HomeMy WebLinkAboutCOM2006-00003 Review of Stormwater Plan - COM Inspections - 4/26/2006 C-io -STA7- MASON COUNTY
MC PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER
yN Shelton, Washington 98584
A =
r� N y
7
00 �O
1864
DATE: January 30, 2006
INTER-DEPARTMENTAL COMMUNICATIONS
TO: Tammi Clark PARCEL #
FROM: Alan Berbisco, Project Engineer-PW BUILDING PERMIT NUMBER: COM2006-00003
SUBJECT: Review of Stormwater Plan NAME- Hood Canal School District
Tammi,
The Stormwater Plan prepared for the proposed Hood Canal Elementary School located 111 N.
State Route106 Shelton has been received and reviewed by Public Works.
3
My comments are shown in the plan (see C4.0). We need to verify the few low point locations
to the designer.
Adequate erosion and sediment control features need to be implemented during land disturbing
activities, to protect neighboring properties and state waters from adverse storm water run off
impacts. The migration or release of silty water or mud from the applicant's property will be
considered a violation of County and State water quality protection regulation.
Please feel free to contact me at 461 if you have any questions regarding these comments, or if
you feel any features need further discussion or attention.
Sincerely,
Iffl'nei�isc�o
Pro ect Engineer
t n Iomhms
a fa, uxa
c"j
�ON_STAP MASON COUNTY
�P ti,(; PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER
° `' `o Shelton, Washington 98584
N TO BE KEPT IN THE
Z� y
0J 1864 DATE: April 26, 2006 PARCEL FILE
INTER-DEPARTMENTAL COMMUNICATIONS
TO: Tammi Clark PARCEL # �0 Vox
FROM: Alan Berbisco, Project Engineer-PW BUILDING PERMIT NUMBER: COM2006-00003
SUBJECT: Review of Stormwater Plan NAME: Hood Canal School District
Tammi,
The Stormwater Plan prepared for the proposed Hood Canal Elementary School located 111 N.
State Route106 Shelton has been received and reviewed by Public Works.
The three low points located in the sheet C4.0 were already corrected. I have no more
comments regarding the submitted storm water plan.
Please feel free to contact me at 461 if you have any questions regarding these comments, or if
you feel any features need further discussion or attention.
Sincerely,
—_ 4 -
A n erbisco_
Project Engineer