Loading...
HomeMy WebLinkAboutGEO2021-00119 Addendum multi parcels in tract - BLD Engineering / Geo-tech Reports - 10/21/2021 G-wv%roteok EVL-O v terWlo Geotechvu,cal,o EvwLrov w vLtaL DraL"Oe°Roadway PLANNING INr August 2,2021 Jack Johnson Construction,Inc. T�n PO Box 1119 l•�/V� Belfair,Washington 98528 OC T? Q Sena Smith 615 404 300 E Archer Ridge Road .q/ Allyn,Washington 98524 air StrG @t RE: Geotechnical Report Addendum#2 for Knutsen Tracts Single Family Residences,Parcel 12220-33-00240,Mason County,Washington Dear Mr.Johnson, Envirotech Engineering (Envirotech) has completed this geotechnical report addendum for the above referenced project. The original report, dated June 12, 2008, was prepared by Envirotech (Project#0857). The project site was revisited by Michael Staten with Envirotech on multiple occasions during the preparation of the original report, subsequent addendum, and inspections. A recent site visit was performed on July 31, 2021 to evaluate the proposed project and verify the absence of new geotechnical hazards since our initial site visit in 2008. We conclude that the natural topographic and geologic conditions were virtually unchanged with relation to the safety of the property. The subject parcel is known as Lot 8 of the Knudsen Tracts within our original report. It is our opinion that the all geotechnical parameters are per current code, and that the development may commence per the original report. Envirotech is pleased to submit this addendum. Please contact Michael Staten at 360-275-9374 if you have any questions,comments,or require additional information. Best Regards, Envirotech En ineering n�L cLYOF S 4 Michael Staten,P.E. Geotechnical Engineer Envirotech Engineering Geotechnical Report Addendum#1 PO Box 984 Page 1 of l Knudsen Tracts Single Family Residences Belfair.Washington 98528 Parcel 12220-33-00250 Ph. 360-275-9374 March 23,2021 -- SECTION 20, T22N, R01 W W.M. ---- F msnm FLOOR: APPROX. uINwLIM./NO BASEMENT ( m. A 6 --------------- ' I ../ ///•�•"'_r _w—_F/" F RIOgE. -1.I00 if 2' _ FIN. g�- A0. NODE FORCE i'� '� 'CRrpER PUMP-PEASIIC - - t _ \� LAIERK ASSEt6LY •_ (DETAIL 7)h VKYE FIN, FAR. '� �'PIN, RR.r AI CAL LOTS R RELEASE STATION d E4 CREST OF HILL � F1N. FLR i tit200 fi95 AT FIN FI.R f t150 TERMINATION FLUSHING CONNECTION �' .Y L. FIN F.-R ±194 >i - ORCf. f SIFM.�--- - _ MST, "AWN IN (STING SHERWOOD CREEK ROAD E GENERAL NOTES: -}•- / ..AITTTITFTau SMALL R IN ACComwe ` . ,�^• -, _�-._ ._._...______..;,. _.:__.__ ___ IRTN 71E LATE ST EDITION a THE "04TON STATE DEPARTMENT OF / _J TAANSWATIDN'S'STANDW L / �?<CONNECT TO EXISTING3'HOPE ROAD,1 SPECIFICATIONS FOR BRIDGE,NO FORCE MAIN N/SADDLE TAR ��Rj NNICIPAL CORE; ION (WSDOT SPEC.) RONAC'306-N'SR2'SADDLE AND THE NEWIAEND"OF MASON CORKY i TAP OR EWVALENT■/ ..-.� unLttt[s BMANAGEMENT R WASTE MNAGE ENT DIVISION. 1FREAOEO 2 CONNECTION LLTBIEXES ' ITIME _ SN FIELD LOCATED O UTILITIES TO f i •-. !. t'+. CONSTtlLTMN. PIDIE MEI[EA FOR UTILITY LOCATES:I-M-WSSSS or 811. r � i •} I L I C.., ., .�0' „k �'% h I.THE CdLiMCTM/OMLER SMALL VFAIFY Wy t T F+ +eL ALL PROPERTY LINES A CONFIMA ALL WORE U 1 L IS NITIEN LEGALLY ACCESSIBLE All' ID i4i4i4 g x? _' "r iNDDACTEIDAi BEY'OID THE vAllC[L NDVENfl isR I ILUCIND 4111, ( 1 114"lr 4.AERIAL PHOTO IS SHOW FOR a pipe with INFoaAnOMAI PNPOSEs ONLY,AND SAIL — — ----- ---- Visited 4 NOT NE swPE FROMIT F OR INTEMASON RETED IN is PICIN IY WWMIES. 1 --J S.A SE1ER PERMIT FROM IMSp1 COUNTY IS REQU[0.ED PRIOR TO COMMENCING THE HOAR. Z q 1 / _ 6.REQLEST INSPECTION FROM MASON COWN J =� x I ` E.AC:;ES$ 11/ 1.y, - _ „ l' i NATER/IASTESNTEN UTILITIES MANAGER a 7y�y PRIOR f0 BWIAL. ES RECORD GROWS ENGINEER AREREQUIRED[AT BY THE LA.1 f 3 ' / / '•.. ..p�� \I:L iB PROIECT COMPLETION. &�Ne". u Aarcu arw SEWER } LIDAE MOTE: SCALE: I'.50' j TAR SMDN IS Ip/NNLL(LOAN EASE Ny MOTE: 50 100 15o FREE.[CLAWS AREAS 0[STORTED TN"FTiifFiFIS ASSFNILEp FROR EFA1R4 CLGA10 AREAS 1 TDONE ID AMAF. PUNK RECORDS. iME OMAR CONTAACfOR/OFRR 70 FDIo VERIFY ALL COFIRACTOR W^ VERIFY PROPERTY GRAPHIC SCALE(M FMt) fIEVATIORCOMTIOI. LINES BEFORE CONIDMCDC THE(MOD. �;.ZS C1 -00 11 f REG ®cT2 C� f ?�Zj Geotechnical Report for Knudsen Tracts Single Family Residences East Sherwood Creek Road Parcels 12220 33 00210, 12229 22 00320, 12220 33 902219 12220 33 90222912220 33 90223 & 12220 33 90224 Mason County, Washington June 12, 2008 Project#0857 Prepared For: Jack Johnson Construction, Inc. PO Box 1119 Belfair, Washington 98528 Prepared By: Envirotech Engineering PO Box 984 Belfair, Washington 98528 Phone: 360-275-9374 CLYDE ST G� DF NN.Asy I9N 43045 <v� FCISTER� SSDNAL�aG 6/12/08 r TABLE OF CONTENTS 1.0 INTRODUCTION.................................................................................................................................I 1.1 PROJECT INFORMATION.................................................................................................................... 1 1.2 PURPOSE OF INVESTIGATION............................................................................................................. 1 1.3 SCOPE OF WORK................................................................................................................................ 1 2.0 SURFACE CONDITIONS....................................................................................................................3 2.1 GENERAL OBSERVATIONS..................................................................................................................3 2.2 TOPOGRAPHY.....................................................................................................................................3 2.2.1 Upslope Geomorphology............................................................................................................3 2.2.2 Downslope Geomorphology.......................................................................................................3 2.3 SURFACE DRAINAGE..........................................................................................................................3 2.4 SLOPE AND EROSION OBSERVATIONS...............................................................................................4 3.0 SUBSURFACE INVESTIGATION.....................................................................................................5 3.1 FIELD METHODS,SAMPLING AND FIELD TESTING...........................................................................5 3.2 GENERAL GEOLOGIC CONDITIONS...................................................................................................5 3.3 SPECIFIC SUBSURFACE CONDITIONS.................................................................................................6 3.3.1 Groundwater............................................................................................................................... 6 3.4 Soms TESTING...................................................................................................................................6 4.0 ENGINEERING ANALYSIS,CONCLUSIONS AND RECOMMENDATIONS...........................8 4.1 BUILDING FOUNDATION RECOMMENDATIONS..................................................................................8 4.1.1 Bearing Capacity........................................................................................................................ 8 4.1.2 Settlement................................................................................................................................... 8 4.1.3 Concrete Slabs-on-Grade........................................................................................................... 9 4.2 LATERAL EARTH PRESSURES............................................................................................................9 4.3 EARTHWORK CONSTRUCTION RECOMMENDATIONS........................................................................9 4.3.1 Excavation......................................................:..........................................................................10 4.3.2 Placement and Compaction of Native Soils and Engineered Fill...........................................10 4.3.3 Retaining Wall Backfill.............................................................................................................11 4.3.4 Wet Weather Considerations....................................................................................................11 4.3.5 Building Pads............................................................................................................................11 4.4 SLOPE STABILITY AND EROSION CONTROL.....................................................................................11 4.4.1 Septic Drainfield Impacts.........................................................................................................16 4.4.2 Building and Footing Setbacks.................................................................................................16 4.4.3 Temporary and Permanent Erosion Control...........................................................................16 4.4.4 Surface and Subsurface Drainage...........................................................................................17 4.4.5 Vegetation Considerations........................................................................................................17 4.4.6 Off-site impacts.........................................................................................................................18 4.5 SEISMIC CONSIDERATIONS AND LIQUEFACTION..............................................................................18 5.0 CLOSURE.............................................................................................................................................19 Appendix A-Site Plan Appendix B—Geological Map Appendix C-Soil Information Appendix D-Slope Stability Appendix E—Erosion Control Appendix F—Drainage Details y 1.0 INTRODUCTION Envirotech Engineering(Envirotech)has completed a geotechnical investigation for a future nine lot subdivision on parcel numbers 12220 33 00210, 12229 22 00320, 12220 33 90221, 12220 33 90222, 12220 33 90223, and 12220 33 90224, Mason County, Washington (Project). As presented herein, this report includes information pertaining to the Project in this Introduction Section; observations of the property and surrounding terrain in the Surface Conditions Section; field methods and soil descriptions in the Subsurface Investigation Section; and, recommendations for foundation, settlement, earthwork construction, lateral earth pressures, slope stability, erosion control, drainage and vegetation considerations in the Engineering Analysis and Recommendations Section. An initial geotechnical evaluation of the Project was conducted by Envirotech with the property owner,Jack Johnson, on May 9, 2008. It was previously determined that slopes in excess of 40% with a vertical relief of at least 10 feet were present within 300 feet of the planned development. Consequently,the proposed development will require a geotechnical report pursuant to Landslide Hazard Areas of Mason County Resource Ordinance 17.01.100. During the site visit by Envirotech, surface and subsurface conditions were assessed. After completion of the field work and applicable Project research,Envirotech prepared this geotechnical report. 1.1 Project Information Information pertaining to the Project was provided by the property owner and owner's representative with general assumptions by Envirotech that are typical of this type of development. The Project is accessed from an unimproved road linking Sherwood Creek Road. See the vicinity map on the following page of this report for a general location of the site. The property is currently vacant land with a dirt road accessing all the planned lots, and one well head. The planned development consists of 1- or 2-story single family residences on each lot. Foundation construction is expected to consist of continuous strip footings and concrete slab-on- grade or stem walls. Anticipated construction other than the residence will include driveways, stormwater management systems, and possible ancillary features typical of this type of development. Septic drainfields are not anticipated for this Project.Earth movement consisting of cutting high areas and filling the low portion of undulations is expected. Approximate building footprint with relation to site features are illustrated in the Site Map in Appendix A. 1.2 Purpose of Investigation The purpose of this geotechnical investigation was to evaluate the Project in order to provide geotechnical recommendations relating to the development of the property. The investigation included characterizing the general Project surface and subsurface conditions, and evaluating the suitability of the soils to support the planned site activities. 1.3 Scope of Work In order to fulfill the purpose of investigation, the geotechnical program completed for the proposed improvements of the Project include: 0 Review project information provided by the Project owner and/ or owner's Envirotech Engineering Geotechnical Investigation PO Box 984 page 1 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 representative. This included a grading and stormwater management plan completed by Michael Wnek,P.E.; • Conduct a site visit to document the site conditions that may influence the construction and performance of the proposed improvements; • Define the general subsurface conditions of the site by observing subsoils extending to a depth of up to 35 feet below the natural ground surface, review geological maps for the general area, research published references concerning slope stability, and review water well reports from existing wells near the Project; • Collect bulk samples at various depths and locations; • Perform soils testing to determine selected index properties of the soils that include 8 visual classifications, 2 in-place density tests, and one direct shear test; • Complete an engineering analysis supported by the planned site alterations, and the surface and subsurface conditions that were identified by the field investigation, soil testing,and applicable project research; and, • Establish conclusions based on findings, and make recommendations for foundations, drainage, slope stability, erosion control, earthwork construction requirements, and other considerations. to W W ke�z V c �J/ �{W/(j�1 oon La cc E coital to 4 � w, DR �W 23yy�20 n!—?4—W tPG R 19 ;£1.nnPl."�20 ` % Prickett lake / �! W _W y� � ,O CASE INLET F 70 O O 25 25 30 iA 29 �o� AUPond y t,CatRah Lake Proj ect E MERRILL D 35 3's 3i 32 Vicinity Map from Mason County Website Envirotech Engineering Geotechnical Investigation PO Box 984 page 2 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 2.0 SURFACE CONDITIONS Information pertaining to the existing surface conditions for the Project was gathered on May 9, May 16, and May 24,2008 by Michael Staten, geotechnical engineer with Envirotech.During the site visits,the type of geotechnical investigation was assessed, site features were documented that may influence construction and slope stability, soil samples were collected from selected locations, and near-surface soils were visually classified. This Surface Conditions Section provides information on general observations, vegetation, topography, drainage and slope/ erosion conditions for the Project and surrounding areas that may impact the Project. 2.1 General Observations The Project is currently vacant land as previously mentioned. Sherwood Creek Road borders the southeast portion of the property,and a residential subdivision is located to the north and west of the property. Beyond the property lines, exist low to moderate density residential development. Vegetation on and near the Project consists primarily of firs, alders,maples,blackberry, and other trees and shrubbery common to this area of the Pacific Northwest. Past clearing has been completed for this property. An aerial photo of the project and immediate vicinity is provided on the following page. 2.2 Topography The Project is situated within and near moderate to very steep sloping terrain. The topographic information provided in this section was extrapolated from a public lidar source,and incorporated observations and field measurements. Slope verification included measuring slope lengths and inclinations with a cloth tape and clinometer. See the Site Map in Appendix A and the Geological Map in Appendix B in this report for an illustration of general topography with respect to the planned development. 2.2.1 Upslope Geomorphology Ascending grades are located to the north and west of the planned development. These slopes are extremely variable, with undulations and vertical reliefs ranging from 10 to 40 feet from the property line. There are no apparent water bodies or wetlands located upslope from the planned development. 2.2.2 Downslope Geomorphology Descending grades also vary considerably, and are limited to a vertical relief of no more than 130 feet of slopes exceeding 40%. Some isolated areas with vertical reliefs of less than 25 feet were observed to have slopes greater than 100%. See the Site Plan and Geologic Map in the appendices of this report. 2.3 Surface Drainage Stormwater runoff originating upslope from the anticipated development is expected to be minimal. Sheet flow down the sloping grades towards the planned development is expected.Most of the upslope runoff appears to be diverted away from the property due to the upslope Envirotech Engineering Geotechnical Investigation PO Box 984 page 3 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 development. Sheet flow down the steeper slopes can be expected, with some minor convergences. Excessive scour, erosion or other indications of past drainage problems were not observed at or near the planned development. It is apparent that the upslope development manages most of its stormwater,and distributes runoff without impacting the Project. 2.4 Slope and Erosion Observations The existing steep slopes near the Project signal a potential landslide or erosion hazard area. Some indicators that may suggest past slope movements include: • Outwash of sediments near the bottom of the slope, • Fissures, tension cracks or naturally stepped land masses on the face or top of the slope, and parallel to the slope, • Fine,saturated subsurface soils, • Old landslide debris, • Significant bowing or leaning trees,or, • Slope sloughing or calving. Significant mass wasting on the property was observed. Indications of recent and past landslides were apparent on the very steep descending slopes. The landslides were limited to shallow translational failures extending to depths of almost 2 feet.The slides did not exceed a length of 30 feet at the bottom failure surface, and had widths of less than 15 feet. Indications of deep seated slope problems were not apparent or observed during the site visit. _ F�k 3hR ate. �-l�'•�''IfT� R���T��. �° '� T " xs ti 4 T -- .�'�,' dal. ` y x�v`�� • �iY. `i'• 000 EK RD� t�ly L00 aA1✓� l w a E NORTH BAY PL � •� � - ! �, f�y,'!+. N y> -i E BROUGHTON HILL RD ' e v 1 i Aerial Photo from Mason County Website Envirotech Engineering Geotechnical Investigation PO Box 984 page 4 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 3.0 SUBSURFACE INVESTIGATION Information on subsurface conditions pertaining to the Project was gathered on May 16, and May 24, 2008 by Michael Staten, geotechnical engineer with Envirotech. Specific information on field methods,sampling,field testing,subsurface conditions,and results from soil testing are presented in this section of the report. Appendix C of this report includes pertinent information on subsurface conditions for the Project, such as subsoil cross-sections, test pit log(s) representative of the bearing soils of the planned building, and water well report(s). Applicable test pit and well log locations are depicted on the Site Plan and Geologic Map provided in the appendix of this report. 3.1 Field Methods,Sampling and Field Testing Information on subsurface conditions for the Project was accomplished by examining soils within test pits extending to depths of up to 15 feet below the existing ground surface, observing soils within existing cuts on the slope of up to approximately 35 feet below the natural ground surface, and observing soils within the shallow landslides. Information on subsurface conditions also included reviewing geological maps and water well reports originating from nearby properties. Bulk samples were collected at the Project site ranging from approximately 2 feet to 15 feet below the existing ground surface. A bulk sample was transported to PSI laboratory for direct shear testing. An additional sample was obtained by driving brass rings into the sandy clay soils exposed at the landslide. The soil samples collected were secured and transported for laboratory testing. From a sand cone test,Envirotech measured the relative density of the upper soils,at a depth of 1- foot below the existing grade. Relative density was also measured from the exposed sandy clay soils from the aforementioned slide by measuring the unit weight from brass rings. Relative density was also gauged from observing the excavations performed by a John Deere 16OLC backhoe.See the soils testing section below for specific testing results. 3.2 General Geologic Conditions In general, soils at the project are composed of materials from glacial advances. The geologic conditions as presented in the "Geologic Map of Washington," compiled by J. Eric Schuster, 2002 indicates Quaternary sediments, Qg. Quaternary sediments are generally unconsolidated deposits, and dominantly deposited from glacial drift,including alluvium deposits. This project is located within the Puget Lowland. Typically, "lower tertiary sedimentary rocks unconformably overlie the Crescent Formation." as revealed in the Geologic Map. Initial sedimentary rocks were formed from shales, sandstones and coal deposits from rivers. During the Quaternary period, the Puget Lowland was covered by numerous ice sheets,with the most recent being the Fraser glacier with a peak of approximately 14,000 years ago. Upon the glacial retreat, the landscape was formed by glacial erosion glacial drift deposits. According to the "Geologic Map of Washington—Northwest Quadrant" (2002),the site geology is composed of both glacial till (Qgt) and advance outwash (Qg�. The glacial till is primarily located in the upper portion of the property such as the building areas,and the advance outwash is shown to be within the lower site geology. Envirotech Engineering Geotechnical Investigation PO Box 984 page 5 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 Glacial till, Qg,,is unsorted, unstratified,highly compacted mixture of clay, silt, sand, gravel, and boulders deposited by glacial ice;may contain interbedded stratified sand, silt, and gravel. Advance outwash, Qg., is glaciofluvial sand and gravel and lacustrine clay, silt, and sand deposited during the advance of glaciers; sandy units commonly thick, well sorted, and fine grained,with interlayered coarser sand,gravel,and cobbles;locally contains nonglacial sediments and deposits mapped as transitional between glacial and nonglacial. 3.3 Specific Subsurface Conditions The following subsurface conditions are estimated descriptions of the Project subgrade utilizing information from the depth of penetration at all testing, sampling, observed and investigated locations. Soils for this project were described utilizing the Unified Soil Classification System (USCS). Using the USCS in conjunction with estimated relative densities and other anticipated engineering properties of the soil, susceptibility for potential landslides, erosion and seismic hazards may be assessed. The Project is composed of native soils with no indications of borrowed fill. For engineering purposes,these native soils consist of distinguishable layers,as presented below. Soils within the upper 15 feet of natural ground were observed to be moist, brown and grey sitly sand (SM) with traces of gravel, cobbles and boulders. This soil description generally includes gravel in the upper 18 inches from the ground surface. Sand content was primarily well graded near the surface, and significant fine sands at depths of over 10 feet. The fines content exhibited low plasticity with small layers of medium plasticity. Weak to moderate cementation was observed throughout test pit 1, and the upper 12 feet of test pit 2. According to the well report soils below the upper 20 feet soil layer consists of brown sandy clay (SC), which extends to a depth of 80 feet below the ground surface.This soil was verified at the face of the recent landside located near the slope toe on Lot 5. 3.3.1 Groundwater From the water well report and knowledge of the general area,permanent groundwater is approximately 150 feet directly below the property at an elevation of about 100 feet above sea level. Perched groundwater at shallow depths was not observed on-site, nor indicated on the well reports. Seepage during wet weather was apparent near the toe of the steep slopes on Lots 4 and 5. 3.4 Soils Testing The soil samples obtained at the Project site during the field investigation were preserved and transported for possible laboratory testing. Visual classification of soils was performed in the field. The following soil tests were performed in accordance with the American Standards for Testing and Materials(ASTM): 8 Visual Classifications(ASTM D2488); Envirotech Engineering Geotechnical Investigation PO Box 984 page 6 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 1 Sand cone test(ASTM D1556); 1 Brass ring unit weight test; and, 1 Direct Shear(ASTM D3080). The results from the visual classification are presented above in the Subsurface Conditions Section at depths of up to 35 feet below the natural ground surface. Specifically, upper sandy soils consisted of approximately 30% gravel, 50% sand-sized soils, and 20% silt. Variations included as a silt content ranging from 10% to 25%, and gravel content of less than 5%. The underlying clayey soils consisted of approximately 0% gravel, 35% sand, and 65% medium plastic clay. A sand cone test, completed by Envirotech was performed near test pit 1. This test indicated that near surface dense, low to moderately cemented soils had a moisture content of 8.1%, and a dry density of 128.1 pcf. One unit weight test was performed by Envirotech by measuring the soils within brass rings that were driven in the exposed clayey strata.This test indicated an in-situ density of 142.2 pcf. Direct shear testing of the weakest substructure was performed by HWA Geosciences, Inc., via PSI. The direct shear test was prepared by remolding the minus No. 4 material to a dry unit weight of approximately 110 pcf, and a moisture content of about 10%. Three shear trials were run at normal stresses of 2.0, 4.0 and 8.0 ksf. The apparent strength parameters from the direct shear test indicated soil cohesion of 70 psf,and an angle of internal friction of 32.8 degrees. Envirotech Engineering Geotechnical Investigation PO Box 984 page 7 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 4.0 ENGINEERING ANALYSIS, CONCLUSIONS AND RECOMMENDATIONS The following sections present engineering analysis and recommendations for the proposed improvements of the Project. These recommendations have been made available based on the planned improvements as outlined in the Introduction Section of this report; general observations including drainage and topography as recapitulated in the Surface Conditions Section; and, soil conditions that were identified from the geotechnical investigation that is summarized in the Subsurface Investigation Section. Engineering analysis and recommendations for the Project that is provided herein, includes pertinent information for building foundations, earthwork construction, slope stability/erosion control,drainage,vegetation and seismic considerations. 4.1 Building Foundation Recommendations Recommendations provided in this section account for the site development of a typical one- or two-story, single family residential structure. Below the upper 12 inches of Project soils, there is apparently one distinguishable layers of soil that will influence the bearing capacity and settlement of the structures. The recommended allowable bearing capacities and settlements as presented below, consider the probable type of construction as well as the field investigation results by implementing practical engineering judgment within published engineering standards. Evaluations include classifying site soils, and deriving probable relative densities, unit weights and angles of internal friction of the in-situ soils based on observed field conditions and soil testing for this Project. The frost penetration depth is not expected to extend beyond 12 inches below the ground surface for this Project under normal circumstances and anticipated design features. The soils on-site have moderate frost susceptible characteristics and should be used only to the extents provided in this report. 4.1.1 Bearing Capacity For the existing site conditions, bearing values should increase with depth. Existing in- situ soils for this Project indicates that the structure can be established on shallow, continuous or isolated footings. Foundations shall be established on relatively undisturbed native soil. Alternatively, foundations may be constructed on selective re- compacted native soil or compacted engineered fill as described in the Earthwork Construction Recommendations Section of this report. Footing width and depth recommendations shall be adhered to, and are based on 1500 pounds per square feet(psf) maximum structural bearing pressure. For a bearing capacity requirement of no more than 1500 psf, a minimum footing width of 15 inches shall be placed at a minimum of 18 inches below the existing ground surface. Foundation recommendations are made available based on adherence to the remaining recommendations that are provided in this report. For foundations placed in building pads consisting of engineered fill, 12-inch footings may be used at a depth of 12 inches below the final ground surface. 4.1.2 Settlement Envirotech Engineering Geotechnical Investigation PO Box 984 page 8 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 Total and differential settlement that a structure will undergo depends primarily on the subsurface conditions, type of structure, amount and duration of pressure exerted by the structure, reduction of pore water pressure, and in some instances, the infiltration of free moisture. Based on the expected native soil conditions, anticipated development, and construction abides by the recommendations in this report, the assumed foundation system may undergo a maximum of 1.0 inch total settlement, and a maximum differential settlement of 0.75 inch. 4.1.3 Concrete Slabs-on-Grade Interior slabs, if utilized, should be supported on a minimum of 6 inches of compacted coarse, granular material that is placed over undisturbed native subgrade or engineered fill. Native soils found at the Project site are not suitable for use as the material directly beneath concrete slabs. The top 4 to 12 inches of native soil should be removed prior to the placement and compaction of the aforementioned 6-inch coarse, granular material. Although not required for the structural integrity of the concrete slab-on-grade, a vapor barrier is usually used for damp-proofing. If vapor barriers are used, it is suggested to utilize a barrier that is sufficiently thick to resist puncturing during construction,or place a 2 inch layer of sand above the barrier prior to placing the concrete slab. 4.2 Lateral Earth Pressures Retaining walls may be utilized for this Project. The lateral earth pressures exerted through the backfill of a retaining wall are dependent upon several factors including height of retained soil behind the wall, type of soil that is retained, degree of backfill compaction, slope of backfill, surcharges,hydrostatic pressures,earthquake pressures, and the direction and distance that the top of the wall moves. An equivalent fluid unit weight used for structural design may be estimated as the product of the backfill soil unit weight and the earth pressure coefficient for at-rest pressures. Retaining walls should be designed to resist a lateral earth pressure based on an equivalent fluid unit weight of 45 pounds per cubic foot(pcf) and 60 pcf for backfill consisting of engineered fill and native soils, respectively. See the Earthwork Construction Recommendations Section for details concerning the use of native soils,engineered fill and placement of backfill. Lateral earth pressure recommendations are based on retaining structures with relatively flat or descending sloping backfill, and the backfill conforming to the recommendations outlined in the Earthwork Construction Recommendations Section of this report. For instances when it is necessary to require ascending sloping backfill or structures will induce passive earth pressures, additional design parameters must be accounted for in the retaining wall analysis.For these cases, recommendations should only be provided by a qualified engineer after the type of backfill is specified,inclination of backfill slope is estimated,and the final wall height is determined. 4.3 Earthwork Construction Recommendations Founding material for building foundations shall consist of undisturbed native soils. Compacted engineered fill, or selective re-compacted native soils may be used to the extents provided in this Earthwork Construction Recommendations Section. The following recommendations include Envirotech Engineering Geotechnical Investigation PO Box 984 page 9 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 excavations, subgrade preparation,type of fill,and placement of fill for building foundations. 4.3.1 Excavation Excavation is recommended to remove any excessive organic content or other deleterious material, if present, beneath foundations and to achieve appropriate foundation depth. Additional sub-excavation will be required for this Project if the soils below the required foundation depth are loose, saturated, or otherwise incompetent due to inappropriate land disturbing, or excessive water trapped within foundation excavations prior to foundation construction. All soils below the bottom of the excavation shall be competent, and relatively undisturbed or properly compacted fill. If these soils are disturbed or deemed incompetent, re-compaction of these soils below the anticipated footing depth is necessary. Excavations shall be completely dewatered, compacted, and suitable before placement of additional native soil, engineered fill or structural concrete. It is suggested that foundation excavations are inspected by a geotechnical engineer or qualified professional in order to assess the bearing material prior to the placement of structural footings. 4.3.2 Placement and Compaction of Native Soils and Engineered Fill For engineered fill or disturbed native soils that will be utilized as fill material directly beneath foundations, observation and/ or geotechnical testing is recommended prior to foundation construction. The following placement and compaction requirements are necessary. For disturbed native soils or engineered fill beneath foundations, limits of compacted or re-compacted fill shall extend laterally from the bottom edge of the foundation at a rate of one foot for each foot of compacted or re-compacted fill beneath the foundation. See the illustration below. FOOTING COMPACTED NATIVE SOILS OR ENGINEERED t FILL 1 1 1 UNBISTURBED SUBGRADE� Both engineered fill and native soils used as compacted fill should be free of roots and other organics, rocks over 6 inches in size, or any other deleterious matter. Engineered fill should consist of 60%to 100% gravel-sized material(particles between 3/16-inch and 3 inches),and less than 10%fines(particles passing#200 standard sieve)by weight. Compaction shall be achieved in compacted lifts not to exceed 8 inches and 12 inches for native soils and engineered fill, respectively. Each lift should be uniformly compacted to at least 95% of the modified Proctor maximum dry density (ASTM D 1557) and within 3% of optimum moisture content. Each lift surface should be adequately maintained Envirotech Engineering Geotechnical Investigation PO Box 984 page 10 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 during construction in order to achieve acceptable compaction and inter-lift bonding. 4.3.3 Retaining Wall Backfill Native soils may be used as retaining wall backfill for this Project. Backfill may also consist of engineered fill, as presented in this report, or borrow material approved by a geotechnical engineer. Compaction of these materials shall be achieved in compacted lifts of about 12 to 24 inches.Each lift should be uniformly compacted to no more than 90% of the modified Proctor maximum dry density(ASTM D 1557). Over-compaction should be prevented since this will cause lateral earth pressures to increase, which may be detrimental to the retaining structure. If clean, coarse gravel soils are utilized as engineered fill, compaction may be achieved from by reasonably densifying granular soils with construction equipment. Backfill for the retaining wall should extend vertically from the top of the footing to the proposed ground surface.At the ground surface,backfill should extend horizontally from the face of the retaining wall to at least 2 feet in back of the wall for every 4 feet in height.Perforated drains for retaining walls should have a minimum diameter of 4 inches and direct water to an appropriate outfall as recommended in the Surface and Subsurface Drainage Section of this report.Coarse,clean gravel is recommended to be placed at least 12 inches around the drain pipe in order to provide increased drainage capabilities. Non- woven geotextile filter fabric should be wrapped around the aforementioned coarse gravel for reducing the potential of silt migration and clogging of the drain pipe. 4.3.4 Wet Weather Considerations Due to the types of subsurface soils, additional provisions may be required during prolonged wet weather. Every precaution should be made in order to prevent free moisture from saturating the soils within excavations. If the bottom of excavations used for footing placement changes from a moist and dense/hard characteristic as presented in this report to muck or soft, saturated conditions, then these soils become unsuitable for foundation bearing material. If this situation occurs, a geotechnical engineer should be notified, and these soils should be completely removed and replaced with compacted engineered fill or suitable native material as presented in this section. 4.3.5 Building Pads Building pads for this Project shall be constructed per the fill placement and compaction recommendations as presented above. Both engineered fill and native soils may be used for building pads. Building pad slopes shall be no steeper than 2:1 for both compacted engineered fill and re-compacted native soils used as fill. Building pad fill shall not exceed 12 feet for this Project unless approved by a geotechnical engineer. 4.4 Slope Stability and Erosion Control Landslides are natural geologic processes, and structures near slopes possess an inherent risk of adverse settlement, sliding or structural damage due to these processes. Geotechnical engineering Envirotech Engineering Geotechnical Investigation PO Box 984 page 11 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 cannot eliminate these risks for any site with sloping grades because gravity is constantly inducing strain on the sloping soil mass. Excessive wet weather and/ or earthquakes will exacerbate these strains. Geotechnical engineering considers excessive wet weather and `design' earthquakes in order to provide an acceptable factor of safety for developing on or near sloping terrain. These factors of safeties are based on engineering standards such as defining engineering properties of the soil,topography,water conditions, seismic acceleration and surcharges. Surface sloughing or other types of surficial slope movements usually do not affect the deep- seated structural capability of the slope. However, excessive and/or repeated surficial slope movements,if not repaired,may represent a threat to the structural integrity of the slope. Sur cial slope movements have occurred are expected to continue naturally on the steep descending slopes during times of extreme inclement weather. It is our opinion that these successive shallow landslides will not threat the planned development during the design life of the structures. According to the Coastal Zone Atlas of Mason County, Washington, the Project is within and near terrain labeled `Stable' and `Intermediate' regarding potential landslide activity. Stable slopes,located within the building areas,are generally not prone to landslides due to small grades and accommodating geology. Historically, intermediate terrains have no known landslides. However, this site is considered inherently hazardous due the existing geology, topography, and the presence of surface sloughing. An additional analyses and recommendations concerning the slopes are presented herein. A Stability Map from the Coastal Zone Atlas for the general area of this Project may be found below in this report this report. According to the Resource Map from the Washington State Department of Natural Resources (DNR), the Project is not within terrain labeled `highly unstable' or `highly erodible' relating to soils. In addition, DNR did not indicated previous landslide activity near the Project. DNR labeled portions of this project as high slope instability with relation to slopes.This delineation is primarily dependent upon slopes and convergence. Secondly, lithology and precipitation are modeled within this delineation. In summary, this designation is based on mapping without considering the specific site geology or soils.A DNR map is provided below in this report. The Simplified Bishop Method, utilizing `STABLE' software, was used to analyze the static stability of the site slopes. Various radii's and center points of the circle were automatically selected, and produced factor of safeties in a graphical and tabular format. Worst case scenario values were used in the slope stability analysis in regards to topography, surcharges, water content, and cohesion of the site soils. STABLE software has been repeatedly checked with manual calculations, and consistently proved to be a very conservative program. The following soil properties were used in the analysis, and are based on observed conditions, known geology, and/or published parameters: Top 2 feet of weathered soils • Soil unit weight: 132 pcf • Angle of internal friction: 30 degrees • Cohesion: 100 psf Soils from 2 feet to 12 feet Envirotech Engineering Geotechnical Investigation PO Box 984 page 12 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 • Soil unit weight: 135 pcf • Angle of internal friction: 39 degrees • Cohesion: 400 psf Soils from 12 feet to 20 feet • Soil unit weight: 110 pcf • Angle of internal friction: 34 degrees • Cohesion: 100 psf Soils below 20 feet • Soil unit weight: 130 pcf • Angle of internal friction: 30 degrees • Cohesion: 1000 psf Seismic conditions were estimated utilizing worst case scenario values from the static analysis, a quasi-static analysis coefficient of at least 0.15, and applying the applicable values to STABLE software.' Envirotech Engineering Geotechnical Investigation PO Box 984 page 13 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 Anticipated building loads, building pads or cuts, are not expected to have any detrimental influence on the global stability of the slopes, provided that the setback requirements, drainage and all other recommendations in this report are adhered to. Based on the aforementioned Project criteria, observations, slope stability analysis, and the recommendations in this report, the building locations have an acceptable factor of safety of over 1.5 relative to deep-seated, static slope failures. Furthermore, an acceptable factor of safety of over 1.1 for seismic conditions was also concluded for this Project. See the slope stability information in Appendix D for input parameters and example of outputs. I w F e 1� F' K 1 '�L _ 1Ob508 170 1705064 i La K MEfson i ie +L T6 r \` .1 •) 05548, 1705M 1705042 f7056" r 3ti; i�r9�ice.W 1 ltt}} Project , + TOWN eh Map from Washington State Department of Natural Resources Envirotech Engineering Geotechnical Investigation PO Box 984 page 14 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 r Taen 7owelc - A ,fj3_ c 3 J., .. p' '� a J/`coFMUD l Project r •' y \ 015mPi ore Rocky P inti a u • Scale 1:24,000 3. o s I Wks o 500 IOW IND mcim Map from Washington State Department of Ecology Website The aforementioned slope stability factors of safety are for the planned building sites. This model depicted safe building sites beyond 40 feet from the top of steep descending slopes. Site conditions and the slope stability model concluded unstable descending slopes. Several slope stability analyses were performed for this Project, and one extremely conservative analysis with relation to site topography and soils is presented herein. The topography was modeled based on potential future conditions due to successive shallow slides. This model included moderate slopes of nearly 20%beyond the top, 10% grades beyond the toe, and an 86% slope with a vertical relief of 100 feet. These grades are excessive with relation to probable conditions during the design life of the structures. Soil inputs, as provided above, were based on direct shear testing for the weakest structure, field testing for the upper dense soils, and laboratory testing for the underlying clay layer. Both published soil characteristics and direct correlation of specific soils testing for this Project Envirotech Engineering Geotechnical Investigation PO Box 984 page 15 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 a depiction of the vegetation buffer. 4.4.6 Off-site impacts From a geotechnical position,it is Envirotech's opinion that the adjacent properties to the proposed development should not be significantly impacted as a result of this development if all recommendations in this report are followed. This is based on the expected site development,and the recommendations presented in this report. 4.5 Seismic Considerations and Liquefaction Soils immediately below the expected foundation depth for this Project are generally Type D, corresponding to the International Building Code (IBC) soil profiles. According to the IBC, the regional seismic zone is 3 for this Project. The estimated peak ground acceleration ranges from 0.50g to 0.60g.This estimation is based on the United States Geological Survey (USGS)National Seismic Hazard Project in which there is an estimated 2% probability of exceedance within the next 50 years. There are no known faults beneath this Project. The nearest Class `A' or Class `B' fault to this property is the Tacoma Fault Zone, in which is approximately 2 miles to the south of this Project. This information is based on the USGS Quaternary Fault and Fold Database for the United States. The potential for liquefaction and other earthquake induced hazards are believed to be low for this Project. This is based, in part, on the slope stability analysis utilizing seismic considerations in addition to subsurface conditions such as soil characteristics and the lack of a permanent shallow water table. Subgrade characteristics that particularly contribute to problems caused from liquefaction include submerged, confined, poorly-graded granular soils. Although gravel- and silt-sized soil particles could be problematic, fine and medium grained sands are typically subjected to these types of seismic hazards. No significant saturated sand stratifications are anticipated to be within the upper 50 feet of the subsoil for this Project. Envirotech Engineering Geotechnical Investigation PO Box 984 page 18 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 5.0 CLOSURE Based on the project information and site conditions as presented in this report, it is Envirotech's opinion that additional geotechnical studies are not required to further evaluate this Project. Due to the inherent natural variations of the soil stratification and the nature of the geotechnical subsurface exploration, there is always a possibility that soil conditions encountered during construction are different than those described in this report. Therefore, it is recommended that a qualified engineer observes and documents the construction, or Envirotech is promptly notified if project and subsurface conditions found on-site are not as presented in this report so that we can re-evaluate our recommendations. This report presents geotechnical design guidelines, and is intended only for the owner, or owners' representative, and location of project described herein.This report should not be used to dictate construction procedures or relieve the contractor of his responsibility. Any and all content of this geotechnical report is only valid in conjunction with the compliance of all recommendations provided in this report. Semantics throughout this report such as `shall,' `should' and `recommended' imply that the correlating design and/or specifications must be adhered to in order to protect life and property. Semantics such as `suggested' or `optional' refer that the associated design or specification may or may not be performed. The recommendations provided in this report are valid for the proposed development at the issuance date of this report. Changes to the site other than the expected development, changes to ordinances or regulatory codes, or broadening of accepted geotechnical standards may affect the conclusions and recommendations of this report. The services described in this report were prepared under the responsible charge of Michael Staten, a professional engineer with Envirotech. Michael Staten has appropriate education and experience in the field of geotechnical engineering in order to assess landslide hazards, earthquake hazards, and general soil mechanics. Please contact Michael Staten at 360-275-9374 if you have any questions, comments, or require additional information. Sincerely, Envirotech Engineering S Michael Staten,P.E. Geotechnical Engineer Envirotech Engineering Geotechnical Investigation PO Box 984 page 19 Knudsen Tracts Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 June 12,2008 APPENDIX A SITE PLAN SCALE. 1 INCH a 150 FEET PROPOSED ACCESS ROAD 140 120 200 180 160 SPATE / / ___f� ,� ADD TED 100 BU0. NG \y LOCATION A ION ANTI PATE hD / DULL NG BO BULL NG IPAIEED LOCA ION Th / BUI AD ION II1N LOCATI BUII T/ B13C / SILT FENCE Ld7 8 y LOCH]Wlw ,.. / 60 411 TN io r� Lor 1 qNT� PATED OT 7 �BUO. O "�`"ION OETEN7O]N BASIN LO 9 .v/ /'"-- 102' 213' LOT LOT 4/ POSSIBLE RETENTION/ DETENTION 83 AREA e T W L C I T 4 EXISTING ACCESS ROAD PROJECT/ OWNER/ LOCATION. / ROPOSE KNUDSEN TRACTS T 5 SASIINN f.- 75(-- END GEOTECHNICAL REPORT JACK JOHNSON CONSTRUCTION, LLC pl TEST PIT SHERWOOD CREEWK ROAD, ALLYN MASON COUNTY, WASHINGTON �SLOPES ENGINEER, EXISTING CONTOUR 74 NE HURDTECH ENGINEERING T 3 30, 74 NE HURD ROAD \ f.-#SILT FENCE OR APPROVED BELFAIR, WASHINGTON 98528 EROSION CONTROL 360-275-9374 SITE PLAN APPENDIX B GEOLOGIC MAP PROPOSED ACCESS ROAD SCALES 1 INCH 150 FEET 200 140 120 1B0 160 00 0 ' 1113' 'n TEO AN C PATE / --"''LL 100 BUILD NG ANTI PATE ANTIC PATEB BUIL NGPATE ION ANT7C PATE BUIL NG Tr B D NG IBUIL PATOr LOCH ION 80 BUR NG ON �L CATWN' A N COCA Add T¢2 60 o �, B LC N TI -____-�"'� �40 ��..--��� ✓OY 2 LOT 1 � / VEGSTATION 40F U7L-DINfi SE,T ACK ��Y BE J2EIIUC TO- FFJZ TOP�N.1,O�pE,g"R'1 NOT MORE THAN 15' ANTIC P ED' T 7 "EX ION 40X FEEYAS NECFSSARY BUIL G� "/ -FAR CON TRUCT�IDN'� ROP iy LOT.,S SIN TION LO 9 A PRO IMATE TOP OF 102' ` OPE EXCEEDING-40 71 LOT / 4 APPROXIMATE TOE OF SLOPES P EXCEEDING 40% SEWERS ARE TO BE ETEN % STUBBED INTO DETENTION SOILS, DENSE SILTY LOCAL COMMUNITY B f AREA SAND OVERLYING SYSTEM T HARD SANDY CLAY W 111000 TIO T 4 N EXISTING ACCESS RDA➢ PROJECT/ OWNER/ LOCATION, KNUDSEN TRACTS 5 IROP SE GEOTECHNICAL REPORT gASI Ti LEGEND JACK JOHNSON CONSTRUCTION, LLC 9TpI TEST PIT SHERWOOD CREEWK ROAD, ALLYN MASON COUNTY, WASHINGTON / --(SLOPES ENGINEER, ENVIROTECH ENGINEERING T�3FT J--75- EXISTING CONTOUR 74 NE HURD ROAD 3pp' BELFAIR, WASHINGTON 9852E (I( �� SILT FENCE OR APPROVED 360-275-9374 EROSION CONTROL -1 GEOLOGIC MAP APPENDIX C SOIL INFORMATION VERTICAL AND HOMIR7TAL SCALE, 40 FEET PROPOSED HOUSE I`E 0 20' MED, TO DENSE SILTY SAND (SM) LOW TO MODERATE CEMENTATION 60' 25%+ V >>i BROWN, HARD SANDY CLAY (CL) V GLACIAL TILL PROJECT/ OWNER/ LOCATION. KNUDSEN TRACTS GE❑TECHNICAL REPORT JACK JUHNS13N CONSTRUCTION,LLC SHERWOOD CREEWK ROAD, ALLYN MASON COUNTY, WASFUNGT13N NOTES. ENGINEER 1) GRADE CHANGES WILL BE COMPLETED PER THE STCIRMWATER ENVIROTECH ENGINEERING MANAGEMENT PLAN AS EXPLAINED IN THE GEOTECHNICAL REPORT. SECTION A-A 74 NE HURD ROAD 2)THE SOIL PROFILE IS ACCURATE FOR THE DEPTH OF BELFAIR, WASHINGTON 98528 THE OBSERVED TEST PITS AT THE SPECIFIED LOCATIONS, 360-275-9374 LOWER DEPTHS ARE BASED ON SITE GEOLOGY, WELL LOG(S), AND/OR EXPERIENCE IN THE GENERAL AREA. S❑IL PROFILE TEST PIT LOG TEST PIT NUMBER TP-1 PROJECT: Geotechnical Report DATE OF LOG: 05/16/2008 PROJECT NO: 0857 LOGGED BY: MCS CLIENT:J.Johnson Construction, Inc EXCAVATOR: Thomas Sharpe LOCATION: Parcel 122203300210, 122292200320,122203390221, DRILL RIG: Deere 160 LC backhoe 122203390222,122203390223,&122203390224 ELEVATION: N/A Mason County,Washington INITIAL DEPTH OF WATER: N/A FINAL DEPTH OF WATER: N/A SOIL STRATA, STANDARD PENETRATION TEST DEPTH SAMPLERS USCS DESCRIPTION LL PI CURVE AND TEST DATA DEPTH N 10 30 50 0 .......... ......................._...... SM Brown,moist SILTY SAND with GRAVEL,loose to medium dense.Gravel _ is coarse.Sand is fine.Low plasticity. 2 Dense to very dense,brown and gray Low to modeately cemented,trace of gravel 4 Increasing coarse gravel 6 Occasional cobble 8 10 12 14 LLILB Excavation terminated at approximately 16 15.0 feet 18 20 No Groundwater Encountered ENVIROTECH ENGINEERING This information pertains only to this boring and should not be Geotechnical Engineering interpreted as being indicitive of the entire site. TEST PIT LOG TEST PIT NUMBER TP-2 PROJECT: Geotechnical Report DATE OF LOG: 05/16/2008 PROJECT NO: 0857 LOGGED BY: MCS CLIENT: J.Johnson Construction, Inc EXCAVATOR: Thomas Sharp LOCATION: Parcel 122203300210, 122292200320, 122203390221, DRILL RIG: Deere 160LC backhoe 122203390222,122203390223,&122203390224 ELEVATION: N/A Mason County,Washington INITIAL DEPTH OF WATER: N/A FINAL DEPTH OF WATER: N/A SOIL STRATA, STANDARD PENETRATION TEST DEPTH SAMPLERS USCS DESCRIPTION LL PI CURVE AND TEST DATA DEPTH N 10 30 50 0 ... ........ SM Brown,moist SILTY SAND with ' GRAVEL,loose to medium dense.Gravel _ is coarse.Sand is fine.Low plasticity. 2 Dense,brown and gray,patches of low to medium plasticity,occasional cobble or boulder 4 Dense to very dense,brown and gray, low to moderate cementation 6 8 10 12 Medium dense to dense,increasing fine sand,trace of gravels 14 " Increasing densty,increasing coarse oravel Excavation terminated at approximately 16 15.0 feet 18 20 No Groundwater Encountered ENVIROTECH ENGINEERING This information pertains only to this boring and shouldnot be Geotechnical Engineering interpreted as being indicitive of the entire site. SOIL LOG TEST PIT NUMBER TP-3 PROJECT: Geotechnical Report DATE OF LOG: 05/16/2008 PROJECT NO: 0857 LOGGED BY: MCS CLIENT:J.Johnson Construction, Inc EXCAVATOR: N/A LOCATION: Parcel 122203300210, 122292200320,122203390221, DRILL RIG: None 122203390222, 122203390223,&122203390224 ELEVATION: N/A Mason County,Washington INITIAL DEPTH OF WATER: N/A FINAL DEPTH OF WATER: N/A SOIL STRATA, STANDARD PENETRATION TEST DEPTH SAMPLERS USCS DESCRIPTION LL PI CURVE AND TEST DATA DEPTH N 10 30 50 p ....................................... SM Brown and gray,moist SILTY SAND with GRAVEL,loose to medium dense 4 - - Dense 8 12 16 20 Sandy,clay pocket 24 28 32 Hardpan 36 Excavation terminated at approximately 35.0 feet 40 No Groundwater Encountered ENVIROTECH ENGINEERING This information pertains only to this boring and should not be Geotechnical Engineering interpreted as being indicative of the entire site. SOIL LOG TEST PIT NUMBER TP-4 PROJECT: Geotechnical Report DATE OF LOG: 05/16/2008 PROJECT NO: 0857 LOGGED BY: MCS CLIENT: J.Johnson Construction, Inc EXCAVATOR: N/A LOCATION: Parcel 122203300210, 122292200320,122203390221, DRILL RIG: None 122203390222, 122203390223,&122203390224 ELEVATION: N/A Mason County,Washington INITIAL DEPTH OF WATER: N/A FINAL DEPTH OF WATER: N/A SOIL STRATA, STANDARD PENETRATION TEST DEPTH SAMPLERS USCS DESCRIPTION LL PI CURVE AND TEST DATA DEPTH N 10 30 50 0 ...._.................._....._.._.. SM Brown,moist SILTY SAND with GRAVEL,loose to medium dense.Gravel is coarse.Sand is fine.Low plasticity. 2 4 6 8 CL Brown,hard,low moisture,SANDY LEAN CLAY.Medium plasticity 10 Excavation terminated at approximately 10.5 feet 12 14 16 18 20 No Groundwater Encountered ENVIROTECH ENGINEERING This information pertains only to this boring and should not be Geotechnical Engineering interpreted as being indicitive of the entire site. SOIL LOG TEST PIT NUMBER TP-5 PROJECT: Geotechnical Report DATE OF LOG: 05/16/2008 PROJECT NO: 0857 LOGGED BY: MCS CLIENT:J.Johnson Construction, Inc EXCAVATOR: N/A LOCATION: Parcel 122203300210, 122292200320,122203390221, DRILL RIG: N/A 122203390222,122203390223,&122203390224 ELEVATION: N/A Mason County,Washington INITIAL DEPTH OF WATER: N/A FINAL DEPTH OF WATER: N/A SOIL STRATA, STANDARD PENETRATION TEST DEPTH SAMPLERS USCS DESCRIPTION LL PI CURVE AND TEST DATA DEPTH N 10 30 50 p .. .......................................... SM Brown,moist SILTY SAND with GRAVEL,loose to medium dense.Gravel Is mostly coarse.Sand is fine and 2 medium.Low plasticity. Dense to very dense,brownish gray, hardpan 4 6 8 10 12 14 16 Excavation terminated at approximately 16.0 feet 18 20 No Groundwater Encountered ENVIROTECH ENGINEERING This information pertains only to this boring and should not be Geotechnlcal Engineering interpreted as being indiciave of the entire site. y+ 6. J - RR y WATER.WELL-REPORT No ice of Intent N0. w 190101 �- Ortgiesl Qr l'toPY-Eeniop,2'troW-owner.3ie catty-d,'aer' - E -Unique Ecology Well ID Tag No. Air_ 421 3), Construction/Dtecommissi.f"I"in circle) a -;O Construction Water Right Permit No. A O becommission-ORIGINAL-INSTALLA TION Notice property OWOer Name Jack Johnson C "7 of latent Number .Well Street Address Sbal � Creek Rd_ a4 S-I PROPOSEDUSE: Domestic ❑ Industrial 0 Municipal. City Allyn County Mason - ❑Dewater ❑lirigation' ❑Ten Wei . 0 Other p 'I'YPB,OFWORK: Owner's number of well(if more thanoie) Location�U4-1/4SN 114 Sec2l) Twn�R�yj wM EwM rime w N3 Newwdl 0 Reconditioned _ Method:❑Dug- 0 Bored ❑Di - Lat/Lon eg 0 Deepened ❑[Came ❑-Rosary.. ❑lotted 8 Cs;t r Lat D Lat Min/Sec V DIMENSIONS:Diamaerorwep r,_btcbes,drined 1 Rn A:- - Still REQUIRED) Long Deg Long Min/Sec ' Depth of completed well 180 R CONSTRUCTION DETAQS Tax Parcel No. 1 2220-33-0021 0 yCuing 7(r1 Welded 6 Dim.from+_Rto 175 R . Immlled:. ❑Lines installed Dian fiom. R to ft..• CONSTRUCTION OR DECOMMISSION PROCEDURE 17 Threaded Diem from R.to .R . _ Perforations: CI Yes M No- - 'nature Describe by color,character,er,size of material end note urc,rmy and the kind end - nettue atihe materiel in each nraltrm penetrated;with at least one entry for each change of �• Type ofptrforatorused information. USE ADDITIONAL SHEETS IF NECESSARY. L7 _ SIZE nrperfs In.by •in.and no.ofperfs_(rom ft to_R MATERIAL FROM TO -.-Screens: )3 Yes ❑No fq K-Pete Location '( •2 Manuficraw's time.. Johnson Type eta i nl sac Model No. Diem. 5 Slotsize . 49 flour 175 ftto- 180 IL To -soil 0 2 Diam. $lot size farm R to R G—diFit er packed:0 Yes ❑No. ❑Size of gmv Vserd - Materials placed from R to Surraci Seal•Ik Yes O No To what,depth? 18 A Material used in"' Fk-i ti iP 6. 4 Did arty strata contain unusable woe Yes MNo 80 150 bType of water? Depth of strata . a Methodorscalingstrwoff Saul &Gravel with water 150 180 PUMP:Manuhrnuer's Name r—•IAG . Type. -etch HP. 3 WATER LEVELS;Land-surface devation&bow:mean sea]wet A static level ` 83 5 R.Wow wp ofweE Date' 0 Artesian pressure lbs.per square lack,Date Artesian water is mrumlled by ' vat etc. _ M, WELL TESTS:Drawdown is serum water level is lowered below static level Was a pump test made?❑Yes 33 No If ycs,by.~ Yield:__:__ - aelJmin.with R dnwdown dkr lint. - Yield: Awfain.with A.drawdown after hrs - V Yield: ua Anmr with A.drawdown after M. ., 'Rrc3.ydotS hl++e rdfvr m:ertr when pwnp omedogJ:lwarerleve/miatirrdJ m wed(: - . top to worry 1,W# Time Water Level Tins: Water LeW Time Water Lad C - - V Date of tat CL Bailatest_2D_gallmiawith. .-7n fl.drawdown after__J _hm C Airtest gallmia with stem set at R for his. Artesian flow a.p.m.Monte Temperature of water_Was a chemical analysis mode? 0 Yes)n No- startmte 8/25/05 Completed Date 10/16/05 WELL CONSTRUCTION CERTIFICATION: I constructed and/oraccept responsibility for construction of this well,and its compliance with all Washington well construction standards. Materials used and the information reported above are true to my best knowledge and belief. MDriller D Engineer 0 Treim Name(Prim)+�'I} Drilling Company tV+vi a rlri 1 1 i ng D.iiaiFatginealrec—sigruture n--(`t a 1 Address '1dn IVR rbavic Farm R13 Drillsatrainee Lieerusc No. 797 _ ..City,State,Zip-Hplfai re rJD 9RS7R If 17tAtNEE, Contractor's _ Drinlcr's ucemed No. - Reginration No.DAVISDI1 I OOA Date Ck'+ n5 Driller'&Sigeahn Ecology is an Equal Opportunity Employer ECY-050.1-20(Ref'3ro5) The Department of Ecology-does NOT warranty the Data and/or Information-an this Well Report APPENDIX D SLOPE STABILITY STABLE Slope Stability Analysis System Envirotech Engineering Project : Knudsen Tracts Data£le: final static Bishop STABLE Version 9.03.00n Bishop +aa..•aa+.a+.++aa.+a.aa.++a+.+.a++r.+rraa.a+.a+a++r..++.+a TITLE final static UNITS (Metric/Imperial) _ GEOMETRY DEFINITION POINTS NO. X Y 1 0.000 0.000 50.000 5.001 3 166.000 105.000 4 266.000 123.000 5 26.600 :.6E0 6 37.800 3.780 7 49.000 4.900 8 E0.200 13.790 9 71.40023.450 10 $:.E00 33.100 11 93.800 42.760 __ 105.000 5:.410 13 116.200 62.070 14 127.400 71.720 15 138.600 81.380 16 149.800 91.030 17 1E1.000 100.690 18 17:.200 10E.120 19 163.400 108.130 20 194.E00 110.150 :1 205.800 112.160 _- 2_17.000 114.180 23 226.200 116.200 25 0.000 -^_.000 :6 50.000 3.000 27 166.000 103.000 :8 :66.000 121.000 :9 0.000 -14.000 30 50.000 -9.000 31 166.000 91.000 3: 266.000 109.000 33 0.000 -:0.000 34 50.000 -15.000 35 166.000 85.000 36 2-66.000 103.000 37 206.000 112.200 38 :06.000 110.:00 LINES Lo X Hi X SOIL 1 _ 1 3 1 STABLE02002 MZ Associates Ltd Printed on: 1110608 15:38:36 Page- STABLE Slope Stability Analysis System Envirotech Engineering Project Knudsen Tracts Datafile: final static Bishop 3 3% 37 4 1 27 38 _ 38 =8 =5 30 3 30 31 3 31 3'_ 3 33 34 5 34 35 5 35 36 5 +aar•++.a.rr.ar.a•aa.a..+.++a.ar+a+..a.aa+aa.r+ra aaa.+a.aa SOILS SOIL NAME LINETYPE-FEN COHESION FRICTION UNIT WT. 1 Soil-1 CONTINUOUS-BLP.CK 100.00 30.0 132.000 - Soil-2 CONTINUOUS-BLUE 400.00 35.0 135.000 3 Soil-3 CONTINUOUS-BROWN 100.00 34.0 110.000 5 Soil-5 CONTINUOUS-CYAN 1000.00 30.0 130.000 6 Soil—6 CONTINUOUS-GRAY 0.00 0.0 0.000 POPE PRESSURE SPECIFICATION SOIL PIEZO P.0 EXCESS Y/N/P Value Value l N 0.000 0.000 N 0.000 0.000 3 N 0.000 0.000 5 N 0.000 0.000 6 N 0.000 0.000 PIEZOMETRIC SURFACE POINT POINT POPE PRESSURES POINT PRESSURE .aa.a..♦a.aa.aa.aaa..«a....:.a.a.aa.a+aaa...+aaa+++aa++.a. SLIP DIRECTION (+/- X) - ..r+a..«+.a•a.a.+...aaa.:•......•...a....a.a.....ar+..a.aa SLIP-CIRCLES MANUAL Circle Centre Grid Extremities 335.800 STABLEp2002 MZ Associates Ltd Printed on: 11/06/08 @ 15:38:36 Page: 2 APPENDIX E EROSION CONTROL GE17TEXTILE FABRIC 2'x2' WOOD POST(TYP) GEOTEXTILE FABRIC WRAP AROUND TRENCH OR EQUIVALENT OR BETTER AND WIRE MESH TO AT LEAST ENTIRE 2 6 FT MAX.O.C. BOTTOM PLACING TRENCH r o.5 E7 BEFORE PLACING GRAVEL I- 6 FT I—j+- 2'x2'x5' WOOD POST OR 12' DEEP, 8' WIDE TRENCH EQUIVALENT OR BETTER EXISTING FILLED WITH 3/4' TO 1 1/Z'� GROUND SURFACE WASHED GRAVEL 2 DIRECTION OF 12 DEEP,8'VIBE WAS FLOW EXISTING GROUND SURFACE TRENCH FILLED WITH iTkT i2• 3/4' TO 1 1/2, j 2S FT WASHED GRAVEL OWT13M EXTENTS Or GEOTEXTTLE FABRIC SILT FENCF—DETAIL SILT FENCE -CROSS SECTIIIN N.T.S. N,T.S. PERMANENT EROSION CONTROL NOTES. GENERAL NOTES, SOD PLACEMENT L SHOULD THE TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHOWN ON L SOD FOR GRASS SWALES SHALL BE MACHINE CUT AT A THESE PLANS PROVE TO BE INADEQUATE DURING CONSTRUCTION, THE CONTRACT13R 3/4—INCH UNIFORM THICKNESS AT THE TIME 13F CURING. SHALL INSTALL AD➢ITIONAL EROSION AND SEDIMENT CONTROL FACILITIES MEASUREMENTS FOR THICKNESS SHALL EXCLUDE TOP GROWTH AND 2.ALL EROSION AND SEDIMENT CONTROL FACILITIES AND DEVICES SHALL BE THATCH INSPECTED DAILY AND IMMEDIATELY MAINTAINED, IF NECESSARY. 2,STANDARD SIZE SECTIONS OF SOD FOR GRASS SWALES SHALL 3.ALL EROSION AND SEDIMENT CONTROL FACILITIES AND DEVICES SHALL BE LEFT IN BE STRONG ENOUGH TO SUPPORT THEIR OWN WEIGHT AND RETAIN PLACE UNTIL THE UPSLOPE AREAS HAVE BEEN PERMANENTLY STABILIZED, THEIR SIZE AND SHAPE WHEN SUSPENDED BY THE END IF A 3 FOOTEMPORARY EROSION CONTROL NOTES. 3,S SECTION. 3,SOD FOR GRASS SWALES SHALL NOT HE HARVESTED DR FOR ALL AREAS WHICH HAVE BEEN STRIPPED O VEGETATION F VTATION OR EXPERIENCED LAND TRANSPLANTED WHEN EXCESSIVELY DRY WET MOISTURE CONTENT MAY ADVERSELY AFFECT ITS SURR VIVAL. DISTURBING ACTIVITIES, AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A 4, SOD FOR GRASS SWALES SHALL HE HARVESTED, DELIVERED PERIOD EXCEEDING THE LISTED CRITERIA BELOW,ALL DISTURBED AREAS MUST BE AND PLACED WITHIN A PERIOD OF 36 HOURS. IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR. GRASS SEEDING SEEDING FOR RAW SLOPES ALONE WILL ONLY BE ACCEPTABLE DURING THE MONTHS OF APRIL THROUGH SEPTEMBER. HOWEVER, SEEDING MAY PROCEED WHENEVER IT IS IN THE INTEREST OF L BEFORE SEEDING,INSTALL NEEDED SURFACE RUNOFF CONTROL THE OWNER/CONTRACTOR, BUT MUST ALSO BE AUGMENTED WITH MULCHING,NETTING MEASURES SUCH AS GRADIENT TERRACES,INTERCEPTOR DIKES, OR OTHER APPROVED TREATMENT. SWALES,LEVEL SPREADERS AND SEDIMENT BASINS. 2. THE SEED BED SHALL BE FIRM WITH FAIRLY FINE SURFACE, DRY SEASON (MAY 1 THRU SEPTEMBER 30) — THE CLEARING IF LAND, INCLUDING THE FOLLOWING SURFACE ROUGHENING.PERFORM ALL OPERATIONS REMOVAL OF EXISTING VEGETATION OR OTHER GROUND COVER, MUST BE LIMITED TO ACCROSS OR PERPENDICULAR TO THE SLOPE. ONLY AS MUCH LAND AS CAN RECEIVE APPROPRIATE PROTECTIVE COVER OR BE 3,SEEDING RECOMMENDATIONS, AS SHOWN BELOW, AND SHOULD BE OTHERWISE STABILIZED,AFTER HAVING BEEN CLEARED OR OTHERWISE DISTURBED , APPLIED AT THE RATE OF 120 POUNDS PER ACRE, BY NO LATER THAN SEPTEMBER 30 OF A GIVEN YEAR.UNLESS IMMEDIATE 4. SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 31 WILL STABILIZATION IS SPECIFIED IN THE EROSION AND SEDIMENT CONTROL PLAN, ALL REQUIRE IRRIGATION AND OTHER MAINTENANCE AS NECESSARY TO AREAS CLEARED OR OTHERWISE DISTURBED MUST BE APPROPRIATELY STABILIZED FOSTER AND PROTECT THE RLBIT STRUCTURE. THROUGH THE USE 13F MULCHING, NETTING,PLASTIC SHEETING,EROSION BLANKETS, 5.SEED BEDS PLANTED BETWEEN NOVEMBER 1 AND APRIL 30, FREE DRAINING MATERIAL, ETC., BY SEPTEMBER 30 OR SOONER PER THE APPROVED ARMORING OF THE SEED BED WILL BE NECESSARY,(e.g.. PLAN 13F ACTION UNLESS OTHERWISE APPROVED BY THE COUNTY, SEEDING, GEOTEXTOLES, JUTE MAT, CLEAR PLASTIC COVERING). FERTILIZING AND MULCHING OF CLEARED OR OTHERWISE DISTURBED AREAS SHALL BE 6.FERTILIZERS ARE T13 BE USED ACCORDING TO SUPPLIERS' PERFORMED DURING THE FOLLOWING PERIO3DS, MARCH 1 TO MAY 15, AND AUGUST 15 TO RECOMMENDATIONS AMOUNTS SHOULD BE MINIMIZED, ESPECIALLY OCTOBER 1. SEEDING AFTER 13CMBER 1 WILL BE DONE WHEN PHYSICAL COMPLETION ADJACENT TO WATER BODIES AND WETLANDS. OF THE PROJECT IS IMMINENT AND THE ENVIRONENTAL CONDITIONS ARE CONDUCIVE 7O SATISFACTORY GROWTH.IN THE EVENT THAT PERANENT STABILIZATION IS NOT USE THE FOLLOWING RECOMMENDED SEED MIXTURE FOR EROSION POSSIBLE, AN ALTERNATIVE METHOD OF GROUND COVER,SUCH AS MULCHING, NETTING, CONTROL,OR A COUNTY APPROVED ALTERNATE SEED MIXTURE PLASTIC SHEETING,EROSION BLANKETS, ETC.,MUST BE INSTALLED BY NO LATER THAN SEPTEMBER 30. PROPORTIONS PURITY IN THE EVENT THAT CONSTRUCTION ACTIVITIES OR OTHER SITE DEVELOPMENT GERMINATION NAME BY WEIGHT(X) (%) ACTIVITIES ARE DISCONTINUED FOR AT LEAST a CONSECUTIVE DAYS,THE (y) OWNER/CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSPECTION 13F ALL EROSION AND SEDIMENT CONTROL FACILITIES IMMEDIATELY AFTER STORM EVENTS,AND AT REDTOP (AGROSTIS ALBA) 10 92 LEAST ONCE EVERY WEEK. THE OWNER/CONTRACTOR SHALL BE RESPONSIBLE FOR 90 THE MAINTENANCE AND REPAIR OF ALL EROSION AN SEDIMENT CDNTR0.FACILITIES. ANNUAL RYE(LDLIUM MULTIFLORUM) 40 98 90 WET SEASON (OCTOBER 1 THRU APRIL 30)—13N SITES WHERE UNINTERUPTED CHEWING FESUE 40 97 CONSTRUCTION ACTIVITY IS IN PROGRESS, THE CLEARING OF LAND, INCLUDING THE 80 REMOVAL OF EXISTING VEGETATION AND OTHER GROUND COVER, SHALL BE LIMITED (FESTUCA RUBRA COMMUTATA) TO AS MUCH LAND AREA AS CAN BE COVERED OR STABILIZED WITHIN 24 HOURS IN (JAMESTOWN, BANNER, SHADOW, KOKE1) THE EVENT A MAJOR STORM IS PREDICTED AND/OR EROSION AND SEDIMENT WHITE DUTCH CLOVER 30 96 TRANSPORT OFF—SITE IS OBSERVED. 90 ALL CLEARED OR DISTURBED AREAS SHALL RECEIVE APPROPRIATE PROTECTIVE (TRIFOLIUM REPENS) COVER OR BE OTHERWISE STABILIZED,SUCH AS MULCHING, NETTING,PLASTIC MULCHING SHEETING, EROSION BLANKETS,FREE DRAINING MATERIAL, ETC., WITHIN 5 DAYS AFTER HAVING BEEN CLEARED IR OTHERWISE DISTURBED IF NOT BEING ACTIVELY WORKED. L MATERIALS USED FOR MULCHING ARE RECOMMENDED TO BE WDOD SILT FENCING, SEDIMENT TRAPS, SEDIMENT PONDS,ETC.,WILL NOT BE VIEWED AS FIBER CELLULOSE,AND SHOULD BE APPLIED AT A RATE OF 1000 ADEQUATE COVER IN AND ON THEMSELVES.IN THE EVENT THAT ANY LAND AREA NOT POUNDS PER ACRE. BEING ACTIVELY WORKED REMAINS UNPROTECTED OR HAS NOT BEEN APPROPRIATELY 2.MULCH SHOULD BE APPLIED IN ALL AREAS WITH EXPOSED STABILIZED 5 DAYS AFTER HAVING BEEN CLEARED,ALL CONSTRUCTION ACTIVITY ON SLOPES GREATER THAN 2.1 (HORIZONTAL-VERTICAL). THE SITE, EXCEPT FOR APPROVED EROSION AND SEDIMENT CONTROL ACTIVITY, SHALL 3,MULCHING SHOULD BE USED IMMEDIATELY AFTER SEEDING OR IN IMMEDIATELY CEASE UNTIL SUCH A TIME AS AFOREMENTIONED LAND AREA HAS BEEN AREAS WHICH CANNOT BE SEEDED BECAUSE OF THE SEASON,ALL APPROPRIATELY PROTECTED OR STABILIZED, AREAS REQUIRING MULCH SHALL BE COVERED BY N13VEMBER L SILT FENCE PROJECT/ OWNER/ LOCATION: 1. GEOTEXTILE FILTER FABRIC TYPE SHALL BE PER SPECIFIED IN THE 'STORMWATER MANAGEMENT MANUAL KNUDSEN TRACTS FOR THE PUGET SOUND BASIN,' OR APPLICABLE COUNTY STANDARDS S GEOTEXTILE FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL CUT TO THE LENGTH IF GE❑TECHNICAL REPORT EACH BARRIER TO AVOID USE OF JOINTS,IF JOINTS ARE NECESSARY,FILTER FABRIC SHALL BE SPLICED JACK JOHNSON CONSTRUCTION,LLL TOGETHER ONLY AT A SUPPORT POST WITH A MINIMUM 6—INCH OVERLAP AND SECURELY FASTENED AT JACK OH CREEWK ROAD,ALLYN BOTH ENDS TO THE POST. SHER COUNTY, WK ROAD, A 3. STANDARD FILTER FABRIC SHALL BE FASTENED USING V STAPLES OR TIE WIRES CHOG RINGS)2 4 IN SPACING, 4.POSTS SHALL BE SPACED AND PLACED AT DEPTHS INDICATED IN THE DETAILS ON THIS SHEET, AND ENGINEER: DRIVEN SECURELY INTO THE GROUND. ENVIROTECH ENGINEERING 5. WIRE MESH SHALL BE 2*X2'X14 GAUGE OR EQUIVILENT.THE WIRE MESH MAY BE ELIMINATED IF 74 NE HURD ROAD EXTRA—STRENGTH FILTER FABRIC (MONOFILAMENT),AND CLOSER POST SPACING IS USED. BELFAIR, WASHINGTON 98528 6.A TRENCH SHALL BE EXCAVATED ACCORDING TO THE DETAILS ON THIS SHEET ALONG THE LINE OF THE 360-275-9374 OM THE SILT FENCE. — 7.STS SILTAND FENCES S14ALL LRBE LOCATED DOWNSLOPE FROM THE CLEARING LIMITS OF THE PROJECT. EROSION CONTROL APPENDIX F DRAINAGE DETAILS STEEL CLAMPS(TYP) CORRUGATED TIGHTLINE 10 FT MIN�—IEVEI 1/2 INCH DIAMETER 6-INCH MIN, DIAMETER SECURELY FASTENED TO PIPE 8-12 INCH QUARRY SPALL OR SECTION APPROVED ENERGY DISSIPAT13R / 1 TWO 3-FO13T o°opo°o°o°000°o ANCHORS CTYP), O�O0O�O�Op0000 1 FT MIN. #4 REBAR OR opo0opopopopo EQUIVALENT 3 FT MIN GEOTEXTILE FABRIC TIGHTLINE DETAILS - OPTION 1 N.T.S. FINAL GROUND SURFACE GEIITEXTILE FABRIC WRAPPED AROUND QUARRY SPALL CORRUGATED TIGHTLINE 8-12 INCH QUARRY SPALL OR 6-INCH MIN. DIAMETER APPROVED INFILTRATION MEDIA o00 o 000000000000 1 FT MIN OOp-0O0-Oappppo SUBSURFACE DRAINAGE DETAILS - IWTOON 2 N.T.S. NOTESINF PROJECT/ OWNER/ LOCATION- THE I 100YR 24HR STORM EEVLTRATION FACILITY 13RENT.T PONDS SHALL <E SIZED FOR KNUDSEN TRACTS GEOTECHNICAL REPORT JACK JOHNS13N CONSTRUCTION, LLC SHERWI30D CREEWK ROAD, ALLYN MASON COUNTY, WASHINGTON ENGIEER- ENVIROTECH ENGINEERING 74 NE HURD ROAD BELFAIR, WASHINGTON 98528 360-275-9374 DRAINAGE DETAILS 1. * II I�1'13- 0 FINISHED FLOOR: APPROX. MINIMUM w/NO BASEMENT -,A\ RIDGE �1,100 LF 2' R-/ �"�� �' '-r I I - Rp HDPE FORCE MAIN �:' -a----% 'GRINDER PUMP-PLASTIC, __ FIN, FIR. �� _� ��i : ^�_�- LATERAL ASSEMBLY I'j1 1 C i Fill F It AIR MUSE STATION! X ((DETAIL 7)&VALVE BOX FIN, FLR, i TTP! ,^ i ICAL 6 L015 1 A200 !E� hJ AT CREST OF NLLL 7- - - FIN. FLR. � xf96 _ - ,,✓ , .r �1 w - Arl 11S0 TERMINATION FLUSHING- �• r—_ rr,,..f a!'+� -,4l E r�/}r Ze_ 1L F A..� .:J.'- CONNECTION �.'�*`. --- ',F� r.1,wB . � -Q�;, Lf -• ,�. !` � .(�' FIH FLR ,,, 2194 BISNLL FORS WAIN OWN NBEVE 1 c..-'��T�n^-�-,� ,A •�J ,�, �t I R Y�;'- ���R3,��, , - 1 �E;•�.= _ �.�� L -_ -� ^ma's o, s T•7 E ,�• f ------ �, / — c SHERWOOD CREEK ROAD.EL` —~ GENERAL NOTES: - J C _ 1 �Sr 'Vj - 1,rCTIN WW(HK SN41L BE IN ACCORDANCE `� WITH THE LATEST EDITION OF THE WASJHINGM `AR ' S l ,� -C� _•�/ l��/.r ' J I, _ TRANSPORTATIONSTA!S D'STAROAAD OF ; TAP OR EQUVALENT CONNECT TO EXISTING 7 HOPE- _ ' SPECIFICATIONS wR Rao,BAfOOE,Axo - t i 1JJ FORCE MAIN w/SADDLE TAP: - MUNICIPAL CONSTRUCTION'(NSfMIT SPEC,) I i i i i j 1 �/ ROMAC'306-H'3'x2'SADDLE AND THE REQUIREMENTS OR MASON CONTY k .�. ` i r/ UTILITIES B WASTE HINAGEM[NT DIVISION. a THREADED 2'CONNEC110N Qi ^� 1.ALL EXISTING IAIOERCAOIND FITtI[t[ES rely` I i !i'+S,'' -i i1'i•i;_LL \. \,�).. / i SHALTBE FIELD LOCATED PRIOR TO lD� r`, ! -s'S •"'E R 1 T,R 1 , i _ -61,- ' CONSTRUCTION. PHONE NUIPIA FOR UTILITY L` / .>•. R.A N , r r.`«,�: } LOCATES:1-BBB-4I4•SSSS Or$11, N:E I :BJE/"` r N 1•,. ' '-': R t 7 /4 3.THE CONTRACTORIONER SMALL VERIFY NWI WE ALL PROPERTY LINES E CONFIRM ALL WAX �, 1,/�' •r N - �, 1 'N �"'� _ '� utii -�• ,y �, IS WITHIN LEGALLY ACCESSIBLE AREAS. NO s g y�`*1 'i``'�(,; ty+F� .ti- - i'%- r 1!'L'F�; 4; I ,' 1 •"k.✓ -t,,, iNNROACHMt BEYOND THE PARBy CEL PROPERT9ZED ' F y�r L 1 i �+. ' I _ '1{ _ +CND+•)_. ER F i A Ni 0. T• •WAES IS AUTHORI Y ALLOWED ' 1 , , BY PERMITS. § r I _ FF EE rs.� r-<1R ')'` ,� �.. 1 i iE t�,1 j T !.r '' •f - i 1 ~1 l WIIII INFORMATIONAL 4.AERIAL TO IS PUAPoSESORIYO,R AND SHALL 4 In l r l{;,.' V''. I- ' 7 E'' r pope NOT BE SCALED FROM.OR INTERPRETED FOR 11.E�L LI 1 ' - --- I --------_--- visited 41 PROPERTY SEW FROM BONaIIE S. �—T t•r A SEVER PERMIT FROG COMMENCING COUNiv IS >'"".^�v N/M,W i- `r' �, ♦ '�.`.. E, � _.S 1 LL\SS\`L�S I .,, 1•.1r' r _--�. --- REQU[Af0 PRIOR TO COMMENCINGTNF HOAR. z �z S L I .1SL i R� N R A• t `',LL\`♦ 1 ` II °� __ 1�L 6.REQUEST INSPECTION IRON MASON COUNTY —J ' I '.., -EI ,R f lIOAO• _ ,LYV YV; A' �¢,AOC'EA / 1{/ NATINAASTEWATER UTILITIES MANAGERQ- p PRIOR TO BURIAL. I-�r 1�. i 1 I r- / ' I + L 1 . 7.RECORD DRAWINGS AND CERTIFICATION BY i I- C. R` THE PROJECT ENGINEER ARE REQUIRED AT 3 ;' ' , -� p 'T .R PROJECT COMPLETION. V) (}(� ti uaE NOTI: SCAIL't SO ^ IaR 6 T'ST'R�i 11r SMONN IS FROM MWLIC LIOVI SASE HRP NOTE' •O 101 i FRfS,CONTOURS NC%I DISTON71D TH B IS ASSfMhEO FROM 0 50 7M 1'YD BIINIO CLlARTO AREAS I TIINENED AAEAS. PRISM(RECORDS. THE ONFR CORAACTpIORNER TO FIELD VERIFY ALL CONTRACTOR SMALL VERIFY PROPERTY GRAPHIC SCALE(In fea L) ELEVATION CONTROL. y GRA LINES BEFORE CdNENCINO THE WORK. v 1.w1w..,m lnor+r.0 t-w $.a �kn flflN1bM(s» osaag>estsaxasss�&sisse-ss�e� an � Aas. 1 s S . 2.01. MM `� S g rOt t8 102E 15 12)It 1 IXY y 1\1 `� In I S.gYg N1p } 1 1LLX �, xa» I 1{L9 i 1>4v 1 ra x g 1anu i E 11 is m cut v� a; I+ is 1 �i g a2ii" g I I t I RLY f I �2w.at p c I �M ��3Yn II INS 6 Y 11 $;;% I ga€ wx gB $ IY Yg tYu lieF(c ;. ��s�a>s>sasazaagsxl'sas'ss�as�o� SEWER PROFILE .1+e.1w°41 xn^1-_ n.2+s, """ a..o.. wm oananl nN •NEN ENGINEEING wm ra.ru.roc JAG% H NSON SEVER FORCE MAN Po BOX1119uUKWEEp Qf2 • E RUSSETT RIDGE RCAD ">.m++. plM k Ks BElFAUt,WA 98528 n.e..mrr wMwm1 t+so