Loading...
HomeMy WebLinkAboutCOM2006-00003 00032 00033 - COM Engineering / Geo-Tech Reports - 4/11/2006 GALCo Engineering April 11,2006 4118 Kyro Road S.E. Olympia,WA 98503 Tamml Clark Phone:(360)491-7591 Mason County Planning Department Cell:(360)789-1865 P. O. Box 279 Fax:(360)456-3802 Shelton, WA 98584 Re: HCSD Permit Number's COM2006-00003,COM2006-00032, &COM2006-00033 Dear Tammi, I have enclosed the following site plans,as requested. 2—sets Architectural Site Plans showing approximate property lines and set backs of the noted 3 —parcels. 2—sets of contract plan sheet C—4.0, grading plan,which show the corrected grade evaluations, as requested. Please share these with the Public Works Department. Please note that the School District is working on a lot consolidation,once the Deeds and legal descriptions are resolved. If you have any questions,please contact me at(360)491-7591 or cell (360) 789-1865. Sincerel .A. son, P.E. cc: Ron Zier; HCSD Stan Zielinski;EMA Trent Ward; Warner Engineering GAL/sal GAL(o Engineering FM January 13, 2006 4118 Kyro Rood S.E. Debbera Coker OlyWia,WA 98503 Mason County Dept. of Community Development Phone:060)491-7591 P.O. Box 186 Cell:(360)789-1865 Shelton, WA 98584 Fax:(360)456-3802 Re: Hood Canal School District 9404 New K-8 Additions and Modernization Project No. 2005-00011. Dear Debbera, Please find enclosed a plan review package for Hood Canal School District's new K-8 school facility. I have included the following documents for the permit and plan review process. • 1- Building permit application. • 1- Plumbing/Mechanical permit application. • Legal description of property parcels owned by school district. • 1- Set of completed Washington State energy code compliance forms. • 1- Set of structural calculations. • P.O. # 12303 in the amount of$13,728.69 for plan review fees. • 4- Sets of A/E project plans. • 4- Sets volumes 1 & 2 of project manual specifications (soil and draft storm drainage reports are included in volume 1). The above A/E plans and specifications are approximately 98% complete with the following exceptions and noted comments. • The large on site sewage disposal system is design if being designed and coordinated with Cindy Waite and Warner Engineering will be submitted separately for plan review and approval. • The entire school will have a full fire sprinkler system. We have been coordinating fire flow and storage requirements with State Fire Marshal Lance Talley and Craig Haugen. A back-up emergency generator is proposed for existing fire pumps. • The frontage setbacks to Hwy106 are approximately 26 feet. • Bracy& Thomas surveyors will be submitting application for a lot consolidation of three property parcels owned by HCSD. Currently no proposed building cross-existing property lines. • Currently, we are working with DOT for the site access driveways along SR 106. Our contact Engineer is Alana Hess. (360) 357-2725 Page 2 • We are currently proposing a connection to the Skohomish Tribe class "A" water system for the domestic supply. The existing school class"A" system will only service site irrigation and fire flow requirements. • A site wetland reconnaissance report prepared by Lee Boad was submitted last spring to the planning department. • The school district will be using the following consultants for all 3rd-party quality control inspections. Hal Parks at Geotechnical Testing Laboratory for all site soils related work. Contact number(360) 754-4612 Mark Robinson at Northwest Testing for soils compaction concrete, rebar, welding, bolting, diaphragm and shear wall nailing. Contact number(360) 866-3647 Please note the proposed pole buildings for bus storage, shown on sheet A2.70 are not being permitted at this time. The school district will submit project plans once a pole-building contractor is selected. FYI The proposed project is scheduled to be advertised February 20, 2006 with a bid opening date of March 16, 2006 and a contractor start date of April 2006. Hopefully I have included all required documents and project information and if I have excluded any thing please advise: II Contact information: Owner: Hood Canal School District Ron Zier, Superintendent 111 North Highway 106, Shelton, WA 98584 Phone: (360) 877-9700 E-mail: rzierghoodcanal.wednet.edu I Project Manager: Gary Larson GALCo Engineering 4118 Kyro Rd SE, Olympia, WA 98503 (360)491-7591 Cell: (360) 789-1865 E-mail: alg coenggaary&comcast.net Project Architect: Stan Zielinski Erickson McGovern Architects 1210 121" Street S., Tacoma, WA 98444-4604 Phone: (253) 531-9197 E-mail: sstan@eficksonmcgovem.com Page 3 We again thank Mason County Staff for continued support of this exciting project for HCSD students, staff and community. Sincerely, 6,,,4, Gary A. Larson, P.E. cc: Ron Zier, Hood Canal School District Stan Zielinski, Erickson McGovern GAL/sal