HomeMy WebLinkAboutCOM2006-00003 00032 00033 - COM Engineering / Geo-Tech Reports - 4/11/2006 GALCo Engineering
April 11,2006
4118 Kyro Road S.E.
Olympia,WA 98503 Tamml Clark
Phone:(360)491-7591 Mason County Planning Department
Cell:(360)789-1865 P. O. Box 279
Fax:(360)456-3802 Shelton, WA 98584
Re: HCSD Permit Number's
COM2006-00003,COM2006-00032, &COM2006-00033
Dear Tammi,
I have enclosed the following site plans,as requested.
2—sets Architectural Site Plans showing approximate property lines and set
backs of the noted 3 —parcels.
2—sets of contract plan sheet C—4.0, grading plan,which show the corrected
grade evaluations, as requested. Please share these with the Public Works Department.
Please note that the School District is working on a lot consolidation,once the Deeds
and legal descriptions are resolved.
If you have any questions,please contact me at(360)491-7591 or cell (360) 789-1865.
Sincerel
.A. son, P.E.
cc: Ron Zier; HCSD
Stan Zielinski;EMA
Trent Ward; Warner Engineering
GAL/sal
GAL(o Engineering
FM January 13, 2006
4118 Kyro Rood S.E. Debbera Coker
OlyWia,WA 98503 Mason County Dept. of Community Development
Phone:060)491-7591 P.O. Box 186
Cell:(360)789-1865 Shelton, WA 98584
Fax:(360)456-3802
Re: Hood Canal School District 9404 New K-8 Additions and Modernization
Project No. 2005-00011.
Dear Debbera,
Please find enclosed a plan review package for Hood Canal School District's new K-8
school facility.
I have included the following documents for the permit and plan review process.
• 1- Building permit application.
• 1- Plumbing/Mechanical permit application.
• Legal description of property parcels owned by school district.
• 1- Set of completed Washington State energy code compliance forms.
• 1- Set of structural calculations.
• P.O. # 12303 in the amount of$13,728.69 for plan review fees.
• 4- Sets of A/E project plans.
• 4- Sets volumes 1 & 2 of project manual specifications (soil and draft
storm drainage reports are included in volume 1).
The above A/E plans and specifications are approximately 98% complete with the
following exceptions and noted comments.
• The large on site sewage disposal system is design if being designed and
coordinated with Cindy Waite and Warner Engineering will be submitted
separately for plan review and approval.
• The entire school will have a full fire sprinkler system. We have been
coordinating fire flow and storage requirements with State Fire Marshal
Lance Talley and Craig Haugen. A back-up emergency generator is
proposed for existing fire pumps.
• The frontage setbacks to Hwy106 are approximately 26 feet.
• Bracy& Thomas surveyors will be submitting application for a lot
consolidation of three property parcels owned by HCSD. Currently no
proposed building cross-existing property lines.
• Currently, we are working with DOT for the site access driveways along
SR 106. Our contact Engineer is Alana Hess. (360) 357-2725
Page 2
• We are currently proposing a connection to the Skohomish Tribe class
"A" water system for the domestic supply. The existing school class"A"
system will only service site irrigation and fire flow requirements.
• A site wetland reconnaissance report prepared by Lee Boad was submitted
last spring to the planning department.
• The school district will be using the following consultants for all 3rd-party
quality control inspections.
Hal Parks at Geotechnical Testing Laboratory for all site soils
related work. Contact number(360) 754-4612
Mark Robinson at Northwest Testing for soils compaction
concrete, rebar, welding, bolting, diaphragm and shear wall
nailing. Contact number(360) 866-3647
Please note the proposed pole buildings for bus storage, shown on sheet A2.70
are not being permitted at this time. The school district will submit project plans
once a pole-building contractor is selected.
FYI The proposed project is scheduled to be advertised February 20, 2006 with a bid
opening date of March 16, 2006 and a contractor start date of April 2006.
Hopefully I have included all required documents and project information and if I have
excluded any thing please advise:
II
Contact information:
Owner: Hood Canal School District
Ron Zier, Superintendent
111 North Highway 106, Shelton, WA 98584
Phone: (360) 877-9700
E-mail: rzierghoodcanal.wednet.edu
I
Project
Manager: Gary Larson
GALCo Engineering
4118 Kyro Rd SE, Olympia, WA 98503
(360)491-7591 Cell: (360) 789-1865
E-mail: alg coenggaary&comcast.net
Project
Architect: Stan Zielinski
Erickson McGovern Architects
1210 121" Street S., Tacoma, WA 98444-4604
Phone: (253) 531-9197
E-mail: sstan@eficksonmcgovem.com
Page 3
We again thank Mason County Staff for continued support of this exciting project for
HCSD students, staff and community.
Sincerely,
6,,,4,
Gary A. Larson, P.E.
cc: Ron Zier, Hood Canal School District
Stan Zielinski, Erickson McGovern
GAL/sal