Loading...
HomeMy WebLinkAboutCOM2002-00084 Field Report - COM Engineering / Geo-Tech Reports - 8/8/2002 Nicolas E. Afeiche, P.E. CONSULTING STRUCTURAL ENGINEER $ 2- FIELD PORT C o w�, COO `c;'� �, 9 2' o �� ATTN: Mr.Ron Zier,Hood Canal School Dist . 404, Shelton WA GIs MA Project Name:Restroom Remodel ram$$ Project No.:20205 Date of site visit:August 1,2002 Date of report: August 2, 2002 General Contractor: Scott Wall Construction,Inc. Weather: Sunny Present at site: Nicolas Afeiche, Structural Engineer of Record Jim Fountaine, Superintendent On site at 1:30 p.m. to perform construction observation of new continuous footings at the primary and intermediate restrooms, and to observe injection of epoxy and installation of reinforcing dowels. Cleaning out of holes with pressurized air, injection of epoxy and installation of all reinforcing dowels were performed in my presence. Installation of epoxied reinforcing dowels is acceptable. Size and reinforcing of continuous footings are in compliance with the approved construction documents. Note: In order to remove existing damaged ledger at the primary rstroom, Contractor had to sawcut existing expansion bolts. Contractor may provide either expansion bolts or epoxied threaded rods with a 6-inch minimum offset from existing holes. Epoxied threaded rods shall be used where edge of concrete is within 6 inches from bolt location. Contractor shall refer to Detail(6 / S2) for size and embedment of connector. I left the site at 2:15 p.m. NOTE: General Contractor shall forward copies of Field Report to job superintendent and subcontractors as appropriate. Items noted of concern or as deficient shall be considered as notification for the Contractor to address and/or resolve as requested. Any corrections, additions or objections to this report must be filed with the Structural Engineer of Record in writing within 7 calendar days of the report date. Copy to: Paul Smith,BJSS DUARTE BRYANT Tom Schrader Scott Wall Construction, Inc. q Mike Grohs,Mason County Bldg. Dept. fAx 421 -- 7799 DECEIVED AL' 0 8 zo 1800 Cooper Point Rd. SW, Bldg. 10 Olympia, WA 98502 Tel (360)352-6391 I ' . Nicolas E. Afeiche, P.E. CONSULTING STRUCTURAL EN ZG fi 2 • of FIELD REPORT No. 2 F G ATTN: Mr.Ron Zier, Hood Canal School District No. 404, Shelton WA onlpt- EXPIRES :!- Project Name: Restroom Remodel Project No.:20205 Date of site visit: August 16,2002 Date of report: August 16, 2002 General Contractor: Scott Wall Construction,Inc. Weather: Sunny V Present at site: Nicolas Afeiche, Structural Engineer of RecordeiC'n Jim Fountaine, Superintendent V On site at 2:00 p.m. to perform construction observation of the new structural framing at the Primary, Intermediate and Health Restrooms,prior to placing plywood floor sheathing. Primary Restroom:New plumbing chase walls, ledger at concrete wall, floor posts, beams and joists are in place. Structural framing is in compliance with the approved construction documents. • I reminded Jim F. that the floor area under the janitor's room shall be treated, as indicated on the contract drawings. Intermediate Restroom:New plumbing chase walls and perimeter edge blocking are in place. Structural framing is in compliance with the approved construction documents. • Due to the presence of ducts near the ceiling, the plumbing chase walls were not extended to the roof decking, as shown on DETAIL 5 /S2. I asked Jim F. to provide(2)additional 2x6 horizontal braces. Nail braces to top of plates of new walls and to bottom chords of adjacent existing girder trusses. • I told Jim F.that existing floor joists, within the new plumbing chase,do not have to be removed. Health Restroom:New minor floor framing and blocking are in place. Structural framing is acceptable. I left the site at 3:10 p.m. NOTE: General Contractor shall forward copies of Field Report to job superintendent and subcontractors as appropriate. Items noted of concern or as deficient shall be considered as notification for the Contractor to address and/or resolve as requested.Any corrections,additions or objections to this report must be filed with the Structural Engineer of Record in writing within 7 calendar days of the report date. Copy to: Paul Smith,BJSS DUARTE BRYANT RECEIVED Tom Schrader, Scott Wall Construction, Inc. AL.7 I r 212002 om�Y Hld�-l�eP�. Mike Grohs, Mason C 1800 Cooper Point Rd.SW,Bldg. 10 Olympia, WA 98502 Tel (360)352-6391