Loading...
HomeMy WebLinkAboutCOM2007-00108 Stormwater Review - COM Engineering / Geo-Tech Reports - 12/12/2007 MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton, Washington 98584 TO BE KEPT IN THE DATE: December 12, 2007 PARCEL FILE C INTER-DEPARTMENTAL COMMUNICATIONS (- TO: Pam Bennett- Cumming PARCEL # 42012-21-90102 FROM: John Sliva, Programs Engineer-PW PERMIT #: COM2007-00108 SUBJECT: Stormwater Review NAME: Extreme Holdings PAGES 2 Pam: The engineered stormwater site plan (SSP) for the proposed auto body shop at 1383 E Shelton Springs Road Shelton was received and reviewed by Public Works. The stormwater site plan was presented as an insert in the Phase I Environmental Assessment. The proposal is to build a 7200 square foot auto repair shop with associated parking next to the existing facilities. The site is fairly level and will require very little grading. The current stormwater facilities include an oil/water separator, bioswales, and ponds. The stormwater facilities were sized for the proposed expansion in the Stormwater and Erosion and Sediment Control Site Plan dated April 18, 2000. The proposal provides an erosion and sediment control plan and a permanent stormwater plan. An addendum letter dated April 4, 2007, from the original design engineer, supplements the 2000 SSP. The original plan was to reserve the westerly 35 feet of the property from Shelton Springs Road to the north side of the ponds for drain fields. The remaining portion of the property lying north of the big shop was considered impervious. The letter notes that it is OK for the stormwater from the proposed new building site area to be piped into the catch basin #3 and discharge to the westerly pond. It is also planned that the future parking area would flow free south along the access road and enter the easterly pond. Both ponds have been sized to handle the proposed improvements. Silt fences, straw and Hay Bale Barriers, are a few Best Management Practices provided in the temporary erosion and sediment control plan (TESC). The Stormwater Site Plan with addendum letter will be acceptable to Public Works if the applicant accepts the following conditions. The stormwater drainage plan should be incorporated into the site development plans. CONDITIONS: 1. Stormwater from the new building site area will be piped to the catch basin #3 that discharges into westerly pond. 2. What does not go to the westerly pond will free flow south along the access road and enter the easterly pond. 3. An oil water separator will be installed in the system for parking and floor drains that are piped to the ponds. 4. A Maintenance and Operations Covenant should be executed unless one already exists for the site. Please feel free to contact me at 724 if you have any questions regarding these comments, or if you feel any features need further discussion or attention. Si nc rely, ohn iva rograms Engineer