HomeMy WebLinkAboutSEP2016-00008 - SEP Determinations - 3/3/2016 oN-STATE MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
° s i Planning Division
~ o T 426 W Cedar St, Shelton, WA 98584
(360)427-9670
1864
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-340)
SEP2016-00008
Description of Proposal: SEPA FOR THE CANOPY PARK PROJECT. 6 METAL
BULDINGS WITH 37,000 SO FT OF BLDG AREA FOR 1-502
PRODUCTION AND PROCESSING AND EXTRACTION. The
first 5 building were already approved and constructed. This fifth
building triggers SEPA review (for all 6). An engineered
stormwater plan has been approved and installed. The site is flat,
and there are no apparent critical areas, except for Critical Aquifer
Recharge Area.
Proponent: CANOPY PARK
Location of Proposal: 50 W WESTFIELD CT BLDG F SHELTON
Parcel Number: 420022490070
Legal Description: LOT 7 OF SP# 3027
Directions to Site: US HIGHWAY 101 NORTH, L ON DAYTON AIRPORT RD, R ON
WESTFIELD COURT TO 50 W
Lead Agency: Mason County
The Lead Agency for this proposal has determined that it does not have a probable significant
adverse impact on the environment. An Environmental Impact Statement (EIS) is not required
under RCW 43.21 C.030(2)(c). This decision was made after review of a completed
Environmental Checklist and other information on file with the Lead Agency. This information is
available to the public upon request.
Please contact Rebecca Hersha at ext. 287 with any questions. This DNS is issued under WAC
197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown
below, when the determination is final. Comments must be submitted to Dept. of Community
Development, P.O. Box 279, Shelton WA 98584 by 3/17/2016. Appeal of this determination
must be filed within a 14-day period following this final determination date, per Mason County
Code Chapter 15.11 A ea
Authorized Local Government Official Date
t r
MASON COUNTY D D 'Jd SEPA Contact List
Sent SEPA 40/6— /7d to (check all that apply) on
Skokomish Tribal Nation,Nat.Res.Dept. WA Department of Ecology
ATTN: Randy Lumper Environmental Review Section
N 541 Tribal Center Rd., Skokomish Nation,98584 PO BOX 47703,Olympia,98504-7703
rlumper@skokomish.org separegister@ecy.wa.gov
Skokomish Tribal Historic Preservation Officer WA Department of Commerce
ATTN: Kris Miller reviewteam@commerce.wa.gov
80 N Tribal Center Rd,Skokomish Nation,98584
shlanay1@skokomish.org E] U.S.Army Corps of Engineers
SEPA Reviewer-Darren Habel
Quinault Indian Nation PO Box C-3755,Seattle,98124
ATTN: Mark Mobbs darren.habel@usace.army.mil
PO Box 189,Tahola, 98587
mmobbs@quinault.org WA Dept of Fish and Wildlife
hpapplications@dfw.wa.gov
Squaxin Tribal Nation,Natural Res.Dept.
2952 SE Old Olympic HWY,Shelton 98584 WA Dept.of Fish and Wildlife
jdickison@squaxin.us-szaniewski@squaxin.us ATTN: Joshua Benton
emarbet@squaxin.us-sneil@squaxin.us (Habitat Biologist-Hood Canal Watershed)
2391 W Deegan Rd.,Shelton,98574
The Confederated Tribe of the Chehalis Joshua.Benton@dfw.wa.gov
ATTN:SEPA Reviewer-Glen Connelly
420 Howanut Rd.,Oakville,98568 WA Dept.of Fish and Wildlife
gconnelly@chehalistribe.org ATTN: Margie Bigelow
(Habitat Biologist-S Puget Sound Watershed)
WA DNR,South Puget Sound Region 2391 W Deegan Rd.,Shelton,98574
950 Farman Avenue N, Enumclaw,98022-9282 margaret.bigelow@dfw.wa.gov
southpuget.region@dnr.wa.gov
WA Dept.of Transportation
WA DNR,Aquatic Resources ATTN: Dale Severson
PO BOX 47027,Olympia,98504-7027 P.O.Box 47440,Olympia 98504-7440
and@dnr.wa.gov OR-SEPA-REVIEW@wsdot.wa.gov
WA DNR,SEPA Center City of Shelton
ATTN: External Coordinator ATTN:Jason Dose
PO BOX 47015,Olympia,98504-7015 525 West Cota St.,Shelton 98584
sepacenter@dnr.wa.gov jasond@ci.shelton.wa.us
Olympic Region Clean Air Agency Port of Shelton
ATTN:Aaron Manley ATTN: Brandon Palmer
2940-B Limited Ln. NW,Olympia.98502 21 West Sanderson Way,Shelton 98584
aaron.manley@orcaa.org BrandonP@portofshelton.com
Mason County Transit Office of Archaeology&Historic Preservation
ATTN:Mike Oliver ` ATTN: Lance Wollwage
PO Box 1880, Shelton,98584 P.O. Box 48343,Olympia,98504-8343
moliver@masontransit.org Lance.Wollwage@dahp.wa.gov
Mason County PUD#1 Tacoma Public Utilities-Real Property Services
ATTN: Jocelyn Gray ATTN: Dave Letterman
N 21971 Hwy 101,Shelton,98584 3628 S 35th St,Tacoma, 98409-3192
jocelyneg@mason-pud1.org dletterm@cityoftacoma.org
Mason Cty P.W.ATTN: Other:
Mason Cty E.H.ATTN: School District:
ID Mason Cty Bldg ATTN: Agent:
ID
Applicant:
MC DCD last updated on 1/22/2016 / J
� 4
cz
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
PO Box 47775 •Olympia, Washington 98504-7775 •(360)407-6300
711 for Washington Relay Service •Persons with a speech disability can call 877-833-6341
March 17,2016
Ms.Rebecca Hersha
Mason County
Department of Community Development
Planning Division
PO Box 279
Shelton, WA 98584
Dear Ms.Hersha:
Thank you for the opportunity to comment on the determination of nonsignificance for the
Canopy Park Project(SEP2016-00008) located at 50 West Westfield Court Building F in Shelton
as proposed by Daniel Kirby, Canopy Park LLC. The Department of Ecology(Ecology)
reviewed the environmental checklist and has the following comment(s):
WATER RESOURCES: Vicki Cline(360)407-0278
Any ground water withdrawals in excess of 5,000 gallons per day or for the irrigation of
more than one-half acre of lawn or noncommercial garden,requires a water right permit from
Ecology.
The Growth Management Act(RCW 19.27.097)requires an applicant to submit evidence of
an adequate water supply before a building permit can be issued for any building requiring
potable water.
Ecology's comments are based upon information provided by the lead agency. As such,they
may not constitute an exhaustive list of the various authorizations that must be obtained or legal
requirements that must be fulfilled in order to carry out the proposed action.
If you have any questions or would like to respond to these comments,please contact the
appropriate reviewing staff listed above.
Department of Ecology
Southwest Regional Office
(SM:16-1086)
cc: Vicki Cline, WR
Daniel Kirby, Canopy Park LLC (Proponent)
SEPA Environmental Checklist Mason County Permit Center Use: j
1�
❑ SEP 2-61 (a - 0000E Single Family DNS: $385 �
Other DNS: 0 to 9.99 acres: $630 Date Rcvd:
10 to 20 acres: $755 RECEIVED
Over 20 acres: $945
❑ DS/EIS: $2,525+70 Per hr JAN 2 6 2016
426 W. CEDAR ST.
Purpose of checklist:
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization
or compensatory mitigation measures will address the probable significant impacts or if an environmental
impact statement will be prepared to further analyze the proposal.
Instructions for applicants: lbf!pl
This environmental checklist asks you to describe some basic information about your proposal. Please
answer each question accurately and carefully, to the best of your knowledge. You may need to consult
with an agency specialist or private consultant for some questions. You may use "not applicable" or
"does not apply" only when you can explain why it does not apply and not when the answer is unknown.
You may also attach or incorporate by reference additional studies reports. Complete and accurate
answers to these questions often avoid delays with the SEPA process as well as later in the decision-
making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact.
Instructions for Lead Agencies:
Please adjust the format of this template as needed. Additional information may be necessary to
evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse
impacts. The checklist is considered the first but not necessarily the only source of information needed to
make an adequate threshold determination. Once a threshold determination is made, the lead agency is
responsible for the completeness and accuracy of the checklist and other supporting documents.
A. BAC KG RO U N D r.=heiLl
1. Name of proposed project, if applicable: Itpipi
CANOP`A Pan.k
2. Name of applicant: h
3. Address and phone number of applicant and contact person: tg
�03
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2014 Page 1 of 11
4. Date checklist prepared: rhev
of f z31 A'L'1i;'
5. Agency requesting checklist: ItLeM
VY\A Sov\ (Ac.t_'A-
6. Proposed timing or schedule (including phasing, if applicable): nei
�ttt l $ COiM�ICE �d — GIs ,, via IJLJLL.l���
eo mO��e-d
7. Do you have any plans for future additions, expansion, or further activity related to or connected with
this proposal? If yes, explain. jhei
INK,C
8. List any environmental information you know about that has been prepared, or will be prepared,
directly related to this proposal. jh_eji21
9. Do you know whether applications are pending for governmental approvals of other proposals
directly affecting the property covered by your proposal? If yes, explain. [�Ie pjl
10. List any government approvals or permits that will be needed for your proposal, if known. Jnet
11. Give brief, complete description of your proposal, including the proposed uses and the size of
the project and site. There are several questions later in this checklist that ask you to describe
certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead
agencies may modify this form to include additional specific information on project description.) tje,�,
to vV'e-A-'Ci A bw G;ems CO - �� a e.ztz �aA"LcA-L-
12. Location of the proposal. Give sufficient information for a person to understand the precise location
of your proposed project, including a street address, if any, and section, township, and range, if
known. If a proposal would occur over a range of area, provide the range or boundaries of the
site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably
available. While you should submit any plans required by the agency, you are not required to
duplicate maps or detailed plans submitted with any permit applications related to this checklist. nI ego
5 D L-0 L'-)�it'ec� C t
Srz� �. a4
!Ze� t�Ia{
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2014 Page 2 of 11
B. ENVIRONMENTAL ELEMENTS h( eM
1. Earth
a. General description of the site Lheht ,
(circle one): Flat rolling, hilly, steep slopes, mountainous, other:
b. What is the steepest slope on the site (approximate percent slope)? nei
L-e_v c L
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)?
If you know the classification of agricultural soils, specify them and note any agricultural land of
long-term commercial significance and whether the proposal results in removing any of these
soils.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe. Lnei NOvvv
e. Describe the purpose, type, total area, and approximate quantities and total affected area of any
filling, excavation, and grading proposed. Indicate source of fill. if,el-1
all C+.ow.�1e-A- eAA
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. [r,eipi
S")
g. About what percent of the site will be covered with impervious surfaces after project
constn ir+ion (for example, asphalt or buildings)? `hei. d
31311(IV
h. Proposed measures to reduce or control sion, or other impacts to the earth, if any: help
2. Air
a. What types of emissions to the air would result from the proposal during construction, operation,
and maintenance when the project is completed? If any, generally describe and give
approximate quantities if known. (hei
N C rE.
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe. 1heipi
c. Proposed measures to reduce or control emissions or other impacts to air, if any: hei
�vv_ Fne_C_lcc1
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2014 Page 3 of 11
3. Water
a. Surface Water: nel
1) Is there any surface water body on or in the immediate vicinity of the site (including year-
round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and
provide names. If appropriate, state what stream or river it flows into. 2ne pl
rorNe-
2) Will the project require any work over, in, or adjacent to (within 200 feet)the described
waters? If es, please describe and attach available plans. Lelp7
3) Estimate the amount of fill and dredge material that would be placed in or removed from
surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material. he!
4) Will the proposal require surface water withdrawals or diversions? Give general description,
purpose, and approximate quantities if known. nL�
5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. ji_'elc
NC-- f'e
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge. .
ND
b. Ground Water:
1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a
general description of the well, proposed uses and approximate quantities withdrawn from
the well. Will water be discharged to groundwater? Give general description, purpose, and
approximate quantities if known. Lhei
l Jor C,:ii�c�irn�v� �Sc QSR i
-1-0 Svol�-�•d�-x��r Aua.1� A - LesS
wo
2) Describe waste material that will be discharged into the ground from septic tanks or other
sources, if any (for example: Domestic sewage; industrial, containing the following
chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of
such systems, the number of houses to be served (if applicable), or the number of animals or
humans the system(s) are expected to serve. n( M � j 4 e-A �
!94vLh &b V' '"'It - '^^off I
c. Water runoff(including stormwater):
1) Describe the source of runoff(including storm water) and method of collection and disposal,
if any (include quantities, if known). Where will this water flow? Will this water flow into other
waters? If so, describe. melpl -1 1
�a-E.�. ►�. �.�-er�'e� ar'vt- F'tos'b a�'�.Ch� � -�-ti�.rs�49t�c�. ViCL UOS�d
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2014 Page 4 of 11
2) Could waste materials enter ground or surface waters? If so, generally describe. Lhel
ti U
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so,
describe.
�130
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern
impacts, if any:
p1Q�-
4. Plants nei
a. Check the types of vegetation found on the site: LtLeM
deciduous tree: alder, maple, aspen, other
X evergreen tree: fir, cedar, pine, other ceunQ -cam �� a��
shrubs
grass
pasture
crop or grain
orchards, vineyards or other permanent crops
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered? hel
Y10 rE .
c. List threatened and endangered species known to be on or near the site. nei
Y10 r Q_
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any: Lre1;2
11c.,� C .
e. List all noxious weeds and invasive species known to be on or near the site.
Y-\o Y\.¢._
5. Animals
a. List any birds and other animals which have been observed on or near the site or are known to
be on or near the site. Examples include: flielpi
birds: hawk, heron, eagle, songbirds, other: 'nol^e--
mammals: deer, bear, elk, beaver, other: r_\0 r�e_�
fish: bass, salmon, trout, herring, shellfish, other: y�o r\(a_
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2014 Page 5 of 11
b. List any threatened and endangered species known to be on or near the site. Ltjei
Y1c vie_
c. Is the site part of a migration route? If so, explain. LLLlM
V-10r-Q-
d. Proposed measures to preserve or enhance wildlife, if any: JLeM
"r2- - Y`oV\e- ► -� `--
e. List any invasive animal species known to be on or near the site.
V-\o rti.e_
6. Energy and natural resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the
completed project's energy needs? Describe whether it will be used for heating, manufacturing,
etc. ItLeM a -. V�& d-
b. Would your project affect the potential use of solar energy by adjacent properties?
If so, generally describe. ir,E�i
Nc
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any: Lt!pj
-Q--rLVL%t Wha-
7. Environmental health
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal?
If so, describe. Lheir noh�
1) Describe any known or possible contamination at the site from present or past uses.
r�E-
2) Describe existing hazardous chemicals/conditions that might affect project development and
design. This includes underground hazardous liquid and gas transmission pipelines located
within the project area and in the vicinity.
tic r,�!,
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during
the project's development or construction, or at any time during the operating life of the
project.
110 vNe—
4) Describe special emergency services that might be required.
v�(D r---
5) Proposed measures to reduce or control environmental health hazards, if any:
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2014 Page 6 of 11
b. Noise
1) What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)? III
1r_XDr_
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi-
cate what hours noise would come from the site. JLeM
3) Proposed measures to reduce or control noise impacts, if any: h[ eip]
v-'Or,e v.ov,e- VAe-"ems
8. Land and shoreline use
a. What is the current use of the site and adjacent properties?Will the proposal affect current land
uses on nearby or adjacent properties? If so, describe. n L,
rc
b. Has the project site been used as working farmlands or working forest lands? If so, describe.
How much agricultural or forest land of long-term commercial significance will be converted to
other uses as a result of the proposal, if any?
Y10 h-L
If resource lands have not been designated, how many acres in farmland or forest land tax
status will be converted to nonfarm or nonforest use? ,eir 1
'rlor.e, — 'r vv�.V_ V\,cl
1) Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access, the application of pesticides,
tilling, and harvesting? If so, how:
rS v
c. Describe any structures on the site. n1 em o o �-
la VvNe 1 Iruu.� - &1,b 0 o sl i"`�
d. Will any structures be demolished? If so, what?
No
e. What is the current zoning classification of the site?
f. What is the current comprehensive plan designation of the site? their,
g. If applicable, what is the current shoreline master program designation of the site? iel;i!
r\C`rC -
h. Has any part of the site been classified as a critical area by the city or county? If so, specify.
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2014 Page 7 of 11
I
i. Approximately how many people would reside or work in the completed project?jbeio
- a"'%&4 _�)' PkZ'F_u_1�'-
j. Approximately how many people would the completed project displace?1heM
k. Proposed measures to avoid or reduce displacement impacts, if any: 1ne
f10 r-JP_ - v10 v.e_ rA-c.
L. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any: 1qgjpJ
Vic r-(ti_ — r'\O r.e_ VW-a—d&A_
m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest
lands of long-term commercial significance, if any:
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-
income housing. Li!ei21
f\o NQ,
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing. LA
4-,c r e_
c. Proposed measures to reduce or control housing impacts, if any: nelL
r"O
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed? he(
vv.Q4,e.A'� a,� — ao 1 axi-d vr,rc l
b. What views in the immediate vicinity would be altered or obstructed? 'ne�
r'-c-h' :
c. Proposed measures to reduce or control aesthetic impacts, if any: jej!
Y1V fe_ - V NO
11. Light and glare
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur?lqg_!pj
Y-No V\.P—
b. Could light or glare from the finished project be a safety hazard or interfere with views?JheM
N0
c. What existing off-site sources of light or glare may affect your proposal? nLe!
NL'>V\e,
d. Proposed measures to reduce or control light and glare impacts, if any: [help]
how _ V,tOV`JL VU2.O_c62a
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2014 Page 8 of 11
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity? hLe1a1
b. Would the proposed project displace any existing recreational uses? If so, describe. ne)
v-'o r-�
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any: nt!
- v- vY'_ . V\A�A"
13. Historic and cultural preservation
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old
listed in or eligible for listing in national, state, or local preservation registers located on or near
the site? If so, specifically describe.
No
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation?
This may include human burials or old cemeteries. Are there any material evidence, artifacts, or
areas of cultural importance on or near the site? Please list any professional studies conducted
at the site to identify such resources.
A,
c. Describe the methods used to assess the potential impacts to cultural and historic resources on
or near the project site. Examples include consultation with tribes and the department of
archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. rrlelp]
K ",_ - rp vim. 1iru�e
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to
resources. Please include plans for the above and any permits that may be required.
V-\c V\,7- _
14. Transportation
a. Identify public streets and highways serving the site or affected geographic area and describe
proposed access to the existing street system. Show on site plans, if any. LeilL
1A drama �A'
b. Is the site or affected geographic area currently served by public transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop? Lis_i
Qov'.O_ — ago Aaf_-
c. How many additional parking spaces would the completed project or non-project proposal have?
How many would the project or proposal eliminate? ne)
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2014 Page 9 Of 11
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle
or state transportation facilities, not including driveways? If so, generally describe (indicate
whether public or private). r, l
V�'c
e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe. Ihelpl
Q0
f. How many vehicular trips per day would be generated by the completed project or proposal? If
known, indicate when peak volumes would occur and what percentage of the volume would be
trucks (such as commercial and nonpassenger vehicles). What data or transportation models
were used to make these estimates? h( eM
1-s/,)4 _ 40-�-a w. c� �t�Q�►J
g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest
products on roads or streets in the area? If so, generally describe.
W
h. Proposed measures to reduce or control transportation impacts, if any: LeM
c\lv Va- -- r'O V\A- V\ua-�
15. Public services
a. Would the project result in an increased need for public services (for example: fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe. Jnei
i'�'C
b. Proposed measures to reduce or control direct impacts on public services, if any. [beMJ
16. Utilities
a. Circle utilities currently available at the site: h yip;
electricit natural gas, water refuse service telep onehoneh
sanitary sewer, septic system other
b. Describe the utilities that are proposed for the project, the utility providing the service, and the
general construction activities on the site or in the immediate vicinity which might
be needed.
1M o,so r Co U h (.t ts
SEPA Environmental checklist(W AC 197-11-960)(MC version-non project portion omitted): 2014 Page 10 of 11
C. SIGNATURE hel
The above answers are true and complete to the best of my knowledge. I understand that the lead
agency is relying on them to make its decision.
Signature:
Date Signed: O\
Print Name of Sig nee: �A
If applicable, Position and Agency/Organization:
Date Submitted:
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2014 Page 11 of 11
EXHIBIT "A" PREMISES DESCRIPTION
LOT 7 OF SHORT PLAT LOCATED AT 450 W DAYTON AIRPORT
ROAD, SHELTON, MASON COUNTY WASHINGTON MORE
SPECIFICALLY DESCRIBED AS:
LOT 7 OF SHORT SUBDIVISION #3027 RECORDER UNDER
AUDITORS FILE #1916060 BEING A PORTION OF THE SOUTH
24.59 ACRES OF THE WEST HALF OF THE EAST HALF OF THE
NORTHWEST QUARTER OF SECTION 2, TOWNSHIP 20 NORTH,
RANGE 4 WEST, W.M. IN MASON COUNTY WASHINGTON