HomeMy WebLinkAboutFIR2009-00005 - FIR Permit / Conditions - 3/19/2009 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262
Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext.352
Shelton, WA 98584
L�
FIRE PROTECTION PERMIT FIR2009-00005
APPLICANT: EXTREME AUTO RECEIVED: 1/20/2009
CONTRACTOR: R& T HOOD AND DUCT SERVICES, INC. 206-726-0940 LICENSE: RTHO( ISSUED: 3/19/2009
SITE ADDRESS: 1383 E SHELTON SPRINGS RD SHELTON EXPIRES: 9/19/2009
PARCEL NUMBER: 420122190102
LEGAL DESCRIPTION: LOTS 1 & 2 OF SP #2968 PTN TR 10 NE NW - DPC#07-32 -
PROJECT DESCRIPTION: New dry chemical system for auto paint booth.
GENERAL INFORMATION System Information
Type of Use: COMM
Sprinkler Heads: Audible Switches: Pull Stations:
Fire District: 11
Hood&Duct?: N Flow Switches: Visual Devices: Door Releases:
Dry Chemical?: Y Pressure Switches:: Smoke Detectors: Duct Detectors:
Zones: Heat Detectors:
Wet Chemical?: N
Sprinkler? N
Standpipe?: N SQUARE FOOTAGE FEES
Monitoring Company: First Floor: Type Amount Due Amount Paid
Monitoring Phone No.:() - Second Floor:
Auto Fire Alarm?:? Third Floor;: Sprinkler System Permit $168.50 $168.50
Sprinkler System Plan S109.53 $109.53
Total: $278.03 $278.03
FIR2009-00005 Please refer to the following pages for conditions of this permit. 1 of 4
CASE NOTES
FIR2009-00005
CONDITIONS FOR
FIR2009-00005
1.) Per section 901.2.1 of the 2006 International Fire code, Statement of Compliance.
Before requesting final approval of the installation. the installing contractor shall furnish a written statement to the fire code official that the subject fire
q 9 PP 9 J
protection system has been installed in accordance with the approved plans and has been tested in accordance with the manufactures specifications and
the appropriate installation standard. Any deviations from the design standards shall be noted and copies of the approvals for such deviations shall be
attache
X t5��ritten statement.
2.)
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is
by means of a progress inspection.The ownerorthe agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above
described property and structure for review-a nd inspection.
OWNER OR AGENT: DATE:
�I
FIR2009-00005 Please refer to the following pages for conditions of this permit. 2 of 4
Global Finishing Solutions
CrTube +tte,re ,
4-Tube Fixture `
JS f
g
for Spray Booths
6-Tube or 4-Tube Fixtures
Energy Efficient
V = Colo Corrected T-
r C r 8 Tubes
Inside Accessible
www.globalfinishing.com
GFS light fixtures were designed with T-8 color corrected tubes for excellent color-matching and
illumination while being cost effective. For an exceptional spraying environment, choose from our
6-tube or 4-tube wall or corner fixtures.
6-Tube &4-Tube Features Dual Voltage Lighting Ballasts
• Energy-Efficient T-8, 32 watt electronic 6-Tube 4-Tube
ballasts ICN-3P32-SCHAZ ICN-4P32-SCHAZ
• Dual voltage 120/277 volt, 50/60 Hz 120V/1.42A 120V/0.94A
or Single voltage 347 volt, 60 Hz
• ETL& ETL-C Listed 277V/0.62A 277V/0.41A
• Class 1, Division 2, Groups A,B,C,D 50/60 Hz 50/60 Hz
• Interlock safety switch 6 x 32W= 192W 4 x 32W = 128W
• Enclosed &gasketed Total Total
Twist-In lamp holders Single Voltage Lighting Ballasts
• Inside access
Allows easy retrofits 6-Tube 4-Tube
• Template for installation 347 volt 347 volt
into existing panels GEL-3P32 GEL-4P32
6-rube Fixture Corner enclosure (optional) 2 x 3 Tube 4 Tube
Corner Fixture 0.52A 0.31 A
Part Numbers: 60 Hz 60 Hz
6-Tube Fixture: LABW12-6 6-Tube Corner Fixture: LAC12-6 6 x 32W = 192W 4 x 32W = 128W
4-Tube Fixture: LABW12-4 4-Tube Corner Fixture: LAC12-4 Total Total
Dimensions Interlocking Safety Switch
52 1/8"
I
18 7!8" Slass Light Cover i
i
e i
Interlocking Safety Switch -------
available on both 4-Tube
S 6-Tube Light Fixtures
50 114"
18. Single Skin Panel 1 K Wiring
Opening for Light Fixture
6-Tube wiring— 4-Tube wiring
Consult your Global Finishing Solutions sales representative for details of required installation,con crete .�—
pit,electrical wiring,conduit,air piping,roof penetrations and automatic fire suppression.The equipment
installation location should be reviewed and approved by the local authorities having jurisdiction.All designs, —
specifications and components are subject to change at the manufacturer's sole discretion at any time
without notice. Data published herein is informational in nature and shall not be construed to warrant
suitability of the unit for any particular purpose as performance may vary with the conditions encountered.
Global • Solutions 800-848-8738 info aglobalfinishing.com
LISTING REPORT
INTERTEK ETL SEMKO
3933 US ROUTE 11 CORTLAND, NY 13045
Job No. 3080616 Issued: August 31, 2005
Revised: 09/08/08
REPORT NO. 3080616-H01
INSPECTION, TESTS AND EVALUATION
OF
LUMINAIRES
RENDERED TO
GLOBAL FINISHING SOLUTIONS
OSSEO,WI 54758
GENERAL: This Report gives the results of the inspection, tests, and evaluation of Paint Spray Booth Light Fixtures
(Models:LAR12-6,LAR3-6,LAR12-4,LAR3-4,LAR 14T5-D12, LAR I6T5-D12,LAB12-4,LAB3-4,LAB12-6,LAB3-6,
LAB12-3-36,LAB 14T5-D12,LAB/6T5-D12)and Luminaire I'Model:LAB 12-4-LAM).The products were investigated for
compliance with the applicable requirements of the standards for Luminaires(UL 1598,Second Edition,Dated:December
30,2004, Luminaries(CSA-C22.2 No.250.0-2004),Electric Lighting Fixtures for Use in Hazardous(Classified)Locations
(UL 844, Eleventh Edition, Dated: August 30, 1995 Revised: March 16 1999), and Electric Luminaires for Use in
Hazardous Locations(CSA-C22.2 No. 137-M1981).The investigation was begun on 08/17/05 and completed on 08/31/05.
A Prototype sample in good condition was provided by the client on 08/02fO5 and tested at INTERTEK ETL SEMKO's
Cortland, NY facility.
Luminaires(UL 1598, Second Edition, Dated: December 30 2004
Luminaries(CSA-C22.2 No.250.0-2004)
Electric Lighting Fixtures for Use in Hazardous(Classified) Locations
(UL 844, Eleventh Edition, Dated: August 30, 1995, Revised: March 16 1999)
Electric Luminaires for Use in Hazardous Locations(CSA-C22.2 No. 137-M1981)
Participant: Global Finishing Solutions Manufacturer: GFS Manufacturing S. DE R.L. DE C.V.
12731 Norway Road Parcela 5 Edificio 1
PO Box 250 Hera Nos. 609,607 y 605
Osseo,WI 54758 Parque Industrial Kalos Guadalupe
Ciudad Guadalupe, N.L. 67190
Mexico
Contact: Allison O'Connell Contact: Juvenal Garcia
Phone: 715-597-8121 Phone: 800-848-8738 ext 2219
Fax: 715-597-2193 E-mail: jgarcia@globalfinishing.com
An independent organization testing for safety,performance,and certification.
This report is for the exclusive use of INTERTEK's Client and is provided pursuant to the agreement between INTERTEK and its Client INTERTEK's responsibility
and liability are limited to the terms and conditions of the agreement INTERTEK assumes no liability to arty party,other than to the Client in accordance with the
agreement,for any loss,expense or damage occasioned by the use of this report.Only the Client is authorized to copy or distribute this report and then only in its
entirety.Any use of the INTERTEK name or one of its marks for the sale or advertisement of the tested material,product or service must first be approved in writing
by INTERTEK.The observations and test results in this report are relevant only to the sample tested.This report by Itself does not Implythatthe material,product,or
service is or has ever been under an INTERTEK certification program.
SO 16.3.10b(8/23/04)Revised 11/22004
INTERTEK ETL SEMKO
Report No. 3080616-H01 Page 2 Issued: 08/31/05
Global Finishing Solutions Revised: 06/27/08
I �
TABLE OF CONTENTS
Report Section: Pages:
Main Report 1 -+ 16
Markings M1 ->• M2
i
I
Illustrations 11 15
Evaluation of Unlisted Components C1 C2
Revisions R1 > R2
Total Number of Pages 27
I
I i
I
SD 1&3.10b(8/23/04)Revised 1102004
I
INTERTEK ETL SEMKO
Report No.3080616-H01 Page 3 Issued:08/31105
Global Finishing Solutions Revised: 09/08/08
C
INTRODUCTION ;I
PRODUCT COVERED: II
Paint Spray Booth Light Fixture u
Models: LAR12-6, LAR3-6, LAR12-4, LAR3-4, LAR 14T5-D12, LAR 16T5-D12, LAB12-4, LAB3-4, LAB12-6, LAB3-6,
LAB12-3-36, LAB 14T5-D12, LAB 16T5-D12
For Use In: Class I, Division 2, Groups A—D Hazardous Locations
Operating Temperature Code: T4A
Ambient Temperature Range: +400C
Luminaire
Model: LAB12-4-LAM*
For Use In: Class I, Division 2, Groups A—D Hazardous Locations
Operating Temperature Code:T4A
Ambient Temperature Range: +400C
*This Luminaire is not to be used for a paint spray booth application.
PRODUCT DESCRIPTION:
The products covered by this report are several paint spray booth light fixtures and two luminaires for use in Class 1,
Division 2,Groups A-D.The fixtures are provided with or without a hub and wire harness.The fixtures are for ceiling or hip
mounting, access from inside or outside the paint spray booth.They are provided with a proximity switch that shuts down
the air to spray gun when a fixture is opened. Model LAB12-4-LAM is not to be used for a paint spray booth application.
MODEL SIMILARITY:
All models are similar.The differences are 4 or 6 bulbs, 1 or 2 ballasts,reflector or mitred box.Model LAB 12-4-LAM is not
to be used for a paint spray booth application.
Model Number: Configuration Description:
LAR12-6 120/277V, reflector type, 6 bulbs
LAR3-6 347V, reflector type,6 bulbs
LAR12-4 120/277V, reflector type,4 bulbs
LAR3-4 347V, reflector type,4 bulbs
LAR 14T5-D12 120/277V, reflector type,4 bulbs
LAR 16T5-D12 120/277V, reflector type, 6 bulbs
LAB12-4 120/277V, mitred box,4 bulbs
LAR3-4 347V, mitred box,4 bulbs
LAB12-6 120/277V, mitred box,6 bulbs
LAB3-6 347V, mitred box,6 bulbs
LAB12-3-36 120/277V, mitred box, 3 bulbs, 36'length
LAB 14T5-D12 120/277V, mitred box,4 bulbs
LAB 16T5-D12 120/277V, mitred box, 6 bulbs
LAB12-4-LAM 120/277V, mitred box,4 bulbs
RATINGS:
Product: olta e : (Current): Temp. Code: Amb.Temp. Rance:
LAR12-6 120/277V 1.42A T4A 400C
LAR3-6 347V 0.52A T4A 400C
LAR12-4 120/277V 0.94A T4A 400C
LAR3-4 347V 0.31A T4A 400C
LAR 14T5-D12 120/277V 2.00/0.86A T4A 400C
LAR 16T5-D12 120/277V 3.04/1.32A T4A 400C
LAB12-4 120/277V 0.94A T4A 400C
LAB3-4 347V 0.31 A T4A 400C
LAB12-6 120/277V 1.42A T4A 400C
LAB3-6 347V 0.52A T4A 400C
LAB12-3-36 120/277V 0.75A T4A 400C
I LAB 14T5-D12 120/277V 2.00/0.86A T4A 400C
LAB 14T5-D12 120/277V 3.04/1.32A T4A 400C
LAB12-4-LAM 120/277V 0.95/0.40A T4A 400C
Interlock Switch Ratings 200VAC/DC 0.5A T4A 400C
SO 16.3.10b(823/O4)Revised 112/2004
INTERTEK ETL SEMKO
Report No. 3080616-H01 Page 4 Issued: 08/31/05
Global FinishingSolutions
Revised: 09/08/08
TEST PERFORMANCE
A sample of the product was tested in accordance with the standards for Luminaires (UL 1598 Second Edition Dated
December 30,2004, Luminaries(CSA-C22.2 No.250.0-2004), Electric Lightinq Fixtures for Use in Hazardous(Classified)
Locations(UL 844, Eleventh Edition Dated:August 30 1995 Revised: March 16 1999),and Electric Luminaires for Use in
Hazardous Locations (CSA-C22.2 No. 137-M1981).
The following tests were performed:
i
i
TEST DESCRIPTION STANDARD CLAUSE
Rust Resistance Test UL 844 27
Temperature Test UL 844 38
Tests for Outside Wall-Mounted Fixtures UL 844 SC4*
Tests for Inside Wall-Mounted Fixtures UL 844 SC5*
Glass Support Test UL 1598 16.24
Dielectric Voltage-Withstand Test UL 1598 17.1
Grounding Continuity Test UL 1598 17.2
Temperature Test CSA-C22.2 No. 137 3.6.3
Dielectric Voltage-Withstand Test CSA-C22.2 No. 137 3.6.5
Glass Support Test CSA-C22.2 No. 250 16.24
Dielectric Voltage-Withstand Test CSA-C22.2 No. 250 17.1
Grounding Continuity Test CSA-C22.2 No.250 17.2
*For Paint Spray Booth Light Fixtures Only.
Results of the tests indicate the specimens conform to applicable test criteria.
I
SO 16.3.10b(8123/04)Revised 1 11212 00 4
INTERTEK ETL SEMKO
f Report No.3080616-H01 Page 5 Issued: 08/31/05
Global Finishing Solutions Revised: NA
i
CONCLUSION
i A representative sample of the product covered by this report has been evaluated and found to comply with the applicable i
requirements of the standards for Luminaires(UL 1598, Second Edition, Dated:December 30, 2004, Luminaries(CSA-
C22.2 No.250.0=2004), Electric Lightin4 Fixtures for Use in Hazardous(Classified)Locations(UL 844 Eleventh Edition,
Dated:August 30, 1995,Revised: March 16, 1999 ,) and Electric Luminaires for Use in Hazardous Locations(CSA-C22.2 II
No. 137-M1981).
Report prepared by: Cortland review/approval of Report by:
1
&ith
Jedd Jeremy Neagle
Project Engineer Engineering Team Leader
I
t
SD 16.3.10b(8/23104)Revised 11/2/2004
!
IntertekAUTHORIZATION TO MARK
This authorizes the application of the Certification Mark(s)shown below to the models described in the Product(s)
1111 Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report.
i� This authorization also applies to multiple listee model(s)identified on the correlation page of the Listing Report.
This document is the property of Intertek Testing Services and is not transferable. The certification mark(s)may be
applied only at the location of the Party Authorized To Apply Mark.
�a«*er
a
C Ili
fS7E
Control Number: 3081409 Authorized by:
William T. Starr, Certification Manager
This document supersedes all previous Authorize ions to Mark for the noted Report Number.
This Authorizertbn to Mark is for the exclusive use of krierteKs Client and is provided pursuant b the Cartificafion agreement between kAertek and its CNen1.Intede Ws resporsbiTity and liability are Whited
to the terns and conditions of the agreement Intertek assumes no l WA*y to any party,other than to the Gent in acoordenoe with the agreormhrrt,for any loos,expense or damage occasioned by the use
of this Authorization to Mark.Only the Cke t is authonzed to permit copying or dsbftbo h of this Artlnrfza ion to Mark and gun only in its sntirety.Use of kdwt@'s Certification mark is restricted to the
corditiofs laid out in the agreement and in this Authorization to Mark.Any(other use of the b dek name for the sale or advertisanerd of the lested material,product or service must first be approved in
writing by Interbk.Wal Factory Assessments and Foflow up Services are for the purpose of assuring appropriale usage of the Certification mark in accordance with the agreement,they are not for the
purposes of production quality control and do not relieve the Client of their obfigatons in tuts respect.
j Intertek Testing Services NA Inc.
165 Main Street, Cortland,NY 13045
I Telephone 800-345-3851 or 607-753-6711 Fax 607-756-6699 II
Applicant: Global Finishing Solutions Manufacturer: GFS Manufacturing S. DE R.L DE C.V. nl
Parcela 5 Edificio 1
Address: 12731 Norway Road Address: Hera Nos. 609, 607 y 605
PO Box 250 Parque Industrial Kalos Guadalupe
Osseo,WI 54758 Ciudad Guadalupe, N.L. 67190
Country: USA Country: Mexico
Contact: Ms. Allison O'Connell Contact: Juvenal Garcia
Phone: (715)597-8121 Phone: 800-848-8738 ext 2219
FAX: (715) 597-2193 FAX:
Email: Email: jgarcia@globalfinishing.cwm
Party Authorized To Apply Mark: Same as Manufacturer
Report Issuing Office: Cortland
Luminaires(UL 1598, Second Edition, Dated: December 30, 2004
Luminaries(CSA-C22.2 No. 250.0-2004)
Standard(s): Electric Lighting Fixtures for Use in Hazardous(Classified) Locations
(UL 844, Eleventh Edition, Dated:August 30, 1995, Revised: March 16, 1999)
Electric Luminaires for Use in Hazardous Locations CSA-C22.2 No. 137-M1981
Paint Spray Booth Light Fixture
Models: LAR12-6, LAR3-6, LAR12-4, LAR3-4, LAR 14T5-D12, LAR 16T5-D12, LAB12-4, LAB34,
LAB12-6, LA133-6, LAB12-3-36, LAB 14T5-D12, LAB 16T5-D12
For Use In: Class I, Division 2, Groups A-D Hazardous Locations
Operating Temperature Code: T4A
Product Ambient Temperature Range: +400C
Luminaire
Model: LAB12-4-LAM'
For Use In: Class 1, Division 2, Groups A-D Hazardous Locations
Operating Temperature Code:T4A
Ambient Temperature Range: +40°C
'This Luminaire is not to be used fora paint spray booth application.
Models: LAR12-6, LAR3-6, LAR124, LAR34, LAR 14T5-D12, LAR 16T5-1312, LAB124, LAB3-4, LAB12-6,
LAB3-6, LAB12-3-36, LAB 14T5-D12, LAB 16T5-D12, LAB 12-4-LAM i
E
ATM for Report 3080616-H01 Page 1 of 1 ATM Issued: 08-Sep-2008
SD 16.3.10a(10/12/07)Mandatory
09/05-2002 06:38 FAX 360 427 7796 MASON CO PERMIT CTR Z 002
MASON COUNTY FIRE MARSHAL
Mason County Bldg,IL 426 W.Cedar
P.O.Box 186 Sneiton,Washington 98584
(360)427-9670
CODE ENFORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PUBLIC EDUCATION
PERMIT NC). R a()oq..
MASON COUNTY FIRE PROTECTION SYSTEM
PERMIT APPLICATION
PLEASE NOTE:This application must be completed and accompanied by a minimum of three (3) copies of
plans,specifications,and applicable calculations per Mason County Fire Protection Standards,and
submitted to the office of the Mason County Fire Marshal. This is not a permit and failure to submit all
necessary information will Cause a delay and/or rejection of your submittal. When a permit has been
iSCU¢d,you Will be notified.
PLEASE PRINT
36 0
o
0 NER:acT121'Z'�t� �� IQ 49 PHONE: 43Z 3625 FIRE DISTRICT I
*r-t 6ZT�+
SI'F.ADDRESS; CITY Sri G�-AXI STATE�ZIP
"LING ADDRESS; CITY STATE ZIP
i
UE1%TITLE HOLGi=R;
i
APDRSSS: CITY STATE_rZIP
CONTRACTOR QT HWV 4— O VGA
AC�DRESS: 6/DO l2 T~/6'r S' CITY SEf-V746 STATEW4 ZIP` COOS'
II 7136
CONTRACTOR PHONE# 72-6 6rf y0 CONTRACTOR REG#-9Tfrdoo�`�
PA CEL# ()v 1 e;� V ( 42EGAL DESCRIPTION:.
I
i
BLDG.SQ.FT. (EXISTING/PROPOSEf D)1ST FL / 2ND _1__3RD /
USE OF BUILDING
DESCRIPTION OF WORK: SPRINKLER: WET___DRYAW_ STANDPIPE: WET DRY
AUITOMATIC FIRE ALARM HOOD&DUCT DRY CHEMICAL
W&CHEMICAL HALON NEW SYSTEM X MODIFICATION -
MONITORING STN PHONE
�J-lk
09iO3/E00E 08:38 F.iX 380 427 7798 ;+LASOv CO PERMIT CI'R Z 003
YOUR SUBMITTAL MUST INCLUDE:
1. DIMENSIONS,SCALE,NORTH ARROW
2. FLOOR PLAN AND CROSS SECTIONAL ELEVATION
3. ALL CONCEALED SPACES(LABELED COMBUSTIBLE AND NQN-COMBUSTIBLE)
4. CUT SHEETS OR REFERENCES FOR ALL NEW DEVICES
S. LOCATIONIDESCRIPTION OF ANY EXISTING DEVICES
6. ! BATTERY CALCULATIONS FOR FIRE ALARM SYSTEMS
7. RISERNWIRING DIAGRAM FOR FIRE ALARM SYSTEMS
8_ HYDRAULIC CALCULATIONS FOR SPRINKLER SYSTEMS
pXO WORK MAY PROCEED ONLY IN ACCORDANCE WITH A VALID FIRE PROTECTION
SY TS EM PERMIT ISSUED 13Y THE MASON COUNTY FIRE MARSHAL. A VALID PERMIT AND AN
APPROVED SET OF PLANS MUST BE ON THE JOB SITE DURING CONSTRUCTION AND MUST REMAIN
THERE UNTIL A FINAL INSPECTION IS DONE BY THE MASON COUNTY FIRE MARSHAL. FAILURE TO
OBtAIN A VALID PERMIT PRIOR TO WORKING ON A FIRE PROTECTION SYSTEM AND/OR FAILURE TO
PR6%ADE THESE PLANS AND PERMIT FOR THE MASON COUNTY FIRE MARSHAL MAY RESULT IN A
CITATION AND FINE.
OWNER'S AFFIDAVIT
I certify that I am exempt from the requirements of the Contractor's Rogistrat:on Law ROW 1 B.27, and am
a e of the Mason County ordinance requirements for which this permit is issued a,d that all work will be done
in c nformance therewith. No changes wilt be made without fiat obtaining approval from the Mason County
Fir Marshal,
OWNER: DATE:
CONTRACTORS AFFIDAVIT
I ce�*that I am a currently registered contractor in the Stata or Washington and I am aware of the ordinance
requirements regulating the work for which the permit is issued and all work done will be in conformance
therewith. No changes will be made without first obtaining approval from the Mason County Fire Marshal.
I
BY:I I DATE:
-- -
9 k G h(/972V7 S LAA (T A
CW
j �(P) 510 - 0S 3z }
!
02/05/2009 15: 35 2067672607 RT HOOD & DUCT PAGE 02
r•
•High Pressure Hood Cleaning
& HOdd and Duct SwAces, Inc. •Firo Suppression Installation&Servico
6100 12th Ave.S. Phone(206) 726-0940 •Flrs Extinguisher Sales,&Service COMPLETE
Sea
ttle,.WA 98108 Fax 'Range Hood and Fan Sorvice&Repair
(206}767-2607 •Filter Sales&Service FIRE PROTECTION
O
��d A—
0 0 G7
1.
1
Chapter 3—System Design
Page 3-1
r s REV. 3
CHAPTER III
SYSTEM DESIGN 0 P
General Designing the Proper Type of System
PYRO-CHEM Industrial Vehicle Paint Spray Booth Fire
Suppression System has been designed and tested for use It is necessary for the system designer to consider the
in commercial vehicle paint spray booth applications. The physical characteristics and layout of the hazard area to
guidelines listed in this chapter deal with the limitations and ensure proper protection. The hazard area must meet the
parameters of various system configurations. It is the criteria for a particular system for that system to be effec-
responsibility of the Certified installer to ensure that the tive. Each nozzle is tested and designed to protect a certain
proper system design is being utilized, and that the system part of the total hazard area.
meets the limitations and parameters listed in this chapter.
Before attempting to design any system, it is necessary to In order to comply with the approval requirements of UL
attend a Factory Certification Training Class and become 1254 Standard, when protecting a Vehicle Paint Spray
Certified to install PYRO-CHEM Industrial Vehicle Paint Booth, no unclosable openings are allowed.
Spray Booth Fire Suppression Systems.
The system must also contain a discharge time delay.
Choosing the Proper Agent The ventilation system must be shut down before the
It is necessary for the system designer to consider the com- discharge of the system.
bustible material found in the hazard area to ensure proper
protection. The agent used in the system must be approved
for the hazard class of the combustible material. The follow—
ing are the hazard classes:
a. Cylinders:
"A" Class —Ordinary solid carbonaceous combustibles. The Models PCI-15ABC, PCI-17ABC, PCI-25sABC, PCI-
These include wood, paper, cloth, fiberglass, and plastics 35ABC, and PCI-70ABC cylinders can be used for total
flooding vehicle paint spray booth applications.
"B" Class— Flammable liquids and gases. These include
paints, solvents, gasoline, oils, and hydraulic fluids. b. Nozzles:
"C" Class— Electrical appliances. These include comput- 'Seven nozzles are available for use in protecting vehicle
ers, power generators, and power transformers. paint spray booths:
"D" Class —Combustible metals such as sodium, potassi- Nozzle Application
um, magnesium, titanium, and zirconium. The PYRO-CHEM NV-WA Work Area/Plenum/Pit (Overhead Position)
Industrial Vehicle Paint Spray Booth Fire Suppression NV-SW Work Area/Plenum/Pit (Sidewall Position)
System is not intended to protect Class D hazards. NV-P1 Backdraft/Pit (Overhead Position)
The following guidelines should be used for determining the NV-UF Under Floor(Overhead Position)
proper agent: NV-DP2 Pit/Duct (End Position —Horizontal)
N-DCT Duct Only'
ABC (monoammonium phosphate-based)—for use with 'N-PLU Three-Way Nozzle (Pits, Plenums, Under
all 'A" "B,"and "C" Class hazards. Floor Trenches)
Can be used with PCI-15ABC and PCI-25sABC cylinders only
As per NFPA 17, pre-engineered dry chemical systems are
not approved for deep-seated or burrowing fires (such as c. Temperature Range:
ordinary combustibles where the agent cannot reach the The operating temperature range for vehicle paint booth
point of combustion), or on chemicals that contain their own applications is 32 OF. to 120 OF. (0 °C. to 48 °C.).
oxygen supply (such as cellulose nitrate). Do not mix differ-
ent types of agents, or agents from different manufacturers. d. Piping Requirements:
*in^ mnji nn -hPn Incampatible chemicals Piping diagrams include limitations on pipe length and fit-
are mixed. iig a agent must �e accept- tings. See the following pages for specific piping design and
able to th r�t risdiction. limitations for each size cylinder.
'MASON COUNTY FIRE M R i-#AL
DATE..-2,y D'� BY
SUBJECT TO FIELD INSPECnON
ALL APPLICAOL CODES SHALL APPLY. ERRORS
AND/011 OMISSIONS ON PLANS ARE SOLE t<*. ULEX 3437 CEx732
SPONSIStLITY OF OWNEWCONTRACfOR. COAMC,T September 1,2006
TONS REQUIRED FROM FIELD ;uSPEmt.ON BNAtI
ME AT OWNER/CONTHACTQR'S '�XPENS9. TM19' I&
PROVAL O"S N07 GRANT TO ANY PRRSF,r, rt-p
RLC14T TO ASAOrrQ4 4MV QATV 00 STn�t: ,. ,.:.
Chapter 3-System Design
Page 3-2
REV.3
d. Piping Requirements: (Continued) r'
1
NV-SW
►Note: All listed piping diagrams represent maximum number �% ; NOZZLE
of nozzles allowed. In applications that do not require the
maximum number of nozzles, the quantity of nozzles can be
1 - 1
reduced.
In applications of this type, along with the already listed lim- Height
itations (notes included with each maximum layout), the fol-
lowing limitations apply:
• On the reduced nozzle side of the piping layout, the
largest listed size pipe on the standard configuration lay-
out must be utilized from T1 to nozzle. \
• The maximum length of the reduced nozzle side must be
the original combination from T1 to T2, and T2 to nozzle. Side I 1 ' Side
Note: In systems utilizing a T3 split, the maximum length �l
of the reduced nozzle side must be the original combina-
tion from T1 to T2, T2 to T3, and T3 to nozzle. Figure 3-2. Sidewall Nozzle Location
0028MPC
• The maximum number of elbows must be the original
combination from T1 to T2, and T2 to nozzle. Note: In Note: See Design Chart for allowable offset of nozzles from
systems utilizing a T3 split, the maximum number of center of each hazard area.
elbows must be the original combination from T1 to T2,
► T2 to T3, and T3 to nozzle.
L 12 FT.
NV-SW MAX.(PER
e. Nozzle Placement: tK NOZZLE NOZZLE
The nozzle is to be mounted in the center (See Note) of the "` LEVEL)
protected area, with the discharge holes in the nozzle no
greater than six (6) inches from the ceiling. For duct protec-
tion, the nozzle is to be mounted in the center. See Figure 12 Fr.
3-1 MAX.
M
� t
" 12 FT.
i ♦ MAX.
006075
Figure 3-2a.
Heignc f. Duct Nozzle Placement:
1
1. The maximum duct perimeter is 12 ft. (3.7 m). See Figure
' 3-2b. Note: Longest side of a square or rectangular duct
1 � .
- ; cannot exceed 36 in. (91 cm).
- 1 •l
ROUND DUCT SQUARE/RECTANGULAR DUCT
♦ 1
Side 1 ` 1 -'
' - Side 2 �Q
Figure 3-1. Nozzle Location
002B66ePC
For sidewall application, the nozzle is to be mounted no MAXIMUM ) PERIMETER
SIDE TOTAL OF
greater than six (6) inches from both the ceiling and wall Figure 3-2b.
(see Note) with the arrow pointing towards the center of the ► OM130
protected area. See Figure 3-2.
ULEX 3437 CEx732
September 1,2006
Chapter 3—System Design
Page 3-3
REV. 3
- f. Duct Nozzle Placement: (Continued)
►2. UL 1254 Paragraph 28.2.6 states: 'The duct length and
elevation shall be the maximum specified by the manufactur-
er for protection by a single nozzle and shall also have the
maximum number of changes in direction (turns) specified
by the manufacturer. Longer lengths of duct and greater
number of changes in direction are to be protected using
additional duct nozzles."
PYRO-CHEIVI duct nozzles have not been UL tested to cover
any turns in direction in the duct line. The use of 900 and
multiple 45' changes that results in a vertical to horizontal
change of direction constitutes additional nozzle coverage
and dry chemical agent. The nozzle must be centered in the
duct and aimed in the direction of the airflow. Protection is
also required before and after any obstructions such as fans
or dampers in the duct line. If a fan or damper is located at
the duct entrance, the nozzle must be placed immediately
after the fan or damper, to a maximum of 2 ft. (.6 m) from
the duct opening. The entire exhaust ductwork must be pro-
tected.
i
r;
i
i
PLENUM
Figure 3-2c.
► 007490
ULEX 3437 CUM
September 1, 2006
Chapter 3—System Design
Page 3-4
REV. 2
►g. Nozzle Coverages
Protection Nozzle Location
Zone/Nozzle Specifications within Nozzle Nozzle
Protection Nozzle L W Ht Maximum Protection Zone Offset3 Orientation
Work Area' NV-WA See Table 3-1 Volume 1920 cu. ft. 2 ft. maximum 0 to 6 in. Vertical
Area 160 sq. ft. off center pointing down
Diagonal 18.86 ft. (each side)
Work Area' NV-SW See Table 3-1A Volume 1920 cu. ft. 2 ft. maximum 0 to 6 in. Vertical
Area 160 sq. ft. off center pointing down
Diagonal 12.8 ft. (each side) (orifices in
(to farthest corner) direction of
arrow)
Backdraft NV-P1 4 ft. 14 ft. 12 ft. Volume 672 cu. ft. Shortest side-center 0 to 6 in. Vertical
Plenum Area 56 sq. ft.
Side 14 ft. Longest side-3 inch
off center (each side)
Pant Leg NV-P1 4 ft. 16 ft. 20 ft. Volume 1280 cu. ft. Shortest side-center 0 to 6 in. Vertical
Plenum2 Area 64 sq. ft.
Side 16 ft. Longest side-3 inch
off center (each side)
Pit NV-P1 24 ft. 4 ft. 4 ft. Volume 384 cu. ft. Shortest side-center 0 to 6 in. Vertical
(Option 1) Area 96 sq. ft.
Side 24 ft. Longest side-center
Pit NV-DP2 24 ft. 4 ft. 4 ft. Volume 384 cu. ft. Shortest side-center 2 to 8 in. Horizontal
(Option 2) Area 96 sq. ft.
Side 24 ft. Height-center
Under Floor NV-UF 16 ft. 14 ft. 4 ft. Volume 896 cu. ft. Shortest side-center 0 to 6 in. Vertical
Plenum Area 224 sq. ft.
Side 16 ft. Longest side-center
Exhaust NV-DP2 3 ft. 3 ft. 24 ft. Volume 216 cu. ft. Shortest side (cross 0 to 6 in. Horizontal for
Duct Area 9 sq. ft. section) —center horizontal ducts
Side 3 ft. Longest side (cross
(Round Duct section) Vertical for
3 ft. 10 in. diameter) vertical ducts
Exhaust N-DCT 12 ft. Perimeter or Length —center 0 to 6 in. Vertical
Duct4 3 ft. 10 in. diameter Width —center (up)
24 ft. length
I NV-WA and NV-SW nozzles can be used for plenum, pit,or under floor protection. The nozzle maximum specifications must be
followed.
2 Pant leg dimensions 4 inch minimum x 48 inch maximum.
3 Nozzle offset is the maximum distance from the tip of the nozzle to the closest edge of the protection zone.
4 Single nozzle application on a PCI-15ABC or two nozzle application on a PCI-25sABC only.
►Note: If the exhaust duct is greater than 46 in. in diameter or 12 ft. perimeter,the use of total flood protection can be utilized.
ULEX 3437 CEx732
September 1,2006
Chapter 3-System Design
Page 3-5
REV. 3
TABLE 3-1
Paint Spray Booth Nozzle Protection Chart - Overhead Application
2 Ft. Max. Off-Center,
Side 1 X longest and shortest side
0-6 in, off ceiling
Side 2
Maximum Dimensions in feet/nozzle for one (1) Model NV-WA
Nozzle Maximum Nozzle Maximum Nozzle Maximum Nozzle Maximum
Side 1 Height Side 2 Side 1 Height Side 2 Side 1 Height Side 2 Side 1 Height Side 2
(feet) (feet) (feet) (feet) (feet) (feet) (feet) (feet) (feet) (feet) (feet) (feet)
3 20 18.62 7 20 13.71 11 20 8.73 15 20 6.40
19 18.62 19 14.44 19 9.19 19 6.74
18 18.62 18 15.24 18 9.70 18 7.11
17 18.62 17 16.13 17 10.27 17 7.53
16 18.62 16 17.14 16 10.91 16 8.00
15 18.62 15 17.51 15 11.64 15 8.53
14 18.62 14 17.51 14 12.47 14 9.14
13 18.62 13 17.51 13 13.43 13 9.85
12 18.62 12 17.51 12 14.55 12 10.67
11 18.62 11 17.51 11 14.55 11 10.67
10 18.62 10 17.51 10 14.55 10 10.67
9 18.62 9 17.51 9 14.55 9 10.67
8 18.62 8 17.51 8 14.55 8 10.67
4 20 18.43 8 20 12.00 12 20 8.00 16 20 6.00
19 18.43 19 12.63 19 8.42 19 6.32
18 18.43 18 13.33 18 8.89 18 6.67
17 18.43 17 14.12 17 9.41 17 7.06
16 18.43 16 15.00 16 10.00 16 7.50
15 18.43 15 16.00 15 10.67 15 8.00
14 18.43 14 17.14 14 11.43 14 8.57
13 18.43 13 17.08 13 12.31 13 9.23
V 12 18.43 12 17.08 12 13.33 12 10.00
11 18.43 11 17.08 11 13.33 11 10.00
10 18.43 10 17.08 10 13.33 10 10.00
9 18.43 9 17.08 9 13.33 9 10.00
8 18.43 8 17.08 8 13.33 8 10.00
5 20 18.18 9 20 10.67 13 20 7.38 17 20 5.65
19 18.18 19 11.23 19 7.77 19 5.94
18 18.18 18 11.85 18 8.21 18 6.27
17 18.18 17 12.55 17 8.69 17 6.64
16 18.18 16 13.33 16 9.23 16 7.06
15 18.18 15 14.22 15 9.85 15 7.53
14 18.18 14 15.24 14 10.55 14 8.07
13 18.18 13 16.41 13 11.36 13 8.17
12 18.18 12 16.57 12 12.31 12 8.17
11 18.18 11 16.57 11 12.31 11 8.17
10 18.18 10 16.57 10 12.31 10 8.17
9 18.18 9 16.57 9 12.31 9 8.17
8 18.18 8 16.57 8 12.31 8 8.17
6 20 16.00 10 20 9.60 14 20 6.86 18 20 5.33
19 16.84 19 10.11 19 7.22 19 5.63
18 17.78 18 10.67 18 7.62 18 5.63
17 17.88 17 11.29 17 8.07 17 5.63
16 17.88 16 12.00 16 8.57 16 5.63
15 17.88 15 12.80 15 9.14 15 5.63
14 17.88 14 13.71 14 9.80 14 5.63
13 17.88 13 14.77 13 10.55 13 5.63
12 17.88 12 16.00 12 11.43 12 5.63
11 17.88 11 16.00 11 11.43 11 5.63
10 17.88 10 16.00 10 11.43 10 5.63
9 17.88 9 16.00 9 11.43 9 5.63
8 17.88 8 16.00 8 11.43 8 5.63
ULEX 3437 CEx732
September 1, 2006
Chapter 3-System Design
Page 3-7
REV. 2
► N-PLU Three-Way Nozzle Application
Protection Zone/Nozzle /. /�a FT.(1.2 m)
Protection Area Nozzle L W H 6 FT.(1.8 m)
Down draft N-PLU Plenum 24 x 4 x 4 ft. l
Side exhaust (7.3 x 1.2 x 1.2 m)
Inverted tee Vertical Riser 6 x 4 x 16 ft.
(1.8 x 1.2 x 4.9 m)
Maximum Nozzle Location within Nozzle
Specifications Protection Zone Orientation em)
768 cu.ft. 5 inches up. Aimed up.(21.8 cu.m) Centered vertically and Side holes aimed
horizontally in plenum. at ends of plenum.
4�(1.2m)-)00-
Protection Zone/Nozzle
Protection Area Nozzle L W H
Down draft N-PLU Pit 24 x 8 x 4 ft. 2a FT.
(73m) / \
Pit and Trench (7.3 x 2.4 x 1.2 m) /
Tee shaped Trench 16 x 8 x 4 ft. ® /
(4.9 x 2.4 x 1.2 m) /
Maximum Nozzle Location within Nozzle / V
Specifications Protection Zone Orientation 4 .( / / \ 4 FT.
(12 \ (1.2 m)
.
�..�_ 1280 cu.ft. 5 inches off wall Aimed at opposite end \
J
(36.2 cu.m) oppposite trench. of trench.Side holes
Centered vertically and aimed at opposite ends a Fr.
horizontally in pit. of pit. (2.4 m) 16 FT.
(4.9 m)
/ 8 FT.
Way v (2.4 m)
Protection Zone/Nozzle
Protection Area Nozzle L W H
Down draft N-PLU Pit 24 x 8 x 4 ft. 24 FT.
Pit and Trench (7.3 x 2.4 x 1.2 m) (7.3 m) ® 4 FT.
L shaped Trench 8 x 8 x 4 ft. / / (1.2 m)
(2.4 x 2.4 x 1.2 m)
Maximum Nozzle Location within Nozzle / J
Specifications Protection Zone Orientation
/
1024 cu.ft. 5 inches off wall Aimed at opposite end FTf 6 FT..
(1.2 m)
(28.9 cu.m) oppposite longest of longest leg. (z.a m) W7CJG \� (2.4 mm)
leg.Centered Side holes aimed at
vertically in pit. oppposite end of a FT
shortest leg. (2.4 mj" /
ULEX 3437 CEx732
September 1, 2006
Chapter 3—System Design
Page 3-10
HEV. 2
PCI-17ABC with 2 nozzles
CYLINDER
T1
NOZZLE
002683PC
Maximum Length Elbows
Cylinder Size Nozzle Quantity Nozzle Type Piping Section Size Maximum Maximum
' PCI-17ABC 2 NV-UF, or any Cylinder to T1 3/4 in. 36 ft. 7
combination of NV-PI (10.9 m)
(See Note 5),
NV-DP2, N-PLU
T1 to Nozzle 3/4 in. 14 ft. (4.3 m) 4
NOTE:
► 1. These limitations apply to PCI-17ABC using two nozzles (any combination of either NV-P1, NV-UF, NV-DP2, or N-PLU).
2. System piping must be balanced. Balanced piping is that in which the difference between the shortest actual pipe length
from T1 to nozzle and the longest actual pipe length from T1 to nozzle does not exceed 10%of the longest actual pipe
length from T1 to nozzle. The number and type of fittings for all T1 to nozzle sections must be equal.
3. A Main/Reserve Swing Check Valve, Part No. 417788, may be located between the cylinder and T1.
4. All systems protecting vehicle paint spray booths require a factory pre-set time delay.
5. When using an NV-P1 nozzle, the two largest discharge orifices in the nozzle body must be positioned parallel to the
longest dimension of the hazard being protected.
► 6. Maximum height of nozzle from base of tank to nozzle—20 ft. (6.1 m).
ULEX 3437 CEx732
September 1,2006
r
Chapter 3—System Design
Page 3-16
REV.3
PCI-70ABC with 4 nozzles
CYLINDER
T1
' T2 A /T2
NOZZLE
002864PC
P. Maximum Length Elbows
Cylinder Size Nozzle Quantity Nozzle Type Piping Section Size Maximum Maximum
► PCI-70ABC 4 NV-WA or NV-SW Cylinder to T1 1 in. 40 ft. (12.2 m) 4
T1 to T2 1 in. 18 ft. (5.5 m) 2
► T2 to Nozzle 3/4 in. 9 ft. (2.7 m) 2
Maximum Length Elbows
Cylinder Size Nozzle Quantity Nozzle Type Piping Section Size Maximum Maximum
PCI-70ABC 4 3 - NV-WA or NV-SW Cylinder to T1 1 in. 40 ft. 4
► and 1 of: (12.2 m)
NV-P1 (See Note 5)
N V-U F
NV-DP2
► Tt to T2 1 in. 18 ft. (5.5 m) 2
► T2 to Nozzle 3/4 in. 9 ft. (2.7 m) 2
(Continued)
ULEX 3437 CEx732
September 1,2006
< 0�� ���� �7��oN C._1 „z1.
2l 00,19 $-7 Ll-
zdanN ��d-•+N /
S,-7
QZ/Z
ynr illy
zl
a
O,/1 /-67
4
7�����