet in any direction mounted no more than 60 inches above the floor to the top of the uni . Portable fire extinguishers shall be maintained and inspected annually. X KEY BOX REQUIRED: A key box/knox box is required to be installed in accordance with the 2012 International Fire Code Section 506. Please contact the local fire district for mor nformation and to discuss inspections for installation of the lock box system. X HIGH-PILED COMBUSTIBLE STORAGE: Storage of combustible materials in closely packed piles or combustible materials on pallets, in racks or on shelves where the top of storage is greater than 12-ft in ght. High -piled combustible storage areas shall be protected in accordance with the 2012 International Fire Code, Chapter 32. X I 15) Interior all and ceiling finishes shall be classified for fire performance and smoke development in accordance with ASTM E 84 or UL 723. Rooms created by 6-mil fire retardant material shall have a flame spread rating of 0-25 and a smoke developed index of 0-450 evidenced by manufacturer specifications. PROVIDE MANUFACTURER SPECIFICATIONS ON SITE DEMONSTRATING THAT THE FLAME SPREAD RATING INDEX AND SMOKE DEVELOPED INDEX COMPLIES WITH CODE SPECIFICATIONS. The wall system is approved provided the material complies with code specifications and is installed as follows: 1)Walls and ceilings shall be fastened in such a manner that the materials will not readily become detached where subjected to room temperatures of 200 degrees fahrenheit for not less than 30-minutes (ref IBC 803.10) 2) Interior finish materials shall be installed in accordance with it's intended use with product mounting system or as approved otherwise. (IBC 803) 3) Interior wall and ceiling finish materials less than 1/4-inch thick shall be applied directly onto a wall, ceiling, or structural element without the use of furring strips and shall not be suspended away from the building element to which it is applied except where exceptions of IBC803.11.4 apply. See code informatio rovided with approved construction plan. Provide compliance information at inspection prepared and sealed by the licensed design professio X COM2014-00125 Page 7 of 11 16) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connect m a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction whi proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned ork i may affect your project. X 17) Business will be l4 ited to no more than 4 employees, as per approved septic design from Jim Henry. Exceeding this limitation could result in over-use of the onsite septic and possible failure to the drainfield. 18) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for'.015eriod not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the ermit h er have prevented action from being taken. No more than one extension may be granted. X 19) All apprcy ed plans are required to be on-site for inspection purposes. If inspection is called for and >cha e n n site, Approval WILL NOT be granted.// In addition, a reinspection fee, based on the current fee schedule, minimum one-hour and collected by the Mason County Building Department prior to any further inspections being performed or approvals granted. X 20) Owner/Agent is responsible to post the assigned address and/or purchase and post private road sig 1sin accordance with Mason County Title 14.28. Commercial structure mile point number or unit designation posting requirements: 50 feet or less setback shall post a 6 inch minimum with a 3/< inch stroke. 50 feet or more setback shall post a 12 inch minimum with a 1 '/2 inch stroke. Designating unit on a building will be no less than 6 inches in height with minimum % inch stroke. Designating unit on a door will be no less than 4 inches in height with minimum % inch stroke 100 foot setback or less shall post 18 inch minimum with 2 inch stroke. 100 foot setback greater shall post 24 inch minimum with 3 inch stroke. X 21) Co r for registration laws are gover under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-6 982. T person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 22) App ved per en ions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. X 23) Recyclabl materials & Solid ste Storage: Space shall be provided for the storage of recycled materials and solid waste. The storage area shall be designe to meet needs of the occupancy, efficiency of pick-up, and shall be available to occupants and haulers.X COM2014-00125 Page 8 of 11 24) STORAGE RACKS Storage racks greater than 5'9" and up to 8'0" in height shall be installed in accordance to manufacturer specifications for seismic attachment. When seismic attachment is not provided by the manufacturer an engineered design and attachment details shall be required. Installation specifications or engineer's design shall be available during inspections performed by the Mason County Building Department. Storage racks greater than 8-ft in height shall require an engineer's design addressing seismic conditions and attachment. In addition, storage racks 8-ft tall or rnoVshall require special inspection performed by the design professional or an approved representative. The special inspection report and en ed design shall be provided to the Mason County Building Department for approval prior to the final occupancy inspection. X 25) STO M ATER APPROVAL LETTER FROM ENGINEER MUST BE PROVIDED TO THE MASON COUNTY BUILDING DEPARTMENT PRIOR TO THE FINAL INSPECTION OF THIS PERMIT: STORMWATER RUNOFF FROM THE ROOF AREAS MUST BE TIGHTLINED DIRECTLY TO AN INFILTRATION POND FOR STORAGE AND INFILTRATION I CORDANCE WITH THE STORMWATER SITE PLAN PREPARED BY OLYMPIC ENGINEERING, DATED APRIL28, 2014. X 26) ALL VERTIES ACE WATER D POTENTIAL RUNOFF WILL BE CONTROLLED ON SITEAND SHALL NOT ADVERSLY AFFECT ANY ADJACENT PRO NO EASE THE VELOCITY FLOW ENTERING OR ABUTTING TO ANY STATE OR COUNTY CULVERTING/DITCHING SYST,F.y OR AY. X 27) This permit is approved to finish the existing structure approved as a shell bldg under Mason County building permit number COM2014-00097. The existing structure will remain as constructed and will not be modified except as approved to add the 3-hour fire wall assembly. Modifications shall not made to the existing structure unless reviewed and approved by the engineer of record and written plans, details and calculations are pro d to the Mason County Building Department for review and approval. X 28) Applicati acknow ges that the structure is only permitted for a use consistent with the current zoning of the parcel. Zoned as Industrial within the S 1 on Ur Growth Area. X 17 29) All Mate i I Safety Data Sheets (MSDS)for all hazardous materials used within the facility all be ed in a notebook and permanently located in a cons�cuous location inside the building near the main entZ(IFC Chapter 50)X 30) The use, handling and storage of hazardous m rials or flle and combustible liquid in excess of 10 gallons is not allowed without the approval of the Mason County Fire Marshal. X COM2014-00125 Page 9 of 11 OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s) for review and inspection. This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if construction work is sus ended f period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATI 0 DAYS WILL INVALIDATE THE APPLICATION. S gnature 1 Date ✓I G(l �Q S�ti OWNER REPRESENTATIVE - CONTRACTOR Print Name (Circle one to indicate) COM2014-00125 Page 10 of 11 r N co CONCRETE MECHANICAL MANUFACTURED HOME Footings /Setbacks Date gy Ribbons Gas Piping o Interior Date By Interior-Date By bate By CD Exterior7Date By Exterior-Data B Sat-up Point Load/Isolated Footings INSULA71ON Date By BG/SLAB INSULATION Date BY Data ey FIFE DEPARTMENT Foundation Walls Floors Dale By Date By Data By DECKS F RAM I N G Watts Date By date By Data By PROPANE TANKS PLUMBING Vault Date By Date BY OTHER Groundw (k: Attie Date By Dane By Type; Date 11y DRYWALL .'ll4f.'V Type_ DO B In I.Brace Wall Date By Y [?ate By FINAL I N SPECTI ON Water i.ine Fire 5icpe�ratian 2 Date gy Date By Data gy m Pass or Request Inspect. Type of Insp.. Pail Date Date Done By comments _ 8 a CD vt cc 0 CD i�w LZ3]16- 4i L? L01L 0 0 o 0 CONCRETE MECHANICAL MANUFACTURED HOME X D � Footings J Setbacks Gas Piping Date 13 y Ribbons Z D o Interior Date By interior-Date By Date By N) Exterior Date By Exterior-Date Byi .up Point Load J Isolated Footings INSULATION _ Date By BG I SLAB INSULATION natP By Data By FIRE DEPARTMENT Foundation Wails Floors Date By Date By Data By DECKS FRAMING Walls; Date By Date 2"� h� By Data By &41 PROPANE TANKS PLUMBING vault Date By Data By OTHER Groundwork Attic Date By Date By L41 Type: Date By D.W.v DRYWALL Type: 0O Int Brace Wall Date By Date 16 Sy L& Date By _ .., _ ic Water Line Fire Separation��t FINAL INSPECTION CD Date L3 Date 21,4 j I S, By Wi)-- Date 7j� r!� By p O Pass or Request Inspect. Type of Insp. Fail Date Date Done By C mments , 544r, v Z i � 3 cM, t..-.i J!t Sail CmI 4sS , ISM lit S1&- t v4 Ov f_ laiC1W & r�QS 3 ' Crc. Q"A ��ss 11 tZ1 ,5' ..0 P4,S,- 1 nvfl- W of e,(- c-/ mf^ lu J 4 .Aa�e­ s-, r,�✓1 5- c i tJ I Y1G i _ 1` "-A ��� I �'f� ��.i_ I e' '� C, ��x>✓t �, n� e,h��e Z7t� D 2 1 ✓Gr Q�rs 01c/' ( - U►t C, kwn� 5 7i i5 Z L 10) bjlglll!� 312&JIAr L�l- permit#G�)'►�► )�( 1Z� MASON COUNTY BUILDING 111 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location 50 W - Ayesrr,e(d C-t 61,0 C-- This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been found: Items listed below must be corrected to gain compliance i t v t t L a _o, hk41Ar T a 5, ki, -t I Icr4i,,Jrrd �Gr a0PfAe I Urivi reys �w. You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK ❑ Call for re-inspection when corrections are made before continuing ❑ please contact our office ❑ Make corrections, items will be checked on next inspection regarding possible structural damage incurred by recent "naturThis is not a complete inspection disasters. made" ❑ P p disasters.This is NOT a Date ZI 1)5� Department CORRECTION NOTICE. 1�� Inspector I-O)L, • ,0* 4 N* ,0T IO4 ' ' THI T,,-- * qu 'Permit# MASON COUNTY ' BUILDING 111 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location -0 �/"j 60te rd e'-f od C- This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been foP nd: Items listed below must be corrected to gain compliance rsr��I 0 i•; 4� �Nd� Qn c,i Y►4 N . ;���•I�Lt— hv ,la; S — rt� ��t '� �LCJ�� �y i'lirNC. ✓� ✓� Oc:��t�: t�r n. 13v�S�n,t-S� �'}C.�t..� u - VXe- You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK ❑ Call for re-inspection when corrections are made before continuing ❑ please contact our office Make corrections, items will be checked on next inspection regarding possible structural ® OK to 1 ft!T, QL-C, 1 i;U damage incurred by recent This is not a com lete inspection disasters. made" ❑ P p disasters.This is NOT a Date 1i1 z 3/15 Department 6 2-411 CORRECTION NOTICE. Inspector ail D* ,# N* NT , '�•�1 �4 ' ' THI TAvm * mw i ®�.� A co N 0 W g— U V a 3i w ■ Supply Ducting Prana- Phase 1 Site plan ■ Return Ducting Inside Air Handler ■ Outside A/C Unit � 1 0 0 0 0 Yr� l7Wvur ASS c �J�j00 SL L'c nW She�,to� •y P� LA ).00 - )-a 4 00 MASON COUNTY PERMIT NO.( ►OM ` DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING•PLANNING•FIRE MARSHAL WWW.CO.MASON.WA.US (360)427-9670 Shelton ext.352 _ - Mason County Bldg. III,426 West Cedar Street (360)275-4467 Belfair ext. 352 1su Shelton,WA 98584 (360)482-5269 Elma ext. 352 �rl�c� BUILDING PERMIT APPLICATION -� - r OWNER INFORMATION: Gk-, CONTRACTOR INFOt�ZA ON: NAME: a k n I E V NAME: MAILING ADDRESS:5n LJ L Jcs1' Ac& cr E MAILING ADDRESS: CITY:-%e1-{L.--� STATE: LJ 6 ZIP: 4'°)SS CITY: STATE: ZIP: PHONE: 5-6yJI?Y-41,4 CELL: PHONE: CELL: EMAIL J es6 a !E �iZ(0 G ma d 44Y✓2 EMAIL : L&I REG# EXP. PARCEL INFORMATION: ��11 PARCEL NUMBER(12 DIGIT NUMBER) 4 Z D D'N l7 FIRE DISTRICT�� LEGAL DESCRIPTION(ABBaVIATSD) SITE ADDRESS 6D UJ L — CITY DIRECTIONS TO SITE ADDRESS w t o 2 co^e t-- . end o v IS PROPERTY WITHIN 200 FT: SALTWATER❑ LAKE ❑ RIVER/CREEK❑ POND ❑ WETLAND ❑ SEASONAL RUNOFF ❑ STREAM ❑ DOES PROPERTY HAVE SLOPE(S)WITHIN 300 FT OF THE PROJECT-GREATER THAN 14% YES[] NO ❑ TYPE OF JOB: NEW ❑ ADDITION ❑ ALTERATION 0'— REPAIR❑ OTHER ❑ D USE OF STRUCTURE(RESIDENCE,GARAGE ETC. '--6 IJ EE PUJLL— IS USE: PRIMARY SEASONAL Fj NUMB OF BEDROOMS ER OF BAA0OMS DESCRIBE WORK SQUARE FOOTAGE: ` 1 ST FLOOR1aaD0 sq.ft. 2ND FLOOR sq.ft. 3RD FLOOR sq.ft. B�l49EI6fF T �4 sq.ft. DECK sq.ft. COVERED DECK sq.ft. STORAGE sq.ft. . R s .ft. GARAGE sq.ft. ATTACHED ❑ DETACHED ❑ CARPORT sq.i* ( TACHED ❑ MANUFACT D HOME INFORMATION: *4 COPIE PLAN MODEL YEAR LEN TH BEDROOMS SERIAL NUMBER OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative,or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced within 180 days ction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPE TIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL I ALID TE THE APPLICATION. X Sig atu a Applicant Date X OWNER / REPRESENTATIVE /CONTRACTOR Print Name (CIRCLE TO INDICATE) DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT p+ PLANNING DEPARTMENT FIRE MARSHAL MASON COUNTY PERMIT NO.CO MZ014- DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING• PLANNING•FIRE MARSHAL _ WWW.CO.MASON.WA.US (360)427-9670 Shelton ext.352 Mason County Bldg. 111, 426 West Cedar Street (360) 275-4467 Belfair ext.352 18sa PO Box 279, Shelton,WA 98594 UU (360)482-5269 Eima ext.352 PLUMBING & MECHANIC) IkPAPAPPLI CATION OWNER INFORMATION: r- � CONTRACTOR INFORMATION: NAME: .)a 6 n [}, e b e-r NAME: MAILING ADDRESS:Sa W L4jejf-F-,-,-1c1 MAILING ADDRESS: CITY: f)t-'t C+*j STATE:_ZIP: gR99 CITY: STATE: ZIP: PHONEC69-F,? G G66 CELL: PHONE: CELL: EMAIL:. p 13N 1-�1 E E(Z C-,rn a l. Gc�✓�'1 EMAIL L&I REG# EXP. PARCEL INFORMATION: PARCEL NUMBER(12 DIGIT NUMBER): LI Z D oZ-- 2`f — 5'0 0 7 D LEGAL DESCR-IPTION(ABBREVL4TED): SITE ADDRESS: So w InJ e s f p,-e_l r) CT CITY: h-r_( m DIRECTIONS TO SITE ADDRESS: 10 j TG Dc-. �n t4trf?rn' . r3 j t Af on Lv.GU "CeLd TYPE OF JOB / NEW ADD ALT ✓ REPAIR OTHER USE OF BUILDING =-5-6 Z LOCATION OF FIXTURES/UNITS- 1 ST FLOOR 2ND FLOOR BASEMENT GARAGE OTHER PLUMBING FIXTURES(SHOW NUMBER OF EACH) MECHANICAL UNITS Type of Fixture No. of Fixtures Fees Fuel Type:Electric LPG Natural Gas Ductless_ Toilets 2 Type of Unit No. of Units Fees Bathroom Sink 2 Furnace Bath Tubs O Heat Pump Z Showers Spot Vent Fan 2— Water Heater Propane Tank Clothes Washer Gas Outlets Kitchen Sinks 0 Wood/Gas/Pellet Stove Dishwasher Kitchen Exhaust Hood C Hose bibs Dryer Vent Other D Solar Panel SEP 9 901 Other �14 �— Base Fee Base Fee n �, CEGIAR TOTAL PLUMBING TOTAL MEC OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION.INACTIVITY OF THIS Yignature ATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. Z C// L,/ o Date �0't l� O_ wner/Owners Representative/Contractor Print Name (indicate which one) DEPARTMENTAL REVIEW APPROVED DATE DENTED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT PLANNING DEPARTMENT FIRE MARSHAL MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Mason County Bldg. III, 426 West Cedar Street PO Box 279, Shelton, WA 98584 1854 www.co.mason.wa.us Shelton(360)427-9670 Belfair(360)275-4467 Elma (360)482-5269 October 9,2014 John Hieber 50 W Westfield Ct.Ste E Shelton,WA 98584 E-Mail: johnhieber@gmail.com Mason County Building Permit Number: COM 2014-00125 Dear Mr.Hieber, Thank you for submitting the building permit application to finish the interior of Building"E"located at 50 W Westfield Ct in Shelton,WA. In order to complete the building department review additional information will be needed which is listed below PLAN REVIEW REQUIREMENT COMMENTS: 1. The tenant improvement plans specify that a 3-hour fire resistive fire wall will be constructed using an assembly that is not consistent with site conditions. The 3-hour wall assembly is proposed where an engineered wood stud wall shear wall is located. The details provided specify that the 3-hour assembly will be constructed in accordance with GA file#2924 which is a tested assembly using steel studs. The firewall is required when fire flow is not provided and mitigation is chosen to reduce fire areas such that no fire area exceeds 6000 sq.ft. Please provide tested assembly details and information for the required 3-hour fire-resistive assembly including wall and openings such as doors, ducts,etc. 2. A letter from the Washington State Liquor Control Board specifies that your business intendsto extract marijuana 'C� using a COZ process. Details and information is not provided on the construction plans. Our office has created a checklist designed to provide information identifying what we will need to approve the part of a building that will be 2. used for marijuana extraction. The checklist is enclosed. Please provide information and plans as directed in the checklist. V 3. The building is in the process of being constructed under Mason County building permit COM2014-00097. During \ the inspection process the building inspector has noted that the truss engineering specifies that the bottom chord of the IN truss is designed for"0"live load. As such the truss system is not designed to support ceiling material such at gypsum wallboard,lighting fixtures,insulation,or mechanical fixtures such as fans and ducting. Please provide information g(� identifying what will be installed and supported by the truss system and provide an engineers approval to install the components in the ceiling. 0 The construction plans specify that 6-mil poly will be used on the ceiling. It appears that gypsum wallboard will be used for wall coverings. Please provide the following information: a. Provide manufacturer specifications for the 6-mil poly material b. Provide information demonstrating that material meets the requirements of IBC Chapter 8 including flame spread,and smoke developed ratings, c. Provide information demonstrating that material will be fastened in such a manner that the materials will not readily become detached where subjected to room temperatures of 200 degrees fahrenheit for not less than 30-minutes(ref IBC 803.10), d. Provide information demonstrating that material will be installed in accordance with it's intended use with product mounting system or as approved otherwise. (IBC 803),and e. Provide information demonstrating that material less than 1/4-inch thick will be applied directly onto the ceiling,or structural element without the use of furring strips and shall not be suspended away from the building element to which it is applied except where exceptions of IBC803.11.4. 5. MSDS sheets were provided with the permit application. Please identify the anticipated quantities of hazardous materials and identify the location where the materials will be stored. When necessary provide compliance information related to IBC 414,and containment information demonstrating compliance to the International Fire Code. 6. Please provide energy code compliance information where required for the envelope,mechanical system(s),and lighting. Task lighting used for plant growth and heating equipment used for the grow operation is exempt from energy code compliance. Areas not used for growing shall comply with energy code requirements. Provide plans and energy code compliance forms. You may access compliance forms at the following link: b.9p://www.neec.net/energy-codes When you have compiled the requested information please submit it to the Mason County Building Department,attention D. Coker. Please respond to comments,in writing,in the order listed. Revisions,required as a result of this letter must be transferred onto building plans. Where required,please return two sets of revised plans and documents along with two sets of calculations. If you have questions please contact me at(360)427-9670 ext. 510 or via e-mail at:DLC@co.mason.wa.us Sincerely, Debber Coker Mas County Building Department uilding Inspector IV Word/COM2014-00125,Bldg&fire code comments CC: Tom Herstad Building Design,Inc/Email: herstaddesign@wavecable.mo Encl.: Marijuana Extraction Operation,Requirements for permit approval