Loading...
HomeMy WebLinkAboutAddendum Bus Barn/Gymnasium - COM Engineering / Geo-Tech Reports - 2/24/2005 "Committed To Excellence" � HOOD CANAL SCHOOL DISTRICT NO. 404 111 North Highway 106 • Shelton, WA 98584 (360) 877-9700 • FAX (360) 877-5144 ADDENDUM MEMO TO: Agencies with Jurisdiction and Interested Recipients FROM: Hood Canal School District #404 RE: Modernization and New Construction to Hood Canal School, Maintenance/Bus Facility and Gym Located at 111 N. Hwy 106, Shelton, WA 98584 DATE: February 24, 2005 On February 18, 2005 Hood Canal School District as Lead Agency issued a "DNS" for the above project. Please substitute pages of the environmental package sent to you: • Replace Page 10, revised and signed. • Replace revised attachment for description of project. Should you have any question please contact Gary A. Larson at (360) 491-7591 or Ron Zier at (360) 877-9700. Sincerely, w1e, &-' Ron Zier Superintendent RZ:jl Cc: GALCo Engineering, Project Manager Erickson - McGovern, Project Architect I An Equal Opportunity Employer I •TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY e. Will the project use (or occur in the immediate vicinity of)water, rail, or air transportation? If so, generally describe. No. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. No change from existing conditions. g. Proposed measures to reduce or control transportation impacts, if any: None anticipated. 15. Public services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. No, existing manpower and equipment should be capable of responding. b. Proposed measures to reduce or control direct impacts on public services, if any. Proposed school will have automatic fire sprinklers reducing impacts on fire district. 16. Utilities a_fircle utilities currently av at the sit : electricit , natural gas,Ovate refuse service, telephone, sanitary sewer(septic syste othe . Heating and fuel oil. Connection to Skokomish Tribe water system is being considered for fire protection. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Electrical: Mason County PUD#1 Refuse: Mason County Garbage Telephone: Hood Canal Communications AT&T C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on the to make its decision. Signature: - Date Submitted: February 18 2005 ATTACHMENTS: Geotechnical Report Site Plans Topographic Map with Property Boundaries. I 10 Attachment for Hood Canal School District and Bus/Maintenance Facility Modernizations and Additions Description of Project: A complete modernization of existing Hood Canal School, Bus/Maintenance Facility and site improvements to meet current code and life safety. The proposed scope of work is to include the following: • Complete replacement of approximately 50,000 S.F. new school. • Complete modernization of approximately 15,000 S.F. at gym building and bus/maintenance facility. • New 3,000 S.F. play-shed. • Demolition of existing school approximately 50,000 S.F. • Siting of new and future portable classroom buildings. • New fire lanes, parking lots, bus and parent drop off/loading zones. • Site/sport field improvements to include softball, hard surface play and play fields. • Expansion of existing water-mains, and new fire hydrants connected to existing storage tank and fire pumps. • Reuse of existing septic tank and drain field or new system. • Proposed new site work includes new storm drainage system, asphalt and concrete paving and walks, new electrical service, area lighting, landscaping and irrigation system. See attached Concept Site Plans "A" and "B" I I III - „Committed To Excellence” HOOD CANAL SCHOOL DISTRICT NO. 404 111 North Highway 106 • Shelton, WA 98584 (360) 877-9700 • FAX (360) 877-5144 R E C E'V 7-D FEB 1 o nuo TO: Agencies with Jurisdiction and Interested Recipients 426 W. CEL Ac� f. FROM: Hood Canal School District #404 RE: Modernization and New Construction to Hood Canal School, Maintenance/Bus Facility and Gym Located at 111 N. Hwy 106, Shelton, WA 98584 DATE: February 18, 2005 The Hood Canal School District No. 404 Modernization of the existing Hood Canal School. Work includes 50,000 S.F. of new school building, play sheds, covered walks, portable classrooms and modernization of 15,000 square feet of existing buildings and improvements to maintenance/bus building along with new parking lots, bus loading and playfield improvements. The preparation and review of the environmental checklist (attached) is in accordance with WAC 197- 11 of the S.E.P.A. guidelines wherein the Hood Canal School District No. 404, as the lead agency, has declared a "Determination of Nonsignificance" (DNS) the proposed project. Review comments are due in writing on or before March 7, 2005 for reconsideration of the proposed declaration. Sincerely, TO BE KEPT IN THE Ron i Superintendent PARCEL FILE RZ:jl Attachments: Environmental Checklist, topographic map, site plans and geotechnical report Cc: GALCo Engineering, Project Manager Erickson - McGovern, Project Architect An Equal Opportunity Employer