Loading...
HomeMy WebLinkAboutCOM2009-00071Paint Mix Room - COM Permit / Conditions - 9/23/2009 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670.ext. 352 Shelton,WA 98584 COMMERCIAL BUILDING PERMIT COM2009-00071 OWNER: EXTREME AUTO RECEIVED: 7/7/2009 CONTRACTOR: LICENSE: EXP: ISSUED: 9/23/2009 SITE ADDRESS: 1383 E SHELTON SPRINGS RD SHELTON EXPIRES: 3/23/2010 PARCEL NUMBER: 420122190102 LEGAL DESCRIPTION: LOTS 1 &2 OF SP#2968 PTN TR 10 NE NW - DPC#07-32 - PROJECT DESCRIPTION: DIRECTIONS TO SITE: INSTALL PAINT MIX ROOM ON SHELTON SPRINGS RD BETWEEN HIGH SCHOOL AND AIRPORT TO ADDRESS General Information Construction &Occupancy Information T Use: : No. of Units: Type of Constr.: Type of U e In s Area: No. of Bathrooms: Occ. Group: Type of Work: ADD Firr.Are Dist.: 11 No. of Stories: Occ. Load: Valuation: $ 9,888.00 Building Height: Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: Model: Width: Building: Year: Serial No.: Basement: Parking Spaces: Setback Information Shoreline&Planning Information Front: Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.: Side 1: Ft. SEPA?: Comp. Plan Desig.: Side 2: Ft. Fire Protection System Information Auto Fire Alarm System?: Y Emergency Key Box?: Y Standpipe?: N Auto Fire Sprinkler System?: N Access Road?: Y Fire Extinguishers?: Y Fixed Fire Suppression System?: Y Fire Hydrants?: N Fire Lanes?: Y COM2009-00071 Please refer to the following pages for conditions of this permit. 1 of 4 Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Plan Check Fee TXni 7r7/9nnQ 5117 R1 C19nngnn IFC Plan Check Fee i AXns 7/9R/9nnQ orp Q1 C19nnQnn Building State Fee ni r. 7/31/9nnQ PA 5n S19nngnn Building Permit Fee ni r 7/11i9nnQ cis i 95 C19nnQnn Total $362.47 CASE NOTES FOR COM2009-00071 CONDITIONS FOR COM2009-00071 1) PER TITLE 14 MASON COUNTY BUILDING CODE - CHAPTER 14.17, STANDARDS FOR FIRE APPARATUS ACCESS ROADS - 14.17.110: A fire apparatus access road in excess of 14% grade and more than 150' to new residential or commercial structures will require an automatic fire sprinkler system installed. Contact the Mason County Fire Marshal at (360)427-9670, extension 273, for further information. x �`" 2) Per the manufactures installation specifications a automatic fire extinguishing system is required to be installed, a separate permit application is required to be A s4b mitted and approved prior to the installation of the system. X rV The paint mixing room is required to be UL approved for this use and must be installed per it's listing. X �2 �_ 3) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-098,,2./The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X �/V 4) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will bq_ch d and collected by the Mason County Building Department prior to any further inspections being performed or approvals granted. X 5) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. r n / X u rV 6) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE O*O QUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x N COM2009-00071 2 of 4 7) Any changes in construction shall be reviewed by engineer of record and submitted in writing to the Mason County Building Department prior to construction. All engineering documents are a part of the approved set of plans and must remain attached thereto. If engineering documents are removed, approval will not be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and collected by t Mason County Building Department prior to any further inspections being performed or approvals granted. X 8) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X 9) Changes to approved building plans that affect compliance to the current Washington State Energy Code (WSEC), ventilation and Indoor Air Quality Code (VIAQ), Building/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction. X �71/ 10) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Buil g Inspector shall be made prior to requesting additional inspections. X —� 11) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being X n-compliant wi Ma on County ordinances and building regulations. 12) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control Xthe permit holddeer hav prevented action from being taken. No more than one extension may be granted. This permit becomes null and void if work orconstruction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of oontinuati ork is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress i ctio .The owneror a nt on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property d stru ure for review d ection. OWNER OR AGENT: DATE: 3�5 /UPs s COM2009-00071 3 of 4 n o rn N CONCRETE MECHANICAL MANUFACTURED HOME X o ---- — _ Date By 1P Footings!Setbacks Ribbons M o Gas Piping 9 o Interior Date By Interior-Date By dater m o -- - - 4 Exterior Date By Exterior-Date By D Set-up INSULATION c Point Load if Isolated Footings Date B v O BG 1 SLAB INSULATION - Date By Data By FIRE DEPARTMENT Foundation Walls Floors Date By Date gy Data BY DECKS FRAMING Walls Date By Date By Data By PROPANE TANKS PLUMBING vault i Date By Date i3y OTHER Groundwork Attic Date By Type Date By Date By DRYWALL Type n o w.v InL Brace Wall Date By p0 Date By �.__� Dale By FINAL INSPECTION N O Water Line Fire Separation O Date By Date By Data i :.I IC Ly iL- cP O O Pass or Request I Inspect. O Type of Insp. Fail Date I Date Done By Comments C tcA n PA ss I Z 31s -a L 1 P► tp LAIC_ A O A PERMIT NO(�P MASON COUNTY PLUMBING/MECHANICAL PERMIT APPLICATION 426 W.Cedar-P.O. Box 186, Shelton, WA 98584 Shelton (360) 427-9670-Belfair(360)275-4467- Elma (360) 482-5269 On the web www.co.mason.wa.us APPLICANT IVORMATION CONTRACTOR INFORMATION 1 Owner re �— Company Name We, e- I ,.,'Sir,r Mailing Addressf A S r Mailing Address 00 City S1 1 ia-m State jy p Code 5"8 City woo state Zip Code Phone-760 V 3.? 36.2s Other Ph. Pho a y,25--771 0!2,26 Other Ph. Lien/Title Holder Contractor Reg.A Exp. E mail address�►,n e ss ex. r-mrcca o o i/, b1.z E Mail Address Drivers Lic.# DOB Drivers Lic.# DOB SEPTIC INFORMATION - Connect to New Septic Existing Septic. Connect to Sewer System Name of Sewer System PARCEL INFORMATION - 12 Digit Parcel No. 'y 2 o/2— 2 1 — 70 /0 AL Fire District Legal Description L o _ g T Site Address (Please include street name,street n mber apd city) 3ff3 K S So ri Directions to site "- r Is property within 200'of Saltwater A40 Lake -River/Creek ND Pond Va Wetland Seasonal Runoff Stream j'' Slopes or Bluffs > 15%—AIGI TYPE OF JOB - New L Add Alt Repair Other Use of Building A/NT /X R OOM Location of Fixtures/Units - 1st Floor ,,, 2nd Floor Basement Garage Closet PLUMBING FIXTURES (Show Number of each) MECHANICAL UNITS Type of Fixture No. of Fixtures Fees Fuel Type:Electric Z_ LPC Natural Gas_ Heat Pump_ Toilets Type of Unit No. of Units Fees Bathroom Sink ' Furnace Bath Hea Showers s �� Spot F Spot Vent Fan 4� Water Heater N Propane Tank Clothes Washer Gas Outlets Kithen Sinks Wood/Gas/PelletStove Dishwasher Kitchen Exhaust Hood Hosebibs Dryer Vent Other Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL OWNER/BULDEFI Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. PROOF OF 90 UATION�F K IS BY MEANS OF A PROGRESS INSPECTION. q X 1.�,•,�s 10 /l�css Date: , /� er/Owners Representative/Contractor (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Planning Pd Ck# Date Bld Pd Receipt No. DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Occ Group-Type Constr. Planning Department Environmental Health Department FEES Plumbing & Base Fee Site Inspection Mechanical & Base fee UFC Plan Review Fee Wood/Gas/Pellet Stove Fee Other Violation Fee TOTAL FEES FORM MUST BE COMPLETED IN INK MASON COUNTY PERMIT NO PLEASE PRESS HARD BUILDING PERMIT APPLICATION 426 W. Cedar• P.O. Box 186, Shelton, WA 98584 Shelton (360) 427-9670 • Belfair (360) 275-4467 • Elma (360) 482-5269 On the web www.co.mason.wa.us APPLICANT I FORMATIO CONTRACTOR INF RMATION Owner L C-- Company Name l.��s�o ¢,� r►►e�f p�✓�s n Mailing A dre Mailing Address ou Soo 3 City StateJaLA_Zip Code City L- r, o State J1 Zip Code c/R_/) Phone's 113.2 .362 5- Other Ph. Phone yo?S 7ZZ 022 4, Other Ph. Lien/Title Holder Contractor Reg. # Exp. E mail address t s. ' ex re wetK b o v_ r z.— E Mail Address Drivers Lic.# DOB I Drivers Lic.# DOB SEPTIC /WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic Connect to Water System Name of Water System Well Sewer System Name of Sewer System PARCEL INFORMATION - 12 Digit Parcel No.­77o O 027 Fire District / Legal Description "l} S Site Address (Please include street name, street number and city) Directions to site 6A 5 Will timber be cut and sold in parcel preparation?Yes/(No .! Is property within 200' of Saltwater A r Lake River/Creek �✓ f Pond /'/0 Wetland L: L Seasonal Runoff,V a Stream 2g/_G Slopes or Bluffs Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes o,'• TYPE OF JOB - New. V Add Alt Repair Other PRIMARY,RESIDENCE ❑ SEASONAL ❑ Use of Building-Li — escribe Work 1 No. of Bedrooms No. of Bathrooms Square Footage- 1 st Floor 2nd Floor 3rd Floor Basement Deck Covered Deck Other Sq. ft. Garage Attached Detached Carport Attached Detached MANUFACTURED HOME INFORMATION - Make Model Year Length Width Serial No. No. of Bedrooms No. of Bathrooms Type of Heat Purchase Price $ Replacement Unit? Yes/ No Installer Name Certification No. OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative,or the contractor. I further declare that I am entitled to receive this permit and to do the work as proposed in the application. I declare that I have obtained the permission from all the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days,or if onstruction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OFAPRO RESS IN�P N.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. X 7'Z7 f o9 �, Date: caner Owners Kepresentative/Contractor (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Date DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Planning Department -Av Environmental Health Department CIF�i O q— ' l]r 5 Fire Marshal 7- FEES Building Permit Fee Site Inspection Plan Review Fee / EH Review Fee Plumbinq & Base Fee Planning Review Fee Mechanical & Base fee Other 18 Wood /Gas/ Pellet Stove Fee State Fee Violation Fee Pre-Paid at Submittal l Valuation $ °" TOTAL FEES 4 3 2 1 C S7o vo�� O_ f p'a94 • III _�— . _�� • III 333cA Dg rn o G) - D o III �— z III • III III rn 5'FOR(XXfTNNMLM WORKING FEIGKT CLEAR WIDTH REQIURED E E)HAUST �v 1 H Q , m s m o b O z ' z H m m I.I ph gb � o 0 a H O p m i* D S m m o rn z A J{ m T D _ � z O N � 3 z y O - z • q > A>$O m yA p p p • rn Z m A {i Ll U x. at m llJl C rt yyy N p N T 8 10'-8" (r�5 A N Ir D S C _ a "p .L moo.- �r$N Z z Z rCRX,q' ORDER NUMBER SCALE DRAWN BY CONCEPT REVISION 3/4 =10 AUTO v.: r r BARRIE,ONTARIO,CANADA ,trG NUMBN2 DATE REVIEWED BY MWMUE EY,MJEVO LEON,ME)aCO 1/1/2008 DALLAS,TE)CAS,USA APPRCNED BY 2 DATE: .:6 DAT 0 :• jon��X OSSEO,WI,USA DESCRIPTION PL E: I-8L10-4%5872 w 1-800-848- M MRW-989 N SHEEr GLOBAL FINISHING SOLUTIONS" MIX ROOM,9'Wx8'Hx9'D-WHITE 1 of 2 v.:s r• 7 DATE, Y: CUSTOWR MPORTANT NOTE:This print c the conhdemial property of GI.M Finishing Solutions L.L.C. It is nat m he used or reproduced In arty manner,nor wbmitted to other parties fu examination without the prior appmeal of Glabal Fnbhing SdYrtiorts LL.C, for q GLOBAL FINISHING SOLUTIONS LL.C.2003 rr 'ti FS �.�...�..� _ k Paint Mix Room Installation, Operation, and Maintenance Manual Customer: Distributor: Model #: Serial #: P.O. #: Read and keep this manual for future reference. All personnel operating the equipment described in this manual should review and understand all instructions before use. 12731 Norway Road • P.O. Box 250 • Osseo, Wisconsin 54758 Phone:(800)848-8738 • Fax: (715)597-2193 [finish i-g.cc,- ........... G F S Limited Warranty GLOBAL(the Sellers)warrants to the original end-user buyer(the buyer)that the equipment manufactured by, and purchased from, the Seller(the Equipment), if properly installed in accordance with the Seller's Service Manual, operated, and maintained, and used under normal conditions, shall be free from defects in workmanship and materials for a period of one(1)year from the date the Equipment is shipped from the facilities of the Seller. The obligation of the Seller,and the Buyer's SOLEAND EXCLUSIVE REMEDY hereunder shall be limited to one of the following,at the Seller's option: (61) The repair or replacement of defective parts or components (collectively, the Parts) of the Equipment; provided, however, the Buyer shall be responsible for the payment of all labor costs associated with anysuch repair or replacement. (62)In the event the Seller is unable to repair or replace the defective Parts, the Buyer shall be entitled to a refund of the cost of the Parts. The Seller shall have no obligation under this Limited Warranty for ordinary wear and tear of the Equipment, if installation of the Equipment does not comply with local, state and federal requirements or laws;or if the Equipment is modified by any other person or organization The Seller makes no warranty of any kind whatsoever with respect to Parts, which are manufactured or supplied by other persons or organizations(an OEM);provided,however,the Seller shall reasonably assist the Buyer in connection with warranties, if any, provided by an OEM. Warranty Performance Procedures In the event the Buyer believes the Seller may be responsible for the performance of any warranty obligation,the Buyer must immediately send written notice ofa claimed defect,and must immediately refrain from any further use of the affected Equipment. No attempted repair of the claimed defect may be made without the prior written consent of the Seller. Before any Parts can be returned to the Seller,the Buyer must contact the Seller and request a Return Authorization. Upon the Buyer's receipt of the Return Authorization form, the Parts maybe shipped, freight prepaid, to the facility designated on the Return Authorization. All Parts returned for repair, replacement, or refund(a refund may be made in the form of a credit to the Buyer's account),must be accompanied by the Return Authorization. All returned parts are subject to a thirty percent(3o%)handling charge. Parts manufactured or supplied by an OEM are subject to the warranties, if any provided by such OEM's;and repair or replacement of such Parts are subject to the approval of the OEM. The Buyer shall be responsible E. for the payment of any handling or restocking charges associated with OEM Parts. Disclaimers of Warranties THE WARRAN17ES CONTAINED HEREIN ARE EXPRESSLY IN LIEU OF ANY OTHER EXPRESSED OR IMPLIED WARRANTIES, OR ANY OTHER OBLIGATION ON THE PART OF THE SELLER, INCLUDING WITHOUT LIMITATION,ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. ANY MODELS, DRAWINGS, PLANS, SPECIFICATIONS, AFRRMA77ON OF FACT PROMISES, OR OTHER COMMUNICATIONS BY 7HE SELLER WITH THE REFERENCE TO THE EQUIPMENT OR THE PERFORMANCE OF THE EQUIPMENT ARE SOLELY FOR THE CONVENIENCE OF THE BUYER AND SHALL NOT IN ANY WAY MODIFY THE EXPRESSED WARRANTIES AND DISCLAIMERS SET FORTH * HEREIN. THE BUYER ACKNOWLEDGES IT IS PURCHASING THE EQUIPMENT SOLELY ON THE BASIS OF THE COMMITMENTS FOR THE SELLER AS EXPRESSLY SET FORTH HEREIN. NO AGENTS OR OTHER PARTIES ARE AUTHORIZED TO MAKE ANY WARRANTIES ON BEHALF OF THE M COMPANY OR TO ASSUME FOR THE COMPANYANY OTHER LIABILITY OR OBLIGA71ON IN CONNECTION WITH THE EQUIPMENT. K, xt Consequential Damages The Sellershall not be liable for any incidental or consequential damages arising from the use of the equipment by the Buyer,the breach 51. �i of any warranties, the failure to deliver, delay in delivery, delay on nonconforming condition, or for any other breach of contract or duty between the Seller and the Buyer. Limitation of Actions Anyaction resulting from the breach of any warranty contained herein by the Sellermust be commenced within one(i)yearafter the cause of action accrues. In no event shall the Seller's total liability for any or all breaches of any warranty exceed the actual purchase price paid by the Buyer for the Equipment. 12731 Norway Road - P.O. Box 250 - Osseo, Wisconsin 54758-0250 Phone: (800) 848-8738 - Fax: (715) 597-2193 www.globalfinishing.com General Information Product Description This Global Finishing Solutions Paint Mix Room IMPORTANT! provides a controlled area to safely mix paints when installed with the proper fan and electric Read and save these instructions before motor. Mix room construction and recommended attempting to assemble, install, operate, or airflow velocities are designed to meet maintain the product described. Protect yourself appropriate OSHA and NFPA 33 regulations. and others by observing all safety information. Failure to comply with instructions could result Global paint mix rooms are fabricated from 18- in personal injury and/orpropertydamage. gauge unpainted galvanized sheet steel. Panels Retain these instructions for future reference. are pre-punched and companion flanged for easy on-site nut-and-bolt assembly. A convenient, built- in 4" [102mm] deep containment base is How to Use This Manual designed into the system. We design our paint mix This manual contains instructions for the safe rooms to comply with safety and fire codes set installation, operation, and maintenance of your forth by OSHA and the NFPA. The paint mix room Paint Mix Room. Please read the Safety must contain an automatic fire extinguishing Information section of this manual before you system. Global does NOT supply this fire unpack and assemble the unit. extinguishing system. Unless otherwise specified, all booths are Introduction shipped complete with a personnel access door and 18"x 24" [457mm x 6101 observation window, high-efficiency fluorescentT8 light A Message for the Purchaser fixture(s), heavy-duty exhaust, TEFC motor, intake The management and employees at Global filter, safety light, fan interlock system, all would like to thank you for selecting our product necessary assembly hardware, and installation for your industry. Our product conforms to drawings. A control panel is optional. Occupational Safety& Health Administration (OSHA), National Electric Code (NEC), and National IMPORTANT! Fire Prevention Association (NFPA) regulations for This equipment is designed expressly for the your safety. The employees of Global understand removal of particulate matter only. Reduction of the importance of a quality system and strive to volatile organic compounds requires manufacture the best product on the market. either coating reformulation or optional, additional equipment. GLOBAL FINISHING SOLUTIONSTM General Information & Introduction (800)848-8738 www.globalffnishing.com Reriabn:05-05-08 f-. Safety Information Safety Notes ■The product must be installed and serviced IMPORTANT! only by a trained, qualified service technician. Incorrect installation may void This manual contains statements relative to the warranty. worker safety. Read this manual thoroughly and ■ All persons who will operate, service, comply as directed. Operate this equipment in inspect, or otherwise handle this product accordance with the guidelines set forth in this must read and understand the safe operating manual. It is impossible to list all potential practices, safety precautions, and warning hazards of this equipment. Instruct all messages in this documentation. personnel involved with this equipment in the ■ Disconnect and lock out the main electrical safe conduct and operation of the system. service before installing, adjusting, or Global recommends that only qualified personnel operate and maintain this equipment. servicing the product. ■ Electrical installation should be completed by a qualified electrician. Installation must General Safety meet all applicable national, state, and local electrical codes. Operation and maintenance of this product must be performed properly by qualified ■ Ensure that all electrical components are personnel who observe the warnings in all grounded to a central ground. documentation and notes provided with and on ■ Become familiar with all controls. the product. ■ Safety signs, panels, and labels that are Follow all general standards for installation and normally affixed to the product must be safety for work on installations. Follow all good replaced immediately if illegible or missing. practices for the proper use of lifting tackle and ■ New or replacement parts that are installed equipment. You must consider the use of during repair or maintenance must include protective equipment such as safety goggles and all safety signs, panels, and labels as protective footwear. specified by the manufacturer.These must be affixed to the new or replacement parts as If any pumps or compressors are included as specified by the manufacturer. part of this installation, you must connect them in ■ Some mix room activities may require the use compliance with data in the documentation of respiratory protection. provided. Guards and covers that prevent contact with ' electrically energized or moving parts are required to direct the flow of air for effective cooling. You must not remove them or leave them open during operation. Sound pressure levels over 85 decibels may cause damage to your health. Where applicable, use earplugs or take other safety measures to protect yourself. GLOBAL FINISHING SOLUTIONS' Safety Information (800)848-873e www.globaffinishing.com Revision:05-05-OB Safety PrecautionsSAFETY HAZARD! ■ Install the mix room in compliance with the standards of the NFPA. There are inherent hazards associated with the operation and service of this equipment. For your ■ Comply with all local electrical, safety, and personal safety, observe a!1 of the safety fire codes and regulations, the National information. Failure to observe these safety Electrical Code (NEC), and OSHA guidelines. practices can result in personal injury or death. ■Turn the exhaust fan on before using this unit. Ensure that the exhaust fan is operating correctly before entering the unit. ■A fire suppression system (sprinklers or dry chemical) is required by the NFPA. A fire suppression system is not supplied with this mix room. ■ If required, use an OSHA-approved respirator when mixing paint in the mix room. ■Treat any paint-contaminated items as flammable products and dispose of them properly and safely. ■ Duct the exhaust air from the fan away from the working environment to the outdoors. (Do not operate the unit unless exhaust has been ducted properly.) ■ Isolate the outdoor vent from air-conditioning intakes, windows, and any other equipment that may re-circulate the exhaust indoors. GLOBAL FINISHING SOLUTIONS"" safety Information (800)848-8738 www.globalfinishing.com Revision 05-05-0B Assembly Instructions c. Slide the lighting fixture box inward and upward so that the two flanges (A) on the Tools required: Screwdriver, wrenches, socket top of the light fixture are on either side of set, hammer, drift pin, caulking gun, and drill with the light panel. Refer to Step 3 in Figure 2. 1/8" and 3/8" bits. d. Straighten the light fixture box and slide it down so that the two bottom flanges (B) IMPORTANT! are on either side of the tight panel. Refer Do not attempt to assemble the mix room until to Step 4 in Figure 2. you have read these instructions carefully. Study NOTE all drawings thoroughly. Each component is If the light fixture is accessible from outside the mix room, shown by part letter on the assembly drawings. you may skip steps 2a. and 2b. This will help you determine where to install the various components. 3. Attach the light cover using eight (6mm x 20mm) cap head screws. These are located under the ballast cover. Refer to Figure 1. NOTE Follow the assembly steps in order and refer to the Figure 1 assembly drawings. Double-check the procedure before you Lighting Assembly continue. If it has not already been done, sort all the panels and channels by size and number before assembly. 1 1 O Insert cage I 1 nut nto Lighting Fixture 1 square hole O STEP 1: Mix Room Assembly cover Please refer to the assembly drawings that I O cage were shipped with the unit. Lighting Fixture som to hole,,-? I nut into hole. Box will be required. STEP 2: Square and Anchor the Mix Room J'O Once in place, 3 Square and anchor the mix room. Global ,�►6� 5new�idgsinde tea. �ti� recommends using concrete anchors. Space them '°'may �, a°��ggr1m Light Pend Wit cover bolt. approximately every two feet around the perimeter (Rolled Edge Down) of the mix room or as needed to anchor the mix room securely. Figure 2 Lighting Assembly STEP 3: Lighting 1. Install the cage nuts into the light fixture Step Step Step step Top 1 2 3 4 box. Refer to the instructions shown in r 1131 O O O Figure 1. 2. Next install the lighting fixture box: a. Start with the rolled edge of the light panel + facing away. Tilt the lighting fixture box (flange B end up) into the opening of the light panel. Refer to Step 1 in Figure 2. b. Slide the lighting fixture box up until flange B engages the lower edge of the Bottom I�"°' x FLANGEA x opening in the panel. Refer to Step 2 in Front ProHe or Light Foftm Figure 2. Please note all drawings in the Assembly Instructions section are for example purposes. Drawings are not in exact proportion. GLOBAL FINISHING SOLU'nONSTM Assembly& Operation Instructions (800)848-8738 www.globaifinishing.com Rev�bn.0.5 05� STEP 4: Control Panel STEP 5: Attaching the Label Some mix rooms may require custom panels or Attach the Global Finishing Solutions label to multiple control packages based on their fan the fire curtain. configurations and number of motors. UL 508 & CUL Listed. Each NEMA-iPanel Enclosure includes the following: ■ Panel mounted disconnect Operating Instructions ■ Magnetic motor starter with overloads 1. Turn the power on at the main breaker/ disconnect. (`this is a black handle on the ■ Fused branch circuits face of the control panel.) ■ Panel mounted controls 2.Turn the lights off/on switch to the on ■ Lighting transformer based on panel position. Standard panels for a maximum of 6 (4 tube 3. Press the start button to enter the booth start-up sequence and operation. After light fixtures). pressing the start button, the system Mount the control panel at a convenient energized light will come on. Then the location on either the exterior paint booth wall or exhaust unit on light will come on. the adjacent wall outside of any hazardous areas. 4. Press the stop button to shut down the DO NOT mount the panel inside the booth booth any time the system is energized. enclosure.The electric motor for the exhaust fan 5. Turn the exhaust fan on before using the requires wiring to the main control panel. mix room. Ensure that the exhaust fan is operating correctly before you enter the This control panel houses a main disconnect mix room. switch, control/lighting transformer (where required), motor starter(s) with fuse and overload protection (per NEC requirements), push buttons, selector switches, and operating pilot lights. All standard units are factory wired for 480 volt 3-phase 60 hertz unless otherwise requested at the time of purchase. IMPORTANT! Install the optional standard control panel following NFPA 33 and NFPA 70 guidelines. Ensure that the installation also complies with all local codes. IMPORTANT! All paint mix rooms must be exhausted to the outside in accordance with local codes and NFPA regulation 33. GLOBAL]FINISHING SOLUTIONS'" Assembly& Operation Instructions (800)848-8738 www.globatfinishing.com Revisim:0545-08 Maintenance Instructions Interior Booth Walls The frequency of many of the following Do not allow paint to accumulate on the inside maintenance checks depends upon the amount of the mix room walls. When paint accumulates, and kind of material being mixed. Performing remove it as soon as possible to prevent a these maintenance checks at regular intervals will possible fire hazard. Use a non-ferrous, non- reduce fire hazards, maintain booth efficiency, sparking scraper to eliminate any possibilities of and hinder any possible mix room rust. igniting combustible material.To aid in mix room clean up, use a pre-coating, clear peel coat, or Exhaust Fan and Motor flame resistant paper. Consult the factory for details. Bearings SAFETY HAZARD! Some exhaust fan units are equipped with sealed-for-life bearings that require no grease. Do not leave piles of paint sweepings in the booth Consult the included operation and maintenance as it creates a possible fire hazard. manual for details. Intake Filters Filter Replacement Replace the intake filter when it is dirty. Lighting To replace a burned-out light tube, 1. Open the light fixture's access panel and remove the burned-out tube. A heavy-duty, pressure lock telescopic lamp holder holds the tube in place. 2. Push one end of the new tube into one of the two spring-loaded holders. 3. Slide the other end into the other holder.To aid in clean up, use a clear plastic film or a clear peel coat over the light glass. Consult the factory for details. GLOBAL FINISHING SOLUTIONS' (800)848"8738 Maintenance www.globalflnishing.com RaNsion:054)5-08 Maintenance Schedule Items to be Inspected and/or Frequency MIX ROOM MAINTENANCE Daily Weekly Monthly 6 Months Yearly Filter Maintenance Check the optional intake filter for cleanliness(visual) X Booth Cleanliness Floors X Walls(remove paint buildup) X Ceiling(remove paint buildup) X Doors(remove paint buildup;check door operation) X All surfaces that would accumulate buildup(clean) X Light tubes(replace burned-out tubes) X Exhaust and intake ductwork X Exhaust plenum X Control panel housing(clean) X Exhaust Fan Maintenance and Inspection Inspect and lubricate bearings* X Check fasteners,set screws,and lock collars X Lubricate the motor X Remove dust and dirt from the motor X Inspect the fan blades X Clean the fan blades X *Use any standard bearing grease lubricant on the grease fittings where applicable. GLOBAL FINISHING SOLUTIONSTM (800)848-8738 Maintenance www.globatfinishing.com Revision:0545-08 ��6•� G o�•• y X/� 1,4 int AA ling Rooms �^ STANDARD FEATURES: j� %`�► . . HEAVY DUTY EXHAUST T8 LIGHT FIXTURE(S) . CUSTOM SIZES AVAILABLE 41 r ,„ \I !4 Complies with OSHA and p NFPA Safety & Fire Codes c £ Frk r. . `.' 1 1 a cont error pre-puhil, r •iM.f 9 .Ir n er' t #C'T i. ...G ti S).'e 1 s ����' ��� " .. +' • � x �: � �` 4< +. -3 t �ti:.:r�,t ire &• � itainO • Y'' >Fr• ,�, �t�r+�xrS rss:;+>,��m k jp / 1 • rr%:• . r, M and •fi. iMeYir a C���,1.1{ , � } .. ` r .ter Available with Pre-Painted White Panels r< 1 Paint Mixing Rooms COMPLETE PACKAGE SEMI-DOWNDRAFT DESIGN Each Paint Mix Room ships with the following: This proven ventilation system uses fresh air constantly V, Personnel access door with 18" X 24" moving through the enclosure to protect personnel from observation window breathing harmful vapors. ® High efficiency T-8 fluorescent light fixture(s) ■ Heavy-duty exhaust SAFE AIR OPERATION ■ TEFC motor 1. Air is drawn from outside of enclosure through filters to ■ Intake filters remove dust and dirt contaminates. O Assembly hardware 2. The down flow of continuously moving air inside the ■ Installation drawings enclosure forces harmful vapors safely down and through ■ Control panel (Optional) the exhaust plenum. ■ Intake Fan (Optional) y _ L, ROOM AIR EXCHANGE This chart identifies the air exchange performance data when mixing rooms are properly installed with clean filters. I i '000K rr • � r i MRG-986-N 432 131.8 949 MRG-989-N 648 87.9 949 MRG-9812-N 864 65.9 949 MRG 9815-N 1080 52.7 949 PersonnelMotor Inside Outside #Light Exhaust .. OPTIONAL Models1•• Cont. HP Fixtures 1 Width Height Depth Width Height Depth Qty Size MRG-986-N 112 9' 8' 6' 9'4" 8'10" 7'4" 1 1 3' x 7' 12" 1,450 PMR CP MRG-989-N 112 9' 8' 9' 9'4" 8'10" 10'4" 2 1 3' x 7' 12" 1,600 PMR CP MRG-9812-N 112 9' 8' 12' 9'4" 8'10" 13'4" 3 1 3' x 7' 12" 1,800 PMR CP MRG-9815-N 112 9' 8' 15' 9'4" 8'10" 164" 4 1 3' x 7' 12" 2,000 PMR CP MRG=Mix Room Galvanized Note: MRW=Mix Room White The amount offlammable or combustible liquid stored in the paint mixing room must be within the following limits per NFPA33: • Paint mixing rooms within 6'of the spray area may contain up to two(z)gallons per square foot of enclosure floor area but may not exceed 6o gallons(US). • Paint mixing rooms further than 6'from the spray area may contain up to two(2)gallons per square foot of enclosure floor area but may not exceed 300 gallons(US). GFS Dallas,TX 9 Osseo,WI •Barrie, ON Monterrey, Mexico \\�j3v 800-848-8738 • www.globalfinishing.com Printed in USA email: info@globalfinishing.com MRG 04-17o6 All designs,specifications and components are subject to change at the manufacturer's sole discretion at any time without notice.Data published herein Is informational in nature and shall not be construed to warrant suitability of the unit for arty particular purpose as performance may vary with the conditions encountered. 02006 Glob,11 in ishing Soluti­All Rights Reserved GLOBAL FINISHING SOLUTIONS 3 GALVANIZED IMT afety Controlled Environment Galvanized Sheet Steel Construction Heavy Duty Exhaust Color Corrected Lighting Standard and Custom Size Configurations www.globa[finishing.com iAJ.,VANIZED PAINT MIXING ROOMS GFS Galvanized Paint Mix Rooms provide a controlled area to safely mix paints. Fabricated from 18-gauge unpainted galvanized sheet steel. Panels are pre-punched and companion flanged for easy nut and bolt on-site assembly. A convenient built-in 4" deep containment base is designed into the system.The Paint Mixing Room must contain an automatic fire extinguishing system, GFS does not supply. SEMI-DOWNDRAFT DESIGN ROOM AIR EXCHANGE This proven ventilation system uses fresh air constantly This chart identifies the air exchange performance data when moving through the enclosure to protect personnel from mixing rooms are properly installed with clean filters. breathing harmful vapors. Model . . per Hour SAFE AIR OPERATION MRG-986-N 432 131.8 949 1. Air is drawn from outside of enclosure through filters to ' 11ARGt98" 648 87.9 949 remove dust and dirt contaminates. MRG-9812-N 864 65.9 949 2. The down flow of continuously moving air inside the MRG-9815-N 1080 52.7 949 enclosure forces harmful vapors safely down and through the exhaust plenum. COMPLETE PACKAGE Each Paint Mix Room ships with the following: r • Personnel access door with 18"X 24" observation window �..�..,� • High efficiency T-8 fluorescent light fixture(s) • Heavy-duty exhaust • ODP motor • Intake filters • Assembly hardware and installation drawings OPTIONS • Control Panel • Intake Fan • Pre-Painted White Panels DoorsInside Dimensions Outside Dimensions #of Ive'rson nei Appx.Shi OPTIONAL Models Motor Entry HP Light Duct Weight Panel Width Height Depth Width Height Depth Qty Size `L MRG-986-N 1/2 9' 8' 6' 9'-4" 8'-10" 7'-4" 1 1 3' X 7' 12" 1,450 PMR CP _7 MRG-989-N 1/2 9' 8' 9' 9'-4" 8'-10" 10'-4" 2 1 3' X 7 12' 1,600 PMR CP MRG-9812-N 1/2 9' 8' 12' 9'-4" 8'-10" 13'-4" 3 1 3' X 7 12" 1,800 PMR CP MRG-9815-N 1/2 9' 8' 15' 9'-4" 8'-10" 16'-4" 4 1 3' X 7 12" 2,000 PMR CP MRG=Mix Room Galvanized Note: MRW=Mix Room White The amount of flammable or combustible liquid stored in the paint mixing room must be within the following limits per NFPA33: • Paint mixing rooms within 6'of the spray area may contain up to two(2)gallons per square foot of enclosure floor area but may not exceed 6o gallons(US). • Paint mixing rooms further than 6'from the spray area may contain up to two(z) gallons per square foot of enclosure floor area but may not exceed 300 gallons(US). GLOBAL FINISHING SOLUTIONS • 800-848-8738 • info@globalfinishing.com �inrr�r- Osseo,WI • Dallas,TX • Barrie,ON Monterrey, Mexico o www.globalfinishing.com ©2007 Global Finishing Solutions.All Rights Reserved. MRG 08212007